Loading...
FLP 2019-0006 Pendry Hotel at Silverrock (03.08.21)March 8, 2021 Teaka McCarthy Gensler San Diego 225 Broadway Suite 100 San Diego, CA 92101 SUBJECT: FINAL LANDSACPE PLAN 2019-0006 SILVERROCK / LQ RESORT PENDRY HOTEL Dear Ms. McCarthy: The City of La Quinta Design and Development Department has reviewed and approved Final Landscape Plan 2019-0006 for SilverRock Pendry Hotel located at 79179 Ahmanson Lane, subject to the following conditions of approval: - The plans are approved, subject to the approved and stamped plans attached and on file. - The applicant shall comply with the Fire Conditions of Approval, attached to this letter - Attached to this letter is a Certificate of Completion, which will need to be completed and submitted to Design and Development department prior to final Planning inspection. If you have any questions, please contact me at (760) 777-7069. Sincerely, Carlos Flores Senior Planner Attachments: 1) Fire Conditions of Approval 2)Certificate of Completion 3) Approved Final Landscape Plans OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 •www.rvcfire.org March 4, 2021 Gensler San Diego 225 Broadway Ste 100 Encinitas, CA 92024 Re: Final Landscape Permit - Fire Plan Review – PENDRY HOTEL FLP2019-0006 / SILVERROCK WAY, LA QUINTA, CA 92253 The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. [1] Fire Protection Equipment (Fire Hydrants, Fire Department Connections, Post Indicator Valves and Backflow Prevention Devices) shall be provided clear access and shall not be visibly obscured. [2] Fire Protection Equipment shall be provided with a minimum 3-feet of clearance around the circumference of the device from any obstructions, including vegetation of any size besides maintained turf grass or treadable groundcover. Consideration for mature plant development and spacing shall be considered when planting in close proximity to the minimum clearance. [3] Planned pathways for firefighter access passing between and around structures shall be provided and maintained to have 36-inches of clear width free of obstructive vegetation. [4] The fire code official shall perform a final inspection of all landscaping and confirm compliance with these conditions. Any landscaping that is in conflict shall be removed or relocated to the satisfaction of the fire code official. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist ATTACHMENT 1 City of La Quinta Design and Development Department 78-495 Calle Tampico La Quinta, California 92253 Telephone: (760) 777-7125 Fax: (760) 777-1233 https://www.laquintaca.gov/ CERTIFICATE OF COMPLETION A. CERTIFICATE OF COMPLETION Per City of La Quinta Municipal Code Section 8.13.030(e)(3), prior to final planning inspection the landscape architect shall provide the planning department a copy of the official certificate of completion The following elements are attached hereto: Irrigation scheduling parameters used to set the controller; Landscape and irrigation maintenance schedule; Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations B. PROJECT INFORMATION Project Name & Number ______________________________________________________________________________________ Site Address/Location ______________________________________________________________________________________ Date of installation(s) ______________________________________________________________________________________ Landscaping Square Footage ______________________________________________________________________________________ C. APPLICANT/OWNER INFORMATION Applicant: ______________________________________________________________________________________________ (Name) (Company) (Telephone) ______________________________________________________________________________________________ (Mailing Address) (Email) Owner(s): ______________________________________________________________________________________________ (Name) (Telephone) ______________________________________________________________________________________________ (Mailing Address) (Email) D. APPLICANT CERTIFICATION I certify that (a) I am qualified by the State of California to provide landscape design services and the landscaping for this project was installed by me or under my supervision; (b) the landscaping for the identified project has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the Model Water Efficient Landscape Ordinance; (c) a diagram of the irrigation plan showing hydrozones is kept with the irrigation controllers; (d) the Certificate of Completion has been completed in compliance with the requirements of the Water Efficient Landscape Ordinance and shall be implemented. Applicant’s Signature _________________________________________________ Date ___________________________ Print Name __________________________________________________________ State License # ___________________ OWNER CERTIFICATION I certify that I am the property owner or an authorized representative and have received copies of all the documents within theLandscape Documentation Package and the Certificate of Completion and that it is my responsibility to see that the project ismaintained in accordance with the Landscape and Irrigation Maintenance Schedule. Owner Signature_________________________________________ Date ___________________________ Print Name _______________________________________________________________ ATTACHMENT 2 ATTACHMENT 3 PLANNING APPROVAL ADMINISTRATIVE CASE# ____________________ EXHIBIT# ____________________ INITIAL cflores DATE 03/08/2021 4:23:05 PM SDP2019-0006