Loading...
EC2021-0003PALATINE C O U R T PROP. LINEAR SEDIMENT BARRIER (TYP.) 58TH AVENUE CORAL VIEW WAYVERA CRUZ COURTPROP. STORM DRAIN CATCH BASIN (TYP.) SE G OVI A VIEW WAY ARAGON WAYC O R AL VI EW WAY SIDON IA WAY A V EN TINA WAYLOT ''S'' LOT ''S'' LOT ''S'' LOT ''P'' BASIN "B" RETENTION RETENTION BASIN "A" RETENTION BASIN "C" LOT ''Q'' PROP. STORM DRAIN CATCH BASIN (TYP.) PROP. STORM DRAIN CATCH BASIN (TYP.) PROPOSED 2' RETAINING WALL PROP. STORM DRAIN CATCH BASIN (TYP.) PROP. STABILIZED CONSTRUCTION ENTRANCE / EXIT PROP. TEMPORARY CHAIN LINK FENCE WITH WIND SCREEN (TYP.) PROP. TEMPORARY CHAIN LINK FENCE WITH WIND SCREEN (TYP.) LOT ''R'' RETENTION BASIN "E" PROP. STORM DRAIN DRYWELL (TYP.) PROP. STORM DRAIN CATCH BASIN (TYP.) RETENTION BASIN "D"LOT ''O'' * 1 5 8 12 14 16 24 30 31 3 34 7 2 4 6 9 3211 15 10 33 13 18 36 17 19 20 21 22 23 2625 28 27 29 38394041424344 45 46 35 37 47 515049 48 52 70 71727374757677 787980 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 81 82 83 84 85 ALTERNATE OR SECONDARY STABILIZED CONSTRUCTION ENTRANCE/EXIT * CURB CUT-BACK (TYP.) CURB CUT-BACK (TYP.) CURB CUT-BACK (TYP.) CURB CUT-BACK (TYP.)W LEGEND LIMITS OF DISTURBANCE SWPPP INTRODUCTION THIS SWPPP IS DEVELOPED FOR A PROJECT WITH COVERAGE UNDER THE STATE WATER RESOURCES CONTROL BOARD (SWRCB) ORDER NO. 2009-0009-DWQ (GENERAL PERMIT NO. CAS000002) AS AMENDED BY 2010-0014-DWQ (CGP) ON THE BASIS OF A RISK LEVEL 1 DETERMINATION. THE POST-CONSTRUCTION STANDARDS AND REQUIREMENTS ARE COVERED UNDER THE WHITEWATER RIVER REGION WATER QUALITY MANAGEMENT PLAN FOR URBAN RUNOFF, PURSUANT TO THE COLORADO RIVER BASIN REGION MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PERMIT. REFER TO THE FOLLOWING LINKS TO REVIEW THE GOVERNING PERMIT DOCUMENTATION IN ITS ENTIRETY: •CALIFORNIA STATE WATER RESOURCES CONTROL BOARD - 2009-0009-DWQ CONSTRUCTION GENERAL PERMIT: (HTTP://WWW.WATERBOARDS.CA.GOV/WATER_ISSUES/PROGRAMS/STORMWATER/CONSTPERMITS.SHTML) •WHITEWATER RIVER REGION WATER QUALITY MANAGEMENT PLAN: (HTTP://RCFLOOD.ORG/NPDES_TEST/WHITEWATERWS.ASPX) •STORM WATER MULTIPLE APPLICATION AND REPORT TRACKING SYSTEM (SMARTS): (HTTPS://SMARTS.WATERBOARDS.CA.GOV/SMARTS/FACES/SWSMARTSLOGIN.JSP) THE LRP SHALL ENSURE THAT THIS SWPPP IS DEVELOPED AND AMENDED OR REVISED BY A QSD. THIS SWPPP IS DESIGNED TO ADDRESS THE FOLLOWING OBJECTIVES: 1. ALL POLLUTANTS AND THEIR SOURCES, INCLUDING SOURCES OF SEDIMENT ASSOCIATED WITH CONSTRUCTION, CONSTRUCTION SITE EROSION AND ALL OTHER ACTIVITIES ASSOCIATED WITH CONSTRUCTION ACTIVITY ARE CONTROLLED; 2. WHERE NOT OTHERWISE REQUIRED TO BE UNDER A REGIONAL WATER BOARD PERMIT, ALL NON-STORM WATER DISCHARGES ARE IDENTIFIED