Loading...
RFP - On-Call Traffic Engineering Consultant Services (Addendum)ta oa&ra - GEM ofrhr DESERT - DATE: June 5, 2018 TO: All Prospective On -Call Traffic Engineering Consultants RE: RFP On -Call Traffic Engineering Consultant Services ADDENDUM NUMBER 1 The following shall be considered as incorporated into the Request for Proposal (RFP) for the above referenced services. Portions of RFP not specifically mentioned in this Addendum remain in force. ■ REQUEST FOR PROPOSAL Question: Insurance and Acknowledgement: Could the City please clarify whether they are requesting the cost to the consultant or the cost to the City? Response: We are requesting the cost to the City. uestion: Insurance and Acknowledgement: Could the City please clarify what is meant by "form"? Is there an actual form that needs to be completed or does "form" refer to the types and limits of coverage? If the former, will the form be provided on the City's RFP site? If the latter, please clarify if an acknowledgement letter from our insurance broker will suffice or do the acknowledgement letters need to be from each individual insurance company? Response: The language is referring to the types and limits of coverage and not an actual form. Question. Due Date and Time: Could the City please clarify if the cover letter, table of contents, and appendix count toward the 20-page limit? Response: The cover letter, table of contents and appendix will not count towards the 20-page limit. uestion: Due Date and Time: Could the City please clarify where in the proposal this subsection should be placed? Will this subsection count toward the 20-page limit? Response: The subsection can be placed at the end of the proposal and will not count towards the 20- page limit. Question: Non -Collusion Affidavit Form: Should the Non -Collusion Affidavit form be included in the Appendix or placed in some other proposal section? Will the form count toward the 20-page limit? Response: The Non -Collusion Affidavit can be placed at the end of the proposal and will not count towards the 20-page limit. Addendum No. 1 Page 1 The Contractor is hereby notified; Addendum No. 1 must be acknowledged as stipulated under the instructions to Bidders and submitted as part of the Bid. Failure to do so shall result in the City designating said bid as "Non -Responsive." APPROVED: BRY N McKINNEY, P.E. City Engineer END OF ADDENDUM NUMBER 1 Addendum No. 1 Page 2