Loading...
CC Resolution 2020-027 Master Fee Schedule - SUPERSEDEDRESOLUTION NO. 2020 – 027 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, ADOPTING A REVISED MASTER FEE SCHEDULE OF VARIOUS USER AND REGULATORY FEES WHEREAS, this action is exempt under the California Environmental Quality Act (CEQA), Article 18, Statutory Exemptions, Section 15273(a) Rates Tolls Fares and Charges; and WHEREAS, this hearing to set fees was duly noticed pursuant to Government Code Sections 6062(a) – Manner of Publication, and 66016, Local agency fees; new fees and increases; procedures; and WHEREAS, on July 16, 2019, the City Council adopted Resolution No. 2019-030 updating the City’s Master Fee Schedule of various user and regulatory fees; and WHEREAS, due to COVID-19 adverse economic impacts on the community the City Council finds it pertinent not to implement annual fees increase based on the all-urban Consumers Price Index (CPI) for Riverside- San Bernardino-Ontario; and WHEREAS, the City would like to incorporate building valuation multiplier tables used by City staff to aid in fee calculations; these tables are not new and do not propose any changes, and are merely incorporated into the fee schedule for reference purposes; and WHEREAS, the fee update includes removal of fee categories that are not actively used because the service is included as part of other fee categories, and recalibration of fees to reflect current estimated service time resulting in a minor fee reduction; and WHEREAS, the City would like to establish set fees for preliminary review applications associated with housing projects in accordance with Senate Bill (SB) 330 signed into law by the Governor of California on October 9, 2019; and Resolution No. 2020 – 027 Master Fee Schedule – Update of User and Regulatory Fees Adopted: July 21, 2020 Page 2 of 3 WHEREAS, the City would like to establish set fees for Use of Public Property – Parking Lots and Open Spaces rentals; and WHEREAS, the City commissioned ClearSource Financial Consulting to conduct the analysis to determine the user and regulatory fee update, which is included in the staff report, and available for public review; and WHEREAS, the City Council hereby finds that the supporting documents provide adequate evidence to conclude that the fees modifications and the fees added to the Master Fee Schedule are set at amounts that do not exceed the estimated cost to provide the service. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: SECTION 1. The City Council hereby adopts each recital set forth above as a specific finding. SECTION 2. Resolution No. 2019-030 is hereby superseded, and revised fees as listed in the Master Fee Schedule attached hereto as “Exhibit A,” and incorporated herewith by this reference, are hereby adopted. SECTION 3. The revisions to the Master Fee Schedule are intended to enhance fee schedule clarity or improve the correlation between the cost of providing services and the fees imposed to recover those costs. SECTION 4. Annually on July 1 the City Manager or his/her designee shall update and promulgate a new fee schedule whereby all fees are increased based on the all-urban consumers CPI for Riverside-San Bernardino-Ontario computed from March of the previous year to March of the current year. If the CPI does not change or goes down in a given year, no change shall be made to the Master Fee Schedule that year. SECTION 5. This Resolution shall become effective on July 21, 2020. The fees imposed by this Resolution shall go into effect 60 days after its adoption on September 21, 2020. PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 21st day of July 2020, by the following vote: COUNCIL RESOLUTION NO. 2020-027 EXHIBIT A MASTER FEE SCHEDULE Adopted July 21, 2020 Table of Contents Contents Page 1 Building Fees - Mechanical, Plumbing, and Electrical 1 2 Building Fees - Miscellaneous Items 4 3 Building Fees - New Construction 7 4 Building Fees - Other Fees 8 5 Planning Fees 10 6 Public Works Fees 13 7 Fire Fees 18 8 NPDES Ongoing Inspection Fees 20 9 Short-Term Vacation Rental Permit Fees 21 10 Medical Cannabis Delivery Application Fees 22 11 False Alarm Response Fees 23 12 Vehicle Impound Cost Recovery Fees 24 13 Code Enforcement Hourly Rate for Services 25 14 Pool Drain and Golf Cart Permit Fees 26 15 Home Occupation Permit Fees 27 16 Film/Photography Permit Fees 28 17 Bingo Permit Fees 29 18 Administrative Fees 30 19 Appeal Fees 31 20 Facility Use Fees 32 21 SilverRock Event Site Facility Rental Fees 34 22 Parking Lot and Open Space Rental Fees 35 Fee * Fee Description Permit Plan Check Total Notes Fee DescriptionPermit Issuance 1 Permit Issuance (Mechanical, Plumbing, Electrical)$101.97 $101.97 Mechanical 2 Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance $40.25 $26.83 $67.08 3 Installation or relocation of each suspended heater, recessed wall heater, or floor-mounted unit heater $26.83 $13.42 $40.25 4 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by the UMC $13.42 $5.37 $18.78 5 Installation or relocation of each boiler, condenser, compressor, or each absorption system $40.25 $26.83 $67.08 6 Air-handling unit, including attached ducts $40.25 $13.42 $53.67 7 Evaporative cooler, other than portable-type $13.42 $13.42 $26.83 8 Ventilation fan connected to a single-duct $13.42 $5.37 $18.78 9 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood $13.42 $5.37 $18.78 10 Each appliance or piece of equipment not classified in other appliance categories, or for which no other fee is listed $40.25 $40.25 $80.50 Mechanical Change-Out 11 Condenser Only $40.25 $26.83 $67.08 12 Furnace Only $40.25 $26.83 $67.08 13 Other Equipment $40.25 $40.25 $80.50 14 Packaged Unit $40.25 $26.83 $67.08 15 Repair / Alteration $13.42 $5.37 $18.78 16 Split-System $40.25 $80.50 $120.75 Plumbing 17 