CC Resolution 2019-032 Estates at Griffin Lakes SDP 2019-0003, TTM ExtensionRESOLUTION NO. 2019 - 032 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING A SECOND TIME EXTENSION FOR A SITE DEVELOPMENT PERMIT AND TENTATIVE TRACT MAP 36744 FOR A RESIDENTIAL DEVELOPMENT ON THE SOUTH SIDE OF AVENUE 54, ONE QUARTER MILE EAST OF MADISON STREET, CASE NUMBERS: SITE DEVELOPMENT PERMIT 2019-0003 (SDP 2014-1003, EXTENSION 2) AND TENTATIVE TRACT MAP 2019-0002 (TTM 36744, EXTENSION 2) APPLICANT: GRIFFIN RANCH INVESTORS LP WHEREAS, the City Council of the City of La Quinta, California, did on the 6th day of August, 2019, consider a request by Griffin Ranch Investors, L.P. for approval of a second extension of time for a Site Development Permit and a Tentative Tract Map for a residential development on 39.8 acres, generally located on the south side of Avenue 54, one quarter mile east of Madison Street, more particularly described as: APN: 767-320-013 WHEREAS, the City Council of the City of La Quinta, California, did on the 5th day of May, 2015, hold a duly noticed Public Hearing and adopted Resolution No. 2015-015 approving a request by Griffin Ranch Investors, L.P. for approval of a Specific Plan Amendment, Tentative Parcel Map, Site Development Permit, and Tentative Tract Map; and, WHEREAS, the City Council of the City of La Quinta, California, did on the 20th day of June, 2017, adopt Resolution No. 2017-029, approving a request by Griffin Ranch Investors, L.P. for approval of a first time extension for Site Development Permit 2014-1003 and Tentative Tract Map 36744; and, WHEREAS, the applicant, on the 22nd day of April 2019, applied for a second time extension for Site Development Permit 2014-1003 and Tentative Tract Map 36744; and WHEREAS, the Design and Development Department has determined that the request has been assessed in conjunction with Environmental Resolution No. 2019-032 Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) Adopted: August 6, 2019 Page 2 of 6 Assessment 2014-1001 prepared for this project for which a Mitigated Negative Declaration and associated Mitigation Monitoring Program was certified on May 5, 2015. No changed circumstances or conditions are proposed, nor has any new information been submitted which would trigger the preparation of a subsequent environmental review pursuant to Public Resources Code Section 21166; and WHEREAS, upon hearing and considering all testimony and arguments of all interested persons, if any, desiring to be heard, the City Council did make the following mandatory findings to justify approval of the Site Development Permit time extension: 1. Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) is consistent with the La Quinta General Plan, in that the project site is designated as Low Density Residential. The City’s General Plan policies relating to Low Density Residential encourage the provision of a full range of residential land uses within the City in order to accommodate development of all housing types, and the proposed project augments those policies. 2. Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) is consistent with the La Quinta Zoning Code in terms of architectural style, building height, building mass, and landscaping. The site development permit conforms to certain modified development standards set forth in the project Specific Plan and has been conditioned to ensure compliance with the zoning standards of the Very Low Density zoning district and other supplemental residential standards as established in Title 9 of the La Quinta Municipal Code. 3. Processing and approval of Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) is in compliance with the requirements of the California Environmental Quality Act. The Design and Development Department has determined that the time extension request has been previously assessed in conjunction with Environmental Assessment 2014-1001 prepared for this project for which a Mitigated Negative Declaration and associated Mitigation Monitoring Program was certified on May 5, 2015. No changed circumstances or conditions are proposed which would trigger the Resolution No. 2019-032 Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) Adopted: August 6, 2019 Page 3 of 6 preparation of subsequent environmental analysis pursuant to Public Resources Code Section 21166. 4. The architectural design of Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) including, but not limited to the architectural style, scale, building mass, materials, colors, architectural details, roof style, and other architectural elements, are compatible with surrounding development and with the quality of design prevalent in the City. The Tuscan and Italian Farmhouse styles of design for the common area buildings and residential units are appropriate in context with surrounding development, and the supplemental design elements (stucco finishes with stone accents and exposed rafters, wood accents on garage doors, and concrete S-tile roofs) appropriately enhance the architecture of the buildings. 5. The site design of Site Development Permit 2019-0003 (SDP 2014- 1003, Extension 2) including, but not limited to project entries, interior circulation, proposed amenities, screening of equipment, exterior lighting, pedestrian accessibility and other site design elements are compatible with surrounding development and with the quality of design prevalent in the City. 6. Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) landscaping is consistent with the landscaping standards and plant palette of the project Specific Plan and implements the standards for landscaping and aesthetics established in the General Plan and Zoning Code. No turf is used in the individual lot landscape concepts which utilize decomposed granite and fractured rock in lieu of turf. The project landscaping for the buildings utilizes a low water use plant palette and shall enhance visual continuity of the development with the surrounding residential areas and will comply with City and Coachella Valley Water District water efficiency requirements, ensuring efficient water use. WHEREAS, upon hearing and considering all testimony and arguments of all interested persons, if any, desiring to be heard, the City Council did make the following mandatory findings to justify approval of the Tentative Tract Map time extension: Resolution No. 2019-032 Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) Adopted: August 6, 2019 Page 4 of 6 1. The design of Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is consistent with the city General Plan and Specific Plan 2014-1001. The Tract Map is consistent with the Low Density Residential land use designation as set forth in the General Plan, at 1.98 units/acre. 2. The design and improvement of Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is consistent with the La Quinta General Plan and Specific Plan 2014-1001 with the implementation of recommended conditions of approval to ensure consistency for the homes proposed on the lots created therein, as well as adequate storm water drainage. The project density at 1.98 units/acre is consistent with the La Quinta General Plan and Specific Plan 2014- 1001, in that the proposed development density is comparable to the surrounding single-family residential developments. 3. The design of Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is not likely to either cause substantial environmental damage or substantially injure fish or wildlife or their habitat. The Design and Development Department has determined that the time extension request has been previously assessed in conjunction with Environmental Assessment 2014-1001 prepared for this project for which a Mitigated Negative Declaration and associated Mitigation Monitoring Program was certified on May 5, 2015. No changed circumstances or conditions are proposed which would trigger the preparation of subsequent environmental analysis pursuant to Public Resources Code Section 21166. 4. The design of Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is not likely to cause serious public health problems, insofar as the project will be required to comply with all laws, standards and requirements associated with sanitary sewer collection, water quality and other public health issues. 5. The site of Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is physically suitable for the potential development and density of development as permitted in the Zoning Ordinance and Subdivision Ordinance. As conditioned, the proposed design of the subdivision is physically compatible with the site with regards to Resolution No. 2019-032 Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2) Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) Adopted: August 6, 2019 Page 5 of 6 topography for the type of land use designation and potential development of the subject property. 6. As conditioned, Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) is consistent with all applicable provisions of the La Quinta Zoning Ordinance and Subdivision Ordinance, including, but not limited to, minimum lot area requirements, any other applicable provisions of this code, and the Subdivision Map Act. 7. The design and improvements required for Tentative Tract Map 2019-0002 (TTM 36744, Extension 2) will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision, for access through or use of the property within the subdivision. All roadway improvements, easements, and surrounding improvements will be completed to City standards. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: SECTION 1. That the above recitations are true and constitute the Findings of the City Council in this case. SECTION 2. That the Mitigated Negative Declaration and associated Mitigation Monitoring Program for the project was certified on May 5, 2015, and no changed circumstances or conditions are proposed, nor has any new information been submitted, which would trigger the preparation of a subsequent environmental review pursuant to Public Resources Code Section 21166. SECTION 3. That it does hereby approve a second time extension to May 5, 2021, for Site Development Permit 2019-0003 (SDP 2014-1003, Extension 2), for the reasons set forth in this Resolution and subject to the attached Conditions of Approval (Exhibit A). SECTION 4. That it does hereby approve a second time extension to May 5, 2021, for Tentative Tract Map 2019-0002 (TTM 36744, Extension 2), for the reasons set forth in this Resolution and subject to the attached Conditions of Approval (Exhibit B). RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 1 of 23 GENERAL 1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Site Development Permit. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. This Site Development Permit extension shall expire on May 5, 2021 and shall become null and void in accordance with La Quinta Municipal Code Section 9.200.080, unless a building permit has been issued. A time extension may be requested per LQMC Section 9.200.080. The two-year time period shall be tolled during the pendency of any lawsuit that may be filed, challenging this Site Development Permit and/or the City’s CEQA compliance. 3. Site Development Permit 2019-0003 shall comply with all applicable conditions and/or mitigation measures for the following related approval(s):  Environmental Assessment 2014-1001  Specific Plan 2014-1001  Tentative Parcel Map 2014-1001 (TPM 36745)  Tentative Tract Map 2019-0002 (TTM 36744)  Site Development Permit 2014-1003 In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Design and Development Director shall adjudicate the conflict by determining the precedence. 4. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies, if required:  Riverside County Fire Marshal  La Quinta Public Works Department (Grading Permit, Green Sheet (Public Works Clearance) for Building Permits, Water Quality Management Plan (WQMP) Exemption Form – Whitewater River Region, Improvement Permit) RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 2 of 23  La Quinta Design and Development Department  Riverside Co. Environmental Health Department  Desert Sands Unified School District (DSUSD)  Coachella Valley Water District (CVWD)  Imperial Irrigation District (IID)  California Regional Water Quality Control Board (CRWQCB)  State Water Resources Control Board  SunLine Transit Agency (SunLine)  South Coast Air Quality Management District Coachella Valley (SCAQMD) The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When these requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvement plans for City approval. 5. Coverage under the State of California Construction General Permit must be obtained by the applicant, who then shall submit a copy of the Regional Water Quality Control Board’s (“RWQCB”) acknowledgment of the applicant’s Notice of Intent (“NOI”) and Waste Discharge Identification (WDID) number to the City prior to the issuance of a grading or building permit. 6. The applicant shall comply with all requirements, directives, and orders established pursuant to Executive Order B-29-15 and all regulations adopted to implement that executive order by any state, regional, or local agency or department, including but not limited to regulations adopted by the State Water Resources Control Board, California Department of Water Resources, California Energy Commission, and Coachella Valley Water District (or other distributor of a public water supply), in furtherance of the mandate to prevent the waste and unreasonable use of potable water. If another executive order or future regulations are issued and adopted in furtherance of a mandate to prevent the waste and unreasonable use of water, the applicant shall comply with all requirements, directives, and orders established thereunder. If a requirement, directive, or order established pursuant to Executive Order B-29-15 (or any future executive order) and regulations adopted pursuant thereto is more restrictive than a requirement under the La Quinta Municipal Code applicable by these RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 3 of 23 conditions of approval, then the applicant shall comply with the most restrictive requirement. 7. The applicant shall comply with applicable provisions of the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; the California Regional Water Quality Control Board – Colorado River Basin Region Board Order No. R7- 2013-0011 and the State Water Resources Control Board’s Order No. 2009- 0009-DWQ and Order No. 2012-0006-DWQ. A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Permitee shall be required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to the State Water Resources Control Board. The applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation. B. The applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City. C. The applicant’s SWPPP shall include provisions for all of the following Best Management Practices (“BMPs”) (LQMC Section 8.70.020 (Definitions)): 1) Temporary Soil Stabilization (erosion control). 2) Temporary Sediment Control. 3) Wind Erosion Control. 4) Tracking Control. 5) Non-Storm Water Management. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 4 of 23 6) Waste Management and Materials Pollution Control. D. All erosion and sediment control BMPs proposed by the applicant shall be approved by the City Engineer prior to any onsite or offsite grading, pursuant to this project. E. The SWPPP and BMPs shall remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City Council. F. The inclusion in the Homeowners’ Association (HOA) Conditions, Covenants, and Restrictions (CC&Rs), a requirement for the perpetual maintenance and operation of all post-construction BMPs as required and the applicant shall execute and record an agreement that provides for the perpetual maintenance and operation of all post- construction BMPs as required. 8. Approval of this Site Development Permit shall not be construed as approval for any horizontal dimensions implied by any site plans or exhibits unless specifically identified in the following conditions of approval. 9. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to review, negotiate and/or modify any documents or instruments required by these conditions, if Developer requests that the City modify or revise any documents or instruments prepared initially by the City to effect these conditions. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. 10. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual consultant’s fees incurred by the City for engineering and/or surveying consultants to review and/or modify any documents or instruments required by this project. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 5 of 23 PROPERTY RIGHTS 11. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction and reconstruction of essential improvements. 12. Pursuant to the aforementioned condition, conferred rights shall include approvals from the master developer or the HOA over easements and other property rights necessary for construction and proper functioning of the proposed development not limited to access rights over proposed and/or existing private streets that access public streets and open space/drainage facilities of the master development. 13. The private street rights-of-way to be retained for private use required for this development include: A. PRIVATE STREETS 1) Streets ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘G’, and ‘H’ - Private Residential Streets measured at gutter flow line to gutter flow line shall have a minimum 36-foot travel width. Property line shall be placed at the back of curb similar to the lay out shown on the (preliminary grading plan/tentative map) and the typical street section shown in the tentative map. Use of smooth curves instead of angular lines at property lines is recommended. 14. Right-of-way geometry for standard knuckles and property line corner cut-backs at curb returns shall conform to Riverside County Standard Drawings #801, and #805, respectively, unless otherwise approved by the City Engineer. 15. The applicant shall offer for dedication those easements necessary for the placement of, and access to, utility lines and structures, drainage basins, mailbox clusters, park lands, and common areas on the Final Map. 16. The applicant shall furnish proof of easements, or written permission, as RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 6 of 23 appropriate, from those owners of all abutting properties on which grading, retaining wall construction, permanent slopes, or other encroachments will occur. STREET AND TRAFFIC IMPROVEMENTS 17. The applicant shall comply with the provisions of LQMC Sections 13.24.060 (Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access for Individual Properties and Development) for public streets; and Section 13.24.080 (Street Design - Private Streets), where private streets are proposed. 18. Streets shall have vertical curbs or other approved curb configurations that will convey water without ponding, and provide lateral containment of dust and residue during street sweeping operations. If a wedge or rolled curb design is approved, the lip at the flowline shall be near vertical with a 1/8" batter and a minimum height of 0.1'. Unused curb cuts on any lot shall be restored to standard curb height prior to final inspection of permanent building(s) on the lot. 19. The applicant shall construct the following street improvements to conform with the General Plan: A. OFF-SITE STREETS 1) Avenue 54 – The applicant should install signing and striping to provide median acceleration lanes at the two development access intersections on Avenue 54. B. PRIVATE STREETS 1) Streets ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘G’, and ‘H’ - Private Residential Streets measured at gutter flow line to gutter flow line shall have a 36-foot travel width. 2) The location of driveways of corner lots shall not be located within the curb return and away from the intersection when possible. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 7 of 23 C. PRIVATE CUL DE SACS 1) Shall be constructed according to the lay-out shown on the tentative map, except for minor revisions as may be required by the City Engineer. D. KNUCKLE 1) Construct the knuckle to conform to the lay-out shown in the tentative tract map, except for minor revisions as may be required by the City Engineer. E. Emergency Turn Around 1) Shall be constructed to conform to the lay-out shown on the tentative tract map, except for minor revisions as may be required by the City Engineer. 20. The design of community parking facilities for common areas shall conform to LQMC Chapter 9.150, and in particular the following: A. The parking stall, aisle widths and double hairpin stripe parking stall design shall conform to LQMC Chapter 9.150. On-street parking designated as guest parking on the approved site plan shall be designed in accordance with parallel stall requirements. B. Cross slopes should be a maximum of 2% where ADA accessibility is required, including accessibility routes between buildings. C. Building access points shall be shown on the Precise Grading Plans to better evaluate ADA accessibility issues. D. Accessibility routes as required shall be shown on the Precise Grading Plan. E. Parking stall lengths shall be according to LQMC Chapter 9.150 and be a minimum of 17 feet in length with a 2-foot overhang for standard parking stalls and 18 feet with a 2-foot overhang for handicapped parking stall or as approved by the City Engineer. Where handicapped parking may be required, one van accessible RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 8 of 23 handicapped parking stall is required per eight handicapped parking stalls. A project parking plan shall be required to include appropriate signage to implement parking restrictions, and on and off-street parking provisions of the CC & R’s subject to City Engineer and Design and Development Department approval. F. Golf cart parking shall be provided at appropriate locations in the development, in particular in close proximity to the Community Building area. Golf cart stall size shall conform to generally accepted industry standards, as may be determined by the City Engineer and Design and Development Department. G. A minimum five-space bicycle rack shall be provided in an appropriate location at the Community Building facility. 21. The applicant shall extend improvements beyond the subdivision boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks). 22. The applicant shall design street pavement sections using Caltrans' design procedure for 20-year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows: Residential 3.0" a.c./4.5" c.a.b. or the approved equivalents of alternate materials. 23. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 24. Improvements shall include appurtenances such as traffic control signs, markings and other devices, raised medians if required, street name signs RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 9 of 23 and sidewalks. Mid-block street lighting is not required. 