Loading...
3514` 1 NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I I I DATE: OS/14/O1 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION N/S Calle Durango W/O Avenida Carranza F/O Avenida ObreRon (Street address or Description of Location) PURPOSE OF CONSTRUCTION To locate VZ buried facilities Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Splice Pit Required DIMENSION OF INSTALLATION OR REMOVAL 4' % 6' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION 2 Days ESTIMATED CONSTRUCTION COST $ 1000.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: See Attached Special. Conditions Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent Verizon Communications 295 N. Sunrise Way Palm Springs, CA 92262 Name of Applicant (please print) Business Address Telephone No. (760) 864-1715 Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 0.00 II Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. 0.00 $ 0.00 Received by Date Recorded by 3514 PERMIT VALIDATION PERMIT NO. 3514 DATE APPROVED 08/08/01 EXPIRATION DATE 11/08/01 DATE ISSUED 08/14/01 `1� /,// ;�;_w By .,.� Raoul Martinez r �f Administrative Authority Telephone: (760) 777-7075 NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 07/31/01 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION N/S CALLE DURANGO W/O AVENIDA CARRANZA E/0 AVENIDA 0RRFr0nl (Street address or Description of Location) PU-RPQ$f DFICr9NSTRUCTION TO LOCATE VZ BURIED Sketch (attach construction plans if appropriate) DE�SHHCIIRIPTIONOFCONSTRUCTION SPLICE PIT RFQ(IIRFn S f' �#G! GM14' or's DIMENSION OF INSTALLATION OR REMOVAL 41 X 6 SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETIOI1DAYS ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacin and/or re lacin im rovement ) 1 1 � •��i1 1 9 P 9 P s In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of work. Signature of Applicant or Agent VERIZON COMMUNICATIONS 295 N. SUNRISE WAY PALM PSRINGS, CA 92262 Name of Applicant (please print) Business Address Telephone %t0/864-1715 Name of Contractor and Job Foreman Contractor's License No. Business Address Telephone No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: $ D' $ .0 Receipt No. Received by Date PERMIT VALIDATION PERMIT NO. DATE APPROVED L EXPIRATION DATE Z 1 2- DATE ISSU D By 06 Authority Recorded by 11 Telephone: (760) 777-7075 r c;vt (THU) 8. 2' 01 6:50/S—. 6:45:/N0. 456U06c'86'7 P 1 CALIFORNIA TRACKING SYSTEM Date: July 23, 2001 WORK ORDER: 0543 9P000EH 017 -to W. O. LOCATION: 51-520 AV,.OBREGON A-a-t DESCRIPTION: _:REMOVE B-TAP CO COMMENTS: NOTIFY FACILITIES WHEN COMPLETE SSP TO COMPLETE THE FOLLOWING: SUBST: ❑ CONSTRUCTION: ® SPLICING: INSPECTOR: 3IM THOMPSON VERIZON TO COMPLETE THE FOLLOWING: SUBST: ❑ . CONSTRUCTION: ❑ SPLICING: ❑ CONST. SUPV. MATERIAL NEED DATE: 07/23/2001 NO CABLE REQUIRED CONSTRUCTION START DATE: 07/23/2001 IN SERVICE DATE: o FACILITIES NOTE: -BUILD IN MARK ❑ INSTALL ORDER NO FORWORD: RUNNINGS SHEETS / SPECIALS LIST ❑ QUESTIONS? PLEASE CALL FERNANDO AHUMADA OSP COORDINATOR SUNBELT DIST. OfCe: 760/778-3602 Fax: 760/325-2536 BLOCKING / STRAPPING SHEETS / CUTS ❑ The following General and Special Provisions are attached to and made a part of Permit No. ✓ I �I GENERAL PROVISIONS The following shall always apply: ' ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to' secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate said cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quints City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be nodfied.