Each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection) $13.42 $13.42 $26.83 18 Sewer Connection / Septic Abandonment $26.83 $18.78 $45.62 19 Rainwater systems, per drain (inside building)$13.42 $13.42 $26.83 20 Water heater and/or vent $13.42 $8.05 $21.47 21 Industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $40.25 $13.42 $53.67 City of La Quinta Master Fee Schedule Schedule of Building Fees - Mechanical, Plumbing, and Electrical 1 Fee * Fee Description Permit Plan Check Total Notes City of La Quinta Master Fee Schedule Schedule of Building Fees - Mechanical, Plumbing, and Electrical 22 Installation, alteration, or repair of water piping and/or water-treating equipment, drainage or vent piping, each fixture $13.42 $13.42 $26.83 23 Backflow protective device other than atmospheric-type vacuum breakers $13.42 $5.37 $18.78 24 Gas piping system - 1 to 4 outlets $13.42 $26.83 $40.25 25 Gas piping system - 5 or more outlets $40.25 $26.83 $67.08 26 Solar (Thermal)$26.83 $26.83 $53.67 Electrical New Construction 27 Residential - First 1,000 SF (includes livable and non-livable SF) $161.00 $53.13 $214.13 28 Residential - Each Additional 1,000 SF (includes livable and non-livable SF) $13.69 $5.64 $19.32 29 Non-Residential - First 2,000 SF $120.75 $93.38 $214.13 30 Non-Residential - Each Additional 2,000 SF $40.25 $10.73 $50.98 Solar (Photovoltaic) 31 Solar (PV) Less than 10kW $26.83 $26.83 $53.67 32 Solar (PV) Greater than 10kW $40.25 $40.25 $80.50 33 Each Additional String (<20)$2.68 $0.67 $3.35 Receptacle, Switch, and Lighting Outlets 34 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - first 20 $26.83 $26.83 $53.67 35 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - each additional $2.68 $0.67 $3.35 Lighting Fixtures 36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $26.83 $26.83 $53.67 37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $2.68 $0.67 $3.35 38 Pole or platform-mounted light replacement, repair or alteration - first 10 $26.83 $26.83 $53.67 39 Pole or platform-mounted light replacement, repair or alteration - each additional $2.68 $0.67 $3.35 Residential Appliances 40 Fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens; counter-mounted cooking tops; electric ranges; self- contained room, console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding one horsepower (HP) in rating, each $13.42 $13.42 $26.83 2 Fee * Fee Description Permit Plan Check Total Notes City of La Quinta Master Fee Schedule Schedule of Building Fees - Mechanical, Plumbing, and Electrical Non-Residential Appliances 41 Residential appliances and self-contained, factory-wired, non-residential appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt ampere (KVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each $26.83 $26.83 $53.67 Power Apparatus 42 Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, each $26.83 $26.83 $53.67 Signs, Outline Lighting, and Marquees 43 Signs, outline lighting systems, or marquees, each $40.25 $53.67 $93.92 Services 44 Services, each $26.83 $13.42 $40.25 Temporary Power Services 45 Temporary service power pole or pedestal, including all pole or pedestal- mounted receptacle outlets and appurtenances, each $26.83 $18.78 $45.62 Miscellaneous Apparatus, Conduits, and Conductors 46 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is identified $26.83 $26.83 $53.67 * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application. 3 Fee * Fee Description Permit Plan Check Total Notes Addition 1 Residential Addition a) Residential Addition - Up to 100 SF $135.24 $189.98 $325.22 [a] b) Residential Addition - Each Additional 500 SF $69.23 $19.32 $88.55 [a] c) Structural Review bill hourly (1 hour min.)[a] 2 Non-Residential Addition a) Non-Residential Addition - Up to 100 SF $155.53 $218.48 $374.00 [a] b) Non-Residential Addition - Each Additional 500 SF $79.61 $22.22 $101.83 [a] c) Structural Review bill hourly (1 hour min.)[a] Antenna 3 Dish > 2 Ft $40.25 $148.12 $188.37 4 Cellular/Mobile Phone $161.00 $228.62 $389.62 5 Equipment Shelter $40.25 $107.87 $148.12 Appeal 6 Appeal bill hourly (1 hour min.) Awning/Canopy (Supported by Building) 7 Awning/Canopy $16.10 $228.62 $244.72 Balcony Addition 8 Balcony Addition $161.00 $188.37 $349.37 Block Wall 9 Block Wall - First 100 LF $53.67 $67.08 $120.75 10 Block Wall - Each Addt'l 50 LF $16.10 $16.10 11 Retaining / Combination Wall - Each 50 LF $16.10 $16.10 Carport 12 Carport - First $80.50 $107.87 $188.37 13 Carport - Each Additional $80.50 $42.93 $123.43 Compliance Survey/Special Inspection 14 Compliance Survey/Special Inspection $80.50 $201.25 $281.75 Demolition 15 Demolition $27.37 $96.60 $123.97 16 Demolition - Interior $40.25 $107.87 $148.12 17 Demolition - Exterior $40.25 $120.75 $161.00 Fence 18 Fence - First 100 LF $53.13 $67.62 $120.75 19 Fence - Each Additional 50 LF $16.10 $16.10 Fireplace 20 Fireplace $161.00 $241.50 $402.50 Flag/Lighting Pole 21 Flag/Lighting Pole - First $40.25 $107.87 $148.12 22 Flag/Lighting Pole - Each Additional $16.10 $4.83 $20.93 Grading 23 Residential Precise Grading (Tract Homes) - Per Home $148.12 see note $148.12 [b] City of La Quinta Master Fee Schedule Schedule of Building Fees - Miscellaneous Items 4 Fee * Fee Description Permit Plan Check Total Notes City of La Quinta Master Fee Schedule Schedule of Building Fees - Miscellaneous Items 24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $40.25 $40.25 $80.50 25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $40.25 $201.25 $241.50 Partition 26 Partition $80.50 $148.12 $228.62 Patio Cover / Covered Porch / Lattice 27 Standard, Open, Pre-Engineered (First)$107.87 $106.26 $214.13 28 Standard, Enclosed, Pre-Engineered (First)$107.87 $146.51 $254.38 29 Special Design (First)$148.12 $186.76 $334.88 30 Each Additional $53.67 $40.25 $93.92 Pool / Spa 31 Swimming Pool / Spa $201.25 $109.48 $310.73 32 Detached Spa / Water Feature $201.25 $201.25 33 Gunite Alteration / Resurfacing $201.25 $109.48 $310.73 34 Equipment Change-out Alone $26.83 $101.97 $128.80 Remodel 35 Non-Structural Review - Up to 100 SF $54.74 $149.73 $204.47 [a] 36 Non-Structural Review - Each Additional 500 SF $24.15 $19.32 $43.47 [a] 37 Structural Review bill hourly (1 hour min.)