25. Standard knuckles and corner cut-backs shall conform to Riverside County Standard Drawings #801 and #805, respectively, unless otherwise approved by the City Engineer. 26. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the City Engineer. Improvement plans for streets, access gates and parking areas shall be stamped and signed by engineers registered in California. IMPROVEMENT PLANS As used throughout these Conditions of Approval, professional titles such as “engineer,” “surveyor,” and “architect,” refer to persons currently certified or licensed to practice their respective professions in the State of California. 27. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of LQMC Section 13.24.040 (Improvement Plans). 28. The following improvement plans shall be prepared and submitted for review and approval by the Public Works Development Division. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. A. Rough Grading Plan 1" = 40' Horizontal B. PM10 Plan 1” = 40’ Horizontal C. WQMP (Plan submitted in Report Form) NOTE: A through C to be submitted concurrently. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 10 of 23 D. On-Site Street Improvements/Signing & Striping/Storm Drain Plan 1" = 40' Horizontal, 1"= 4' Vertical E. Off-Site Signing & Striping Plan 1" = 40' Horizontal NOTE: D through E to be submitted concurrently. (Separate Storm Drain Plans if applicable) The following plans shall be submitted to the Building and Safety Division for review and approval. The plans shall utilize the minimum scale specified, unless otherwise authorized by the Building Official in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. F. On-Site Residential Precise Grading Plan 1" = 30' Horizontal Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formats approved by the City Engineer prior to commencing plan preparation. All On-Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans and/or as approved by the Engineering Department. “Rough Grading” plans shall normally include perimeter walls with Top Of Wall & Top Of Footing elevations shown. All footings shall have a minimum of 1-foot of cover, or sufficient cover to clear any adjacent obstructions. The applicant shall prepare an accessibility assessment on a marked up print of the building floor plan identifying every building egress and notes the 2016 California Building Code accessibility requirements associated with each door. The assessment must comply with the submittal requirements of the Building & Safety Division. A copy of the reviewed assessment shall be submitted to the Public Works Department in conjunction with the Site Development Plan when it is submitted for plan checking. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 11 of 23 In addition to the normal set of improvement plans, a “Site Development” plan is required to be submitted for approval by the Building Official, Planning Manager and the City Engineer. “Site Development” plans shall normally include all on-site surface improvements including but not limited to finish grades for curbs & gutters, building floor elevations, wall elevations, parking lot improvements and ADA requirements. “Street Parking” plan shall include appropriate signage to implement the “No Parking” concept, or alternatively an on-street parking policy shall be included in the CC & R’s subject to City Engineer’s Approval. The parking plan or CC & R’s shall be submitted concurrently with the Street Improvement Plans. 29. The City maintains standard plans, detail sheets and/or construction notes for elements of construction which can be accessed via the “Plans, Notes and Design Guidance” section of the Public Works Department at the City website (www.la-quinta.org). Please navigate to the Public Works Department home page and look for the Standard Drawings hyperlink. 30. The applicant shall furnish a complete set of all approved improvement plans on a storage media acceptable to the City Engineer (currently mylars). 31. Upon completion of construction, and prior to final acceptance of the improvements by the City, the applicant shall furnish the City with reproducible record drawings of all improvement plans which were approved by the City. Each sheet shall be clearly marked "Record Drawing" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all approved mylars previously submitted to the City, revised to reflect the as-built conditions. The applicant shall employ or retain the Engineer Of Record during the construction phase of the project so that the EOR can make site visits in support of preparing "Record Drawing". However, if subsequent approved revisions have been approved by the City Engineer and reflect said "Record Drawing" conditions, the Engineer Of Record may submit a letter attesting to said fact to the City Engineer in lieu of mylar submittal. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 12 of 23 IMPROVEMENT SECURITY AGREEMENTS 32. Prior to approval of any Final Map, the applicant shall construct all on and off-site improvements and satisfy its obligations for same, or shall furnish a fully secured and executed Subdivision Improvement Agreement (“SIA”) guaranteeing the construction of such improvements and the satisfaction of its obligations for same, or shall agree to any combination thereof, as may be required by the City. 33. Any Subdivision Improvement Agreement (“SIA”) entered into by and between the applicant and the City of La Quinta, for the purpose of guaranteeing the completion of any improvements related to this Tentative Tract Map, shall comply with the provisions of LQMC Chapter 13.28 (Improvement Security). 34. Improvements to be made, or agreed to be made, shall include the removal of any existing structures or other obstructions which are not a part of the proposed improvements; and shall provide for the setting of the final survey monumentation. When improvements are phased through a “Phasing Plan,” or an administrative approval (e.g., Site Development Permits), all off-site improvements and common on-site improvements (e.g., backbone utilities, retention basins, perimeter walls, landscaping and gates) shall be constructed, or secured through a SIA, prior to the issuance of any permits in the first phase of the development, or as otherwise approved by the City Engineer. Improvements and obligations required of each subsequent phase shall either be completed, or secured through a SIA, prior to the completion of homes or the occupancy of permanent buildings within such latter phase, or as otherwise approved by the City Engineer. In the event the applicant fails to construct the improvements for the development, or fails to satisfy its obligations for the development in a timely manner, pursuant to the approved phasing plan, the City shall have the right to halt issuance of all permits, and/or final inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 13 of 23 35. Depending on the timing of the development of this Tentative Parcel Map, and the status of the off-site improvements at the time, the applicant may be required to: A. Construct certain off-site improvements. B. Construct additional off-site improvements, subject to the reimbursement of its costs by others. C. Reimburse others for those improvements previously constructed that are considered to be an obligation of this tentative Tract map. D. Secure the costs for future improvements that are to be made by others. E. To agree to any combination of these actions, as the City may require. Off-Site Improvements should be completed on a first priority basis. The applicant shall complete Off-Site Improvements in the first phase of construction or by the issuance of the 20% Building Permit. In the event that any of the improvements required for this development are constructed by the City, the applicant shall, prior to the approval of the Final Map, or the issuance of any permit related thereto, reimburse the City for the costs of such improvements. 36. If the applicant elects to utilize the secured agreement alternative, the applicant shall submit detailed construction cost estimates for all proposed on-site and off-site improvements, including an estimate for the final survey monumentation, for checking and approval by the City Engineer. Such estimates shall conform to the unit cost schedule as approved by the City Engineer. At the time the applicant submits its detailed construction cost estimates for conditional approval of the Final Map by the City Council, the applicant shall also submit one copy each of an 8-1/2" x 11" reduction of each page of the Final Map, along with a copy of an 8-1/2" x 11" Vicinity Map. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 14 of 23 Estimates for improvements under the jurisdiction of other agencies shall be approved by those agencies and submitted to the City along with the applicant’s detailed cost estimates. 37. Should the applicant fail to construct the improvements for the development, or fail to satisfy its obligations for the development in a timely manner, the City shall have the right to halt issuance of building permits, and/or final building inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. GRADING 38. The applicant shall comply with the provisions of LQMC Section 13.24.050 (Grading Improvements). 39. Prior to occupancy of the project site for any construction, or other purposes, the applicant shall obtain a grading permit approved by the City Engineer. 40. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following: A. A grading plan prepared by a civil engineer registered in the State of California, B. A preliminary geotechnical (“soils”) report prepared by a professional registered in the State of California, C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter 6.16, (Fugitive Dust Control), and D. A Best Management Practices report prepared in accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES Stormwater Discharge Permit and Storm Management and Discharge Controls). E. A WQMP prepared by an authorized professional registered in the State of California. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 15 of 23 All grading shall conform with the recommendations contained in the Preliminary Soils Report, and shall be certified as being adequate by soils engineer, or engineering geologist registered in the State of California. A statement shall appear on the Final Map that a soils report has been prepared in accordance with the California Health & Safety Code § 17953. The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit. Additionally, the applicant shall replenish said security if expended by the City of La Quinta to comply with the Plan as required by the City Engineer. 41. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open graded, undeveloped land shall either be planted with interim landscaping, or stabilized with such other erosion control measures, as were approved in the Fugitive Dust Control Plan. 42. Grading within the perimeter setback and parkway areas shall have undulating terrain and shall conform with the requirements of LQMC Section 9.60.240(F) except as otherwise modified by this condition. The maximum slope shall not exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted with ground cover. The maximum slope in the first six (6) feet adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is within six feet (6’) of the curb, otherwise the maximum slope within the right of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be depressed one and one-half inches (1.5") in the first eighteen inches (18") behind the curb. 43. Building pad elevations on the rough grading plan submitted for City Engineer’s approval shall conform with pad elevations shown on the tentative map, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval. 44. Building pad elevations of perimeter lots shall not differ by more than one foot higher from the building pads in adjacent developments unless RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 16 of 23 otherwise approved by the City Engineer. 