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage swctures, City of La Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall' be removed from the -right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of la Quints roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he 'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: t NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. / UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way v authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. LrIIL TY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance 8461. R'S PARKWAY GRADING: Area between the property line and top of the proposed concrete curb sball'be graded to a slope of 1/4 inch to one foot (1). R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior io removal. Depressed curb, matching concrete gutter and concrete driveway approach &ball be constructed in conformance with City of La Quints Standard 8207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road, paving shall be 2 1/2 inches of A.C. paving placed on (_) of class aggregate base. Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL S-fTJU IZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with. the manufacturer's specifications. R 1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of Le Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quints forces to preclude delay or interference with State of City of La Quints projects. 02 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. 13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. 155 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of Le Quints deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFELL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be ottained with the structural section of the roadway. R17 BACKFJLL PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. Rig COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R1.9 COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. 20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. PERMANENT. PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. QR2- FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. f 3 STREET REST'RIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon G completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quints road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump bole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large boles resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 3514 VERIZON --- In addition to the standard permit conditions, the following shall. apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work sha11 be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and.to the satisfaction of the City Engineer. 2. Verizon, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 an to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this. permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No.3514 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO. 3514 - VERIZON --- Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory .completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No.3514 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3514 ---VERIZON --- E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not. greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness .of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No.3514 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3514 ---VERIZON --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and -base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches -across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. I T . Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. Stock pile shall not exceed 3' in total height from the existing surrounding area. 19. This permit allows for the location of existing Verizon facilities and for a splice pit. This work is located on Calle Durango between Avenida Carranza Avenida Obregon. 20. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No.3514 Page 4 of 4 NOTE: ' With proper validation this form constitutes an encroachment permit • CITY OF LA QUINTA 0 APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 08/14/01 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION /S Gale: Dur anf-o 1:/0 tivntdd.: C3 r_nr.�, 17/0 Ayo:a?do. O'ar,::,nt: (Street address of Description of Location) PURPOSE OF CONSTRUCTION To locatj VZ buried ;itcjl�l.itino Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Srplicu Pit rki qu :r"e, DIMENSION OF INSTALLATION OR REMOVAL 4' X 6' Ooe Attached Spocicl Coadit±oi. SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION, Z J. 1�`-' ESTIMATED CONSTRUCTION COST $ luju.VU (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four :24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent Vory�un CoL�,unir.itio:ic. 295 a4'• Gu'a;r ._ t""y P.11! i 5pri3Fvn, Q'�1 9;4,6 1 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule 0.00 Inspection Fee $ Permit Fee 0.00 Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by $ 0.UO Date t--' .. r r PERMIT VALIDATION 3�14 PERMIT NO. DATE APPROVED 01i/0L,/01 EXPIRATION DATE jZ/ It. 161 DATE ISSUED By r ►"•l .. . , Administrative Authority Telephone: (760) 777-7075 r� .-e The following General and Special Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly ligbted and barricaded as deemed necessary by the City Engineer or La Quints City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall' be removed from the'rigbt of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be -removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS following shall apply when indicated: t NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. /( L I'IIM CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way v authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. sZ3 LTIUJT Y CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quints Road Improvement Standards and Specifications, Ordinance N461. R'5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb sball'be graded to a slope of 1/4 inch to one foot (1'). R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quints Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (_) of class aggregate base. Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL STERIMER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with. the manufacturer's specifications. EL61 4anagl palep'atulo;!IeO;o a1e1S'sCeMgBgj;o uo!s!A!