[a] Replacement of Plans/Job Card 38 Replacement of Job Copy of Approved Plans $228.62 $228.62 39 Replacement of Inspection Record Card $40.25 $40.25 Re-Roof 40 Re-Roof - Up to 2,000 SF $54.74 $109.48 $164.22 41 Re-Roof - Each Additional 1,000 SF $12.88 $12.88 Sign 42 Monument Sign - First $80.50 $148.12 $228.62 43 Monument Sign - Each Additional $27.37 $27.37 44 Wall/Awning Sign - First $27.37 $96.60 $123.97 45 Wall/Awning Sign - Each Additional $27.37 $27.37 $54.74 Storage Racks 46 Storage Racks - First 100 LF $27.37 $106.26 $133.63 47 Storage Racks - Each Additional 100 LF $12.88 $12.88 Stucco Application 48 Stucco Application - First 500 SF $27.37 $82.11 $109.48 49 Stucco Application - Each Additional 500 SF $8.05 $8.05 Temporary Trailer 50 Temporary Trailer $161.00 $161.00 $322.00 Utility Release 51 Electrical Utility Release $80.50 $80.50 Window / Sliding Glass Door / Other Fenestration 52 Retrofit/Repair - Up to 7 $67.62 $66.01 $133.63 53 Retrofit/Repair - Each Additional 5 $11.27 $11.27 5 Fee * Fee Description Permit Plan Check Total Notes City of La Quinta Master Fee Schedule Schedule of Building Fees - Miscellaneous Items 54 New/Alteration - First $107.33 $122.36 $229.69 55 New/Alteration - Each Additional $11.27 $12.88 $24.15 Administrative Plan Check Initial Deposit - For Various Non-OTC Items 56 a) Miscellaneous Items $161.00 $161.00 [c] 57 b) New Construction varies [c] [d] 58 Plan Check / Permit Extension Processing $107.87 $107.87 59 Change of Contractor, Architect, Owner Processing $107.87 $107.87 60 Request/Research for Alternative Methods/Product Review bill hourly (1 hour min.) 61 Temporary Certificate of Occupancy $483.00 $483.00 [e] 62 Disabled Access Compliance Inspection $161.00 $161.00 63 Partial Inspection Fee $80.50 $80.50 [f] 64 Re-inspection Fee $80.50 $80.50 [f] 65 Excess Plan Check Fee bill hourly [g] 66 Investigation Fee for Work Commenced Without a Permit equal to permit fee [d] Initial deposit varies depending on project details. [e] Per issuance, each extension will be assessed fee at each occurrence. [c] Non-Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against total fees. [f] The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. [g] The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including the cost of structural engineering review services. [a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection fees are collected separately. [b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based on the number of sheets submitted for plan review. See Public Works fee schedule. 6 Fee Description Fee - Permit * New Construction 1 $1 - $10,000 $161.00 for the first $5,000, plus $48.30 for each additional $1,000 or fraction thereof, to and including $10,000 2 $10,001 - $25,000 $402.50 for the first $10,000, plus $10.73 for each additional $1,000 or fraction thereof, to and including $25,000 3 $25,001 - $200,000 $563.50 for the first $25,000, plus $8.28 for each additional $1,000 or fraction thereof, to and including $200,000 4 $200,000 and Up $2,012.50 for the first $200,000, plus $4.14 for each additional $1,000 or fraction thereof Fee Description Fee - Plan Check * (Project Valuation) 5 $1 - $10,000 $161.00 for the first $5,000, plus $80.50 for each additional $1,000 or fraction thereof, to and including $10,000 6 $10,001 - $25,000 $563.50 for the first $10,000, plus $18.78 for each additional $1,000 or fraction thereof, to and including $25,000 7 $25,001 - $200,000 $845.25 for the first $25,000, plus $2.99 for each additional $1,000 or fraction thereof, to and including $200,000 8 $200,000 and Up $1,368.50 for the first $200,000, plus $2.39 for each additional $1,000 or fraction thereof Fee Description Fee - Plan Check for Multiple Structures - Each Additional ** (Project Valuation) 9 All Valuations $53.67 Fee Description Fee 10 Building Department Staff $161 per hour 11 City Attorney or Other Legal Review 100%of actual costs 12 Outside Service Providers 100%of actual costs For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. City of La Quinta Master Fee Schedule Schedule of Building Fees - New Construction * The new construction fees identified in this fee schedule include the cost of structural engineering review services currently conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond second review. * The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. * The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services. ** Fee applies when multiple identical units are submitted for review and permitted at the same time. 7 Fee Description Fee Notes Strong Motion Instrumentation (SMI) Fee Calculation 1 Residential $0.50 or valuation x .00013 2 Commercial $0.50 or valuation x .00028 Art In Public Places (AIPP) Fee Calculation [a] 3 Residential $20.00 or 1/4 of 1% of value exceeding $200,000 4 Commercial $20.00 or 1/2 of 1% of value Building Standards Administration Special Revolving Fund (SB 1473) Fee Calculation [b] 5 Valuation: a) $1 - $25,000 $1 b) $25,001 - $50,000 $2 c) $50,001 - $75,000 $3 d) $75,001 - $100,000 $4 e) Every $25,000 or fraction thereof above $100,000 Add $1 Technology Enhancement Fee 6 Technology Enhancement Fee (per permit)$5 Digital Archiving and Records Management Fee 7 Digital Archiving and Records Management Fee a) OTC Permit/Application $10 b) All Others $21 [a] Source: La Quinta Municipal Code 2.65.060. [b] Source: California Health and Safety Code