Loading...
3802NOTE: ' With proper validation `this form constitutes an encroachment permit • CITY OF LA QUINTA • APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like,public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS x DATE: D tcoaboy 31.. 2002 LOCATION OF CONSTRUCTION santa 1644 P1044* and tvonvo 9oraud*# wad aortbwos+t corn*r Subdivision Improvement Permit— Class III Minor Improvement Permit Class IV ft 29909 # northwoot cornor of Calla Taf Dowt Club X (Street address or Description of Location) PURPOSE OF CONSTRUCTION���` c�c�� Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION ' in. foot o« WtAo crouch to connect. to CM stub (at butte 3ocstio0e) DIMENSION OF INSTALLATION OR REMOVAL 6' V 30" se►ah **Saes attach** opetkl 4t+ndit1o"e4*s SIZE OF EXCAVATION, IF NEEDED b' X 3 " X 5t "Ste APIPROXIMATE TIME WHEN WORK WILL BEGIN 444"r1` 31 2003 ✓'� kini� dayse ci ti APPROXIMATE TIME OF COMPLETION 30 war��j, ESTIMATED CONSTRUCTION COST $ 5.000 �� 0 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and aga s�F�fany and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ♦ � �•• �'Q, 4 may. Signature of Applicant or Agent septa toaa Pines# P.O. 30% 111,503 L4 Qaiuts (76+0) 777-4017 Name of Applicant (please print) Business Address Telephone No. Ddtaland GQztatructl.on SQw3C3 Comtk*41► t 6R; 3c98-�$3b Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. .40 4usarwicie Co. A02AC12417 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs. Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule 150.00 Inspection Fee $ 100.00 Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No 250.00 Received by Date Recorded by PERMIT VALIDATION PERMIT NO. 9$02 DATE APPROVED Dotember 31, Z 00 EXPIRATION DATE Doerr bor 31, 2003 DATE ISSUED By , '��CLsar [►iF ,, b t;� .a1C. i" dn-Y trrative Authority Telephone: (760) 777-7075 :3 80 Z' 1 -NOTE: t ' `With.proper validation this form constitutes an ,encroach'ment permit ti �CITY OF' LA QUINTA �``� v• APPLICATION FOR PERMIT PUBLIC WORKS _CONSTRUCTION '(ENCROACHMENT) For the 'construction of.'public or private curbs, driveways; pavements, sidewalks, parking lots, .sewers, vvateNmains and other like•,public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit.— Class I II DATE: Decembet" 31.,__2002 Minor Improvement Permit -Class IV LOCATION 'OF CONSTRUCTION Santa Rosa Pldza, Pal` 29909._,,°@ - a6rthvrest .corner of Calle Tatnpico' and Avenue Bermudas and northwest corner of C41 ' Tampico & Desert Club (Street address oe Description of -Location) • l� PURPOSE OF CONSTRUCTION. WAter line connection Sketch (attach construction plans if appropriate) r DESCRIPTION OF -CONSTRUCTION 30' Llu. feet of .6f vida. drench: to connect• to CVWA stub (at both lecatidns) M1 DIMENSION OF INSTALLATION OR REMOVAL 6' x 30' each #*gee attached.-sp►scial ,coAdiei©naft SIZE OF.EXCAVATION,IF NEEDED V X 30' r5 5' each APPROXIMATE TIME WHEN WORK WILL'BEGfN hnuary '1' 2003 APPROXIMATE TIME OF COMPLETION 30 workina da.vei jESTIMATED CONSTRUCTION COST t 5.000 (lkluding removal of all obstruction, materials, and debris, backfilling, com- ..JA N 2 2.2003 paction andf placing permanent resurfacing and/or replacing. improvements) ®F ': t UINTA In consideration of .the granting of this permit, the applicant hereby agrees to: FINANCE EiEPL Indemnify, defend• and save the City, 'its authorized agents, officers; representatives. and employees, harmless from and against any.and all penalties, liabilities or loss resulting from claims or court action and,arising out of any accident,' loss or damage to persons or property happening or occurring,as a proximate result of any work undertaken under the permit granted ,pursuant to this. application. . Notify the' Administrative Authority at least twenty-four (24) hours in advance -.of the time when work will ,be started., .' Comply with all applicable City, Ordinances, the terms and .conditions of the permit and'all applicable rules and regulations'of the City of 'La.Quinta and to,pay for any additional replacement necessary as the result of this work. ;r Signature of Applicant or Agent' ' Santa Ro€ a Plato P.Q. Box . 503 La Quit to (760.) .777-407.7 Name of Applicant (please print) ' Business Address Telephone .No. Dateland Conotructioa 50-305 Coachella : (760)'3.98-5'544 Name of'Contractor and Job Foreman Business Address Telephone No:' 396695. 00031 Contractor's License No. City Business.License No. 11RH Insurance. Co. A02AG12417 ' Applicant's -Insurance Company. Policy Number FEES: Subdivision. Improvement Permit — Class I I I Public improvements: 3% of'estimated construction costs Private. improvements: 3% of estimated construction costs Mirior.