Loading...
PM102021-0006STONE CREEK WA Y STONE CREEK TRAIL WESTSTONE CREEK TRAIL WESTSTONE CREEK CT.PALO VERDE PLACEAVENUE 58OLD RANCH TRAIL SOUTHCORAL MOUNTAIN COURT460'460'460'RETENTION BASINQ-100 WATER SURFACE ELEV. 458.9RET.BASINEMERGENCY ACCESS ROAD12345678910111213141516171819202122232425262728293031323334353637384042434445464748495051525354555657585960616264676869707172737475769EX. HOUSEOLD RANCH TRAIL NORTHSTONE CREEK TRAIL EAST66EX. HOUSE39EX. HOUSE41VACANT LOT63EX. HOUSE65EX. HOUSEFHFHFHFHFHFHFHFHFHFHFHFHFHFHFHFHSTAGING AREACONSTRUCTIONSTABILIZEDTEMPORARYPARKING / SALES TRAILERRETENTIONBASINQ-100WATERSURFACEELEV. 460.2'RETENTIONBASINQ-100WATERSURFACEELEV. 460.2'PM10 SIGN15MPHLIMIT SIGN*PROP. STABILIZEDCONSTRUCTIONENTRANCE / EXITBACK-UPWATER SOURCE(NOT OWNED BY TOLL ORPART OF THE PROJECT)1111CITY LIMITSN.T.S.VICINITY MAP60TH AVENUE58TH AVENUEAIRPORT BOULEVARD54TH AVENUE52ND AVENUE50TH AVENUE48TH AVENUEHIGHWAY 111JACKSON STREETMONROE STREETMADISON STREETJEFFERSON STREETWASHINGTON STREETPROJECTLOCATIONCITY LIMITSIN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIATRACT MAP NO. 30834 - STONE CREEK RANCHLOCATED IN A PORTION OF THE SOUTHEAST 1/4 OF SECTION 21, TOWNSHIP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO MERIDIANAUGUST 2021PREPARED FOR:TOLL LAND XII LIMITED PARTNERSHIP725 WEST TOWN AND COUNTRY ROAD, SUITE 200ORANGE, CA 92868(760) 770-0707FUGITIVE DUST (PM-10) MITIGATION PLANDATESHEETOFFUGITIVE DUST (PM-10) MITIGATION PLANTRACT MAP NO. 30834 - STONE CREEK RANCHLOCATED IN A PORTION OF THE SE 1/4 OF SECTION 21 TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.MCITY OF LA QUINTA, CALIFORNIA4SHEETSAPPROVEDREVISIONSNO.BENCHMARKELEV.MSA CONSULTING, INC.34200 Bob Hope Drive, Rancho Mirage, CA 92270760.320.9811 msaconsultinginc.comLOCATIONJHCDESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OFSIGNATUREA.Q.M.D. CERTIFICATION # CV2103-010513-10533JESUS HERRERA-CORTESDRAWN BYCHECKED BYDGJHCPM-10 NOTES1. MATERIAL AND EQUIPMENT STORAGE YARD TO BE FENCED.2. EQUIPMENT MAINTENANCE AND CALIBRATION SHOULD BE CONDUCTED IN ACCORDANCE WITHMANUFACTURER AND REGULATORY REQUIREMENTS.3. PRE-CONSTRUCTION SITE WATERING SHALL BE DONE BY AGRI-TYPE WATER SYSTEM PRIOR TOBEGINNING SITE DISTURBANCE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSINGTHE PROJECT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CUTAREA; THE MOISTURE CONTENT OF FILL/IMPORT MATERIAL SHALL BE MAINTAINED AT LEAST 70% OF THEOPTIMUM SOIL MOISTURE CONTENT. REQUIRED DEPTH OF WATER PENETRATION TO BE DETERMINED BYGRADING CONTRACTOR'S FIELD SUPERINTENDENT AND SOILS ENGINEER.4. SITE WATERING SHALL BE DONE BY WATER TRUCKS UNTIL COMPLETION OF CONSTRUCTION. THISWATERING SHALL BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSINGTHE PROJECT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CUTAREA; THE MOISTURE CONTENT OF FILL/IMPORT MATERIAL SHALL BE MAINTAINED AT LEAST 70% OF THEOPTIMUM SOIL MOISTURE CONTENT, AND AS DIRECTED BY CITY ENGINEER.5. SITE WATERING SHALL BE UTILIZED ON DISTURBED AREAS AFTER CONSTRUCTION IS COMPLETED. THISWATERING IS TO BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THEPROJECT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CUT AREA;THE MOISTURE CONTENT OF FILL/IMPORT MATERIAL SHALL BE MAINTAINED AT LEAST 70% OF THEOPTIMUM SOIL MOISTURE CONTENT. SITE WATERING MAY BE TERMINATED UPON SOIL STABILIZATION(MEASURES DISCUSSED IN NOTE 12, PERMANENT AUTOMATIC IRRIGATION OR COMPLETEDIMPROVEMENTS)6. SITE WATERING SHALL BE DONE BY TRUCKS ON ROADWAYS USED BY CONSTRUCTION TRAFFIC. THISWATERING IS TO BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THEPROJECT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CUT AREA;THE MOISTURE CONTENT OF FILL/IMPORT/EXPORT MATERIAL SHALL BE MAINTAINED AT LEAST 70% OF THEOPTIMUM SOIL MOISTURE CONTENT.7. A SPEED LIMIT OF 15 MILES PER HOUR SHALL BE ENFORCED ON ALL DIRT ROADS FOR ALLCONSTRUCTION VEHICLES.8. WHEN LOCAL WINDS EXCEED 25 MPH AND DURING 1ST AND 2ND STAGE SMOG ALERTS, THEDIRECTIONS THROUGHOUT THIS PLAN RELATED TO WATERING, SOIL STABILIZATION AND COVERING OFHAUL VEHICLES SHOULD BE ADHERED TO INCLUDING THE FOLLOWING ACTIONS RELATING TO THESESPECIFIC CATEGORIES:EARTH MOVING - GRADING ACTIVITY SHALL BE SUSPENDED. WATER SHALL BE APPLIED TO SOILS NOTMORE THAN 15 MINUTES PRIOR TO MOVING SUCH SOILS.DISTURBED SURFACE AREA - SEE CALCULATION FOR "FREQUENCY" UNDER "PROJECT LEVELINFORMATION" THIS SHEET.UNPAVED ROADS - APPLY WATER TWICE PER HOUR DURING ACTIVE OPERATION OR AS NEEDED.OPEN STORAGE PILES - APPLY WATER TWICE PER HOUR OR INSTALL TEMPORARY COVERINGS.9. SOIL STOCKPILE AREAS SHALL BE WATERED AND COMPACTED TO ALLOW A CRUST TO FORM UNTILSOIL STABILIZER IS APPLIED, AND WATERED AS NECESSARY; HOWEVER, NO STOCKPILE IS APPROVED. CITYENGINEER APPROVAL REQUIRED PRIOR TO STOCKPILING.10. TEMPORARY 6' CHAIN LINK FENCE WITH WINDSCREEN:STEEL POSTS TO BE 214" DIAMETER @ 8' O.C. WITH 158" DIAMETER STEEL TOP RAILS. POSTS TO BE EMBEDDED3' INTO NATIVE SOIL. WINDSCREEN TO BE PLACED ON THE NORTH OR WEST SIDE OF FENCE. ATTACHWINDSCREEN TO FENCE WITH METAL GROMMETS @ 2' O.C. ON TOP AND BOTTOM. PLACE GROMMETS@ 2' O.C. VERTICALLY AT EVERY POST.11. NO SOIL STABILIZATION/DUST MITIGATION MEASURES ARE REQUIRED ON AREAS LEFT IN THEIRNATURAL CONDITION, UNLESS DISTURBED BY CONSTRUCTION TRAFFIC OR IF VISIBLE DUST OCCURS.12. SOIL STABILIZATION/DUST MITIGATION MEASURES SHALL BEGIN PRIOR TO THE GRADING OF EACHAREA. WATERING MEASURES SHALL BE USED FOR PERIODS UP TO 4 DAYS BEFORE AND AFTER GRADINGTERMINATES UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. AFTER 