Section 18931.6 City of La Quinta Master Fee Schedule Schedule of Building Fees - Other Fees 8 Building Valuation Data Occupancy and Type Cost per Sq Ft Avg Occupancy and Type Cost per Sq Ft Avg Occupancy and Type Cost per Sq Ft Avg Occupancy and Type Cost per Sq Ft Avg 1 APARTMENT HOUSES:7 DWELLINGS:13 JAILS:Type III-B $26.70 Type I-A or I-B *$72.50 Type V - Masonry $60.80 Type I-A or I-B $130.00 Type V-A $27.10 (Good)$89.00 (Good)$78.00 Type III-A $116.90 20 RESTAURANTS: Type V - Masonry Type V - Wood Frame $54.30 Type V-A $88.00 Type III-A $78.80 (or Type III)$58.80 (Good)$77.90 14 LIBRARIES:Type III-B $76.20 (Good)$71.80 Basements -Type I-A or I-B $95.40 Type V-A $72.00 Type V - Wood Frame $51.60 Semi-Finished $16.20 Type II-A $68.90 Type V-B $69.10 (Good)$65.90 (Good)$18.50 Type II-B $65.50 21 SCHOOLS: Type I - Basement Garage $30.80 Unfinished $12.20 Type III-A $72.70 Type I-A or I-B $90.90 2 AUDITORIUMS:(Good)$14.30 Type III-B $69.20 Type II-A $61.20 Type I-A or I-B $85.80 8 FIRE STATIONS:Type V-A $68.20 Type III-A $65.70 Type II-A $61.50 Type I-A or I-B $92.80 Type V-B $65.20 Type III-B $62.30 Type II-B $58.80 Type II-A $60.50 15 MEDICAL OFFICES:Type V-A $61.20 Type III-A $64.60 Type II-B $57.50 Type I-A or I-B *$97.40 Type V-B $58.40 Type III-B $61.70 Type III-A $66.70 Type II-A $74.60 22 SERVICE STATIONS: Type V-A $61.40 Type III-B $63.80 Type II-B $71.20 Type II-B $54.40 Type V-B $58.50 Type V-A $62.20 Type III-A $78.60 Type III-A $56.60 3 BANKS:Type V-B $59.20 Type III-B $75.70 Type V-A $48.10 Type I-A or I-B *$121.40 9 HOMES FOR THE ELDERLY:Type V-A $72.90 Canopies $22.60 Type II-A $88.20 Type I-A or I-B $85.00 Type V-B $70.00 23 STORES: Type II-B $85.60 Type II-A $68.40 16 OFFICES**:Type I-A or I-B *$67.40 Type III-A $97.70 Type II-B $65.20 Type I-A or I-B *$87.20 Type II-A $40.60 Type III-B $94.30 Type III-A $71.20 Type II-A $57.80 Type II-B $39.80 Type V-A $87.90 Type III-B $68.20 Type II-B $55.20 Type III-A $49.60 Type V-B $85.00 Type V-A $68.60 Type III-A $62.40 Type III-B $46.80 4 BOWLING ALLEYS:Type V-B $65.70 Type III-B $59.60 Type V-A $41.60 Type II-A $41.10 10 HOSPITALS:Type V-A $57.80 Type V-B $38.40 Type II-B $38.30 Type I-A or I-B *$133.50 Type V-B $54.90 24 THEATERS: Type III-A $44.90 Type III-A $109.40 17 PRIVATE GARAGES:Type I-A or I-B $89.80 Type III-B $41.90 Type V-A $103.50 Wood Frame $19.60 Type III-A $64.60 Type V-A $30.50 11 HOTELS AND MOTELS:Masonry $22.00 Type III-B $61.60 5 CHURCHES:Type I-A or I-B *$82.20 Open Carports $13.30 Type V-A $60.40 Type I-A or I-B $81.20 Type III-A $71.00 18 18. PUBLIC BUILDINGS:Type V-B $57.40 Type II-A $60.20 Type III-B $67.60 Type I-A or I-B *$101.40 25 WAREHOUSES***: Type II-B $57.20 Type V-A $62.90 Type II-A $80.90 Type I-A or I-B $40.40 Type III-A $65.50 Type V-B $59.90 Type II-B $77.60 Type II-A or V-A $23.60 Type III-B $62.50 12 INDUSTRIAL PLANTS:Type III-A $83.80 Type II-B or V-B $22.20 Type V-A $60.80 Type I-A or I-B $46.60 Type III-B $81.10 Type III-A $27.10 Type V-B $58.00 Type II-A $32.10 Type V-A $76.70 Type III-B $25.90 6 CONVALESCENT HOSPITALS: Type II-B $29.40 Type V-B $73.80 Type I-A or I-B *$113.80 Type III-A $35.30 19 PUBLIC GARAGES:EQUIPMENT Type II-A $77.20 Type III-B $32.80 Type I-A or I-B *$39.60 AIR CONDITIONING: Type III-A $80.10 Tilt-up $24.10 Type I or II Open Parking * $30.00 Commercial $3.50 Type V-B $75.10 Type V-A $33.00 Type II-B $23.20 Residential $2.90 Type V-B $30.20 Type III-A $29.90 SPRINKLER SYSTEMS:$1.70 * Add 0.5 percent to total cost for each story over three. ** Deduct 20 percent for shell-only buildings. *** Deduct 11 percent for mini-warehouses. Note: Building valuation data transcribed from Building Standards, July-August 1994 and adapted to 2007 CBC Types of Construction. Revised 3/5/2009. 9 Fee Description Fee * Notes Temporary Use 1 Temporary Use Permit - Minor (Standard)$400 2 Temporary Use Permit - Minor (Requests Requiring Additional Effort) bill per hour, with $400 base fee 3 Temporary Use Permit - Major (Standard)$2,093 4 Temporary Use Permit - Major (Requests Requiring Additional Effort) bill per hour, with $2,093 base fee Minor Use 5 Minor Use Permit bill per hour, with $400 base fee 6 Minor Use Permit - Amendment bill per hour, with $400 base fee Conditional Use 7 Conditional Use Permit bill per hour, with $6,413 base fee 8 Conditional Use Permit - Planned Unit Dev.bill per hour, with $6,413 base fee 9 Conditional Use Permit - Amendment bill per hour, with $3,126 base fee 10 Conditional Use Permit - Time Extension $1,691 Expedited Review Fee 11 Expedited Review Fee 1.5x standard fee [a] Site Development 12 Development Agreement bill per hour, with $3,327 base fee [b] 13 Site Development Permit - Planning Commission bill per hour, with $8,909 base fee 14 Site Development Permit - Administrative bill per hour, with $7,621 base fee 15 Site Development Permit - Amendment bill per hour, with $4,669 base fee 16 Site Development Permit - Time Extension $1,691 17 Modification by Applicant bill per hour, with $400 base fee 18 Minor Adjustment bill per hour, with $400 base fee 19 Variance bill per hour, with $2,415 base fee Landscape Plan 20 Final Landscape Plan $1,771 Housing 21 Senate Bill (SB) 330 Application Review $1,288 Conceptual Design Review 22 Conceptual Design Review $2,254 [c] Signs 23 A-Frame Sign Permit $0 24 Sign Permit $355 25 Sign Program bill per hour, with $2,844 base fee 26 Sign Program Amendment $966 City of La Quinta Master Fee Schedule Schedule of Planning Fees 10 Fee Description Fee * Notes City of La Quinta Master Fee Schedule Schedule of Planning Fees Zoning 27 Zone Change bill per hour, with $9,392 base fee 28 Director's Determination $405 29 Certificate of Compliance $505 30 Zoning Letter - Basic Property Information $263 31 Zoning Letter - Basic Property Information with Additional Research Required $1,369 32 Zoning Text Amendment bill per hour, with $9,445 base fee Street Name Change 33 Street Name Change $1,852 Historical Structures 34 Landmark Designation/Cert of Appropriateness $1,320 Environmental Review 35 Environmental Assessment $483 36 Recordation of Exemption $161 37 Initial Study (ND/MND)bill per hour, with $3,220 base fee 38 Environmental Impact Report bill per hour, with $8,855 base fee General/Specific Plan 39 Specific Plan bill per hour, with $10,680 base fee 40 Specific Plan - Amendment bill per hour, with $4,776 base fee 41 General Plan Amendment bill per hour, with $10,465 base fee Map 42 Tentative Parcel Map bill per hour, with $5,045 base fee 43 Tentative Parcel Map - Waiver $1,369 44 Tentative Parcel Map - Amendment bill per hour, with $3,005 base fee 45 Tentative Parcel Map - Revision bill per hour, with $3,005 base fee 46 Tentative Parcel Map - Time Extension $966 47 Tentative Tract Map bill per hour, with $8,372 base fee 48 Tentative Tract Map - Amendment bill per hour, with $3,971 base fee 49 Tentative Tract Map - Revision bill per hour, with $3,971 base fee 50 Tentative Tract Map - Time Extension (CC or PC)$1,852 51 Tentative Tract Map - Time Extension (Admin)$1,047 52 Tentative Condominium Map bill per hour, with $8,372 base fee 53 Amended Final Parcel Map (Entitlement Support)bill per hour, with $4,025 base fee 54 Amended Final Tract Map (Entitlement Support)bill per hour, with $6,440 base fee Zoning Clearance - Planning Plan Check 55 Zoning Clearance - Planning Plan Check a) Alterations/Additions - Residential $81 b) New Construction - Single Family Residential $161 c) New Construction - 2-4 Residential Units $242 d) New Construction - 5+ Residential Units $644 e) New Construction - Non-Residential $322 f) Alterations/Additions - Non-Residential $161 11 Fee Description Fee * Notes City of La Quinta Master Fee Schedule Schedule of Planning Fees Scanning 56 Scanning Fee $161 Technology Enhancement Fee 57 Technology Enhancement Fee $5 Digital Archiving and Records Management Fee 58 Digital Archiving and Records Management Fee a) OTC Permit/Application $10 b) All Others $21 Appeal 59 Appeal $1,500 Fee Description Fee * Notes 60 Planning Department Staff $161 per hour 61 City Attorney or Other Legal Review pass-through of 100%of actual costs 62 Outside Service Providers pass-through of 100%of actual costs [b] In addition to the fee shown for Development Agreement, the City shall collect a $2,000 initial deposit to offset City Attorney costs. [c] 50% of fee may be credited toward entitlement application submittal. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application. For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. [a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and workload. 12 Fee Description Fee *Unit Notes Land Subdivision 1 Parcel Map: a) Final Parcel Map i) Initial Sheet $2,496 per sheet ii) Each Additional Sheet $725 per sheet b) Final Parcel Map - Amendment i) Initial Sheet $2,496 per sheet ii) Each Additional Sheet $725 per sheet c) Substantial Conformance Review i) Initial Sheet $2,938 per sheet ii) Each Additional Sheet $1,288 per sheet 2 Tract Map: a) Final Tract Map i) Initial Sheet $2,657 per sheet ii) Each Additional Sheet $805 per sheet b) Final Tract Map - Amendment i) Initial Sheet $2,657 per sheet ii) Each Additional Sheet $805 per sheet c) Substantial Conformance Review i) Initial Sheet $2,938 per sheet ii) Each Additional Sheet $1,288 per sheet 3 Reversion to Acreage: a) Initial Sheet $2,737 per sheet b) Each Additional Sheet $725 per sheet 4 Lot Line Adjustment/Parcel Merger a) Lot Line Adjustment $1,932 per request b) Parcel Merger $1,932 per request 5 Street Dedication/Vacation a) Land Action Documents (ROW/Easements/Grant Deeds) $1,972 per request b) Vacation of Street/Public ROW $2,415 per request 6 Land Survey a) Record of Survey $523 per request b) Certificate of Correction $684 per request Grading / Project Improvements 7 Plan Review (First 3 Reviews): a) Rough Grading i) Initial Sheet $1,489 per sheet ii) Each Additional Sheet $805 per sheet iii) Revisions - Initial Sheet $1,148 per sheet iv) Revisions - Each Additional Sheet $805 per sheet City of La Quinta Master Fee Schedule Schedule of Public Works Fees 13 Fee Description Fee *Unit Notes City of La Quinta Master Fee Schedule Schedule of Public Works Fees b) Precise Grading - Commercial i) Initial Sheet $1,811 per sheet ii) Each Additional Sheet $1,127 per sheet iii) Revisions - Initial Sheet $1,470 per sheet iv) Revisions - Each Additional Sheet $1,127 per sheet c) Precise Grading - Tract Homes i) Initial Sheet $1,047 per sheet ii) Each Additional Sheet $201 per sheet iii) Revisions - Initial Sheet $625 per sheet iv) Revisions - Each Additional Sheet $201 per sheet d) Precise Grading - Custom Home [a] e) PM10 i) Initial Sheet $585 per sheet ii) Each Additional Sheet $0 per sheet iii) Revisions - Initial Sheet $450 per sheet iv) Revisions - Each Additional Sheet $0 per sheet f) Street Improvements i) Initial Sheet $1,650 per sheet ii) Each Additional Sheet $966 per sheet iii) Revisions - Initial Sheet $1,309 per sheet iv) Revisions - Each Additional Sheet $966 per sheet g) Storm Drain i) Initial Sheet $1,650 per sheet ii) Each Additional Sheet $966 per sheet iii) Revisions - Initial Sheet $1,309 per sheet iv) Revisions - Each Additional Sheet $966 per sheet h) Signing and Striping i) Initial Sheet $1,489 per sheet ii) Each Additional Sheet $805 per sheet iii) Revisions - Initial Sheet $1,148 per sheet iv) Revisions - Each Additional Sheet $805 per sheet i) Traffic Signal i) Initial Sheet $1,328 per sheet ii) Each Additional Sheet $644 per sheet iii) Revisions - Initial Sheet $987 per sheet iv) Revisions - Each Additional Sheet $644 per sheet j) Sidewalk i) Initial Sheet $1,167 per sheet ii) Each