(j'suoveoytaadS pmpuelS atp in I0'E'9 uO93aS V/4 AIdmoo llegs deal ao!lasdwo0 pottlam play ro laedw! aql ,(q paa!maalap se uo!laedmoo ialeai8 atp s! ianaga!gM'punoi8 8utpanouns aql of IaalsA!nba ro laaorad 06 asgl seal aoa o) paloedwoa pus pallylloeq aq (legs xeeowar am woy 8atllnsar saloq a8nrl 'samq Ile is o!lgnd 8a1IaAen aq1 loalad o1 PaP!Aord aq hags gapeaureq to pas aam8el; 'su8!s menbapV -amp auo kas 19 laaj 00S;0 mmmrcsm a o1 palouisar aq Ilegg 4iom alp 'oyjej) la!ulsar of ,Gesgaaau samoaaq st ajagM •qde vmd 8atmollo; aql ut payloads so paloedwoa ,(Iglnorogl pus pallyaloeq aq Ilegs aloq dmmg aq•l, •)CamgB!q aql in Ma!A at sa!emaa sugap on lg4l as jo pasodstp pas panomar aq Ilege dwnls am. atp;o g)p!m artlua aq•l• •oWun dsmg8!q of pjmq in aaaajajrala! lnogl!m ,(la;es palpusq aq aso ga!gM sao!laas at aq IIs4s panomaJ aq of scam •oopeaol Mau 91t is uo!l!paoo 8otmar8 snorOSTA 9 ul coal aql a!mu!em of aau!mrad aq1 in dl!l!q!-Odsaa aql aq Iptgs 11 'o!lgnd 8atlanen atp 01 plexmq 10 aauarajralm inogl!m'(la;ee palpaeq pae'aa!AJas aa» pairem pug papuoq'pasuaoq a Xq pags!Idm000a aq (lags ,Cem in 1g8!j peon ela!na e'I in 4!:) aq) a!gUm uO!leaolai 20JI :,IVAOW3II 110 N0LLV3O'I3X 331LE Kv •srtedar luaaemrad in no!laldwoa aodn paasxda all Ixege 8atdule gaits 'paleABaxa aq of s)ams an alq!s!A pns s! 8atduls loans aragM :ONad;H•LS3X 133111S aaau!2u3 d1tJ aq1 •(q pau!mia)ap ge aeoae go)ed Its JOAO pa!ldde aq jMg ao!slnwa anlegdse jo uo!leagddg us jo 8atlg!suoa few leas 80; V :'IV3S OO,L Z� •i!sdai peoi Amuodmaljo, co!laldwoa jays sXsp • asq) jalel on paaeld aq Ilegs aseq sgela qau! a no paaeld 8atosjrns •O•V sagaa! jo gmed wauswiad V 11ale!pammt paoeld aq Ilegs 008-JS in (.Z) gagaat oM1 in 8at1s!9uoa ga)ed dieiodmal a'palaldmw uaaq aneq ao!laedww pas Ily:laeq iayV :IM(13ll IN3W3AVd'.LN3NVWlI3d •)!m!I ,(ep (S) aAy s paaaza )uawaAed bujodmal aql jo wawweld ag1 Ilegg also on a! 1nq'palaldmoa saotpuado llg4oeq pas poieAma uaaq seq gouan jo laaj reaml 000E jo mnm!xgul a rase paoold aq pegs BalAed Cjsrodtnm 008-:)S aq.L apsjNgnq pajudard a no paaeld aq llegs 008-:)S;o sagou! Z;o 8uns!s0w ga)ed (Ieaodm2l s'saopvjado aopaedmoa pas lItjj3gq jo uo!laxdmw raaV :SWVd3111N3W3AVd AH"O&VML �Z EL6[ krunugj palep 'e!ujojgv:) in ale1S 'e(gMg8tg j0 a0I9IAIQ 'saopeay!aadS pxep�S aql;o 10'E'9 ao!taag a! paa!pno se apem ag (legs sisal ao!)aedmoO 'si!¢dar laaaemrad 8anlem of rood poly pas lenordde joj raaa!8ag (I!j'ag3 of papjemro; aq hags (sal gaea jo •(doa (1) aa0 •au!l aopuas jo 8u!ggoio goes to; apem aq llegs sisal aotlaedmoo'ro)aadsat aql (q.pannbar Us it :SISSL NOLL)VdWO.3 6 jId EL6I Crettaej palep'etaio;!lei jo ale1S'e(BMgBtH j0 aO!S!A!(l 9uo!)eay!aad3 pisptms aql jo 10'E'9 aogoaS a! paa!pno ss apem aq Ilsgs sisal ao!laedwo:) •sr!edar Iuacgmrad 8ur)Mm of rood poly pae laeordda rol joaa!8ag (1!:) atp of papmAuoj aq Ilsgs (sal gala in (doo (1) aaO -peon gaea no Isa) (1) auo jo mnm!atw a pug laaj 0001 aegl aJOm 1Oa j0 gprnra)a! Is apem aq Ilggs sisal aop:)sdmoa'iol�adsu! aql ,Cq par!nbar os;l :SIS'M NOLL)VdWOJ Sill •snonagaoo aq llegg ,Clddns talem all) pas ra(el gaea jo wo)loq atp gaear of gl8aal Iaa!ayjns jo aq Ilmgs s)af aqI 'pasn g! 8atuaf , uagM •ralem aql upnaa of pa)otu)guw aq Ip m sa>ftp alenbape'laamaluag mnw!xgm a ro; pogo st 8utpooa ro 8atpaod aragM •aollaedmoa jaleai8 aq1 et rgnagalgm'punor8 8a!panorrng atp of IaalaA!nba ro laaaiad 06 cell) seal ion aq Ilegs aopaedmoo 8atllnsw aql )B47 og paaeld aq Ilsgs leua)em Ily:laeg •sao!lejado 80!pooa Xq Iloms amanxa of pa)aafgns ton