Loading...
EC2017-0002APN NUMBERS: 764-200-071 LEGAL DESCRIPTION: BEING LOT 85 OF TRACT NO. 31681-2, MB 397, PAGES 34 THROUGH 44. OWNER INFORMATION: NAME: NOLAN SPARKS COMPANY: T.D. DESERT DEVELOPMENT, L.P. ADDRESS: 81-570 CARBONERAS, LA QUINTA CA OWNER'S AQMD CERTIFICATION NUMBER: CONTACT PHONE N (760) 408-0106 SIGNATU DATE: W N1 INDIVIDUAL QUALIFIED FOR SWPPP INSPECTION: NAME: COMPANY: CONTACT PHONE NUMBER: SIGNATURE: QSP#: DATE: OWNER CERTIFICATION: CERTIFY THAT I HAVE READ THIS STORM WATER POLLUTION PREVENTION PLAN AND UNDERSTAND I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE SWPPP CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. AS THE AUTHORIZED COMPLIANCE OF THIS PROJECT I WILL RESPOND TO SWPPP COMPLAINTS WITHIN 1 HOUR LIMIT. I UNDERSTAND THAT SWPPP CONTROL IS REQUIRED 24 HOURS PER DAY 7 DAYS A WEEK, FROM THE DATE OF THE PROJECT IS FIRST DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED, NAME: NOLAN SPARKS COMPANY: T.D. DESERT DEVELOPMENT, L.P. ADDRESS: 81-570 CARBONERAS, LA QUINTA CA CONTACT PHONE NU (760) 408-0106 SIGNATUXV' DATE: NIAS r TWO WIDE I I GRAVEL BAGS TWO a .... ', HIGH SECTION A -A 3" CLR. (TOP ROW ONLY) NOTE: BARRIER SHALL BE MINIMUM OF 1' IN HEIGHT EXCEPT FOR BARRIERS AT STREET GRADE >8% (UNPAVED) WHICH SHALL BE MINIMUM 18" HIGH r-R n vFi GRAVEL BAGS i s GRAVEL BAG CHECKDAM SECTION C-C AT CATCH BASIN O3 CATCH BASIN BARRIER PLACEMENT (SE10) NO SCALE UNDERGROUND SERVICE ALERT CALL TOLL FREE 811 2 WORKING DAYS BEFORE YOU DIG � IIII •yY Y-y7-Y-iY-�IIIIIII� IVI�I�I�1�.1�� T :: Y`�Y ::Y�: Tom: y�Y��Y�.Y��Y�Y�T :.�:.I:.�:.I:.I:.� DETAIL — CONSTRUCTION ENTRANCE N.T.S EXISTING WATER SOURCE CVWD_ HYDRANT (500 GPM) ti 72 t i �0 I 76. � �Eet`G0o PQ��NG1 G0o5 P�� PgqE�E01 PROPOSED ©3 Q GATE ACCESS N1 GRAVELED CONSTRUCTION ENTRANCE AND TRACK OUT 15 INSTALL PM- 10 FENCE / MESH GUARD k i� s ' CONSTRUCTION NOTES: O INSTALL FIBER ROLLS (SE-5) PER THE CASQA BMP MANUAL. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE AND EXIT 2O (TC-1) PER THE CASQA BMP MANUAL. OCONSTRUCT STORM DRAIN INLET PROTECTION (SE-10) PER DETAIL THIS SHEET. REFERENCE MAP SCALE: 1" = 100' 15 INSTALL PM-10 FENCE W1 MESH GUARD 00 x 22 15 INSTALL PM-10 FENCE W/ MESH GUARD 15 INSTALL PM-10 FENCE W/ MESH GUARD GRAPHIC SCALE 1 INCH = 100 FT. ( IN FEET) 200 300 BMP IMPLEMENTATION NOTES: 1� IMPLEMENT NS-9 & 10, DURING ALL VEHICLE & EQUIPMENT MAINTENANCE & FUELING DONE ONSITE PER THE CASQA BMP MANUAL. 02 IMPLEMENT WM-1, DURING ALL MATERIAL DELIVERY & STORAGE & WM-2 MATERIAL USE PER THE CASQA BMP MANUAL. n3 IMPLEMENT WM-3, STOCKPILE MANAGEMENT USING EC-7, PLASTIC SHEETING, & SURROUND WITH SE-6 GRAVEL BAGS PER THE CASQA BMP MANUAL. ® IMPLEMENT WM-4, SPILL PREVENTION DURING ALL ACTIVITIES PER THE CASQA BMP MANUAL. 