Additional Sheet $483 per sheet iii) Revisions - Initial Sheet $826 per sheet iv) Revisions - Each Additional Sheet $483 per sheet k) Traffic Control Plan $81 per sheet 14 Fee Description Fee *Unit Notes City of La Quinta Master Fee Schedule Schedule of Public Works Fees l) Record Drawings Review i) Initial Sheet $845 per sheet ii) Each Additional Sheet $161 per sheet m) Hydrology Report $1,731 per report i) Revisions $805 per report n) Traffic Study $1,328 per study o) WQMP Report i) With Prior Entitlement $1,570 per report ii) Without Prior Entitlement $1,892 per report iii) Revisions $805 per report p) SWPPP $1,811 per plan i) Revisions $644 per plan q) Sewer and Water i) Initial Sheet $1,127 per sheet ii) Each Additional Sheet $483 per sheet iii) Revisions - Initial Sheet $805 per sheet iv) Revisions - Each Additional Sheet $483 per sheet 8 Plan Review (>3 Reviews)$161 per hour 9 Expedited Plan Review Fee 1.5x standard fee [b] 10 Permit Inspection a) Rough Grading i) First 3 Acres $3,220 ii) Each Additional Acre $805 iii) Last One Acre $403 b) Precise Grading i) First 3 Acres $3,220 ii) Each Additional Acre $805 iii) Last One Acre $403 c) Precise Grading - Tract Homes $148 [c] d) Precise Grading - Custom Homes $81 [c] e) PM10 i) < 10 Acres $3,864 [d] ii) 10 - 50 Acres $5,796 [d] iii) 51 - 200 Acres $7,728 [d] iv) > 200 Acres $11,592 [d] f) Street Improvements - Off-Site i) First 1,000 LF $5,152 ii) Each Additional 1,000 LF $4,508 iii) Last 1,000 LF $2,898 15 Fee Description Fee *Unit Notes City of La Quinta Master Fee Schedule Schedule of Public Works Fees g) Street Improvements - On-Site i) First 1,000 LF $3,542 ii) Each Additional 1,000 LF $2,898 iii) Last 1,000 LF $1,932 h) Storm Drain i) First 1,000 LF $3,059 ii) Each Additional 1,000 LF $2,415 iii) Last 1,000 LF $1,610 i) Signing and Striping i) First 1,000 LF $1,610 ii) Each Additional 1,000 LF $966 iii) Last 1,000 LF $483 j) Traffic Signal $4,347 k) NPDES $1,932 l) Bond Reduction Request $2,174 m) Final Inspection/Acceptance $2,898 n) Traffic Control Only i) One Day $325 ii) Two - Five Days $650 iii) Each Additional Day (Up to 10 Days)$325 iv) 11+ Days $3,784 o) Cut/Bore $725 p) Driveway i) Residential $175 ii) Commercial $1,047 q) Excavation / Trenching i) First 100 LF $725 ii) Each Additional 100 LF $322 iii) Last 100 LF $161 r) Sidewalk i) First 100 Lineal Feet $1,369 ii) Each Additional 100 Lineal Feet $966 iii) Last 100 Lineal Feet $322 s) Sewer and Water $1,288 t) Night Work $403 11 Research/Administrative a) Subdiv'n Improvement Agreem't (SIA)$1,932 per request b) SIA - Time Extension $1,127 per request c) Assignment & Assumptions Agreement $2,093 per request 16 Fee Description Fee *Unit Notes City of La Quinta Master Fee Schedule Schedule of Public Works Fees d) Flood Plain Research/FEMA App $966 per request e) Bid Protest Review $725 12 Reactivation of Permit a) Reactivation of an Expired Permit 10% of original permit fee each 13 Technology Enhancement Fee Technology Enhancement Fee $5 Digital Archiving and Records Management Fee 14 Digital Archiving and Records Management Fee a) OTC Permit/Application $10 b) All Others $21 15 Transportation Permits a) Annual $90 each b) Single Event $16 each Fee Description Fee Unit Notes 16 Public Works Personnel $161 per hour 17 City Attorney or Other Legal Review 100%pass-through of actual cost 18 Outside Service Providers 100%pass-through of actual cost For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. [a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot size of the custom home. See Building fee schedule, Grading section. [b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See Building fee schedule, Grading section. [d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the number of months permitted. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any discrete costs incurred from the use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan review consulting costs, which are included in the fees listed above. 17 Fee * Fee Description Plan Review Permit / Inspection Total Notes Construction-Related Fire Review and Inspection Fees 1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)$483 $322 $805 2 New Commercial / Industrial $483 $403 $886 3 Residential Addition / Remodel $161 $161 $322 [a] 4 Commercial Tenant Improvement $242 $161 $403 5 Commercial / Industrial Addition or Remodel $242 $242 $483 6 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)$403 $483 $886 [b] 7 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)$483 $322 $805 8 Fire Alarm Systems $564 $483 $1,047 9 Fire Sprinkler Systems - Single Family Detached [a] a) 1-50 Sprinkler Heads $242 $161 $403 [a] b) 51-100 Sprinkler Heads $242 $242 $483 [a] c) Over 100 Sprinkler Heads $242 $322 $564 [a] 10 Fire Sprinkler Systems - Multi-Family 3 or more units $322 $242 $564 [c] 11 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $403 $242 $644 12 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $483 $282 $765 13 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $564 $403 $966 14 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $644 $564 $1,208 15 Fire Sprinkler Systems - Tenant Improvement $242 $161 $403 16 Fire Pumps $322 $322 $644 17 Fire Standpipe Systems $242 $322 $564 18 Fire Alarms - Monitoring and Tenant Improvements $242 $161 $403 19 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)$564 $483 $1,047 20 Fire Water Tanks $242 $161 $403 21 Plan Revision Submittals - each $161 $0 $161 22 Plan Resubmittals (in Excess of 3 Reviews) - each $161 $0 $161 23 Failed or Additional Field Inspections (Excessive) - each $0 $161 $161 Operational Permit 24 Fire Operational Permit (per hour)bill hourly bill hourly per hour Other 25 Master Plan bill hourly bill hourly per hour 26 Tract access/Hydrant inspection $0 $161 $161 27 Special Event