s! Isua)mm llyKaeq sill leql pastoraxa aq of et ara;j •sgldap aA!ggaaxa jo arc sagaaajl aragm sag (,S) IOO;-any jo mmm!csw a ro 8atpooU atojaq gouan atp in gldap telol aql 16 laawad OS rill( ajom ton in sia(el a!'pa!ldde aq llegg IIyXJeH :•EN3W30V'Id 'I'ILDIOVH Lill •,(empeoi aq1;o aotloas leaillatule agl ql!m paa!elae aq llegs luawad S6 jO aopaedmoa aA!lelw 9 'astlo ,(ae ut Inq 'palmpsgns aq ,Csm spoglam awaimiV 'lcamdtnba lualsAlnba ro radunnojq!A 8atgn palejq!A pae (,E) 122; camp astp ralewS )on jo gall at paoeld,aq Ilegs pas laalsnlnba in pugs x!w-1!Suerl panardde aq Ilagg py>IOBH :(INVS 'I'ILDIOVH 9I'd •IaAejt jo lines panoidde as (q poasldai to palaawalddns aq (legs Inq'llyaloeq ro; pasn aq Ion lleqs aopeneaxa 8aunp pajalunoaua s! go!gM (pruawm palsaluss ro ,(Buods) algel!nsun gmaap ela!no erl jo ki!:) aql ga!gm Isuatew ,(aV •Ilg4aeq palepgosuoo Clalenbaps ue 8atanpord jo sasodrnd joj asn sit of pnuamu)ap aoaelsgns a!ae8io iaglo ro eloor 'gsnrq in aajj aq Iprgs 11yXaeH :'IM3.LVW 'I'IL:()DV% 94 •al!s aµoM aql no dllamos s! laualem ao!73nnsao3 aql ssalun apem aq hags ao!Ieneoxa ON •s,(ep (S) any 8atpaaaxa pouad a ro; aado atemaj Ilegs aopeneaxa ON •asea gosa at 8mpeouisq aopeneaxa jo (ppynins aql aa!wjalap llegg roloadsul g>IroM a!lgnd aqy •atlgnd 8u!lanen aq1;o aopaa)oid aql joj sdeptloq pug epua4aam no')g8tarano slg8!l qa!M papea!ueq klaadoid ag hags euopeneaxa llV 'at8aq Isom gooperodo pyAoeq arojaq goaan aado jo ml mu!l 0001 o1 pm!m!l aq Ixegs saol)eneaxg :SN0LLVAV3X3 30 1,1441"1 bill •pmoouoa aq llsgg sa8pa lg8tane )aamaned of a8earep Sag'saopeaado Soloed [say o1 rood •oWerl moo lejaa28 aq) alsltltoe; )sail O1 Be aop!sod 9 gang dt paasld aq Ilegs leualem ao!Ieneaxg (tuamaned;o 8apina or rood aleneaxa o7 Paso all loawdtnba 8apeneaxa llegs saaaelsmnor!a on rapaN •raaa!8ug A!:) atp in aay;o aql g8nojgl panoidde aq hags 8utun3 laawaned in poglayll aopeneaxa of rood a8pa lg8!ene a o1 lg8!erlg a o1 ma meg (lta.3pmgo2m aq p!M Iuamaned..:gNjfj rn-1 LN314MLVl ET aaasreaI* laafad iadoid joj slaamnuom 42AMS Ile in laamaaeldar io aotlaldwoa aodn paypon aq 1ptgs aoyjo g!qy 'glaamnaom Cam jo lsAomaj aq) of rood raaat8ag ,(l!j aql of pags!urnj all Iprgs slaamnuom amp of gap aql 8utmogg go)ou jo )ag moldmoo V •aau'tmaad aq) jo asuadxa aql Is 109;IArns ro raau18118 l!A!a pasaaog o Cq paaeldar aq dpaouoo pas kppear ,(em Sag1 as lno pall dlawldmw aq Ilegs paAlona! uagm saug ,Clradoad ro simis Ile jo au!lralaaa Ott; no lspta ga!gm slaamnaom ,CaArng jig 'aopanrlsaoa jo 8ataut8aq ro aopeneaxa 01 rood :S 143 MOW A3AWIS Z j .el -ford ma!no eel in ,y!:) jo almlS ql!m aaaarajram! jo Selap apnlaaid o1 saaio; ela!no rl jo A!:) ro alm1S aq1 qUm palea!prwa aq llsgg jioM •1!mjad s!ql jo pouad aql 8aunp Bare etgl a! lonpaw ,(em ela!nO ej ;o d1!Z) jo e!ujoj!pt:) jo alslS aql go!gm uoperado Sue o) palgu!pjogng aq Ilegs )from pasodord aq•l, :g1IOM 311W A003 j d SPECIAL CONDITIONS --PERMIT NO. 3 514 ---VERIZON --- In addition to the standard permit conditions, the following shall. apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Verizon, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m.