4 DAYS OF NO GRADINGACTIVITY OR BUILDING ACTIVITY, SURFACE SOIL STABILIZATION SHALL BE APPLIED. ALL SOILSSTABILIZATION MATERIALS SHALL CONTAIN TAN COLORANT FOR CONFIRMATION OF APPLICATION.PRODUCT OPTIONS ARE AS FOLLOWS:1. SOIL-SEMENT (ACRYLIC POLYMER EMULSION) 180 GALLONS OF CONCENTRATE PER ACRE. DILUTE9 PARTS WATER TO 1 PART CONCENTRATE (6 MONTH COATING.) NO FOOT OR VEHICULARTRAFFIC ALLOWED.2. ENVIROTAC II (ACRYLIC POLYMER EMULSION) 150 GALLONS OF CONCENTRATE PER ACRE.DILUTE TO 10 PARTS WATER TO 1 PART CONCENTRATE (6 MONTH COATING.) NO FOOT ORVEHICULAR TRAFFIC ALLOWED.3. FIBER-SORB (NATURAL WOOD FIBER BY-PRODUCT) 112" LAYER, APPROXIMATELY 100 TONS PERACRE (6 MONTH COATING.) FOOT TRAFFIC AND MINIMAL VEHICULAR TRAFFIC ALLOWED.4.ENVIROTAC II (ACRYLIC POLYMER EMULSION) 180 GALLONS OF CONCENTRATE PER ACRE.DILUTE TO 8 PARTS WATER TO 1 PART CONCENTRATE (1 YEAR COATING). NO FOOT ORVEHICULAR TRAFFIC ALLOWED.5. COMPOSITE OF 300 GALLONS OF ENVIROTAC II (CONCENTRATED), 600 POUNDS OF PAPER FIBERMULCH AND 8 PARTS WATER. INGREDIENTS TO BE MIXED AND APPLIED WITH A HYDRO SEED SPRAYRIG. THE AMOUNTS LISTED ARE PER ACRE. MATERIAL CERTIFICATES ARE TO BE PROVIDED BYAPPLICATOR UPON COMPLETION OF STABILIZATION.13. THE PROJECT OWNER WILL DESIGNATE AN INDIVIDUAL RESPONSIBLE FOR DUST CONTROL. THISINDIVIDUAL IS AVAILABLE 24 HOURS A DAY 7 DAYS A WEEK. THIS INDIVIDUAL WILL BE AVAILABLE 7 DAYSA WEEK, 24 HOURS PER DAY, FOR ANY ISSUES OR PROBLEMS PERTAINING TO FUGITIVE DUST MITIGATION.14. THE PROJECT OWNER TO PROVIDE AND INSTALL SITE SIGNS, VISIBLE TO THE PUBLIC ON EACH PUBLICROADWAY LISTING THE FOLLOWING: PROJECT NAME, TRACT/PARCEL, GENERAL CONTRACTOR'S NAME,ENVIRONMENTAL PERSON'S 24/7 PHONE NUMBER, CITY NAME AND PUBLIC WORKS DEPARTMENT PHONENUMBER, SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT COMPLAINT LINE (1-800-CUT-SMOG) ANDTHE FOLLOWING TEXT: IF YOU SEE DUST COMING FROM THIS PROJECT PLEASE CALL: (RESPONSIBLEPERSON'S NUMBER) IF YOU DO NOT GET A RESPONSE WITHIN 1 HOUR, PLEASE CALL: (PUBLIC WORKSDEPARTMENT PHONE NUMBER) REPORT THE PERMIT OR PROJECT NUMBER AND THE PHONE NUMBERABOVE OR CALL AQMD AT: AIR QUALITY MANAGEMENT DISTRICT (AQMD'S PHONE NUMBER.)15. EXPORT ACTIVITIES SHALL FOLLOW THE DIRECTIONS THROUGHOUT THIS PLAN RELATED TO WATERING,SOIL STABILIZATION, TRACK OUT AND COVERING OF HAUL VEHICLES. THE FOLLOWING ARE ADDITIONALACTIONS RELATING TO EXPORT:-EXPORT SOILS WILL BE PREMOISTENED AT THE PROJECT SITE AND ADDITIONALLY WHEN SOIL IS PLACEDIN TRUCKS (BEFORE COVERING.) MOISTURE CONTENT SHALL BE 6%-8%.-TRUCKS TO BE USED FOR EXPORT OF SOIL WILL BE BOTTOM DUMP OR END DUMP (NUMBER OF TRUCKSTO BE DETERMINED BY CONTRACTOR.)