45. Minimize the differential in building pad elevations of perimeter lots and building pad elevations in adjacent developments. Building pad elevations of perimeter lots have been allowed by the City Engineer to differ by more than the standard one foot in elevation from adjacent developments due to the unique site conditions of this project and the effort by the applicant to lower the site as much as possible. Meeting the one foot standard would impose an unreasonable hardship upon the applicant. 46. Minimize the differential in elevations of lots within this development and elevations in adjoining developments. The differences in elevation between the adjoining properties and the lots within this development as shown on the TTM and the grading plan will be allowed by the City Engineer due to the unique site conditions of this project and the effort by the applicant to lower the site as much as possible. Further lowering of the site would impose an unreasonable hardship upon the applicant. 47. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation. Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation and the difference between the two, if any. Such pad certification shall also list the relative compaction of the pad soil. The data shall be organized by lot number, and listed cumulatively if submitted at different times. DRAINAGE 48. Stormwater handling shall conform with the approved hydrology and drainage report for the Estates at Griffin Lake, Tract Map 36744. Nuisance water shall be disposed of in an approved manner. 49. The applicant shall comply with the provisions of LQMC Section 13.24.120 (Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. More specifically, stormwater falling RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 17 of 23 on site during the 100 year storm shall be retained within the development, unless otherwise approved by the City Engineer. The design storm shall be either the 1 hour, 3 hour, 6 hour or 24 hour event producing the greatest total run off. 50. Nuisance water shall be retained on site. Nuisance water shall be disposed of per approved methods contained in Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. 51. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise and as approved by the City Engineer. 52. The project shall be designed to accommodate purging and blowoff water (through underground piping and/or retention facilities) from any on-site or adjacent well sites granted or dedicated to the local water utility authority as a requirement for development of this property. 53. No fence or wall shall be constructed around any retention basin unless approved by the Planning Manager and the City Engineer. 54. For on-site above ground common retention basins, retention depth shall be according to Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed 3:1 and shall be planted with maintenance free ground cover. Additionally, retention basin widths shall be not less than 20 feet at the bottom of the basin. 55. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7). 56. The design of the development shall not cause any increase in flood boundaries and levels in any area outside the development. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 18 of 23 57. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route. 58. Storm drainage historically received from adjoining property shall be received and retained or passed through into the historic downstream drainage relief route. 59. The applicant shall comply with applicable provisions for post construction runoff per the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2009-0009-DWQ and Order No. 2012-0006-DWQ. A. For post-construction urban runoff from New Development and Redevelopments Projects, the applicant shall implement requirements of the NPDES permit for the design, construction and perpetual operation and maintenance of BMPs per the approved Water Quality Management Plan (WQMP) for the project as required by the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011. B. The applicant shall implement the WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs approved by the City Engineer. A project specific WQMP shall be provided which incorporates Site Design and Treatment BMPs utilizing first flush infiltration as a preferred method of NPDES Permit Compliance for Whitewater River receiving water, as applicable. C. The developer shall execute and record a Stormwater Management/BMP Facilities Agreement that provides for the perpetual maintenance and operation of stormwater BMPs. UTILITIES 60. The applicant shall comply with the provisions of LQMC Section 13.24.110 (Utilities). RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 19 of 23 61. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above-ground utility structures including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 62. Existing overhead utility lines within, or adjacent to the proposed development, and all proposed utilities shall be installed underground. All existing utility lines attached to joint use 92 KV transmission power poles are exempt from the requirement to be placed underground. 63. Underground utilities shall be installed prior to overlying hardscape. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained, or required by the City Engineer. The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. CONSTRUCTION 64. The City will conduct final inspections of habitable buildings only when the buildings have improved street and (if required) sidewalk access to publicly-maintained streets. The improvements shall include required traffic control devices, pavement markings and street name signs. If on-site streets in residential developments are initially constructed with partial pavement thickness, the applicant shall complete the pavement prior to final inspections of the last ten percent of homes within the development or when directed by the City, whichever comes first. 65. A final noise analysis shall be completed when final lot layout and pad elevations have been completed to assure that the existing Avenue 54 wall is sufficient to meet the City’s noise control standards for all affected units. 66. A final acoustical analysis shall be completed and submitted for review at time of building permit plan check, based on final lot layout and pad elevations, to demonstrate that the City’s standards for interior and exterior CNEL levels will be met for each proposed dwelling unit. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 20 of 23 LANDSCAPING 67. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans). Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and common areas shall be signed and stamped by a licensed landscape architect. 68. All new and modified landscape areas shall have landscaping and permanent irrigation improvements in compliance with the City’s Water Efficient Landscape regulations contained in LQMC Section 8.13 (Water Efficient Landscape). 69. Except as otherwise stated in these conditions, all landscaping shall consist of, at minimum, 36” box trees (i.e., a minimum 2.5 inch caliper measured three feet up from grade level after planting), 5-gallon shrubs, and groundcover. Double lodge poles (two-inch diameter) shall be used to brace and stake trees. 70. The applicant shall submit final landscape plans for review, processing and approval to the Planning Division, in accordance with the Final Landscape Plan application process, as a major final landscape plan. Plans shall include construction design for all walls, fences, gated entries, trellises, landscape and common area lighting, etc. Planning Manager approval of the final landscape plans is required prior to issuance of the first building permit unless the Planning Manager determines extenuating circumstances exist which justify an alternative processing schedule. NOTE: Plans are not approved for construction until signed by the appropriate City official, including the Planning Manager and/or City Engineer. Prior to final approval of the installation of landscaping, the Landscape Architect of record shall provide the Planning Division a letter stating he/she has personally inspected the installation and that it conforms with the final landscaping plans as approved by the City. If staff determines during final landscaping inspection that adjustments are required in order to meet the intent of the Planning Commission’s approval, the Planning Manager shall review and approve any such revisions to the landscape plan. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 21 of 23 71. The applicant or his agent has the responsibility for proper sight distance requirements per guidelines in the American Association of State Highway and Transportation Officials (AASHTO) “A Policy on Geometric Design of Highways and Streets” latest edition, in the design and/or installation of all landscaping and appurtenances abutting and within the private and public street right-of-way. PUBLIC SERVICES 72. The applicant shall provide public transit improvements as required by SunLine Transit Agency and as approved by the City Engineer. At this time, SunLine has not requested any such improvements; however, should such a request be made in the future, depending on project phasing and completion, the applicant may be required to provide certain said improvements. MAINTENANCE 73. The applicant shall comply with the provisions of LQMC Section 13.24.160 (Maintenance). 74. The applicant shall make provisions for the continuous and perpetual maintenance of common areas, perimeter landscaping up to the curb, access drives, sidewalks, and stormwater BMPs. FEES AND DEPOSITS 75. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees and Deposits). These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 76. Provisions shall be made to comply with the terms and requirements of the City's adopted Art in Public Places program in effect at the time of issuance of building permits. 77. Applicant shall pay the fees as required by the Coachella Valley Unified School District, as in effect at the time requests for building permits are submitted. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 22 of 23 FIRE PROTECTION 78. For residential areas, provide approved standard fire hydrants, located at each intersection, with no portion of any lot frontage more than a maximum of 500 feet from a hydrant. Minimum fire flow for all residential structures shall be 1000 GPM for a 2-hour duration at 20 PSI. 79. The required water system, including fire hydrants, shall be installed and accepted by the appropriate water agency prior to any combustible building material being placed on an individual lot. Two sets of water plans are to be submitted to the Fire Department for approval. 