- to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Speciah Conditions - Permit No.3514 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO.. 3514 ---VERIZON --- Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Pernuttee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permvttee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No.3514 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3514 ---VERIZON --- E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Page 3 of 4 Special Conditions - Permit No.3514 SPECIAL CONDITIONS --PERMIT NO. 3514 ---VERIZON --= C. . Permanent pavement replacement shall be installed using a City approved 3/a" max medium asphalt concrete as the base course lift and a City approved 1/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max'medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize. any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. I T . Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. Stock pile shall not exceed 3' in total height from the existing surrounding area. 19. This permit allows for the location of existing Verizon facilities and for a splice pit. This work is located on Calle Durango between Avenida Carranza Avenida Obregon. 20. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No.3514 Page 4 of 4 CA-776-0013 Verizon I C11 AREA STATE: CA DIVISION: INLAND VALLEYS I EXCH.: ZNj]IQ W.C.: ()�)U3 WO NO.: ` Pi)L)UEH I TAX DST: CONTROL NUMBER: CO17 TITLE: CONDITION FR. FiDSL c51=52A AVE MUM DATE:O? 00 ( REV. DATE: I SCALE: FILE: "'DWLT A" DRWN ENG APRVD PRINT i OFZ i •125041 (01) a $� CABLE F-0303-A AEF 2 a M 282 50 b m 2t6..s b 1• z m 4 t7 > 0 52 3 { °mh m 2,a ® . d t, 204' 2421.10 T 1 512 2423.10 Now N r5N b I M 2 1650 � e I F 50-24 N e rvro a - UK 6 0$ t9 M ry _ 1 0 3) AE 25 26 m((�ro , m If1N N Bf I5t 175 1700 2a21.10 b BFTA 226-250 1 Bf.251-275 m+a m ion,F, m (s 'a J ^ 14 M"282650 I tnNy,I (nN `mQmIBFS26-700 � AE 5 �-26 P* N o � 38' 2423.10 XD.26 50 mm^mm.mN5Q. rvoLL N t9 D.1 21$ aJ �NrvN^ Z 50-26 - r F.676 �80 ..m l08564 2423.I0 4>•Qmm r m c!/N8F,176-225 te2)-o L •3297 2423.10 (86) � S_ M J s Y'.� � 25-8MT 51975 AYENIOA EGON NT am� *-• R arv, n _1682 2 B m ro N it4 . 0 ... •3305 2423.10 .486) i -- I/T•1956 • rvU) i J4.{J I.��sW(,•18009 (93) v- 23l I/T•1927 ... 32130 2423.10 (961 ty _ 5238 (82) g9 �• Y�aao 15 M•280650 00 26 ( i • 1-975 AVENIDA ALVARADO N , BF,676 700 M•221482 O OF.126-250 !/T 1935 e i a �; a.• A2 e6 $ 740 2421.10 o- • -• /T 1945 I o e 260 2421.10 6�J e AKF 50-26 ffi BF.376 40D I I 5I80 f82) I 6t85 t82) F,451-475 ewLP N'♦ AE 200-24 r L..�i 6.A0/ IN EFfECi XD.151-200 M•265650 H. 231650 NN m�tm a BF.176-225 189' 2423.10 42' 2423.1fl I (pm" t9 N^cn SF,651 850 1250 1 AEF 50 26 I AE 50 26 .., n • .,• �n a l0 ��, . f..� REVISED Bf.301-350 BF.376-425 CALLE DURANGO I . s N •5179 (82) -•• •5180 o- •5183 182) -o •5186 i82)-o •5199 (82) 0 M•12268a t M"122684 I M•265686 M•122486 • ( -� B M5122689 )� 7 O01AF COW. DATE 250' 2423.10 260 2423.10 250 2423.10 250 2423.10 O 180 ISO O 265 2423.10 a50 2423.i0 3P00IDK'96 UEF 400-26 - - _ - - --_UEF TO-26 - _ , _ - � � _ � �AEF 600-26 � ^ _ _ � _ _ _ -UEF 600-24 _ _ - - - _. _ _ _ ._ � .' � UEF 900-26 SlEF_t00_26 _ - - - -*� ---- ---- -- - _ - - -- - - 7P001AL 6-97 RRG GC BF,1 400 37 OHMS BF:1-�00 BF.t•600 BF.1-600 r Z Bf,1-900 0 BF.1-900 3RC 1970452 12-97 R 108595 -e i _ P203DR-120 '019 GC ( R `u "D1PD R� WYV CDUNoF108565 M•282482941 -o LJF1 I �l 1 ' 28' 2421.10 Y �`1' tico 1 m UKF 200-24 I �� I i ra� L� 5 SF.651-850 3308 2423.10 (86) / 51J8 182) m , • • 08563 2421.10 t94) �!`` rr q� ® 9766 2423.10 (92) BF Ll1A'y900 M 122682 I ... 