-STREET CLEANING SHALL OCCUR, AS NECESSARY, AT SOIL EXPORT LOCATION (IN ADDITION TO STREETCLEANING AT PROJECT SITE.)16. THE RESPONSIBLE DUST CONTROL INDIVIDUAL AND KEY PERSONNEL SHALL ATTEND THE SCAQMDPM10 CLASS AND OBTAIN THE PM10 CERTIFICATE NUMBER PRIOR TO CONSTRUCTION ACTIVITY.TRAINING INFORMATION MAY BE OBTAINED BY CONTACTING SCAQMD AT (909) 396-2183.17. THE LOCATION OF THE PERIMETER FENCE SHALL BE CONSIDERED TEMPORARY, UNTIL SUCH TIME ASTHE PERIMETER WALL OF THE PROJECT IS IN PLACE. THIS TEMPORARY LOCATION SHOULD PROVIDE FORADEQUATE SIGHT DISTANCE AT INTERSECTIONS, BY MEANS OF A SETBACK OF A SUFFICIENT ANGLE TOALLOW FOR A SAFE STOPPING DISTANCE. AFTER A REASONABLE PERIOD OF TIME, THE TEMPORARYPERIMETER FENCING AND SAND SHIELD WILL BE MOVED BACK FROM THE PROPERTY LINE.18. STREET CLEANING SERVICES SHALL BE PROVIDED BY INDEPENDENT CONTRACTOR.GENERAL NOTES1. FOR CONSTRUCTION NOTES, REFER TO THE CONSTRUCTION PLAN.2. FUGITIVE DUST MITIGATION MEASURES MAY REQUIRE ADJUSTMENTS AS NECESSARY BASED ON THEPROGRESS OF CONSTRUCTION AND OBSERVED SITE CONDITIONS.3. FOR GRADING NOTES, REFER TO GRADING PLANPM10 SIGN15 MPH SPEED LIMIT SIGN(LOCATION IS SCHEMATIC ONLY)(LOCATION IS SCHEMATIC ONLY)WDID: 7 33C394319 R=20'INTERIOR PAVED ROADRUMBLE STRIPS (TYPICALLY 8'X10')DETAIL A3" COARSE AGGREGATE, 6" THICK50'STABILIZED CONSTRUCTION ENTRANCE (FOR REFERENCE)N.T.S.24'THE BMP DIMENSIONS MAY REQUIRE ADJUSTMENTS TO THE SPACE ANDCONFIGURATION AVAILABLE AT THE STAGING LOCATION LOT.NOTE:FHLEGENDDISTURBED DISTURBED SURFACE LIMITED TO 70 INDIVIDUAL LOTS WITH A TOTAL AREA OF 18.28 ACRES. EXISTING PAVEDSTREETS, LANDSCAPING, CONSTRUCTED LOTS, AND OTHER COMMON AREAS ARE NOT PART OF THE PROJECT.APPROPRIATE SCREENING SHOULD BE INSTALLED TO PROTECT EXISTING HOMES OR NEW HOMES THAT BECOME OCCUPIED.SITE MAP*TEMPORARY CONSTRUCTION STAGING AREALOCATION OF CONSTRUCTION TRAILER, RESTROOMS, TEMPORARY POWER, MATERIAL STORAGE, EQUIPMENT STORAGE,EQUIPMENT MAINTENANCE, WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMP'S. THE LOCATION ANDEXTENT SHOWN IS SCHEMATIC ONLY, CONTRACTOR TO DETERMINE THE ACTUAL LOCATION (AND RE-LOCATION) .EXISTING SOLID WALL / BARRIERSTABILIZED CONSTRUCTION ENTRANCE/EXIT (TC-1)INSTALL PER TC-1 GUIDELINES AND SCAQMD RULE 403/403.1 REGULATIONS.(PERMANENT SEDIMENT BARRIER)EXISTING FIRE HYDRANT(QSP OR CONTRACTOR TO IDENTIFY WHICH FIRE HYDRANT WILL PROVIDE CONSTRUCTION WATER.)PROJECT PARCELS/LIMITS OF DISTURBANCE Jesus Herrera-Cortes            9/14/21 2DATESHEETOFFUGITIVE DUST (PM-10) MITIGATION PLANTRACT MAP NO. 30834 - STONE CREEK RANCHLOCATED IN A PORTION OF THE SE 1/4 OF SECTION 21 TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.MCITY OF LA QUINTA, CALIFORNIA4SHEETSAPPROVEDREVISIONSNO.BENCHMARKELEV.MSA CONSULTING, INC.34200 Bob Hope Drive, Rancho Mirage, CA 92270760.320.9811 msaconsultinginc.comLOCATIONJHCDESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OFSIGNATUREA.Q.M.D. CERTIFICATION # CV2103-010513-10533JESUS HERRERA-CORTESDRAWN BYCHECKED BYDGJHC Jesus Herrera-Cortes            9/14/21 3DATESHEETOFFUGITIVE DUST (PM-10) MITIGATION PLANTRACT MAP NO. 30834 - STONE CREEK RANCHLOCATED IN A PORTION OF THE SE 1/4 OF SECTION 21 TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.MCITY OF LA QUINTA, CALIFORNIA4SHEETSAPPROVEDREVISIONSNO.BENCHMARKELEV.MSA CONSULTING, INC.34200 Bob Hope Drive, Rancho Mirage, CA 92270760.320.9811 msaconsultinginc.comLOCATIONJHCDESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OFSIGNATUREA.Q.M.D. CERTIFICATION # CV2103-010513-10533JESUS HERRERA-CORTESDRAWN BYCHECKED BYDGJHCGRADING CONTRACTOR OR COMPANY NAME:PART 4APPLICATION CONSENT AND AGREEMENTAPPLICATION FOR APPROVAL OF THIS PM10 PLAN IS HEREBY MADE TO THE CITY ENGINEER OR HIS DESIGNEE, AS PART OF AGRADING PERMIT APPLICATION, SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN:1. EACH PERSON UPON WHOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE REQUEST AND FORWHOSE BENEFIT WORK IS PERFORMED UNDER AND PURSUANT TO ANY PERMIT ISSUED AS A RESULT OF THISAPPLICATION AGREES TO, AND SHALL INDEMNIFY AND HOLD HARMLESS THE CITY OF LA QUINTA, ITS OFFICERS,AGENTS AND EMPLOYEES.2. ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS NOT COMMENCEDWITHIN 90 DAYS FROM THE DATE OF ISSUANCE OF SUCH PERMIT.3. THE APPLICANT, OWNER, CONTRACTOR(S), SUBCONTRACTOR(S), BUILDERS OR OTHER AGENTS, HEIRS OR ASSIGNEESSHALL CONFORM TO THIS PM10 DUST CONTROL PLAN AS APPROVED BY THE CITY. SAID PLAN INCLUDES NOTESAND/OR DRAWINGS OF TEMPORARY OR PERMANENT CONTROL METHODS OR DEVICES PROPOSED TO BE USED. THISPM10 PLAN SHALL BE CONSIDERED AN ADDENDUM TO, AND A NECESSARY PART OF, ANY GRADING, STOCKPILE,IMPROVEMENT, BUILDING OR DEMOLITION PLAN OTHERWISE REQUIRED FOR CITY PERMITS.4. BY AGREEING TO CONFORM TO THIS PLAN AS APPROVED BY THE CITY, THE OWNER, CONTRACTOR(S),SUBCONTRACTOR(S) AND BUILDERS, DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENTPROCEDURES AS SHOWN ON SHEET 3.5. NO CONTRACTOR, SUBCONTRACTOR, OR BUILDER OF ANY TYPE SHALL BE ALLOWED TO WORK ON SITE WITHOUTHAVING ATTENDED A REGULARLY SCHEDULED A.Q.M.D. WORKSHOP.LICENSED CONTRACTOR'S DECLARATION:I HEREBY AFFIRM THAT I AM LICENSED UNDER THE PROVISIONS OF CHAPTER 9 (COMMENCING WITH SECTION 7000 OFDIVISION 3 OF THE BUSINESS AND PROFESSIONS CODE), AND THAT MY LICENSE IS IN FULL FORCE AND EFFECT. I HAVE READTHE CONDITIONS OF THE FUGITIVE DUST (PM10) MITIGATION PLAN AND THE OWNER HAS AUTHORIZED IMPLEMENTATION OFALL OF ITS PROVISIONS THROUGHOUT PROJECT BUILD OUT AND UNTIL THE ISSUANCE OF CERTIFICATES OF OCCUPANCY.LICENSE CLASSNO.CONTRACTORS NAMECOMPANY NAMECOMPANY ADDRESSCONTACT PHONE NUMBERSDAY NIGHTCONTRACTORS SIGNATUREDATEI HAVE READ THE CONDITIONS OF