Permit $161 $242 $403 28 Pyrotechnic Permit $403 $322 $725 29 Pyrotechnic Event Standby (per hour)bill hourly bill hourly per hour City of La Quinta Master Fee Schedule Schedule of Fire Fees 18 Fee * Fee Description Plan Review Permit / Inspection Total Notes City of La Quinta Master Fee Schedule Schedule of Fire Fees 30 Fire Miscellaneous (per hour)bill hourly bill hourly per hour Technology Enhancement Fee 31 Technology Enhancement Fee n/a n/a $5 Digital Archiving and Records Management Fee 32 Digital Archiving and Records Management Fee a) OTC Permit / Application n/a n/a $10 b) All Others n/a n/a $21 Fee Description Fee * Notes 33 City Assigned Fire Safety Specialist $161 per hour 34 Other County Fire Services See County Fees 35 City Attorney or other legal review 100%of actual costs 36 Outside Service Providers 100%of actual costs [b] For underground water supply to sprinkler riser, fee is per riser. [c] Fee is per building. [a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is necessary or if review fees have been collected as part of the development planning process. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including but not limited to legal review. For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. 19 Fee Description Fee Unit Notes NPDES Ongoing Inspection Fee 1 Food Establishment Facilities $47 per year 2 Hazardous Waste/Materials Facilities $98 per year Code Compliance 3 Code Compliance Follow-Up, If Required $118 per hour City of La Quinta Master Fee Schedule Schedule of NPDES Ongoing Inspection Fees 20 Fee Description Fee Unit Notes Short-Term Vacation Rental Permit Fee 1 Annual Permit Fee $200 per year 2 Code Compliance Inspection Fee (if applicable)$325 per unit 3 Technology Enhancement Fee $5 per year City of La Quinta Master Fee Schedule Schedule of Short-Term Vacation Rental Permit Fees 21 Fee Description Fee Unit Notes Medical Cannabis Delivery Services Application 1 Medical Cannabis Delivery Service Application a) Delivery Service Application - New $468 per year b) Delivery Service Application - Renewal $468 per year 2 Technology Enhancement Fee $5 per year City of La Quinta Master Fee Schedule Schedule of Medical Cannabis Delivery Application Fees 22 Fee Description Fee Unit Notes False Alarm Response 1 Police False Alarm Response [a] a) 1st False Alarm Response No Charge each b) 2nd False Alarm Response No Charge each c) 3rd False Alarm Response $60 each d) 4th False Alarm Response $105 each e) 5th and Each Additional False Alarm Response $120 each 2 Fire False Alarm Response [a] a) 1st False Alarm Response No Charge each b) 2nd False Alarm Response No Charge each c) 3rd False Alarm Response $60 each d) 4th False Alarm Response $275 each e) 5th and Each Additional False Alarm Response $605 each [a] Based on number of false alarms in a 365 day period. City of La Quinta Master Fee Schedule Schedule of False Alarm Response Fees 23 Fee Description Fee Unit Notes 1 Vehicle Impound Cost Recovery Fee $228 each City of La Quinta Master Fee Schedule Schedule of Vehicle Impound Cost Recovery Fees 24 Fee Description Fee Unit Notes 1 Code Enforcement Hourly Rate a) Code Enforcement Hourly Rate $118 per hour [a] b) Code Enforcement Hourly Rate - For Outside Agency Reimbursement Request $109 per hour [b] City of La Quinta Master Fee Schedule Schedule of Code Enforcement Hourly Rate for Services [a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event support, etc. [b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of various fleet and technology related costs. 25 Fee Description Fee Unit Notes 1 Pool Drain Permit $25 per permit 2 Golf Cart Permit a) New $50 per permit b) Renewal $25 per permit City of La Quinta Master Fee Schedule Schedule of Pool Drain and Golf Cart Permit Fees 26 Fee Description Fee Unit Notes 1 Home Occupation Permit $100 per permit 2 Home Occupation Permit - Address Change $50 per permit City of La Quinta Master Fee Schedule Schedule of Home Occupation Permit Fees 27 Fee Description Fee Unit Notes Film/Photography Permit 1 Cast and Crew Totaling One to Three Persons: a) Permit Issuance Fee i) Private Property $89 per permit ii) Private Property with Staging in Public Right of Way $118 per permit iii) Public Property $118 per permit b) Location Use Fee i) Private Property $0 per day ii) Private Property with Staging in Public Right of Way $100 per day [a] iii) Public Property $150 per day [a];[b] 2 Cast and Crew Totaling Four or More Persons: a) Permit Issuance Fee i) Private Property $207 per permit ii) Private Property with Staging in Public Right of Way $325 per permit iii) Public Property $384 per permit b) Location Use Fee i) Private Property $0 per day ii) Private Property with Staging in Public Right of Way $250 per day [a] iii) Public Property $500 per day [a];[b] Other Fees, If Applicable 3 Pre-Application Meeting (upon request)$236 per meeting 4 City Film Monitor (as needed)$118 per hour 5 Violations: a) Filming/Photography without a Permit 2 times applicable fees b) Violation of Permit $350 per violation, per day [a] Proposed fee is a market-based rate for exclusive private use of public space/facilities. [b] Does not include any applicable facility rental fees that may apply. City of La Quinta Master Fee Schedule Schedule of Film/Photography Permit Fees Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status; however, the permitting process for filming/photography is still required for these projects. 