AND EITHER ELIMINATED, CONTROLLED OR TREATED; 3. SITE BMPs ARE EFFECTIVE AND RESULT IN THE REDUCTION OR ELIMINATION OF POLLUTANTS IN STORM WATER DISCHARGES AND AUTHORIZED NON-STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITY TO THE BAT/BCT STANDARD; 4. CALCULATIONS AND DESIGN DETAILS AS WELL AS BMP CONTROLS FOR SITE RUN-ON ARE COMPLETE AND CORRECT; 5. STABILIZATION BMPs INSTALLED TO REDUCE OR ELIMINATE POLLUTANTS AFTER CONSTRUCTION IS COMPLETED. THE LRP IS REQUIRED TO MAINTAIN A PAPER OR ELECTRONIC COPY OF ALL REQUIRED RECORDS FOR THREE YEARS FROM THE DATE GENERATED OR DATE SUBMITTED, WHICHEVER IS LAST. THESE RECORDS MUST BE MADE AVAILABLE AT THE CONSTRUCTION SITE DURING WORKING HOURS AND SHALL BE MADE AVAILABLE UPON REQUEST BY A STATE OR MUNICIPAL INSPECTOR UNTIL CONSTRUCTION IS COMPLETED. ALL INSPECTION, MAINTENANCE, REPAIR AND GENERAL IMPLEMENTATION ACTIVITIES OF THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PERFORMED OR SUPERVISED BY A QUALIFIED SWPPP PRACTITIONER (QSP) REPRESENTING THE DISCHARGER. THE QUALIFIED SWPPP PRACTITIONER MAY DELEGATE ANY OR ALL OF THESE ACTIVITIES TO AN EMPLOYEE PROPERLY TRAINED TO PERFORM THE ENCLOSED TASKS, BUT SHALL PROVIDED SUFFICIENT DOCUMENTATION OF TRAINING AND ENSURE ADEQUATE DEPLOYMENT. REPORTABLE DISCHARGES OR OTHER VIOLATIONS OF THE GENERAL PERMIT SHALL BE PROPERLY DOCUMENTED. AN ANNUAL REPORT SHALL BE PREPARED, CERTIFIED AND ELECTRONICALLY SUBMITTED IN ACCORDANCE WITH THE REPORTING REQUIREMENTS NO LATER THAN SEPTEMBER 1 OF EACH YEAR. THE SWPPP SHALL BE AMENDED OR MODIFIED BY A QUALIFIED SWPPP DEVELOPER (QSD) TO REFLECT ANY CHANGES IN CONSTRUCTION OR OPERATIONS WHICH MAY AFFECT THE DISCHARGE OF POLLUTANTS FROM THE CONSTRUCTION SITE TO SURFACE WATERS, GROUNDWATER(S), OR A MINICIPAL STORM SEWER SYSTEM (MS4). REFER TO THE SWPPP AMENDMENT LOG ON SHEET 4. CHANGES TO PERMIT COVERAGE SHALL BE PROPERLY DOCUMENTED AND FILED WHEN A PORTION OF THE PROJECT IS COMPLETE AND/OR CONDITIONS FOR TERMINATION COVERAGE HAVE BEEN MET; WHEN OWNERSHIP OF A PORTION OF THE PROJECT IS SOLD TO A DIFFERENT ENTITY; OR WHEN NEW ACREAGE IS ADDED TO THE PROJECT. TERMINATION OF COVERAGE UNDER THE GENERAL PERMIT SHALL BE ATTAINED THROUGH A NOTICE OF TERMINATION (NOT) SUBMITTED ELECTRNICALLY VIA SMARTS. THIS SWPPP HAS BEEN PREPARED ASSUMING THE PROJECT QSP'S UNDERSTANDING OF THE APPLICABLE CONSTRUCTION GENERAL PERMIT REGULATIONS. ANY INSTRUCTIONS, MEASURES OR REFERENCES FOUND IN THIS DOCUMENT THAT ARE NOT SUFFICIENTLY SELF-EXPLANATORY TO THE PROJECT'S QSP SHALL BE CLARIFIED WITH THE QSD ON RECORD TO ENSURE A TIMELY AND PROPER IMPLEMENTATION. IT IS THE QSP'S RESPONSIBILITY TO ENSURE ADEQUATE