THE FUGITIVE DUST (PM10) MITIGATION PLAN AND THE OWNER HAS AUTHORIZED THEIMPLEMENTATION OF ALL ITS PROVISIONS THROUGHOUT PROJECT BUILD OUT.TRADELICENSE CLASS NO.PHONE NUMBEREMERGENCY PHONE NUMBERSIGNATURE OF GRADING CONTRACTOR OR AUTHORIZED REPRESENTATIVEDATESEWER AND WATER CONTRACTOR OR COMPANY NAME:TRADELICENSE CLASS NO.PHONE NUMBEREMERGENCY PHONE NUMBERSIGNATURE OF GRADING CONTRACTOR OR AUTHORIZED REPRESENTATIVEDATEDRY UTILITY CONTRACTOR OR COMPANY NAME:TRADELICENSE CLASS NO.PHONE NUMBEREMERGENCY PHONE NUMBERSIGNATURE OF GRADING CONTRACTOR OR AUTHORIZED REPRESENTATIVEDATEPAVING CONTRACTOR OR COMPANY NAME:TRADELICENSE CLASS NO.PHONE NUMBEREMERGENCY PHONE NUMBERSIGNATURE OF GRADING CONTRACTOR OR AUTHORIZED REPRESENTATIVEDATELANDSCAPE CONTRACTOR CONTRACTOR OR COMPANY NAME:TRADELICENSE CLASS NO.PHONE NUMBEREMERGENCY PHONE NUMBERSIGNATURE OF GRADING CONTRACTOR OR AUTHORIZED REPRESENTATIVEDATECONTRACTOR AGREEMENT CONTINUED ON SHEET 4OWNER'S CERTIFICATIONFINANCIAL SECURITY:TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURES, A FINANCIAL SECURITY WHICH IS EQUAL TOTHE COST OF IMPLEMENTATION OF ANY MITIGATION MEASURES SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANYPERMIT. ANY FINANCIAL SECURITIES COLLECTED UNDER THE PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITYOF LA QUINTA FOR POTENTIAL USE IN MITIGATING SOURCES OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THEPROPERTY OWNER. THE UNUSED BALANCE SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTEDTHE FINAL IMPROVEMENT AND ISSUED CERTIFICATES OF OCCUPANCY.I CERTIFY THAT I HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THISPROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. I UNDERSTAND THAT THE DUST CONTROLSECURITY THAT I'VE POSTED WITH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, AND ADDITIONAL CHARGES, IFNEEDED, TO MITIGATE ANY VISIBLE EMISSIONS OR FUGITIVE DUST, IF I FAIL TO KEEP THE DUST UNDER CONTROL. IUNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THISSITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THEPROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE-VEGETATED ANDPAVED. RESPONSIBILITY FOR THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL ORA PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS OR OWNERS. A REPLACEMENT PM10 PLAN AND DUSTCONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED PORTION OF THE PROJECT.I HEREBY AUTHORIZE THE PERSON LISTED BELOW AS THE "RESPONSIBLE PERSON" AND HIS DESIGNATED AGENTS, TO BE THEREPRESENTATIVE AND CONTACT PERSON FOR ALL DUST COMPLAINTS INVOLVING THIS PROJECT.I CERTIFY THAT I HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN IS TRUE AND CORRECT. IAGREE TO COMPLY WITH THE CITY FUGITIVE DUST ORDINANCE, A.Q.M.D. RULE 403, 403.1 AND THE FINAL