5 IMPLEMENT WM-5, SOLID WASTE MANAGEMENT PER THE CASQA BMP MANUAL. © IMPLEMENT WM-8, CONCRETE WASTE MANAGEMENT & NS-12 & NS-13 DURING ALL CONCRETE ACTIVITIES PER THE CASQA BMP MANUAL, 71 INDICATES NON-VISIVLE SAMPLING LOCATIONS. 8❑ INDICATED DISCHARGE LOCATIONS. 9� IMPLEMENT SE-7, STREET SWEEPING PER THE CASQA BMP MANUAL. 10 IMPLEMENT NS-3, DURING ALL PAVING, GRINDING & SAWCUTTING OPERATIONS PER THE CASQA BMP MANUAL. 11 INSTALL SE-5, FIBER ROLLS PER THE CASQA BMP MANUAL. 12 IMPLEMENT SE-10, STORM DRAIN INLET PROTECTION PER THE CASQA BMP MANUAL. 13 INSTALL TC-1, STABALIZED CONSTRUCTION ENTRANCE AND EXIT PER THE CASQA BMP MANUAL. 14 IMPLEMENTWM-9, SANITARY/SEPTIC WASTE MANAGEMENT, PER THE CASQA BMP MANUAL. 95 INSTALL SE-1, SILT FENCE, PER THE CASQA BMP MANUAL AS NEEDED. FRED�G MILES AVI L o\ Is CAL PROJECT .04 SITE 58TH AVE. � C G 2 Z 60TH AVE. O 0 62ND AVE. VICINITY MAP NTS SECTION 27, T.6.S., R.7.E., S.B.B.& M. STORM WATER POLLUTION PREVENTION PLAN NOTES: 1. ALL PROJECTIVE DEVICES SHOWN SHALL BE IN PLACE AT END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY (40) PERCENT. SILT AND OTHER DEBRIS MUST BE REMOVED AFTER EACH RAINFALL, 2. IF GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES PRIOR TO STORM EVENT, THE SLOPES SHALL BE STABILIZED BY STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STATE OF CALIFORNIA. 3. ALL LOOSE SOIL AND DEBRIS WHICH MAY CREATE A POTENTIAL HAZARD TO OFF -SITE PROPERTY SHALL BE REMOVED FROM THE SITE AS DIRECTED BY THE INSPECTOR. 4. ALL EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 5. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 6. ERODED SEDIMENT AND OTHER POLLUTANTS MUST BE RETAINED ON -SITE AND MAY NOT BE TRANSPORTED FROM THE SITE VIA SHEETFLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE COURSES, OR WIND. 7. EXCESS OR WASTE CONCRETE OR DRILLING FLUIDS MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS SOLID WASTE. B. TRASH AND CONSTRUCTION RELATED SOLID WASTE MUST BE DEPOSITED INTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. IMPLEMENT THE FOLLOWING THROUGHOUT DURATION OF PROJECT: EC-1 - SCHEDULING EC-2 - PRESERVATION OF EXISTING VEGETATION WE-1 - WIND EROSION CONTROL WM-1 - WIND EROSION CONTROL WM-2- MATERIAL USE WM-3- STOCKPILE MANAGEMENT WM-4 - SPILL PREVENTION AND CONTROL WM-5- SOLID WASTE MANAGEMENT WM-9 - SANITARY WASTE MANAGEMENT LEGEND: PAVED AREA CONCRETE AREA LANDSCAPE/ D.G. AREA -o—o- SILT FENCE -� DIRECTION OF FLOW - - - - DRAINAGE AREA WDID NO. 7 33C383284 f-C20! ! - tXOL