•Iniprovement Permit — Class IV: See attached schedule 0 .802 Inspection, Fee' $ 450.0o PERMIT VALIDATION 100.b0 Permit Fee PERMIT NO. 3802 ,Penalty December 31, 2002 Cash Deposit -Surety Bond DATE APPROVED . if required.. EXPIRATION DATE December 31, •2003 TOTAL $ ft 25O.00 `DATE ISSUEDReceipt No.' t, B '. Received by, Date ,.. Adr% strative Authority Victor Motu, Assistant Esgineez F t Recorded by Telephone: (760) 777-7075 - ` City of La Quinta' The following General and Special Provisions are attached to and made a part of j -Permit Number r r* The folloyVin4 shall always apply: , , + x ' • } ; Y ; +' ` `, y , E ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City, of La Quinta's right of way t}�� • ONLY. Whenever construction extends within private property, it is the responsibility of the permitted for his contractors, to secure permission = t` from abutting property owners. Such authorization must be secured by the permittee prior to starting work. �- ' T _ ' • +- N�f�• ' TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted *to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving - Y during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas.' If the existing pavement is scarred, spalled,;` .� ,,or broken during the term of this contract or if the pavement is marred, City of La-Quinta shall request that these portions'of road be resurfaced r over their entire width. Resurfacing'shall consist of one coat of two inches (2") of A'.C. surfacing plus appropriate seal coat as specified above. . • PROTECTION OF -TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessa b the City t P P Y 9 rY Y Y.-�'` Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.14 f+•; • yx=" , io.'} , _,• CARE OF DRAINAGE STRUCTURES: Any drainage structure to•include corrugated metal pipe, concrete pipe,'steel culvert and concrete ••. structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. , •t _ * RIGHT-OF-WAY CLEANUP Any surplus material resulting from excavation and backfill operations shall be.removed from the right of way. All, • paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line _ r• , " and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to'paving..Water tanker. ' shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. •" : DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La'Quinta roads,, it shall be the ; •4 responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary... CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for.% 4 •' the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any lengthof time, permittee shall contact this office to obtain the necessary permission. `. SPECIAL PROVISIONS �a. p s: ' �. ; , f. The following shall apply when indicated: NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7075 at,least.forty-eight hours (48) in advance of starting, . ' construction. r ® R2 ` ..UTILITY CLEARANCE: (Substructures) Prior to making'any excavations within the City of La Quinta right-of-way authorized , x ` by permit, the permittee shall contact all concerned utility companies relative to the location of, existing substructures. , , ` ' Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the ' - r. permittee. , ;•' ®. R3 =, w UTILITY CLEARANCE .(Surface Structures) No work shall be done under this permit until all utilities=.are clear of the ' proposed work site. The permittee shall notify all concerned utility companies of the proposed work. t • ''' a'C ❑ R4 ' ."s.. '? +' PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced ' with *' N/A ** inches of A.C. paving laced on ** N/A " inches of " N/A ** aggregate sub -base course havin an, }' ( ) P 9P ( ) ( )9 "R" value of not less than (** N/A ") and in conformance with the City of La Quinta Road Improvement Standards and, FSpecifications, Ordinance #461. ❑-R5`.'. ;'PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of. one-fourth inch ('/<") to one foot s ❑ R6;i' j -` GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by .. a licensed engineer. # .► + 4 ' Y Z` 'r " 'r ' b ®I R7 ' CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A'*,) feet shall ;y be removed.-kCurb and/or curb and gutter shall be saw cut prior.to removal. Depressed curb, matching concrete.gutter and F' ` concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. 4�_ ,• '.