Loading...
TC2015-0064. See. below for Finance Revenue Codes ENCROACHMENT PERMIT OFT' PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. DATE: 9/28/2015 LOCATION OF CONSTRUCTION(Street address or Description): WASHINGTON ST SOUTH OF FRED WARING DR PURPOSE OF CONSTRUCTION: TREE REMOVAL ON WASHINGTON STREET. DESCRIPTION OF CONSTRUCTION: TRAFFIC CONTROL FOR TREE REMOVAL FOR PALM ROYAL C.0 DIMENSION OF INSTALLATION OR REMOVAL: APPROXIMATE TIME WHEN WORK WILL BEGIN: 9/21/2015 TIME OF COMPLETION: 9/28/2015 ESTIMATED CONSTRUCTION COST: $18M00.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS: In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and re ulations of the City of and to pay for any additional replacement necessary as the result of this work. SIgn2u1Iof Applicant or Agent PWLC II, INC.- PAUL RASMUSSEN Name of Applicant (please print) PWLC II, INC. LIBERTY MUTUAL INS. CO. Applicant's Insurance Company 3584 E. LA CAMPANA WAY PALM SPRINGS, CA 92262 Business Address 3584 E. LA CAMPANA WAY PALM SPRINGS, CA 92262 BKW1656406468 Policy Number (760)323-9341 Telephone No. (760)323-9341 Telephone No. Name of Contractor and Job Foreman Business Address 855783 0103876 Contractor's License No. City Business License No. Finance Revenue Code PERMIT INSPECTION TRAFFIC CONTROL ONLY - 2-5 DAYS $580.00 TOTAL: $580.00 PERMIT NO: TC2015-0064 Afl DATE ISSUED: 1Q4. IS DD EXPIRATION DATE: i R 09 2015J BY: OCT WORK INSPECTED BY*: CI1YOFLAQUINTA PERMIT COMPLETION DATE: 4CWMUNITY DEVELOPMENT DEPARTMENT 5 ff the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. Date: Tract No: Vicinity: T4hf 4 a V QUM& PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Project Name: Palm Royal Country Club CO EIVED 112015 FLAQUINTA V DEVELOPMENT Purpose of Construction (i.e.: Rough Grading, Offsite Street, etc.) Treeremoval on Washington Street, close north bound right traffic lane Description of Construction (i.e.: See Plan Set No. 01234) Tree removal !- °--LST Dimension of Installation or Removal: Approximate Construction Start Date: September 21, 2015 Approximate Construction Completion Date: September 25, 2015 Estimated Construction Cost: $ 18,000.00 Estimated Construction Cost shall include the removal of all ohstriclicns, materials, and debris, back-filling. compaction and placing permanent resurfacinp and or replacing improvements Contact Name: Paul Rasmussen Phone Number: 760 323- 9341 Name of Applicant"Owner: Paul Rasmussen Applicant Address: 3584E. La Campana way, Palm Springs, CA 92262 Applicant Telephone Number: 760 323-9341 Applicant E-mail Address: paul-pw1c@hotmail.com Name of Contractor: PWLC II, INC. Contractor Address: 3584 E. La Campana Way, Palm Springs, CA 92262 Contractor Telephone Number: 760 323-9341 Contractor State License Number: C-7 855783 Contractor City Business License Number: Iic-0103876 Contractor E-mail Address: paul-pwlc@hotmail.com lllio A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED Applicant or Contractor General Liability Insurance Company: Liberty Mutual Insurance Company Applicant or Contractor General Liability Insurance Policy Number: BKW1656406468 Office Use Only: Office Use Only: 1 Inspection Fee. Assigned Permit Number: J ( Permit Fee: Approval Date: As-Built Deposit: Dust Control Deposit: Credit Amount: TOTAL FEE DUE: Application to Expiration D.te: Issue Date: Adniimslrativc Authoril\ :\ .. I: ,thXjJ o yJKJ' 1 PWLC II, Inc. u Landcare Management 3584 E. La Campana Way. PAUL RASMUSSEN Palm Springs, CA. 92262 PRESIDENT/C.E.O. Office: (760) 323-9341 paul-pwIchotmaiI.com Fax: (760) 323-9345 www.pwlclandcare.com Lic. # C27-855783 n :1 PWLC II, Inc. wtot Landcare Management R;:CEIVED rni Tf IVCDTZQ flVD A PAUL RASMUSSEN PRESIDENT/ C.E.O. paul-pwlc@hotmail.com www.pwlclandcare.com 3584 E. La Campana Way. IPPLICATION FOR PERMIT SEJ' 112015 Palm Springs, CA. 92262 Office: (760) 323-9341 Fax: (760) 323-9345 CITY QF LA QUINTA Lic. # C27-855783 oject Name: Palm Royal Country Club COMMUNrrY DEVELOPMENT Purpose of Construction (i.e.: Rough Grading, Mite Street, etc.)Tree removal on Washington Street, close north bound right traffic lane Description of Cotructiçn (i.e.: See Plan Set No. 01234) Tree removal , f)jj c Dimension of Installation or Removal: Approximate Construction Start Date: September 21, 2015 Approximate Construction Completion Date: September 25, 2015 Estimated Construction Cost: $ 18,000.00 .-' Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back-filling, compaction and placing permanent resurfacing and or replacing improvements Contact Name: Paul Rasmussen Phone Number: 760 323- 9341 Name of Applicant/Owner: Paul Rasmussen Applicant Address: 3584 E. La Campana way, Palm Springs, CA 92262 Applicant Telephone Number: 760 323-9341 Applicant E-mail Address: paul-pwlc@hotmail.com - - Name of Contractor: PWLC II, INC. Contractor Address: 3584 E. La Campana Way, Palm Springs, CA 92262 Contractor Telephone Number: 760 323-9341 Contractor State License Number: C-7. 