80. Applicant/Developer shall mount blue dot retro-reflectors pavement markers on private streets, public streets and driveways to indicated location of the fire hydrant. It should be 8 inches from centerline to the side that the fire hydrant is on, to identify fire hydrant locations. 81. Residential fire sprinklers are required in all one and two family dwellings per the California Residential Code, California Building Code and the California Fire Code. Contact the Riverside County Fire Department for the Residential Fire Sprinkler Standard. 82. Fire Apparatus access road and driveways shall be in compliance with the Riverside County Fire Department Standard number 06-05 (located at www.rvcfire.org). Access lanes will not have an up, or downgrade of more than 15%. Access roads shall have an unobstructed vertical clearance not less than 13 feet and 6 inches. Access lanes will be designed to withstand the weight of 80 thousand pounds over 2 axles. Access will have a turning radius capable of accommodating fire apparatus. Access lane shall be constructed with a surface so as to provide all weather driving capabilities 83. Any turn-around requires a minimum 38-foot turning radius. 84. The minimum dimension for gates is 20 feet clear and unobstructed width and a minimum vertical clearance of 13 feet 6 inches in height. Any gate providing access from a road shall be located at least 35 feet setback from the roadway and shall open to allow a vehicle to stop without obstructing traffic on the road. Where a one-way road with a single traffic lane provides access to a gate entrance, a 38-foot turning radius shall be used. RESOLUTION NO. 2019-032, EXHIBIT A CONDITIONS OF APPROVAL – SITE DEVELOPMENT PERMIT 2019-0003 (2014-1003 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 Page 23 of 23 85. Gates may be automatic or manual and shall be equipped with a rapid entry system (KNOX). Plans shall be submitted to the Fire Department for approval prior to installation. Automatic gate pins shall be rated with a shear pin force, not to exceed 30 pounds. Gates activated by the rapid entry system shall remain open until closed by the rapid entry system. Automatic gates shall be provided with backup power. PLANNING DIVISION 86. Lots 1 through 31, as depicted on the approved Tentative Tract Map (I.e. along the east and south sides of the project), shall be restricted to single story units, not to exceed 22 feet in height. This restriction shall be designated by note on the final map and/or incorporated into the project CC&R’s, referencing this Condition and shall further state that compliance with the restriction shall be verified during review of precise grading plan submittal(s). 87. The applicant shall consider incorporation of a pedestrian pathway that provides direct access from the street to the front door areas of the homes. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 1 OF 25 GENERAL 1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Tentative Tract Map, or any Final Map recorded thereunder. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. This Tentative Tract Map, and any Final Map recorded thereunder, shall comply with the requirements and standards of Government Code §§ 66410 through 66499.58 (the “Subdivision Map Act”), and Chapter 13 of the La Quinta Municipal Code (“LQMC”). The City of La Quinta’s Municipal Code can be accessed on the City’s Web Site at www.la-quinta.org. 3. This Tentative Tract Map shall expire on May 5, 2021, unless recorded or granted a time extension pursuant to the requirements of La Quinta Municipal Code 13.12.160 (Extensions of time for tentative maps). The two-year time period shall be tolled during the pendency of any lawsuit that may be filed, challenging this Tentative Tract Map and/or the City’s CEQA compliance. 4. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies, if required:  Riverside County Fire Marshal  La Quinta Public Works Department (Grading Permit, Green Sheet (Public Works Clearance) for Building Permits, Water Quality Management Plan(WQMP) Exemption Form – Whitewater River Region, Improvement Permit)  La Quinta Design and Development Department  Riverside Co. Environmental Health Department  Desert Sands Unified School District (DSUSD)  Coachella Valley Water District (CVWD)  Imperial Irrigation District (IID)  California Regional Water Quality Control Board (CRWQCB)  State Water Resources Control Board RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 2 OF 25  SunLine Transit Agency (SunLine)  South Coast Air Quality Management District Coachella Valley (SCAQMD) The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When these requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvement plans for City approval. 5. Tentative Tract Map 36744 shall comply with all applicable terms, conditions and/or mitigation measures for the following related approvals:  Environmental Assessment 2014-1001  Specific Plan 2014-1001  Tentative Parcel Map 2014-1001 (TPM 36745)  Site Development Permit 2019-0003 In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Design and Development Director shall adjudicate the conflict by determining the precedence. 6. Coverage under the State of California Construction General Permit must be obtained by the applicant, who then shall submit a copy of the Regional Water Quality Control Board’s (“RWQCB”) acknowledgment of the applicant’s Notice of Intent (“NOI”) and Waste Discharge Identification (WDID) number to the City prior to the issuance of a grading or building permit. 7. The applicant shall comply with all requirements, directives, and orders established pursuant to Executive Order B-29-15 and all regulations adopted to implement that executive order by any state, regional, or local agency or department, including but not limited to regulations adopted by the State Water Resources Control Board, California Department of Water Resources, California Energy Commission, and Coachella Valley Water District (or other distributor of a public water supply), in furtherance of the mandate to prevent the waste and unreasonable use of potable water. If another executive order or future regulations are issued and adopted in furtherance of a mandate to prevent the waste and unreasonable use of water, the applicant shall comply with all requirements, directives, and orders established thereunder. If a requirement, directive, or order established pursuant to Executive Order B-29- RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 3 OF 25 15 (or any future executive order) and regulations adopted pursuant thereto are more restrictive than a requirement under the La Quinta Municipal Code applicable by these conditions of approval, then the applicant shall comply with the most restrictive requirement. 8. The applicant shall comply with applicable provisions of the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; the California Regional Water Quality Control Board – Colorado River Basin Region Board Order No. R7- 2013-0011 and the State Water Resources Control Board’s Order No. 2009- 0009-DWQ and Order No. 2012-0006-DWQ. A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Permitee shall be required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to the State Water Resources Control Board. The applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation. B. The applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City. C. The applicant’s SWPPP shall include provisions for all of the following Best Management Practices (“BMPs”) (LQMC Section 8.70.020 (Definitions)): 1) Temporary Soil Stabilization (erosion control). 2) Temporary Sediment Control. 3) Wind Erosion Control. 4) Tracking Control. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 4 OF 25 5) Non-Storm Water Management. 6) Waste Management and Materials Pollution Control. D. All erosion and sediment control BMPs proposed by the applicant shall be approved by the City Engineer prior to any onsite or offsite grading, pursuant to this project. E. The SWPPP and BMPs shall remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City Council. F. The inclusion in the Homeowners’ Association (HOA) Conditions, Covenants, and Restrictions (CC&Rs), a requirement for the perpetual maintenance and operation of all post-construction BMPs as required and the applicant shall execute and record an agreement that provides for the perpetual maintenance and operation of all post-construction BMPs as required. 9. Approval of this Tentative Tract Map shall not be construed as approval for any horizontal dimensions implied by any site plans or exhibits unless specifically identified in the following conditions of approval. 10. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to review, negotiate and/or modify any documents or instruments required by these conditions, if Developer requests that the City modify or revise any documents or instruments prepared initially by the City to effect these conditions. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. 11. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual consultant’s fees incurred by the City for engineering and/or surveying consultants to review and/or modify any documents or instruments required by this project. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 5 OF 25 PROPERTY RIGHTS 12. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction and reconstruction of essential improvements. 13. Pursuant to the aforementioned condition, conferred rights shall include approvals from the master developer or the HOA over easements and other property rights necessary for construction and proper functioning of the proposed development not limited to access rights over proposed and/or existing private streets that access public streets and open space/drainage facilities of the master development. 14. The applicant shall retain for private use on the Final Map all private street rights-of-way in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer. 15. The private street rights-of-way to be retained for private use required for this development include: A. PRIVATE STREETS 1) Streets ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘G’, and ‘H’ - Private Residential Streets measured at gutter flow line to gutter flow line shall have a minimum 36-foot travel width. Property line shall be placed at the back of curb similar to the lay out shown on the (preliminary grading plan/tentative map) and the typical street section shown in the tentative map. Use of smooth curves instead of angular lines at property lines is recommended. 16. Right-of-way geometry for standard knuckles and property line corner cut-backs at curb returns shall conform to Riverside County Standard Drawings #801, and #805, respectively, unless otherwise approved by the RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 6 OF 25 City Engineer. 17. When the City Engineer determines that access rights to the proposed street rights-of-way shown on the approved Tentative Tract Map are necessary prior to approval of the Final Map dedicating such rights-of-way, the applicant shall grant the necessary rights-of-way within 60 days of a written request by the City. 18. The applicant shall offer for dedication those easements necessary for the placement of, and access to, utility lines and structures, drainage basins, mailbox clusters, park lands, and common areas on the Final Map. 19. Direct vehicular access to Avenue 54 from lots with frontage along Avenue 54 is restricted, except for approved access points identified on the tentative tract map, or as otherwise conditioned in these conditions of approval. The vehicular access restriction shall be shown on the recorded final tract map. 20. The applicant shall furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which grading, retaining wall construction, permanent slopes, or other encroachments will occur. 