DEPLOYMENT OF THIS SWPPP. PERMIT REGISTRATION DOCUMENTS (PRDs) THE FOLLOWING ITEMS WERE ELECTRONICALLY FILED TO OBTAIN COVERAGE UNDER THE GENERAL PERMIT: 1. NOTICE OF INTENT 2. RISK ASSESSMENT 3. SITE PLAN 4. STORM WATER POLLUTION PREVENTION PLAN 5. FEE STATEMENT 6. SUPPORTING INFORMATION AND DOCUMENTATION REFER TO THE STORM WATER MULTIPLE APPLICATION AND REPORT TRACKING SYSTEM (SMARTS) TO ACCESS COPIES OF THESE DOCUMENTS. NOTE WRITTEN AND NOTARIZED PERMISSION MAY BE NECESSARY FROM ANY ADJACENT LAND OWNERS WHOSE PROPERTY WILL BE USED IN ANY MANNER FOR CONSTRUCTION, STAGING, ACCESS, ETC. PRIOR TO SUCH USAGE. WDID: 7 33C394292 WATER RISK DETERMINATION DOES THIS PROJECT DISCHARGE TO A WATER BODY LISTED AS IMPAIRED DUE TO SEDIMENTATION PURSUANT TO SECTION 303(D) OF THE CLEAN WATER ACT? NO DOES THE SITE DRAIN INTO A WATER BODY WITH A SEDIMENT/SILTATION OR TURBIDITY TMDL? NO DOES THE DISTURBED AREA DISCHARGE TO A WATER BODY WITH DESIGNATED BENEFICIAL USES OF SPAWN & COLD & MIGRATORY? NO R FACTOR VALUE:38.72 K FACTOR VALUE: 0.37 LS FACTOR VALUE: 0.74 WATERSHED EROSION ESTIMATE:10.6015 PROJECT SUMMARY THIS SWPPP APPLIES TO A PREVIOUSLY ENTITLED AND PARTIALLY CONSTRUCTED TRACT MAP NO. 31249, NAMED CANTERA AT CORAL MOUNTAIN, ENCOMPASSING APPROXIMATELY 33.21 ACRES, LOCATED SOUTH OF AVENUE 58 AND APPROXIMATELY 0.50 MILES WEST OF MADISON STREET IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE. THE PROJECT IS LOCATED WITHIN THE WHITEWATER RIVER REGION AND APPROXIMATELY 7.4 MILES UPSTREAM OF THE COACHELLA VALLEY STORMWATER CHANNEL. TRACT MAP NO. 31249 WAS RECORDED ON OCTOBER 12TH, 2006. THE PROJECT OBTAINED GRADING AND HYDROLOGY DESIGN APPROVALS, LEADING TO INITIAL SITE ACTIVITIES INVOLVING CLEARING, GRADING, AND STORM DRAIN SYSTEM CONSTRUCTION PRESENTLY OBSERVED. THE ENTITLED, APPROVED, AND PARTIALLY CONSTRUCTED STORM DRAIN SYSTEM FOR THE PROJECT SERVES AS THE BASELINE CONDITION FOR THIS SWPPP. THE APPROVED DOCUMENTS HAVE ALREADY DETERMINED THE ON-SITE DRAINAGE CONDITIONS (DRAINAGE CONVEYANCES, INLET LOCATIONS, OUTLET POINTS) TO BE REFLECTED IN THIS PLAN. THE PROJECT INVOLVES 85 NUMBERED SINGLE-FAMILY RESIDENTIAL LOTS AND 18 LETTERED LOTS FOR A COMBINED MAP AREA OF 33.21 ACRES (GROSS). THE LETTERED LOTS CORRESPOND TO INTERIOR STREETS, OPEN SPACE, AND DESIGNATED RETENTION BASIN AREAS. BASED ON THE TRACT MAP NO. 31249 SUPPLEMENTAL HYDROLOGY REPORT, THE PROJECT IS DIVIDED INTO FIVE DRAINAGE AREAS, IDENTIFIED AS A, B, C, D & E. EACH DRAINAGE AREA INCLUDES A RECEIVING ON-SITE RETENTION BASIN SIZED TO CONTAIN THE 100-YEAR STORMWATER RUNOFF VOLUME. AN OFF-SITE TRIBUTARY STREET SURFACE PORTION OF AVENUE 58 TO THE NORTH WILL BE