28 Fee Description Fee Unit Notes 1 Bingo Permit a) Initial $50 per permit b) Renewal $50 per permit City of La Quinta Master Fee Schedule Schedule of Bingo Permit Fees 29 Fee Description Fee *Unit Notes 1 Black and White Copy - up to 8.5 x 14 $0.15 per single-sided page 2 Black and White Copy - 11 x 17 $0.20 per single-sided page 3 Color Copy - up to 8.5 x 14 $0.25 per single-sided page 4 Color Copy - 11 x 17 $0.50 per single-sided page 5 Oversized Sheets (Plans/Maps)$3.00 per sheet [a] 6 CD/DVD/Flash Drive $5.00 per CD or DVD 7 Agency Credit Card Service Fee 1.8%% of fees paid [b] 8 Processing Fee for Receipt of Non-Sufficient Funds a) First from Payee $25.00 per occurence [c] b) Each Subsequent from Payee $35.00 per occurence [c] [a] If more than two sheets are requested, the City will typically process the request using an outside vendor service. [b] Fee is intended to function as a pass-through of credit card transaction vendor charge. Annual updates should be based on vendor charge. [c] Set by State (Civil Code Section 1719). City of La Quinta Master Fee Schedule Schedule of Administrative Fees * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific request for information/service. * In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy, including construction, programming and computer services. 30 Fee Description Fee Unit Notes 1 Appeal to Hearing Officer of Administrative Citation $25 per appeal [a] 2 Appeal of an Administrative Decision to City Manager $250 per appeal [a] 3 Appeal to Construction Board of Appeals $1,500 per appeal [a] 4 Appeal to Planning Commission $1,500 per appeal [a] 5 Appeal to City Council $1,500 per appeal [a] City of La Quinta Master Fee Schedule Schedule of Appeal Fees [a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council. 31 Fee Description Class I (per season) Class II Class III Class IV SPORTS FACILITIES 1 Sports Complex Baseball Diamonds/ Football Field or La Quinta Park Baseball Diamonds (with or without field lights) $10 per resident/ $15 per non- resident $25/hour (per field) N/A N/A 2 La Quinta Park or Colonel Mitchell Paige Soccer Fields (with or without field lights) $10 per resident/ $15 per non- resident $25/hour (per field) N/A N/A 3 Sports Complex, La Quinta Park, and Colonel Mitchell Paige Sports Fields (per field) N/A N/A $25/hour ($40/hour with lights) $35/hour ($55/hour with lights) 4 Sports Complex or La Quinta Park Snack Bar Use $200.00 N/A N/A N/A 5 La Quinta Boys & Girls Club Gymnasium N/A $25/hour $35/hour $45/hour 6 Tennis Courts/Pickleball Courts (per court)N/A $5/hour $5/hour $10/hour PARKS 7 Civic Center Campus, Gazebo, Amphitheater (50 people or less) N/A $75/hour $125/hour $175/hour 8 Civic Center Campus (Non-profit events with 100 people or more; TUP required) N/A $150/hour N/A N/A 9 Cove Oasis Trailhead (50 people or less)N/A $75/hour $125/hour $175/hour 10 Fritz Burns or La Quinta Park Party (50 people or less)N/A $50 (4 hours)$65 (4 hours)$90 (4 hours) 11 Fritz Burns or La Quinta Park (Non-profit events with 100 people or more; TUP required) N/A $50/hour N/A N/A BUILDINGS 12 Wellness Center Multi-Purpose Room (max capacity is 200)$55/hour $75/hour $125/hour $175/hour 13 Museum Meeting Room (Meetings only; max capacity is 65)N/A $50/hour $50/hour $50/hour 14 Museum Meeting Room & Courtyard (max capacity is 150)N/A $75/hour $125/hour $175/hour 15 Museum Meeting Room, Courtyard, & Upstairs Patio (max capacity is 175) N/A $100/hour $150/hour $200/hour 16 Library Community Room (Small events/meetings with 60 people or less) N/A $50/hour $50/hour $50/hour 17 Library Classroom (Meetings only; max capacity is 60)N/A $50/hour $50/hour $50/hour 18 Wellness Center, Library Community Room, and Museum Kitchen $10/hour $20/hour $25/hour $30/hour City of La Quinta Master Fee Schedule Schedule of Facility Use Fees 32 Fee Description Class I (per season) Class II Class III Class IV City of La Quinta Master Fee Schedule Schedule of Facility Use Fees 19 Wellness Center Multi-Purpose Room Museum Meeting Room & Courtyard Museum Meeting Room & Courtyard w/Upstairs Patio $500.00 20 La Quinta Park & Sports Complex snack bars $350.00 21 $200.00 22 Museum Meeting Room Library Community Room Fritz Burns Tennis Courts (per court) Fritz Burns or La Quinta Park (Non-profit events w/ 100+ people) $100.00 23 Fritz Burns or La Quinta Park Party $50.00 CLASSIFICATIONS Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under) Class II: LQ non-profit organizations, community-based organizations, competitive youth sports leagues (DSUSD - Sports Complex Use Only) Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex) Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses Library Classroom Cove Oasis Trailhead Civic Center Campus, Gazebo, Amphitheater (50 people or less) SECURITY DEPOSITS (Refundable upon post conditions after use) Sports Fields Boys & Girls Club Gym Civic Center Campus (Non-profit events with 100 people or more) 33 Fee Description Non-Profit All Others SILVERROCK EVENT SITE (4-Hour Minimum Rental) 1 Permit Processing Fee (per application)$118 $118 2 Facility Rental Fee (per hour)$250 $300 3 Security Deposit a) One Day Event $500 $500 b) Event Lasting Two or More Days $1,000 $1,000 CLASSIFICATION Non-Profit: 501(c)3 tax organization. City of La Quinta Master Fee Schedule Schedule of SilverRock Event Site Facility Rental Fees 34 Fee Description Fee Notes Parking Lot / Open Space Use Fees [a];[b] 1 Daily Use Rate Per Space a) Per Hour Rate $1.50 [c] b) Maximum Per Day $12 2 Daily Use Rate Per Area a) Per Quarter Acre i) Hourly Rate $47 [c] ii) Maximum Per Day $375 b) Per Acre i) Hourly Rate $188 [c] ii) Maximum Per Day $1,500 [a] Public property use rental will be facilitated via a "use permit" issued by Planning Department or "The Hub". [c] Four-hour minimum. City of La Quinta Master Fee Schedule Use of Public Property - Parking Lots and Open Space [b] As part of permit review and review of potential impacts on the community and facilities, staff will determine if there is a need for a security deposit. Security deposit amount will be determined based on use requirements and will be refundable assuming conditions of rental/use are met. 35