21. The applicant shall cause no easement to be granted, or recorded, over any portion of the subject property between the date of approval of the Tentative Tract Map and the date of recording of any Final Map, unless such easement is approved by the City Engineer. STREET AND TRAFFIC IMPROVEMENTS 22. The applicant shall comply with the provisions of LQMC Sections 13.24.060 (Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access for Individual Properties and Development) for public streets; and Section 13.24.080 (Street Design - Private Streets), where private streets are proposed. 23. Streets shall have vertical curbs or other approved curb configurations that will convey water without ponding, and provide lateral containment of dust and residue during street sweeping operations. If a wedge or rolled curb design is approved, the lip at the flowline shall be near vertical with a 1/8" RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 7 OF 25 batter and a minimum height of 0.1'. Unused curb cuts on any lot shall be restored to standard curb height prior to final inspection of permanent building(s) on the lot. 24. The applicant shall construct the following street improvements to conform with the General Plan: A. OFF-SITE STREETS 1) Avenue 54 – The applicant should install signing and striping to provide median acceleration lanes at the two development access intersections on Avenue 54. B. PRIVATE STREETS 1) Streets ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘G’, and ‘H’ - Private Residential Streets measured at gutter flow line to gutter flow line shall have a 36- foot travel width. 2) The location of driveways of corner lots shall not be located within the curb return and away from the intersection when possible. C. PRIVATE CUL DE SACS 1) Shall be constructed according to the lay-out shown on the tentative map, except for minor revisions as may be required by the City Engineer. D. KNUCKLE 1) Construct the knuckle to conform to the lay-out shown in the tentative tract map, except for minor revisions as may be required by the City Engineer. E. Emergency Turn Around 1) Shall be constructed to conform to the lay-out shown on the tentative tract map, except for minor revisions as may be required by the City Engineer. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 8 OF 25 25. The applicant shall extend improvements beyond the subdivision boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks). 26. The applicant shall design street pavement sections using Caltrans' design procedure for 20-year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows: Residential 3.0" a.c./4.5" c.a.b. or the approved equivalents of alternate materials. 27. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 28. Improvements shall include appurtenances such as traffic control signs, markings and other devices, raised medians if required, street name signs and sidewalks. Mid-block street lighting is not required. 29. Standard knuckles and corner cut-backs shall conform to Riverside County Standard Drawings #801 and #805, respectively, unless otherwise approved by the City Engineer. 30. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the City Engineer. Improvement plans for streets, access gates and parking areas shall be stamped and signed by engineers registered in California. FINAL MAPS RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 9 OF 25 31. Prior to the City’s approval of a Final Map, the applicant shall furnish accurate mylars of the Final Map. The Final Map shall be 1” = 40’ scale. IMPROVEMENT PLANS As used throughout these Conditions of Approval, professional titles such as “engineer,” “surveyor,” and “architect,” refers to persons currently certified or licensed to practice their respective professions in the State of California. 32. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of LQMC Section 13.24.040 (Improvement Plans). 33. The following improvement plans shall be prepared and submitted for review and approval by the Public Works Development Division. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. A. Rough Grading Plan 1" = 40' Horizontal B. PM10 Plan 1” = 40’ Horizontal C. WQMP (Plan submitted in Report Form) NOTE: A through C to be submitted concurrently. D. On-Site Street Improvements/Signing & Striping/Storm Drain Plan 1" = 40' Horizontal, 1"= 4' Vertical E. Off-Site Signing & Striping Plan 1" = 40' Horizontal NOTE: D through E to be submitted concurrently. (Separate Storm Drain Plans if applicable) RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 10 OF 25 The following plans shall be submitted to the Building and Safety Division for review and approval. The plans shall utilize the minimum scale specified, unless otherwise authorized by the Building Official in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. F. On-Site Residential Precise Grading Plan 1" = 30' Horizontal Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formats approved by the City Engineer prior to commencing plan preparation. All On-Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans and/or as approved by the Engineering Department. “Rough Grading” plans shall normally include perimeter walls with Top Of Wall & Top Of Footing elevations shown. All footings shall have a minimum of 1- foot of cover, or sufficient cover to clear any adjacent obstructions. The applicant shall prepare an accessibility assessment on a marked up print of the building floor plan identifying every building egress and notes the 2016 California Building Code accessibility requirements associated with each door. The assessment must comply with the submittal requirements of the Building & Safety Department. A copy of the reviewed assessment shall be submitted to the Public Works Division in conjunction with the Site Development Plan when it is submitted for plan checking. In addition to the normal set of improvement plans, a “Site Development” plan is required to be submitted for approval by the Building Official, Planning Manager and the City Engineer. “Site Development” plans shall normally include all on-site surface improvements including but not limited to finish grades for curbs & gutters, building floor elevations, wall elevations, parking lot improvements and ADA requirements. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 11 OF 25 “Street Parking” plan shall include appropriate signage to implement the “No Parking” concept, or alternatively an on-street parking policy shall be included in the CC & R’s subject to City Engineer’s Approval. The parking plan or CC & R’s shall be submitted concurrently with the Street Improvement Plans. 34. The City maintains standard plans, detail sheets and/or construction notes for elements of construction which can be accessed via the “Plans, Notes and Design Guidance” section of the Public Works Department at the City website (www.la-quinta.org). Please navigate to the Public Works Department home page and look for the Standard Drawings hyperlink. 35. The applicant shall furnish a complete set of all approved improvement plans on a storage media acceptable to the City Engineer (currently mylars). 36. Upon completion of construction, and prior to final acceptance of the improvements by the City, the applicant shall furnish the City with reproducible record drawings of all improvement plans which were approved by the City. Each sheet shall be clearly marked "Record Drawing" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all approved mylars previously submitted to the City, revised to reflect the as-built conditions. The applicant shall employ or retain the Engineer Of Record during the construction phase of the project so that the EOR can make site visits in support of preparing "Record Drawing". However, if subsequent approved revisions have been approved by the City Engineer and reflect said "Record Drawing" conditions, the Engineer Of Record may submit a letter attesting to said fact to the City Engineer in lieu of mylar submittal. IMPROVEMENT SECURITY AGREEMENTS 37. Prior to approval of any Final Map, the applicant shall construct all on and off- site improvements and satisfy its obligations for same, or shall furnish a fully secured and executed Subdivision Improvement Agreement (“SIA”) guaranteeing the construction of such improvements and the satisfaction of its obligations for same, or shall agree to any combination thereof, as may be required by the City. 38. Any Subdivision Improvement Agreement (“SIA”) entered into by and between the applicant and the City of La Quinta, for the purpose of RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 12 OF 25 guaranteeing the completion of any improvements related to this Tentative Tract Map, shall comply with the provisions of LQMC Chapter 13.28 (Improvement Security). 39. Improvements to be made, or agreed to be made, shall include the removal of any existing structures or other obstructions which are not a part of the proposed improvements; and shall provide for the setting of the final survey monumentation. When improvements are phased through a “Phasing Plan,” or an administrative approval (e.g., Site Development Permits), all off-site improvements and common on-site improvements (e.g., backbone utilities, retention basins, perimeter walls, landscaping and gates) shall be constructed, or secured through a SIA, prior to the issuance of any permits in the first phase of the development, or as otherwise approved by the City Engineer. Improvements and obligations required of each subsequent phase shall either be completed, or secured through a SIA, prior to the completion of homes or the occupancy of permanent buildings within such latter phase, or as otherwise approved by the City Engineer. In the event the applicant fails to construct the improvements for the development, or fails to satisfy its obligations for the development in a timely manner, pursuant to the approved phasing plan, the City shall have the right to halt issuance of all permits, and/or final inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. 40. Depending on the timing of the development of this Tentative Parcel Map, and the status of the off-site improvements at the time, the applicant may be required to: A. Construct certain off-site improvements. B. Construct additional off-site improvements, subject to the reimbursement of its costs by others. C. Reimburse others for those improvements previously constructed that are considered to be an obligation of this tentative Tract map. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 13 OF 25 D. Secure the costs for future improvements that are to be made by others. E. To agree to any combination of these actions, as the City may require. Off-Site Improvements should be completed on a first priority basis. The applicant shall complete Off-Site Improvements in the first phase of construction or by the issuance of the 20% Building Permit. In the event that any of the improvements required for this development are constructed by the City, the applicant shall, prior to the approval of the Final Map, or the issuance of any permit related thereto, reimburse the City for the costs of such improvements. 