COACHELLAVALLEY S.I.P. AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES, LANDSCAPING, AND BUILDING OPERATIONS. IAUTHORIZE REPRESENTATIVES OF THE CITY OF LA QUINTA TO ENTER UPON THE ABOVE-MENTIONED PROPERTY FORINSPECTION AND/OR ABATEMENT PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY AND ITS REPRESENTATIVES FROMLIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT.OWNER'S NAME(S):OWNER'S ADDRESS:CONTACT PHONE NUMBERS: DAYOWNER'S SIGNATURE(S):DATE:AUTHORIZED RESPONSIBLE PERSON'S CERTIFICATIONI CERTIFY THAT I HAVE READ THIS APPLICATION AND PM10 PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THECOMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. AS THE AUTHORIZEDRESPONSIBLE PERSON FOR THIS PROJECT I WILL LIST MY PHONE NUMBER ON THE REQUIRED SITE SIGNS, AND I WILL RESPONDTO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT. I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY 7DAYS PER WEEK, FROM THE DATE THAT THE PROJECT IS FIRST DISTURBED IN ANY WAY FROM THE NATURAL VEGETATEDCONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THEPROJECT SITE IS ACCEPTABLY RE-VEGETATED AND PAVED. I ALSO CERTIFY THAT I HAVE ATTENDED AN A.Q.M.D. SEMINARON FUGITIVE DUST CONTROL.NAME:CERTIFICATION NO.:COMPANY:ADDRESS:CONTACT PHONE NUMBER (24 HOURS):SIGNATURE:PART 5COST INFORMATIONAPPLICABLE TO MEDIUM-LARGE SCALE CONSTRUCTION/DEMOLITION PROJECTS(GREATER THAN 5 ACRES)FUGITIVE DUST (PM10) MITIGATION PLANDATE: JURISDICTION: PERMIT NO.: IN ACCORDANCE WITH THE FUGITIVE DUST CONTROL ORDINANCE, OF THE CITY OF LA QUINTA, THE FOLLOWING FORMSHALL BE COMPLETED AND RETURNED WITHIN 15 DAYS PRIOR TO ISSUANCE OF CERTIFICATES AND PERMITS FOR GRADING,USE AND OCCUPANCY PERMITS OR AT OTHER TIMES PREDETERMINED BY THE CITY.PROJECT OWNER/PROPONENT:ADDRESS: DAY PHONE NUMBER:EMERGENCY PHONE NUMBER:IN THE SPACE PROVIDED BELOW LIST THE COSTS ASSOCIATED WITH IMPLEMENTATION OF ALL DUST CONTROL MEASURES.THE COST INFORMATION PROVIDED BELOW SHALL INCLUDE ALL IMPLEMENTATION COSTS (INCLUDING LABOR, EQUIPMENT,MATERIALS AND TOOLS) REQUIRED FOR DUST CONTROL THROUGHOUT THE PROJECT. ALL MEASURES LISTED BELOW MAYNOT APPLY TO ALL PROJECTS.WATERING:CHEMICAL STABILIZATION:WIND FENCING:COVERING HAUL VEHICLES:WHEEL WASHERS: STREET SWEEPING:PAVING:WIND SHELTERING:COVERINGS:VEGETATION RE-ESTABLISHMENT:AFTER PROJECT COMPLETION THESE RECORDS SHALL BE TRANSMITTED TO THE AGENCY WHERE THE GRADING/DEMOLITIONPERMIT WAS ATTAINED AND TO THE COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS (CVAG) AT THE ADDRESSPROVIDED BELOW.PM10 COST MONITORING SECTION, COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS73-710 FRED WARING DRIVE, SUITE 200PALM DESERT, CALIFORNIA 92260PART 6RESPONSIBLE PERSON1. NAME AND LIST ALL RESPONSIBLE PERSONS.2. RESPONSIBLE PERSONS SHALL BE