Loading...
29889 La Quinta Professional Plaza�#7 -),° ? BANK PAS a NATID�, ' January 23, 2001 Marshall Italiano, President Lake La Quinta Board of Directors c/o J & W Management Co. P.O. Box 1398 Palm Desert, California 92261 Subject: Palm Desert National Bank Drainage Plan as it relates to the Lake La Quinta Master Drainage Plan Dear Mr. Italiano, This letter is in response to your January 19, 2001 memo, specifically clarifying drainage issues. The project site is approximately 4.96 acres, of which 3.67 acres was not included in the 1989 Lake La Quinta Master Drainage Plan. Based upon the attached drainage analysis, it can be concluded that development of the Palm Desert National Bank site to be known as La Quinta Professional Plaza as proposed will have a less than significant impact on the existing drainage improvements and the Lake La Quinta development, and that the additional 100-year runoff volume added by the development over the riir1en} natu'rui state vriii 4111VUIIL to an inircaSc ill the VYatel IeVel Vf aUVIJt V. IV Inch dlstri'u'eo over t le surface of the lake. Interest has been raised by the residents of the Lake La Quinta community concerning the nuisance runoff as well as that of 100-year runoff volume. To address the nuisance water, a combination catch basin/dry well will be located in the landscaping adjacent to the Caleo Bay access. Grading will be performed in such a way as to insure that runoff will be directed towards this point, and away from Caleo Bay. The purpose of this dry well will be to retain as much nuisance water onsite as possible during normal rain events. This is being done with the understanding that water above and beyond the capacity of this well during such events as a 100-year storm will be allowed to flow off site and be addressed per the Lake La Quinta Drainage Plan. With regard to the water that will run offsite into Caleo Bay Street, property owners of the La Quinta Professional Plaza development will share some of the costs associated with clean up of the affected dry wells, the details of which are to be worked out as the development proceeds, and ultimately be incorporated into the Covenants, Conditions and Restrictions of the La Quinta Professional Plaza. Based on this arrangement, the Lake La Quinta Homeowner's Association endorses the drainage plan described above in regards to the 3.67 acres not included in the 1989 Lake La Quinta Master Drainage Plan. And, under significant rain events, including the 100-year runoff volume, consent is given to allow the project to drain onto Caleo Bay and ultimately into Lake La Quinta as it is now being drained. Ver my yours, Randal D. Miller, President/ COO Palm Desert National Bank Colin Mc e'rmott Palm Desert National Bank Approved: Marsha , President Lake La Quinta Homeowner's Association Board of Directors 73-745 El Paseo, Palm Desert, California 92260-4328 (760) 340-1145 • 70-390 Highway 111, Rancho Mirage, California 92270-5100 k. Engineering, Planning, & ASSOCIATES, INC. Professional Teams for Complex Projects January 15, 2001 Environmental Sciences and Management Services Mr. Colin McDermott Palm Desert National Bank 73-745 El Paseo Palm Desert, California 92260 Subject: Pain: Desert National Bank (PDNB) Comments: Neu, Site on Washington and 47`' Dear Colin: 75-150 Sheryl Avenue Suite C Palm Desert, California 92211 760.341.6660 Fax 760.346.6118 # 2432-05 As per our discussion with the City and you, Dudek & Associates has evaluated the drainage situation for the proposed PDNB facility to be located at the southeast corner of Washington Street and 47'h Avenue. The project site is approximately 4.96 acres and is located at the southeast comer of Washington Street and 47' Avenue. The entire area is vacant and it naturally drains from the northwest to the southeast direction. This site is part of the large drainage area contributing to Caleo Bay Street and ultimately into Lake La Quinta through catch -basins, storm drains and dry -wells already in place. Lake La Quinta is relatively large, covering almost 25 acres. 111OW4111721FAX►►' The project site is approximately 4.96 acres. The portion of the site excluded from the Lake La Quinta drainage study is about 3.67 acres (see attached map). The total area included in the drainage study is approximately 151 acres, thus, the 3.67 acres that was excluded makes up less than 2.5% of the total area. The PDNB site naturally drains to the southeast corner of the property into Caleo Bay. With the development of the site, there will be a marginal increase in the amount of How that will go into the Caleo Bay storm drain system. The following is an estimate of incremental drainage due to the development of PDNB site: A. I: Area = 3.67 acres 100-year/24 hour precipitation = 4.5" Runoff coefficient = 0.73 100-year runoff volume - undeveloped state = 3.67 x 4. x 0.73 = 1.01 acre foot 12 Area = 3.67 acres 100-year/24 hour precipitation = 4.5" Runoff coefficient = 0.88 100-year runoff volume - undeveloped site = 3.67 x 4.5 x 0.73 = 1.21 acre foot 12 Mr. Colin McDermott Palm Desert National Bank January 15, 2001 Page 2 #2432-05 As a result, the 100-year runoff volume created by the development will only increase by 0.20 acre foot over its natural undeveloped state. This volume represents a relatively small increase (approximately 0.54%) compared to the total volume of -runoff from 151 acres at the 100-year runoff volume, which is approximately 37.28 acre foot'. Another method to illustrate this small increase is to measure its impact on the water surface elevation of the lake. Lake La Quinta is about 25 acres in size, and with 0.20 acre foot distributed over the surface it amounts to about 0.10 inch elevation difference. Thus, the PDNB project will have an insignificant effect on the existing drainage system. Based upon this drainage analysis, it can be concluded that development of the PDNB site as proposed will have a less than significant impact on the existing drainage improvements and the Lake La Quinta development. We request that the Lake La Quinta Homeowners' Association endorse the PDNB project and give their consent to the project draining onto Caleo Bay and ultimately into Lake La Quinta. Lake La Quinta Drainage Report, August 1989. Dudek & Associates, Inc. 75-150 Sheryl Avenue ■ Suite C a Palm Desert ■ California 92211 r (760)341-6660 ■ (760)346-6118 fax