52035 A ENIOA OBREGON NT `25-FC •5277 (82) -o AVD. DIAZ 260' 2423.10 m • 1/T•1880 ® 1/T 7890 10 M"231682 UEF 200-26 t/T■838 m 17981 2421.10 (93) 1 BF.751-775 142' 2423.10 BF 1-200 I SF,1701-1750 . Q AE 200-26 11 • I ■1127 all- 1 350 8F.651-850 • I/T 862 M I18350 I •3329 2421.10 t86) 1 �d 8F.1826-1850 1 P31550CWT �t117.2411.10 (83) ,? x 3s'-B M•000001 X 25-FC ... • 9?/ - ^ Oo ( .. :r 1/P90736I0 1/T 2616 I % Now. 00'-0 • 7 ) BF.1576-1600 /� �B6! �°n°o I 1 961 242L10 (93 •3298 2423.10 (86) l•? .. �tim •534 182> a 1/T•148 AVO, DIAZ 9g =za I ®M•22 482 - , •4293 (73)ro 1/T•839 + \ 130 421.10 BF.826 850 pG4 ® N AE 20 24 110221625 r BF,1701-1750 •1118 2411.10 183) v •3310 2423.10 (86) I SF.651-650 612 242L10 AE 25-26 M•000001 X _ 1/P9233510 i • ..• �l m m 4 m N Bf.1576 1600 00' 0 1/T 1881 l 4 mNW Nei CO - m N All in �3 (9 N In■ NW W 1nr w LL 03331 2421.10 186) l ?y o N w m I • Yna m • S�a m 17962 2421.10 (9 1/T"1865 2J mro N ... I/T*1898 /e N. N CO $F.826-850 SF,1576-1600 I / r NNa • 08562 2421.10 (94) r1116 241Li0 (83) 6 B. i0 f+ °j : "EyNia m ) 52080 AV NIDA ALVARADO NT 25 •1128 41h10 (89) M•000001 25-fC \A) 66 . 1/T t891 M•118350 1//,922010 X,. v I •3328 2423.10 t86) 3 BF.751-775 I PGT105422 00'-0 l' AVD. DIAZ �� 1 1m '"'MVT•840 t(o •1129 2411.Ifl (89) O 13311 2423.10 (86) I M•118350 ♦ • Bf.1701 1750 .•. 1 I/P41460CWT 1/T•1882 \1 35'-0 � 4 m` m N _-m to /7e •/ N mNNN m gy88� w+ , ,a ryNN m - FH/O3f vNNN m �N� n q.gg?J." u`�ii Nw U. cr) aNPN n HtcCO ig , £n¢ m N O Nw a @Flir•N44! Z 1 Leib © yo ��N(n'n° ■1113 2411.10 (89) ina m 20 •Be lt39 ¢ c� /• cc !9 ` a.� ?WILL M•00000! t, 92S '•aS. M W N, , o m >n C3 1/P90299510 4 bvE © \? •3302 2423.10 186 •17982 2421.10 f93) r S�alm O 00'-0 OC s1115 2411.10 (83) t, 1 N n,o mm s't AVO DIAZ • ..• •3312 2423.10 (86, ¢ co 1130 2411.10 189) • 0 M•000001 4 ••• 10856I 2421.10 (94) X Q 1/T■841 M•118350 1/T 1874 % 1/P9222010 .-, • Ems Cox y1 6rO i 1/Pat45CWT � BF,1826-1850 1/T•950 ® 52174 AV MDA ALVARADO NT 25 fC ¢ 00 0 0 :.•\0 35'-0 m _j I/T•1892 C3 wZ ¢ SF.751-775 Z > I uj • I ¢ 0 _ O Q ' m N W ( > > ¢ ry OJm NNE Q .• --NQN !, Q .+ WvNeI m W c�s� NNlow m ^i aLLI� > y? Irl• low-. V/ . smQ m I •9765 9421.30 (91) PRE -POSTED AUTH. 9 rip /� rBG •3313 4 r•.• o. l• •., / 1n 2 2310 (86� • 9?? • p1 •V892 2421.10 l8) 8F.601-825 25- d�; •\ i! 1.7992 t93> I •108837 2423.10 (81 1/T 1863 Ipt M 282682 52205 AVENIDA DI Z NT 1 1/T•• 40 2200-2 - • _ I 25-$MT 1/T•642 •l131 2411.10 (89) •1111 2411.10 (89) BF,776 8 0 1114 241LI0 (83) UKF 2fl0 26 -�- M-118350 M•000001 O M0000001 %� OF,i501-1625 8F.1701-1725 ( X •` 1/PW73710 ' N XO.126-200 I 1/P4145dCWT 1/P40866[0 9/001-0 6 JJ •5215 (81)-+. I J 0 M0265650 •17987 03) a- - , -y C esq m 4 8' 4 10 M•280680 -a ' 1� 97l t93) N d rv. 6 2 -260 t Q 9 • M 282625 ., 41, J A - r 15' 2423:10 8 17974 2423.10 (93) � � / g M�7960 t93> -a EF 50 26 s 70 2423.10 1, / 280650 BF.145I-1500 AKF 100 26 - re• I _ l• 9 9y a0'250-26 BF,1701-1800 Nr ]/T■1884 UKF 25 26 Qe 3j 1�� m (h BF.1901 1925 AKF 50-26 c z ? BF.501525 r, F W • 800 (93) -• •17989 2423.10 (93) r �'S m B ,2001 205fl l3 M 282680 AVD DIAZ N/SONORA m / � S .T I 9 • $ M•280680 -" IC�f L • o ri N d 610' 2423.10 1/T•843 < f� •.9�i N 40' 2423.10 = I7969 2427.10 3) / > . v 2201 VENIOA OBREGON T P + + m UKF 100-26 $F,1701-1750 m ro n ^ XD.t-50 \ NSS N AKf 100-26 1/T•18 3 m m a BF.1801-1900 •1121 2411.10 (83) n q n n n BF.l45t 1500 m w BF.776- 0 801 v tnln - CALLE SONORA I M•04,c : i c - c • 11 r 73810 .. t 1120 24IL10 I89) Oq,_e , •17957 193) -> =m • • ^ •280 I M•000001 B0' 0 • .. M•280669 , ■179% 2423.10 (86) M•282683 "17990 2423.10 t86) M•280686 s 4 •�7970 <93> 0 AKF 900-26 ••• 83' 42 . 