Loading...
Shark PoolsDate : 09/05/2019 PJJ��0- 041W Estimate good for 30 days 82253 Highland Dr. Indio California 92203 760-347-2079 760-347-2457 shark_poolsnspas@yahoo.com FRITZ BURNS POOL HEATERS PURCHASE AND INSTALLATION ESTIMATE SHARK POOLS PROPOSAL: Deliver 2 Hi Delta commercial Pool heaters 602C to include Suction and Return ports modification of existing Pool Circulation and return PVC Sch. 80 hydraulics 6 and 8 inches all fittings, valves, open and close returns etc. Basic Product Data: Bronze primary pump, Bronze primary speed injector, pump and controller, Horizontal 2- pass Cupronickel -finned Tube Primary Heat Exchanger with bronze headers, #125 PRV Enable/Disable Connection, HSI low Nat. Gas pressure switch, VERSA IC modulat- ing controller with LCD Display, Diagnostics with fault memory, Pump off delay, Flow switch air filter, T&P Gauge, Dry Contacts for Alarm, Outdoor Application Cat B Vents, cooling pump. Total...... $ 73,995.00 EXTRAS: OPTION 1 PROPOSAL TO INCLUDE Level out dirt and pour concrete pad for pool heaters: 153/4' length x 11' width, 3.5" thick, 4,000 PSI, at southwest corner of pool building (outside of block wall). Install 6' high heavy commercial pre -galvanized black powder coated regal iron fence with 3' wide gate entry; 153/4' length x 11' width area; 11/2" sq. top and bottom rails with 3/4" sq. pickets spaced 4" apart. Double primed and double painted in blue, all ma- terial welded, by-pass and reroute existing underground irrigation in the new proposed 153/4' length x 11' width area. Installation of pool heater: Drill 4" diameter boring through building exterior CMU wall from inside pool system room and through existing block wall to exterior area to direct suction and return lines to new heater location; drill holes on existing CMU's wall to bring gas line to heater (location of gas meter TBD); plumbing of heater to existing pool pump; installation of electrical fittings and connection to heater; electrical connection of heater to existing breakers and timer. Total...... $ 15,975.00 OPTION 2 PROPOSAL TO INCLUDE... Extend existing block wall by 2' to the west; match new block with existing block (split face 6x8x16 - rough exterior facing street, smooth interior; Arizona Pink color); relo- cate entry gate to northwest corner of block wall; fill in block wall after current entry gate is removed; pour concrete on new dirt (153/4' length x 2' width area). Block wall must be constructed to City Building Division pre -approved standard (see attached Freestanding Block Wall attachment) and then approved with City inspection. Installation of pool heater: Drill 4" diameter boring through building exterior CMU wall from inside pool system room to exterior area to direct suction and return lines to new heater location; drill holes on existing CMU's wall to bring gas line to heater (location of gas meter TBD); plumbing of heater to existing pool pump; installation of electrical fit- tings and connection to heater; electrical connection of heater to existing breakers and timer. Total .... $ 17,675.00 Price to include support vertical and horizontal rebar material as per illustration attached, L bracket style steel on new footings to erect and extend new wall leaving draining weep holes at bottom course. Hi Delta Sure -Rack Kit: • Install a boiler vertical frame metal rack kit original from Raypak • B-31 Wall Assembly Sensor • D-11 Outdoor Vent Termination Cap Cat B • G-12 California Approved Code Controls Total...... $ 6,975.99 NOTE: Total final to be dictated by chosen option. Payments Terms : 50 % of Total to schedule project 50 % immediately at completion Time Frame of Heaters Installation2-3 weeks Warranties: 1 Year parts and Labor Acceptance of proposal by Position Date Signature _ CITY OF LA QUINTA FRITZ BURNS POOL HEATER PURCHASE AND INSTALLATION REQUEST FOR PROPOSAL The City of La Quinta Fritz Burns Pool facility recently changed from a summer season only pool to year-round pool operations, so the City now needs a contractor to purchase and install commercial pool heaters to heat the City's recreation pool during the cooler, off-season months. The City is seeking a contractor who embodies high quality standards, demonstrates a thorough knowledge of commercial pool heaters, and possesses comprehensive experience in installation of commercial pool heaters. Fritz Burns Pool is located at 78060 Frances Hack Lane in La Quinta, CA. SCOPE OF WORK The City is requesting the purchase and installation of two (2) new commercial pool heaters for Fritz Burns recreation pool: Hi Delta Raypak Hydronic boilers 650k NG IID each (Hi Delta 016062-P-652C 650k NG IID. X 2; 84% efficiency each unit). Basic Product Data: Bronze primary pump, Bronze primary speed injector, pump and controller, Horizontal 2- pass Cupronickel -finned Tube Primary Heat Exchanger with bronze headers, #125 PRV Enable/Disable Connection, HSI low Nat. Gas pressure switch, VERSA IC modulating controller with LCD Display, Diagnostics with fault memory, Pump off delay, Flow switch air filter, T&P Gauge, Dry Contacts for Alarm, Outdoor Application Cat B Vents, cooling pump. All proposing contractors are to provide total cost for two installation options: one option that includes new concrete pad, new iron rod fencing, and rerouting current irrigation; second option to include extending existing block wall by 2', filling in concrete, and stacking heaters with Hi Delta Sure Rack Kit. OPTION 1 PROPOSAL TO INCLUDE... Level out dirt and pour concrete pad for pool heaters: 153/4' length x 11' width, 3.5" thick, 4,000 PSI, at southwest corner of pool building (outside of block wall). 