� r. ElR8 ty • "DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property • r ', ` '' a - • w', ' line and the existing road paving shall be two and a half inches (2 of A.C. . paving on (" N/A ") of class (' *'• N/A ** ) ' aggregate base. ® R9 ` SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all', times. �. ❑ R10.. '-SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the ^ manufacturer's specifications. City of La Quints T. • ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of,California or Cityof •_ La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ' f ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on- 'the _ • centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties •'' to these monuments shall be furnished to the City .Engineer prior to the removal of any monuments. This office shall be ... , notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement. ' cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be . ? - used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the , general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.' ® R14 • LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill . T operations must begin. All excavations shall be properly barricaded with lights overnight, on•weekends and liolidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. + " ® R15 Y BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes, • •'Y of producing.and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or . saturated material) which is encountered during excavation shall not be used for backfill,-but shall be supplemented'or , replaced by an approved sand or gravel. ® R16t BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment.. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.b ® R17 P BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the + trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths.. Care is to be exercised ' that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the • ',' resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to, ,. retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water w ' supply shall be continuos. ® R18 . w COMPACTION TESTS: If so required by the inspector, compaction test shall be- made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of•each test shall be forwarded tot the City , t Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. i ® COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or'service line. f . .• ,R19 , One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. , ® R20 • TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed `after . a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed; but in no • case shall the placement of the temporary pavement exceed a five (5) day limit. ' ® R21 •. PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 4 ) inches of A.0 surfacing placed on a (6 ) - inch ( crushed ) aggregate base shall be placed no later than ( 7 ) days after completion of temporary road repair. , ' .• - • .. sty-:• ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as_ determined by the City Engineer. ® R23 '. STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon C , completion of permanent repairs. - ❑ R24 - TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta`road right-of-way. shall be accomplished! by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. :It , shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. • 4 Trees to be removed shall be in sections, which can be handled safely without interference or hazard,to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debrisremains in view of the highway: The -' - / stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph.. Where it becomes. '; • ' necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate - , • v signs, flagmen and or barricades shall be provided to protect the traveling public at all times: , Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. ' ;. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, ;' 4 ,, dated January 1973. • e - - . s r' ' . �., � , .. .5,•t - s... _-,' is PERMIT NO. 3802 ' . �,. ti=_� • J. ; u r . SANTA ROSA, PLAZA,' ? ` !�` �� '.4 • 4 � In addition to the standard permit conditions, the'following shall apply J. , .Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance•10 § 1 (part), '1.982);'all J J. work shall be performed in accordance with - the latest edition of the Standard Specifications For Public = Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. -�. r, + w I,, SANTA: ROSA PLAZA, hereinafter referred to as "Perrnittee", shall •.be responsible for providing continuous dust and erosion control. ' . r : r -3 . ,: F• :'' '` 3. --Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more,'' s frequently if required. ` k , 'rl �a ' } 4: - Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 §'1,1982); throughout then -; . work site, the Permittee shall comply with City regulated work'hours. Operation and niaintenance,of__-', i equipment within one-half mile of human occupancy shall be performed only during the following time ." periods: ,j' .. ". �� h;.;�, ! Y . • }jk.' October Ist to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.Jl Saturday 8:00 a.m. to 5:00 p.in.' 4, , May.,l st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.` t. Saturday 8:00 'a.m. to 5:00 p.m: Work shall be prohibited on legal holidays and Sundays. 5. , • Work performed within 500 feet of a signalized intersection is restricted between the hours'of t,9 a:m 3 p.m. Traffic control shall be set up after 9 a.m. arid removed before•3 p.m. The Pennittee shall contact.the Riverside Country Traffic Signal Maintenance ,Department at (909).275=6894 if. signal Operation at the intersection is to be altered in any way. y , + n 6; � Pursuant to Section -14.16.110 of the La Quinta Municipal- Code (Ordinance 10 § - P (part), 1982)' iPermittee shall assume responsibility for repair of any pavement damage to any public or private street' y~ '"arid- for any damage to other City streets or facilities as a result of work per under,this permit: 7., *,Pursuant to Section 14.16.250 of the La Quinta Municipal Code•(Ordinance 10-§�1 t: advance warning, signs and traffic'control shall be installed and maintained in accordance with Cal, Y r Y Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control t `' plan shall'be prepared in accordance 'with the WATCH Manual and submitted to the City for , +� F. •"`; review and approval one (1) week prior to starting any construction. It'shall be the Permittee's.,:*' responsibility to appropriately detour and barricade all construction sites. Permit No. 3802 Special Conditions = j T Page I of 5 U - - .. � . •. _ .. • , ail . 9:f, J. " ( - ' PERMIT NO.3802 c, ♦r .1�, ;< ,: SANTA ROSA PLAZA - 5 • y' v. T Pursuant to. Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 f § 1 (part), 11982), street _ ' closures shall not be permitted. A minimum of two (2) travel lane of paved surface shall be maintained at all times. r } �- {• '' h♦.. �. I 8. `„ `Prior to excavating, if required, the Permittee shall contact Underground,Service Alert at'I,, -422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops,,; , , irrigation lines electrical conduits and storm drain facilities. � "'`:; . - .' 9:,. •''-Should additional work, materials; or modifications of the work be required in order to meet'City - standards, safety requirements, signage requirements; or to fit actual field conditions,'the work shall be = performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the "City of La Quinta. 10.- Pursuant to Section 14.16,370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), ' backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified`.' herein. ►,. -'� i �'' ;-r`: _.K 4 `' ` . ,.,Native material maybe used as backfill material provided that minimum compaction; achieved in tlie : L ' F,. s .manner prescribed herein, is achieved. Backfill shall be performed by mechanical means!'no water*,, w , 1 densified compaction via j etting or flooding or other means shall be allowed.. It.shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and onsite, at all',' �inspection, times during backfill operations. • �., 4Y Backfill compaction shall be achieved by the following conditions: • � r .:r ! r • � .. • .• .. J • ', .+ �. +. . ems, r A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material; such" _ 4 - material shall be removed to the limits directed by the Geotechnical Inspector and/or the' City a .•�• Inspector and the resulting excavation backfilled with pipe bedding material:, r• `• r .' �• "„"'. J, B. Backfill materials shall be brought to or maintained at an appropriate moisture content f&' r - ' compaction. The appropriate moisture content range shall be established at the onset of the,,. ;r y. . ' • project and ensured prior to use of the materials through progress testing on the stockpiles: ` C. . ' The first length trench backfilled shall be backfilled in the presence of the City Inspector. , - .of ,• "'. Compaction shall be tested at random depths at approximate three-foot vertical intervals, as .' �� ' ' •� 3' : backfill is placed to ensure the effectiveness of the compaction methods and to.establish the depth 4 of lift that can be compacted. =, Special Conditions - Permit No. 3802 1, • - f• Page 2 of 5 • ,' r A.. � - r , ' .,. r. .. . !. h as • } t•' } 5r „ _r PERMIT NO.3802 °, �` 4" 4�S4 3 a ANTA ROSA PLAZA. f ' r, ; a, 1.7, J . • s} i' `� i . ' � •ti . ' ti •i� ' ' s . ,•3 "� t r � is �' +�;'' ;1� %: - . t _t it. - .