APPROVED BY THE CITY ENGINEER. RESUMES OF EXPERIENCE AND CERTIFICATIONOF ATTENDANCE AT AQMD PM-10 CLASSES AND OTHER REQUESTED DOCUMENTATION SHALL BE PROVIDED TO THECITY FOR REVIEW PRIOR TO ACCEPTANCE.3. THE CITY RESERVES THE RIGHT TO REJECT ANY PROPOSED OR ACCEPTED RESPONSIBLE PERSON, AT ANY TIMEWITHOUT PREJUDICE.4. EACH OBSERVER SHALL BE EQUIPPED WITH A 24 HOUR CELLULAR PHONE, RESPONSIBLE PERSON CHECKLIST, ACAMERA, A LOG BOOK AND A VEHICLE.5. IF THE PM-10 RESPONSIBLE PERSON LEAVES THE SITE FOR ANY REASON, NO CONSTRUCTION THAT MAY CAUSEFUGITIVE DUST SHALL OCCUR UNTIL THE RESPONSIBLE PERSON, OR A REPLACEMENT HAS RETURNED. CONSTRUCTIONACTIVITY DURING THE RESPONSIBLE PERSON'S ABSENCE SHALL BE LIMITED TO OPERATION OF FUGITIVE DUSTPREVENTION EQUIPMENT INCLUDING WATER TRUCKS, CHEMICAL STABILIZATION TRUCKS, AND EQUIPMENT REQUIREDFOR INSTALLATION AND REPAIR OF WIND FENCING.6. THE CELLULAR PHONE SHALL BE IN THE POSSESSION OF THE RESPONSIBLE PERSON AT ALL TIMES.7. THE PHONE NUMBER FOR THE 24 HOUR PHONE SHALL BE MAINTAINED AND POSTED ON THE CITY APPROVED 8'X4' OR4'x3' PERIMETER SIGNS.8. THE REPORT SHALL BE PREPARED EVERY DAY. THE REPORTS, LOGS AND PHOTOS SHALL BE CONTAINED IN A FOLDERTHAT IS ACCESSIBLE IN THE CONSTRUCTION TRAILER, 24/7.ALLEN JANISCH725 WEST TOWN AND COUNTRY ROAD, SUITE 200, ORANGE, CA 92868(760) 275-9082ALLEN JANISCHCVTOLL LAND XII LIMITED PARTNERSHIP725 WEST TOWN AND COUNTRY ROAD, SUITE 200, ORANGE, CA 92868(760) 275-9082CITY OF LA QUINTATO BE PROVIDEDTOLL LAND XII LIMITED PARTNERSHIP725 WEST TOWN AND COUNTRY ROAD, SUITE 200ORANGE, CA 92868(714) 347-1300(760) 275-9082 Jesus Herrera-Cortes             9/14/21 4DATESHEETOFFUGITIVE DUST (PM-10) MITIGATION PLANTRACT MAP NO. 30834 - STONE CREEK RANCHLOCATED IN A PORTION OF THE SE 1/4 OF SECTION 21 TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.MCITY OF LA QUINTA, CALIFORNIA4SHEETSAPPROVEDREVISIONSNO.BENCHMARKELEV.MSA CONSULTING, INC.34200 Bob Hope Drive, Rancho Mirage, CA 92270760.320.9811 msaconsultinginc.comLOCATIONJHCDESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OFSIGNATUREA.Q.M.D. CERTIFICATION # CV2103-010513-10533JESUS HERRERA-CORTESDRAWN BYCHECKED BYDGJHCSAMPLE PM10 SIGN DETAIL3' TYP.4"x4" WOOD POSTS4'3'PERMIT NO. XXXXXCITY OF LA QUINTAFROM THIS PROJECT PLEASE CALL:IF YOU SEE DUST COMING2.5"6.0"1.5"6.0"TEXT HT.6' MIN.TRACT MAP NO. 30834 BLACK LETTERS, WHITE BACKGROUND - 4' H x 8' L(760) 275-90826.0"3.0"3.0"IF YOU DON'T GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL:THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT (760) 416-5315 REPORT THE PERMIT OR PROJECT NO. AT THE PHONE NUMBER ABOVEOR CALL AIR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-76641.5"2.0"1.5"1.5"COMPACTEDSOILO.G.ALLEN JANISCH6.0" Jesus Herrera-Cortes            9/14/21