1 Install 6' high heavy commercial pregalvanized black powder coated regal iron fence with 3' wide gate entry; 153/4' length x 11' width area; 11/2" sq. top and bottom rails with 3/4" sq. pickets spaced 4" apart. Double primed and double painted in blue, all material welded. By-pass and reroute irrigation in the 153/4' length x 11' width area. Installation of pool heater: Drill 4" diameter boring through building exterior CMU wall from inside pool system room and through existing block wall to exterior area to direct suction and return lines to new heater location; drill holes on existing CMU's wall to bring gas line to heater (location of gas meter TBD); plumbing of heater to existing pool pump; installation of electrical fittings and connection to heater; electrical connection of heater to existing breakers and timer. ■ OPTION 2 PROPOSAL TO INCLUDE... Extend existing block wall by 2' to the west; match new block with existing block (split face 6x8x16 - rough exterior facing street, smooth interior; Arizona Pink color); relocate entry gate to northwest corner of block wall; fill in block wall after current entry gate is removed; pour concrete on new dirt (153/4' length x 2' width area). Block wall must be constructed to City Building Division pre -approved standard (see attached Freestanding Block Wall attachment) and then approved with City inspection. Installation of pool heater: Drill 4" diameter boring through building exterior CMU wall from inside pool system room to exterior area to direct suction and return lines to new heater location; drill holes on existing CMU's wall to bring gas line to heater (location of gas meter TBD); plumbing of heater to existing pool pump; installation of electrical fittings and connection to heater; electrical connection of heater to existing breakers and timer. Hi Delta Sure Rack Kit: • Install a boiler vertical frame metal rack kit original from Raypak ■ B-31 Wall Assembly Sensor D-11 Outdoor Vent Termination Cap Cat B G-12 California Approved Code Controls Total proposal costs must include delivery and installation of heaters, crane truck to install heaters, and calibrating and setting controls to work at desired times and desired temperature. Prevailing wage is required and must be included within total cost. Selected contractor must coordinate with the City's Design and Development department to apply for applicable building permit(s). Selected contractor must coordinate with So Cal Gas to schedule installation of gas meter. The City will work closely with the successful bidder to ensure prompt purchase and installation of pool heaters. All services provided by the contractor must be compliant with all applicable local, county, state and federal laws. Proposals must be submitted to the City in a sealed envelope on or before Wednesday, September 4, 2019 at or before 5:00 p.m. Proposals received after the stated deadline will not be accepted. Proposals are to be delivered to: Robert Ambriz, Jr., Maintenance & Operations Superintendent City of La Quinta Wellness Center 78450 Avenida La Fonda La Quinta, CA 92253 All questions must be submitted in writing to Robert Ambriz, Jr. at rambrizj@laquintaca.gov prior to August 30, 2019. Review of bids: The Director or designee shall review all bids received for completeness, accuracy, responsiveness to the invitation and the bid documents, and the City's experience with or knowledge of the qualification and reliability of each bidder and shall prepare a recommendation to the City Council. Written amounts shall take precedence over associated numeric amounts. Mathematical errors, if found, shall be corrected and shall not disqualify a bid. The corrected total shall be the bid amount considered in determining the lowest responsible bidder and shall be the contract amount awarded if the bid is selected. The City of La Quinta will open contract negotiations with the lowest cost bidder. The City reserves the right to reject any or all proposals, and to waive any irregularities in the proposal. Proposal must include: (1) The name, address office; (2) Contact information contract; and phone number of the contractor's main for the person who will be managing the 3 (3) Statement of Qualifications; (4) Compliance Form; and (5) Cost: must include prevailing wage Attached is a copy of the Agreement for Contract Services (including insurance information) required of the selected Contractor. Should the selected Contractor have any objections to the proposed Contract Services Agreement, the Contractor must object in writing on the Compliance Form provided. The successful Contractor will be expected to enter into the City of La Quinta's standard Contract Services Agreement. Proposals are to be submitted in a 9" x 12" envelope, clearly marked with the Contractor's name, address and phone number and labeled with the project title. Only one proposal package per Contractor will be considered. Proposal packages are to be submitted to the City on/or before Wednesday, September 4, 2019, at 5:00 p.m. Proposals received after the stated deadline will not be accepted. Thank you for your interest, Robert Ambriz, Jr., Maintenance & Operations Superintendent 760-777-7091 rambrizi@laguintaca.gov CONTACT INFORMATION I)- CONTRACTOR'S MAIN OFFICE CONTACT INFORMATION: Name:Shark Pools Inc. Address: 82253 Highland Dr Indio CA 92203 Il Phone: 760-347-2079 Cell: 760-427-687 Email: shark_poolsnspas@yahoo.com jesustheshark@gmail.com State of Incorporation: California (2) CONTACT INFORMATION FOR PERSON MANAGING THE PROJECT: Name: Jesus // Jesse Lugo Phone Cell: 760-427-6878 Email Address: jesustheshark@gmail.com Business License Numbers: State No.956125 C53 Expiration Date: 12/31/2020 City of La Quinta: On File AGREEMENT FOR CONTRACT SERVICES FRITZ BURNS POOL HEATER PURCHASE AND INSTALLATION COMPLIANCE FORM Read and initial one of the paragraphs below, then sign at the bottom. JFL I have read and understand the conditions of the Contract Services Agreement for Fritz Burns Pool Heater Purchase and Installation. If I am selected to perform Fritz Burns Pool Heater Purchase and Installation for the City, I am willing and able to comply with all contract documents. JFL I have read and understand the conditions of the Contract Services Agreement for Fritz Burns Pool Heater Purchase and Installation for the City but am not able to commit to all of the conditions required. Below are the portions I contest. Changing the described items would enable me to comply. (If you need more space 5