ACCEPTED BY THE ON-SITE STORM DRAIN SYSTEM AND RETENTION BASINS CORRESPONDING TO DRAINAGE AREAS D AND E. CANTERA AT CORAL MOUNTAIN (TRACT MAP NO. 31249)PROJECT NAME PROJECT LOCATION CITY COUNTY SOUTH OF AVENUE 58 LA QUINTA COUNTY OF RIVERSIDE REGION REGION 7 - COLORADO RIVER BASIN LATITUDE/LONGITUDE 33.62590 NORTH, -116.26160 WEST EXISTING LAND USE GRADED UNDER PRIOR APPROVALS PROPOSED LAND USE RESIDENTIAL AREA OF DISTURBANCE 33.21 ACRES EXISTING SITE IMPERVIOUS AREA APPROX. 5% EXISTING SITE PERVIOUS AREA APPROX. 95% PROP. SITE IMPERVIOUS AREA APPROX. 48 % PROP. SITE PERVIOUS AREA APPROX. 52 % ESTIMATED PROJECT START DATE:JULY 2021 ESTIMATED PROJECT COMPLETION DATE:JULY 2025 SOURCE OF WATER MUNICIPAL SOURCE (CVWD) PROJECT RECEIVING WATER RISK LOW PROJECT SEDIMENT RISK LOW RISK LEVEL DETERMINATION RISK LEVEL 1 (LOCATION IS SCHEMATIC ONLY. CONTRACTOR TO ADJUST LOCATION AS NECESSARY BASED ON FIELD OBSERVATIONS, PROGRESS OF CONSTRUCTION, AND QSP FEEDBACK. REFER TO CASQA FACT SHEETS SE-5 AND SE-6 FOR IMPLEMENTATION CONSIDERATIONS AND DETAILS. SE-5 FIBER ROLLS: RECOMMENDED ALONG PORTIONS OF THE PROJECT-WIDE AREA OF DISTURBANCE PERIMETER WITHIN FENCED LIMITS. FOR SLOPE SEDIMENT CONTROL, INSTALL ON LEVEL CONTOURS WITH SPACING BASED ON SLOPE INCLINATION PER CASQA FACT SHEET SE-5. SE-6 GRAVEL BAG BERM: SERIES OF GRAVEL-FILLED BAGS TO BE PLACED ON A LEVEL CONTOUR TO INTERCEPT SHEET FLOWS. FOR SUITABLE APPLICATIONS AND MAINTENANCE, REFER TO CASQA FACT SHEET SE-6. CURB CUT-BACK: SUITABLE AT TRANSITIONS BETWEEN NEWLY PAVED AREAS AND EXPOSED SOIL AT A LATER STAGE OF CONSTRUCTION. CUT BACK SOIL FROM CURB 2" - 4" DEEP TO FORM A TEMPORARY SEDIMENT TRAP. EXTEND A CUT-BACK DISTANCE OF 3' - 4' FROM BEHIND THE CURB. ALLOW RUNOFF TO INFILTRATE OR EVAPORATE. REMOVE ACCUMULATED SEDIMENT TO MAINTAIN SYSTEM CAPACITY. DISTURBED SURFACE AREA IS BASED ON THE TRACT LIMITS AND ASSOCIATED AVENUE 58 IMPROVEMENTS. QSP TO CONFIRM THE ACTUAL EXTENT BASED ON FIELD OBSERVATIONS. OFF-SITE DISTURBANCE IN THE FORM OF TEMPORARY CLEARING, GRADING, PARKING AND MATERIALS STORAGE IS NOT PERMITTED WITHOUT A CHANGE OF INFORMATION (COI) BEING FILED IN SMARTS) TEMPORARY LINEAR SEDIMENT BARRIER PROPOSED 6' CHAIN LINK FENCE WITH WIND SCREEN INSTALL AND MAINTAIN WIND FENCE AT PROJECT PERIMETER UNTIL A SOLID WALL IS CONSTRUCTED IN ITS PLACE. INTERIOR WIND FENCING WILL BE DETERMINED BY CONSTRUCTION PHASING. JESUS HERRERA-CORTESNAME QUALIFIED SWPPP DEVELOPER (QSD) CASQA QSD/QSP CERTIFICATE NO. CERTIFIED PROFESSIONAL IN STORM WATER QUALITY COMPANY NAME ADDRESS 26933 1173 MSA CONSULTING, INC. 34200 BOB HOPE DRIVE CITY, STATE AND ZIP CODE RANCHO MIRAGE, CALIFORNIA, 92270 TELEPHONE (760) 320-9811 FAX (760) 323-7893 CONTACTOR NAME CONTRACTOR/SUB CONTRACTOR COMPANY NAME ADDRESS CITY, STATE AND ZIP CODE TELEPHONE STORM DRAIN INLET PROTECTION (SE-10) (INLET PROTECTION PER CASQA FACT SHEET SE-10) SITE MAP 1 STABILIZED CONSTRUCTION ENTRANCE/EXIT (TC-1) INSTALL PER TC-1 GUIDELINES AND SCAQMD RULE 403/403.1 REGULATIONS.