- �. '. •: , W• it vr.�N, I; �, . D. If lifts greater than one foot are attempted in this trial length of trench; compaction tests shall be` a' •taken -within -the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory �,? • completion of this portion.of trench, the City Inspector shall establish the maximum lift thickness a i Ao be compacted for the remainder of the project. E. • In subsequent lengths of trench, the frequency of compaction tests shall equal one per,each lift r backfill, per 300 linear feet of open trench, at randomly selected locations -within the open length .:oftrench. f IF. The depth of the randomly selected'compaction tests shall also be randomly selected except than where multiple tests are required in a given length of trench, the tests shaltbe no closer than three' feet (vertically) from.each other. G. F- If any compaction test fails, previously placed backfill (in the same length of open trench or.,,,-, a previous lengths of trench) which is ' represented by the failing test' (as- determined by, the City ' . .` Inspector), shall be tested for compliance with compaction requirements. , ',µj z • ", H:,,i All costs incurred due to the conditions above shall be borne by the Perm'ittee. •Copies of all test „ results shall be furnished to the City Inspector. "( T r ((' ' .x , • r '' ,11: All excavations within City of La Quinta right -of --way shall be backfilled; and temporarily paved within the existing travel way, at the end of every workday as directed by and to the satisfaction of the r `;.City Engineer for the protection of the public. Lengths of open,trench shall not greatly exceed than 't ~' ,which cannot be backfilled in the same day. Excavated,trenches shall not be allowe'd'ope'n'overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty(20) feet in length, - a . t open overnight at a point where construction will begin the next day, provided that this length oftrench' is completely covered by steel plating. ti • ��� 1`t i ' 12 All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original,condition. ., �13 , Access and egress to all local properties shall be maintained at all times.' [ 14. ' Pursuant to Section 14.16.375 of the La Quinta Municipal Code' (Ordinance 10 § Y1.-(part), 1982), ' permanent pavement replacement shall be completed no later than seven (7) days after the completion ; of the work. Permanent pavement replacement shall conform to the following conditions: ' A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond "trench edges.' Edges shall , be straight and clean. 4 t ,Special Conditions - Permit No. 3802 r� P 1 Page 3 of 5 ,4, 4 Y y � � ' ' •, J 9 .� F�4 11 ' �Sn*-�. l a• . ' . •, ` e .. y ,.. ` , r.• x j PERMIT NO.3802 = •'" n =( > r ;. �' . . SANTA ROSA PLAZA B: , Permanent pavement replacement structural section, within all trenches, shall be 1 thicker than existing of asphalt concrete over the same existing thickness 'of crushed aggregate base or crushed,', • F: miscellaneous base, meeting the requirements of Sections 200-2.2 and 200=2:4 of the Standard ; ', ' • , y' 'Specifications for Public Works Construction. The replaced pavement and base material shall be,• compacted to 95% relative compaction and respectively tested; for each 3001inear feet of trench: ' Verify exact structural replacement section thicknesses with,the City,onor to installation. ' C:. Permanent pavement replacement shall'be installed using a Cify� approved' 3/4" max medium .. asphalt concrete as the base course lift and a City approved ''/2" max medium finish course lift for h ' capping. Asphalt concrete mix design shall be approved by the City prior to its placement. y , D: Cold -Mill and Overlay - The existing pavement which was properly protected iri place'during the y�e h ; 4fi trenching operation located adj acent to the trench saw, cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled surface. The cold -milled area pavement and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000'' �' :j'" asphalt concrete mix. The width of the cold milling'area shall be as. follows: • s' , For longitudinal trenches located in a parking lane: two (3) feet outside the sawcut removal =. ' lines. „ • . ._ , • For longitudinal trenches located in a traffic lane: two (3) feet outside the sawcut removal,', lines, or to the lane line striping, whichever is greater. ' ` • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines: E.:: If grinding and capping operations are not performed in the:same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete'shall be installed from saw -cut edge to". saw -cut edge flush with the existing street surface. The base course lift of paving shall riot be left 0.10' low in anticipation of grinding and capping. F:" Any existing lane striping or any existing detour lane striping affected by.this resurfacing `shall be replaced in kind by'the Permittee, as directed by and to the satisfaction of the City Engineer.--' Affected traffic signal loops shall be removed and replaced in kind. The finished pavement = °� surface shall be smooth; consistent, and shall conform to the surrounding grades. 15:::'Permittee shall permanently stabilize any and all soil that was disturbed as,a result of work'performed' " 4 under this permit with an approved dust control treatment. Soil stabilization shall be done iminediately_' ' _ --1-after completing the operation.�, ♦ �w rl `ny 'Special Conditions --Permit No. 3802 , PAge 4'of 5 �`'+ PERMIT .NO.3802 SANTA ROSA PLAZA ' �4 6: - . Pursuant to Chapter 12.56 of the La Quinta Municipal -Code (Ordinance 10 § 1 (part), 1982) the it designated certain city streets as Truck Routes. The weight limit for restricted.streets (i.e., sireets`not - .. part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted - 1 ; street if making a delivery or pickup on the subject street, or if this permit specifically.granis permission . , , :to use the street to deliver street construction materials and/or equipment � •�c« w 17. 'The City of La Quinta reserves the right to revoke, suspend orAvoid this permititat, any;time 18. The permittee shall indemnify, hold harmless and assume the• defense of the CityfromIall, f damages, delay costs, {costs or expenses in law or equity thatmayarise out of work undealus = ;n 4 permit.tiA +. A t - L a 1.r V i Y t o-. i Vie" G J. 1•• `] w,! ? - , - , - r• +iK•,t rzk. Ch xr ": 1•�:a; -r t 1 .. s' ... � �. �rrF a. r� ry�,�`y m rt +t'r'r s a'"•".S- r• . as .. - }' f•' '%6,.'''�' � ., 3+. . .. f' ' �` � r - 1 .. • t Pry �� ` . � 6 , ' NOTE: With proper validation this form constitutes an CITY OF LA 'QUINTA encroachment permit - APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or. private curbs, driveways, pavements, sidewalks, parking lots, sewers,- water mains and other like public works improvements in connection with MINOR. IMPROVEMENTS and APPROVED SUBDIVISIONS . Z-21 Subdivision Improvement Permit— Class III X DATE: Jv Minor Improvement Permit Class IV LOCATION F /C'ONSTRUCTION � Ui�� `�/ [8.SN� Na,Pr3ka/cs,co�Nz n� c�GCF r� (Street dress or' Description f Location) s���SE.�T'CL PURPOSE OF CONSTRUCTION ��G4PJ 3'i!l�e¢�,�«v Sketch `(attach construction plans if appropriate) DIMENSION OF INSTALLATION OR REMOVAL _ Cy SIZE OF EXCAVATION, IF NEEDED — E APPROXIMATE TIME WHEN WORK WILL BEGIN /' 03 APPROXIMATE TIME OF COMPLETION . ESTIMATED CONSTRUCTION COST $To SJ* (Including removal of all obstruction,�materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit; the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as' a proximate result of any work undertaken under the permit granted. pursuant to this application. A Notify .the Administrative Authority at least twenty-four (24) ,hours in advance of the .time when work will be started. Comply .with all applicable City Ordinances, the terms and 'conditions -.of the permit and all applicable rules andregulations of the City of ' La Quinta ,and to pay for any additional replacement necessary the result of this work. of Applicant or-.1kgent ' Name of Appi ica ntA please print) Business Mdress -7/o6- `' Telephone No. 'Yt�� , Name of Contractor and Job Foreman. Business Address Telephone No. Contractor's License No. City Business License No. f ; Applicant's Insurance Company, .{ Policy Number FEES: Subdivision Improvement, Permit — Class III . Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit —Class IV: See attached schedule Inspection Fee $ r/.�Sd.— PERMIT VALIDATION Permit Fee ` /� a��o.Z PERMIT NO. Penalty Cash Deposit Surety Bond DATE APPROVED'���► a�- if required ZQ / EXPIRATION DATE �'li TOTAL: $ �OATE ISSUED Receipt No.' - By Received by Date % Administrative Authority cry �i'v Z-S�sl Recorded by Telephone: (760) 777-7075' ��