0 1133 2411 AKF 600 .1 ( - 280686 ���` 2423.10 ($6) M 28068631 -. 275' 2423 to ... 2852423.10 2 2 31 - .^ _ - ----- --_-_- • 1/T"S.P. AKF 600 26 M•118400 (- . 250'2423.10 1/T•S.R 3 '2423.10 BF,la01 2100 t/T 5_P. _ - - - UKF 300-26 1 _. 1LP9145ZCW - BF,1401-2000 - - - - - - - - - AKF 600-26 A F 600-26 _t 1 BF.1401-1625 BF.1401-2000 40'-0 _ _ _ _ _ - r. ._ _ - .._ - - - - - XD,701-800 f X0.226-300 I r - BF.1401-2000 - XD,801-900 - = I ......CCC"' 8F,1401-2000 I I I •17975 (82) -++ mie to: n: 52320 AlENIDA ALVARA00 NT - 25 C M• 8065014) -17965 3) b - •1132 2411.10 (89) 0 M•221625 , N1nr1N a• I • vi I/T•1894 c ® ' •3381 2421.10 (86) 0 ? 2 N 4 m o , 0 ZOO'2421.10 roN�pro , i • 40' 2423.10 ... a e0 9/ i9t9c3m m M I1835fl _ 18m'- ® F- BF.1951-1975 •• AKF 50-26 , 6 . 92 Oj N m AE 25 26 1Dm. m I BF.1951-2000 - . 1/T 1500 •6 ?2? / mmN , I/P4 U56CwT mvt9 L:. 35'-0 0 '.: SF.1876-000 ft,4 � E- N - m /O cu)am m •1 983 2421.10 I931 - • �' LL I •• , I79ca (93) •-e -• - PROPRIETARY INFORMATION !. (.NlS1tL ^....: .« Y.o m N 5293 (66)-► i M•280625 • ■3344 2423.10 (as) I 3 M•zz1425 ® 5 a FOR USE BY AUTHORIZED mr mwl 17976 (66)-•� O 32 2 21.10 VERIZON EMPLOYEES ONLY 4 e f.aa m I/T•1876 ®M"221425 • ••• i � 540' 242L10 AKF 2526 \ �. n •17994 (93)-0 •3346 2423.10 (86) BF.1851-1875 200 242I.10 1/T 1885 Ip1 n AE 25-24 - m 0" N I ... BF,2026 2050 4 '$'('r'v - 12 M•280625 ..,�ipp1� • AE 25-24 i I : BF.1951-1975 -- m m m s^ r - �+ 610'2421.10 112 1/T 844 BFd851-1875 s17973 03)-► 'am-)v N �1 SCALESI -rJ0 NNr'N mn AKF 25-2g ®M•282625 •1� 966 l93) -o `r4rry �pti NN+ y SF.1501-1525... I : I 350'2423.10 ®M280625 _ f.-Nlnm W TAX E1n°a m s17984 (93) -> UKF 25-26 •1109 .24LLI0 (89) 310 2421.10 NNiaN N �0'i 0n' T AREA RES. ZONE •5219 (92) -0 I M•280625 M•000001 X AKF 25-26 m. m e`o a'ti0 r-+ - 0 M•221625 l96' 2421.10 BF,1926-1950 l/P90867I0 BF,1476-2000 • E(p` 500' 2421J0 I AKF 25-26 ( I 00-0 • \� _ 33 •3341 2421.10 6) AE 25-26 BF,1876-1900 Q W UG ROUTE REF. COND & MAN H REF ... BF.1526-1550 I - I I _.. lY � . 1/T•341 p m f^ •1134 2411.10 (83) �- W (n • • H 3379 2421.10 1861 � ' m ^ m I 1l 00 >- •3345 2423.10 (B6) No, S 3348 2423.10 (86) I "' 1/P48102CWT Z to STATE/AREA DISTRICT Nu o T 1895 /®... +N n m I CA HIM DESERT/SU B �•1 N LT (/T•645 NN. N n) 40 0 � I NNO l/T•95l � W � to ' . E(n¢ m F-0305-A Z W Z J Q EXCHANGE SERVICE SECTION { GTE CALIFORNIA, INCORPORATED W 0- INDIO IMPORTANT NOTICE W w W GTE Colifornta Incorporated rGTEC•1 does not essuee WIRE CENTER - responsibtLty for the ooewacy or completeness of (J) W : these drawings. Now tnstallahoi% remevel, or relo- 0543 LA DUINTA m _. _- _:. :. • -- __ .::, _._-..- - .. eetfen of telephone Plant may have oeowred since *a0 date of this drawing. - You wet call Underground Ser= PLRT.•"�I40- .. . a vice Alert at least two .erbn days before eXCOVat - d <7 $ea-4z2 4t33). g �•+9 F0303C CA 776-0013 Verizon C11 AREA STATE: CA DIVISION: INLAND VALLEYS I EXCH.: ,LNDTQ W.C.: 0541 WO NO,: ` PbL)0F14 TAX DST: CONTROL NUMBER: CQ (% TITLE:CONQITION PR. RQSL q,51=520 AVE GB'u6bli DATE:03 o Q ( REV. DATE: SCALE: FILE: "DW& A,t DRWN IZr` ENG APRVD I PRINT 1 OF2_ -- -- -