41. If the applicant elects to utilize the secured agreement alternative, the applicant shall submit detailed construction cost estimates for all proposed on- site and off-site improvements, including an estimate for the final survey monumentation, for checking and approval by the City Engineer. Such estimates shall conform to the unit cost schedule as approved by the City Engineer. At the time the applicant submits its detailed construction cost estimates for conditional approval of the Final Map by the City Council, the applicant shall also submit one copy each of an 8-1/2" x 11" reduction of each page of the Final Map, along with a copy of an 8-1/2" x 11" Vicinity Map. Estimates for improvements under the jurisdiction of other agencies shall be approved by those agencies and submitted to the City along with the applicant’s detailed cost estimates. 42. Should the applicant fail to construct the improvements for the development, or fail to satisfy its obligations for the development in a timely manner, the City shall have the right to halt issuance of building permits, and/or final building inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. GRADING 43. The applicant shall comply with the provisions of LQMC Section 13.24.050 RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 14 OF 25 (Grading Improvements). 44. Prior to occupancy of the project site for any construction, or other purposes, the applicant shall obtain a grading permit approved by the City Engineer. 45. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following: A. A grading plan prepared by a civil engineer registered in the State of California, B. A preliminary geotechnical (“soils”) report prepared by a professional registered in the State of California, C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter 6.16, (Fugitive Dust Control), and D. A Best Management Practices report prepared in accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES Stormwater Discharge Permit and Storm Management and Discharge Controls). E. A WQMP prepared by an authorized professional registered in the State of California. All grading shall conform with the recommendations contained in the Preliminary Soils Report, and shall be certified as being adequate by soils engineer, or engineering geologist registered in the State of California. A statement shall appear on the Final Map that a soils report has been prepared in accordance with the California Health & Safety Code § 17953. The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit. Additionally, the applicant shall replenish said security if expended by the City of La Quinta to comply with the Plan as required by the City Engineer. 46. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open graded, undeveloped land shall either be planted with interim landscaping, or RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 15 OF 25 stabilized with such other erosion control measures, as were approved in the Fugitive Dust Control Plan. 47. Grading within the perimeter setback and parkway areas shall have undulating terrain and shall conform with the requirements of LQMC Section 9.60.240(F) except as otherwise modified by this condition. The maximum slope shall not exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted with ground cover. The maximum slope in the first six (6) feet adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is within six feet (6’) of the curb, otherwise the maximum slope within the right of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be depressed one and one-half inches (1.5") in the first eighteen inches (18") behind the curb. 48. Building pad elevations on the rough grading plan submitted for City Engineer’s approval shall conform with pad elevations shown on the tentative map, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval. 49. Building pad elevations of perimeter lots shall not differ by more that one foot higher from the building pads in adjacent developments unless otherwise approved by the City Engineer. 50. Minimize the differential in building pad elevations of perimeter lots and building pad elevations in adjacent developments. Building pad elevations of perimeter lots have been allowed by the City Engineer to differ by more than the standard one foot in elevation from adjacent developments due to the unique site conditions of this project and the effort by the applicant to lower the site as much as possible. Meeting the one foot standard would impose an unreasonable hardship upon the applicant. 51. Minimize the differential in elevations of lots within this development and elevations in adjoining developments. The differences in elevation between the adjoining properties and the lots within this development as shown on the TTM and the grading plan will be allowed by the City Engineer due to the unique site conditions of this project and the effort by the applicant to lower the site as much as possible. Further lowering of the site would impose an unreasonable hardship upon the applicant. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 16 OF 25 52. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation. Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation and the difference between the two, if any. Such pad certification shall also list the relative compaction of the pad soil. The data shall be organized by lot number, and listed cumulatively if submitted at different times. DRAINAGE 53. Stormwater handling shall conform with the approved hydrology and drainage report for the Estates at Griffin Lake, Tract Map 36744. Nuisance water shall be disposed of in an approved manner. 54. The applicant shall comply with the provisions of LQMC Section 13.24.120 (Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. More specifically, stormwater falling on site during the 100 year storm shall be retained within the development, unless otherwise approved by the City Engineer. The design storm shall be either the 1 hour, 3 hour, 6 hour or 24 hour event producing the greatest total run off. 55. Nuisance water shall be retained on site. Nuisance water shall be disposed of per approved methods contained in Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. 56. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise and as approved by the City Engineer. 57. The project shall be designed to accommodate purging and blowoff water (through underground piping and/or retention facilities) from any on-site or RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 17 OF 25 adjacent well sites granted or dedicated to the local water utility authority as a requirement for development of this property. 58. No fence or wall shall be constructed around any retention basin unless approved by the Planning Manager and the City Engineer. 59. For on-site above ground common retention basins, retention depth shall be according to Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed 3:1 and shall be planted with maintenance free ground cover. Additionally, retention basin widths shall be not less than 20 feet at the bottom of the basin. 60. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7). 61. The design of the development shall not cause any increase in flood boundaries and levels in any area outside the development. 62. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route. 63. Storm drainage historically received from adjoining property shall be received and retained or passed through into the historic downstream drainage relief route. 64. The applicant shall comply with applicable provisions for post construction runoff per the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2009-0009-DWQ and Order No. 2012- 0006-DWQ. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 18 OF 25 A. For post-construction urban runoff from New Development and Redevelopments Projects, the applicant shall implement requirements of the NPDES permit for the design, construction and perpetual operation and maintenance of BMPs per the approved Water Quality Management Plan (WQMP) for the project as required by the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011. B. The applicant shall implement the WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs approved by the City Engineer. A project specific WQMP shall be provided which incorporates Site Design and Treatment BMPs utilizing first flush infiltration as a preferred method of NPDES Permit Compliance for Whitewater River receiving water, as applicable. C. The developer shall execute and record a Stormwater Management/BMP Facilities Agreement that provides for the perpetual maintenance and operation of stormwater BMPs. UTILITIES 65. The applicant shall comply with the provisions of LQMC Section 13.24.110 (Utilities). 66. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above-ground utility structures including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 67. Existing overhead utility lines within, or adjacent to the proposed development, and all proposed utilities shall be installed underground. All existing utility lines attached to joint use 92 KV transmission power poles are exempt from the requirement to be placed underground. 68. Underground utilities shall be installed prior to overlying hardscape. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained, or required by the City RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 19 OF 25 Engineer. The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. CONSTRUCTION 69. The City will conduct final inspections of habitable buildings only when the buildings have improved street and (if required) sidewalk access to publicly- maintained streets. The improvements shall include required traffic control devices, pavement markings and street name signs. If on-site streets in residential developments are initially constructed with partial pavement thickness, the applicant shall complete the pavement prior to final inspections of the last ten percent of homes within the development or when directed by the City, whichever comes first. 70. A final noise analysis shall be completed when final lot layout and pad elevations have been completed to assure that the existing Avenue 54 wall is sufficient to meet the City’s noise control standards for all affected units. 71. A final acoustical analysis shall be completed and submitted for review at time of building permit plan check, based on final lot layout and pad elevations, to demonstrate that the City’s standards for interior and exterior CNEL levels will be met for each proposed dwelling unit. LANDSCAPE AND IRRIGATION 72. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans). 73. The applicant shall provide landscaping in the required setbacks, retention basins, common lots and park areas. 74. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and parks shall be signed and stamped by a landscape architect licensed in California. 