855783 Contractor City Business License Number: lic-01O876 Contractor E-mail Address: 'A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED 4 Applicant or Contractor General Liability Insurance Company: Liberty Mutual Insurance Company Applicant or Contractor.Gèneral Liability Insurance Policy Number: Office Use Only: Inspection Fee: Permit Fee: As-Built Dcposit: Dust Control Deposit: Credit Amount TOTAL FEE DUE: Office Use Only: Assigned Permit Number: TC?fIES OO( &/ Approval Date: Expiration Date: Issue Date: Administrative Authority: City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number TC2015-0064 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quintas right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK-LAYING CONSTRUCTION EQUIPMENT: Cleated track-laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber-tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spatted, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2) of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE-WATER OPERTATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: RI NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. 0 R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify alIconcerned utility companies of the proposed work. D R4 . PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( N/A ) inches of A.C. paving placed on ( N/A ) inches of ( N/A ) aggregate sub-base course having an value of not less than ( N/A ) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. 0 R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (W) to one foot (1'). R6 . GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( N/A ) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. RB DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 W) of A.C. paving on ( N/A ) of class ( N/A ) aggregate base. 0 R9 SIGHT CLEARANCE: Sight Clearance of six-hundred feet (600') in all directions shall be assured and maintained at all times. El RIO SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturers specifications. City of La Quinta R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee: A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. 0 R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one-thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed on lifts not greater than three feet (3) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. 0 R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.00 1 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-BOO shall be placed on a prepared sub-grade. The SC-BOO temporary paving shall be placed after a maximum of three-thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. 0 R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of three inches (3") of SC-BOO shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La Quinta Standard 600 shall be placed no later than ( N/A ) days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. 0 R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. Z R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five-hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO. TC2015-0064 Palm Royale Country Club I Traffic Control for Tree Removal/ Washington St South of Fred Waring Dr In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.3 20 of the La Quinta Municipal Code (Ordinance 10 § 1.(part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. PWLC II, Inc. (Paul Rasmussen), hereinafter referred to as "Permitfee", shall be responsible for providing continuous dust and erosion control. This permit or copy of it shall be on the work site for inspection during the actual work performed. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. The Palm Royale perimeter landscaping on Washington Street shall be stabilized with DG to prevent any dust complaints and maintained consistent with the LQMC after the trees are removed. The Palm Royale HOA shall submit a final landscaping plan to the City and CVWD for review and approval before relandscaping this perimeter area on Washington Street. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday-Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday-Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays., Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:30 a.m. and after 4:30 p.m. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the City Traffic Maintenance Technician at (760) 777-7070 if signal operation at the intersection is to be altered in any way. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public .or.private Street and for any damage to other City streets or facilities as a result of work performed under this permit.. Special Conditions Page I of 3 PERMIT NO. TC2015-0064 Palm Royale Country Club / Traffic Control for Tree Removal! Washington St South of Fred Waring Dr The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts provided in Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name the City as an additional insured. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at residential streets, advance warning signs and traffic control shall be installed and maintained in accordance the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or prepared under the guidance of the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil or traffic engineer registered in the State of California. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, a traffic control plan for review and approval prior to start of construction or parking on the paved RJW. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee' s responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Associate Engineer) of the private land owner whom is being encroached upon. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Special Conditions Page 2 of 3 PERMIT NO. TC2015-0064 Palm Royale Country Club I Traffic Control for Tree Removal! Washington St South .of Fred Waring Dr IT. All excavations within City of La Quinta right-of-way shall be backfihled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfihled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. All landscaping, irrigation, decorative rock, decorative concrete, sidewalk, lighting, etc., shall be replaced to its original condition. Access and egress to all local properties shall be maintained at all times. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: No asphalt work is anticipated within the scope of work or this permit. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole cost for proper sight distance requirements per guidelines in the AASHTO "A Policy on Geometric Design of Highways and Streets, Si" Edition" or latest, in the installation of all appurtenances abutting and within the public street right-of-way. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated àertain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Special Conditions - - - Page 3 of 3 vV2 W20-5(RT) WORK - / \ RIGHT M1 &HEAO ( CLOSES 2 EXISTING 030 CA) ,\ MUST liliES RIGISTI 100 LANE CLOSED,' IDFL SO'VIA - 1..fA Is t 420-2 Ril END 1iN1 ROAD WORE / 'do EXIS'NG — 1 % - - % ROAD WORE ' A N Z4 O SCALE BUS STOP EXISTING EXISTING CALLE LAS BRSAS FRED WARiNG DR e Nge 10 ol ResSwed By Tree Removal Wne 0 PWLC II, nc Paul Rasmusser (760) 323-9341 Tmft GonVolDwIp by ompffed By By Tops N Barricades.Inc-Matt Upp Ron Afield Speed LETSt TXIT oEee( Wmw 80G)82T0PS 50 39/02; 4 5 1 cm : go of as INDIAN WELLS BUS E20T040 TENNIS GARDEN STOP w7l STAT WORE AHIAD CJDvP kv &t M NO . SS. ALL TRAFFIC CONTROL DE'/ICES FOR THIS PPQ.ECT SHALL BE W ACCORDANCE NIT THE 2O4 CALIFORNIA MANUAL ON UNIFORM TRAFC CONTROL DE:iCES CALIFORNIA Mu.TO.D 2 TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED ADDITIONAL TRAFFIC CONTROL MA BE REQUIRED O ACILITATE PUBLIC SAFET'Y AND TRAFFIC FLOW IF DEEMED NECESSARY BY OF LA OUIN TA REPRESENTATINE 3 THROUGHOLT EACH PICRK PERIOD CONTRACTOR SHAL, NSPEC TRAFFIC CONTROL SIGNS BARRICADES A DELjNEA"DPS A N D MAINTAIN SAME NCOORDANCE WITH TRAFFlC CONTROL PLANS, 4 CONTRACTOR SHALL MAINTAIN 4 MINIMJM ¶ i12 TYP TRAFFIC LANE WIDTH AT ALL 1MES 5 ACCESS TO:1 R!,,-ATE PROPEPTv SMALL BE MAINTAINED AT ALL TIMES 5 THI S TRAFIC CON TROL SL BE IN PLACED JR NC /VORI< -OURS ONLY AT THE END OF WORK OIJS 'HE ROAD SHALL BE LEAF OF DEBRIS AND IC REJRNED TO NORMALL 7 TRAFFIC CONTROL SHALL NOT BE PLACED BEORE 8 15 AM 8. 'HE CONTRACTOR WILL CLOSE THE SIDE`AjAL< ONLY WHEN NECESSARY SIGNS SHAL BE OSTE A NEARES CRNER T' TE SECON rF SIDEWALK 0 BE CLOSED AND SIDEWAL SL --'SEC uHEAC CROSS MERE SIONS SHAL BE POSED AT NEARES NTERSEQTh)N MTo'AC ROSSWALI 0 CROSS E STREET CALLE LAS BRISAS rc2o VA fA 14 INDIAN WELLS TENNIS GARDEN ROAD C30 (CA ! WORK AHEAD /LANE ..CLOSED VIP, DEL SoL % G20-2 (Ri END L ROAD WORK XWG — 0 \ ' WORE _---• 01 - 01 Cx ca Bus a STOP a ROAD WORE AHEAD [ FRED WARING DR W20-5(RTt I. ROAD *i / J WORK AHEAD ML CLOSED ST N6 C: "01 01 01 01 01 01 01 01 G21i-2 END ROAD WORK ':4 IS01tkGVXA SA OO RIGHT fooV NOTES 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA M.U.T.C.D.) 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. 3 THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS. BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROL PLANS. 4 CONTRACTOR SHALL MAINTAIN A MINIMUM 10 (12 TYP.( TRAFFIC LANE WIDTH AT ALL TIMES. 5 ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 6 THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY AT THE END OF WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL. 7, TRAFFIC CONTROL SHALL NOT BE PLACED BEFORE 815 AM. 8. THE CONTRACTOR WILL CLOSE THE SIDEWALK ONLY WHEN NECESSARY. SIGNS SHALL BE POSTED AT NEAREST CORNER TO THE SECTION OF SIDEWALK TO BE CLOSED AND SIDEWALK CLOSED AHEAD CROSS HERE SIGNS SHALL BE POSTED AT NEAREST INTERSECTION WITH A CROSSWALK TO CROSS THE STREET. Reed By PVW NUM130 Pending Trafc Cww Pw for Tree Removal C PWLC II, Inc Paul Rasmussen (760) 323-9341 c Conb Deeq by Praid By Ciedced By Tops N Barricades, Inc. Matt Upp Ron Fifield SPOWLIMIt Date She1 PAimber (800)852-TOPS 50 09/02/15 1