Loading...
RFP - Eisenhower Median Landscape Project No. 2018-222/6/2019 PROJECT NO 2018-22 EISENHOWER MEDIAN LANDSCAPE Dianne Hansen CITY OF LA QUINTA City of La Quinta Project No. 2018-22 Eisenhower Median Landscape From Ave 50 to Silver Hawk Apartments Start Date: Monday, February 11, 2019 Contractor will provide labor, irrigation materials, and equipment for installation of plant and hardscape materials. Contractor is responsible for mobilization, site protection, and dust control. Means and methods required to perform the work are to be determined by Contractor. Lane Closures, decomposed granite (DG), rock and plant material to be provided by the City. To minimize disruption to residents and school traffic, contractor will coordinate work schedules with the City, working hours can begin at 8:00 a.m. Item No. Description Qty Unit Unit Price (Dollars) Item Total (Dollars) 1 Remove existing plant material and DG as needed; 1 LS 2 Grade as needed; 1 LS 3 Furnish and Install Irrigation to new plant material as needed, install plants, cap existing un-used irrigation; 1 LS 4 Install Cobble; ¾ Stone; DG; 1 SF Total: The overall length of the Median is roughly 1,074 ft. with a section of paved stone separating two sections. - First section: 244 feet; Length of wide (8’) to narrow portion: 88 ft o Narrow section 156’ - Second section: 830 feet; Length of wide (10’) to narrow area: 128 feet o Narrow section 702’ - Width of narrow sections: 5 feet Note: measurements at estimated, actual measurements need to be taken on site. Basic Concept: (Adjustments will be made on site) Mobilization includes expenditures for all preparatory work and operations, including but not limited to, those costs necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site as well as the related demobilization costs anticipated at the completion of the project. Irrigation: All pipe 3” and smaller shall be Schedule 40 PVC Type 1, Grade 1 pipe. All plastic pipes will bear the following markings: the manufacturer’s name, nominal pipe size or schedules. Note: Irrigation sleeves have been previously installed at the landscape islands. Contactor is responsible to connect irrigation to the existing system. Main Line Fittings will be solvent welded using pipe primer ASTM F656 and pipe solvent ASTM D-2564. All other fittings will be solvent welded with pipe solvent ASTM D-2564, NSF or approved equal. Fertilizer is to be applied at planting of palm trees and shrubs. Industry standard generic fertilizer on installation. Boulders: Bury boulders 1/3 of boulder dimension so that they appear in natural state. Orientation of boulder shall expose most surface area possible set as approved by Project Manager. Crushed rock is to be spread over the planting area to a 2” depth. Apply moisture after spreading and raking to compact and remove dust.