75. The applicant shall submit final landscape plans for review, processing and RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 20 OF 25 approval to the Planning Division, in accordance with the Final Landscape Plan application process, as a major final landscape plan. Plans shall include construction design for all walls, fences, gated entries, trellises, etc. Planning Manager approval of the final landscape plans is required prior to issuance of the first building permit unless the Planning Manager determines extenuating circumstances exist which justify an alternative processing schedule. NOTE: Plans are not approved for construction until signed by the appropriate City official, including the Planning Manager and/or City Engineer. Prior to final approval of the installation of landscaping, the Landscape Architect of record shall provide the Planning Division a letter stating he/she has personally inspected the installation and that it conforms with the final landscaping plans as approved by the City. If staff determines during final landscaping inspection that adjustments are required in order to meet the intent of the Planning Commission’s approval, the Planning Manager shall review and approve any such revisions to the landscape plan. 76. Landscape areas shall have permanent irrigation improvements meeting the requirements of the Planning Manager. Use of lawn areas shall be minimized with no lawn, or spray irrigation, being placed within 24 inches of curbs along public streets. 77. The applicant or his agent has the responsibility for proper sight distance requirements per guidelines in the American Association of State Highway and Transportation Officials (AASHTO) “A Policy on Geometric Design of Highways and Streets” latest edition, in the design and/or installation of all landscaping and appurtenances abutting and within the private and public street right-of- way. 78. A master wall plan, detailing the design and location of sound wall areas, entry walls, and interior property line walls, shall be subject to review and approval by the Planning Division, in accordance with the landscape review process as conditioned. The wall plan shall specify wall section details, colors and materials, capping, pilasters, entry monuments, planters, and any other related features. RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 21 OF 25 PUBLIC SERVICES 79. The applicant shall provide public transit improvements as required by SunLine Transit Agency and as approved by the City Engineer. At this time, SunLine has not requested any such improvements; however, should such a request be made in the future, depending on project phasing and completion, the applicant may be required to provide certain said improvements. MAINTENANCE 80. The applicant shall comply with the provisions of LQMC Section 13.24.160 (Maintenance). 81. The applicant shall make provisions for the continuous and perpetual maintenance of common areas, perimeter landscaping up to the curb, access drives, sidewalks, and stormwater BMPs. FEES AND DEPOSITS 82. The applicant shall comply with the provisions of Section 13.24.180 (Fees and Deposits), LQMC. These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 83. Permits issued under this approval shall be subject to the provisions of the Development Impact Fee and Transportation Uniform Mitigation Fee programs in effect at the time of issuance of building permit(s). 84. Permits issued under this approval shall be subject to the Coachella Valley Multi-Species Habitat Conservation Plan/Natural Community Habitat Conservation Plan Mitigation Fee, in accordance with LQMC Chapter 3.34. 85. Tentative Tract 36744 shall provide for parks through payment of an in-lieu fee, as specified in Chapter 13.48, LQMC. The in-lieu payment(s) shall be based on the fair market value of the land within the subdivision. Land value information shall be provided to the Design and Development Director, via land sale information, a current fair market value appraisal, or other information on land value within the subdivision. Payment of the in-lieu fee RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 22 OF 25 shall be made prior to, or concurrently with recordation of the first final map within the tentative map. FIRE PROTECTION 86. For residential areas, provide approved standard fire hydrants, located at each intersection, with no portion of any lot frontage more than a maximum of 500 feet from a hydrant. Minimum fire flow for all residential structures shall be 1000 GPM for a 2-hour duration at 20 PSI. 87. The required water system, including fire hydrants, shall be installed and accepted by the appropriate water agency prior to any combustible building material being placed on an individual lot. Two sets of water plans are to be submitted to the Fire Department for approval. 88. Applicant/Developer shall mount blue dot retro-reflectors pavement markers on private streets, public streets and driveways to indicated location of the fire hydrant. It should be 8 inches from cent erline to the side that the fire hydrant is on, to identify fire hydrant locations. 89. Residential fire sprinklers are required in all one and two family dwellings per the California Residential Code, California Building Code and the California Fire Code. Contact the Riverside County Fire Department for the Residential Fire Sprinkler Standard. 90. Fire Apparatus access road and driveways shall be in compliance with the Riverside County Fire Department Standard number 06-05 (located at www.rvcfire.org). Access lanes will not have an up, or downgrade of more than 15%. Access roads shall have an unobstructed vertical clearance not less than 13 feet and 6 inches. Access lanes will be designed to withstand the weight of 80 thousand pounds over 2 axles. Access will have a turning radius capable of accommodating fire apparatus. Access lane shall be constructed with a surface so as to provide all weather driving capabilities 91. Any turn-around requires a minimum 38-foot turning radius. 92. The minimum dimension for gates is 20 feet clear and unobstructed width and a minimum vertical clearance of 13 feet 6 inches in height. Any gate providing access from a road shall be located at least 35 feet setback from the RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 23 OF 25 roadway and shall open to allow a vehicle to stop without obstructing traffic on the road. Where a one-way road with a single traffic lane provides access to a gate entrance, a 38-foot turning radius shall be used. 93. Gates may be automatic or manual and shall be equipped with a rapid entry system (KNOX). Plans shall be submitted to the Fire Department for approval prior to installation. Automatic gate pins shall be rated with a shear pin force, not to exceed 30 pounds. Gates activated by the rapid entry system shall remain open until closed by the rapid entry system. Automatic gates shall be provided with backup power. ARCHAEOLOGY/PALEONTOLOGY 94. If buried cultural materials are discovered during any earth-moving operations associated with the project, all work in that area shall be halted or diverted until a qualified archaeologist can evaluate the nature and significance of the finds. 95. If any resource recovery occurs, a final report shall be submitted to the Planning Division prior to the issuance of the first Certificate of Occupancy for the project. 96. Collected archaeological resources shall be properly packaged for long term curation, in polyethylene self-seal bags, vials, or film cans as appropriate, all within acid-free, standard size, comprehensively labeled archive boxes and delivered to the City prior to issuance of first Certificate of Occupancy for the property. Materials shall be accompanied by descriptive catalogue, field notes and records, primary research data, and the original graphics 97. A paleontological resource impact mitigation program shall be developed and implemented for the proposed project in accordance with the provisions of CEQA, as well as the proposed guidelines of the Society of Vertebrate Paleontology. The primary component of the mitigation program will be monitoring of ground disturbances during the project by qualified personnel. Since the surface soils have been extensively disturbed in the past, only periodic monitoring is recommended during demolition, tree removal, grubbing, or shallow surface grading. Continuous monitoring shall be conducted for deeper grading and excavations that reach beyond a depth of two feet. The mitigation program should include but not be limited to the RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 24 OF 25 following:  The excavation of areas identified as likely to contain paleontological resources, such as undisturbed Lake Cahuilla beds and any undisturbed subsurface alluvium, shall be conducted by a qualified paleontological monitor. The monitor should be prepared to quickly salvage fossils, if they are unearthed, to avoid construction delays, but must have the power to temporarily halt or divert construction equipment to allow for removal of abundant or large specimens. Proof that a monitor has been retained shall be given to City prior to issuance of first earth-moving permit, or before any clearing of the site is begun.  Samples of sediments should be collected and washed to recover small invertebrate and vertebrate fossils.  Recovered specimens should be identified and curated at a repository with permanent retrievable storage that would allow for further research in the future.  A report of findings with an appended itemized inventory of specimens shall be submitted to the City prior to the first occupancy of a residence being granted by the City. The report shall include pertinent discussions of the significance of all recovered resources where appropriate. The report and inventory, when submitted to the City, will signify completion of the program to mitigate impacts to paleontological resources.  Collected resources and related reports, etc. shall be given to the City for curation. Packaging of resources, reports, etc. shall comply with standards commonly used in the paleontological industry. PLANNING DIVISION 98. To comply with the Migratory Bird Treaty Act (MBTA), any vegetation or tree removal, or other ground disturbing activities occurring between January 1st and August 31st with the potential to impact nesting birds shall require a qualified biologist to conduct a nesting bird survey to determine if there is a potential impact to such species. All vegetation and suitable nesting habitat (including open ground) on the project site, whether or not it will be removed or disturbed, shall be surveyed for nesting birds. If no nests are present, this RESOLUTION 2019-032, EXHIBIT B CONDITIONS OF APPROVAL – TENTATIVE TRACT MAP 2019-0002 (TTM 36744 EXT 2) ESTATES AT GRIFFIN LAKE GRIFFIN RANCH INVESTORS LP AUGUST 6, 2019 PAGE 25 OF 25 condition will be cleared. Conducting construction activities outside the breeding season (September 1st through December 31st) can avoid having to implement these measures. If active nests of any native bird are found on site, they will be avoided until after the young have fledged. 99. Lots 1 through 31 as depicted on the approved Tentative Tract Map shall be restricted to single story units, not to exceed 22 feet in height. This restriction shall be designated by note on the final map and/or incorporated into the project CC&R’s, referencing this Condition. Compliance with this restriction shall be verified during review of precise grading plan submittal(s). 100. It shall be disclosed to any and all parties involved in the sale or other transfer of residential Lots 1through 78, as part of the CC&R’s, that Lot 79 is developed with a residential estate that is approved as a private and public event venue and luxury estate residential rental use. The disclosure shall incorporate language to describe potential impacts due to noise, traffic, and other characteristics associated with the use of Lot 79 as an event venue on a regular basis.