* PROPOSED STORM DRAIN LINE IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA TRACT NO. 31249 - CANTERA AT CORAL MOUNTAIN BEING A PORTION OF THE NORHTEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.M. AUGUST 2021 PREPARED FOR: BEAZER HOMES 310 COMMERCE, SUITE 150 IRVINE, CA 92620 (714) 672-7000 EROSION CONTROL PLAN / DATE SHEET OF STORM WATER POLLUTION PREVENTION PLAN (SWPPP) TRACT NO. 31249 - CANTERA AT CORAL MOUNTAIN BEING A PORTION OF THE NORHTEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.M. CITY OF LA QUINTA, CALIFORNIAMSA CONSULTING, INC. 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com 3 SHEETS APPROVEDREVISIONSNO. EROSION CONTROL AND BM #655 3.5" BRASS DISK IN CURB, FLUSH, 270 FEET WEST OF THE E.C.R. OF THE NORTHWEST CURB RETURN AT THE INTERSECTION OF STONE CREEK WAY AND AVENUE 58. ELEV = -26.431 (DATUM NAVD88 + 500.00= 473.60) LOCATION BENCH MARK 473.60ELEV. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) JHC DESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OF DRAWN BY CHECKED BY DG JHC N.T.S. VICINITY MAP 58TH AVENUE 60TH AVENUE AIRPORT BLVD. 54TH AVENUE MADISON STREETMONROE STREETJACKSON STREETJEFFERSON STREET PROPOSED CONCRETE TRUCK WASHOUT (WM-8) INITIAL LOCATION SHOWN IS ASSUMED TO OCCUR WITHIN INITIAL STAGING AREA. TO BE RELOCATED AS NECESSARY BASED ON THE PROGRESS OF CONSTRUCTION W TEMPORARY CONSTRUCTION STAGING AREA LOCATION OF CONSTRUCTION TRAILER, RESTROOMS, TEMPORARY POWER, MATERIAL STORAGE, EQUIPMENT STORAGE, EQUIPMENT MAINTENANCE, WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMP'S. THE LOCATION AND EXTENT SHOWN IS SCHEMATIC ONLY, CONTRACTOR TO DETERMINE THE ACTUAL LOCATION (AND RE-LOCATION) . BILLY AGUIRRE BEAZER HOMES 310 COMMERCE, SUITE 150 IRVINE, CA 92602 (562) 365-4113 CUT-BACK CURB DETAIL2 - 4"MAINTAIN MINIMUM DEPTH OF 2-4" TO FORM SEDIMENT TRAP MAINTAIN CUT-BACK DISTANCE OF 1 - 2 FT. N.T.S. 1 - 2' (CLEAR ACCUMULATED SEDIMENT AS NEEDED) RECOMMENDED AS ALTERNATIVE TO FIBER ROLLS OR SILT FENCE FOR LOT FRONTAGES, AFTER THE INTERIOR ROAD/CURB/GUTTER HAVE BEEN CONSTRUCTED. OWNER'S CERTIFICATION (LEGALLY RESPONSIBLE PERSON STATEMENT) I CERTIFY THAT THIS DOCUMENT WAS PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE INFORMATION SUBMITTED IS, TRUE, ACCURATE, AND COMPLETE. SAMPLING LOCATION NAME INDIVIDUAL QUALIFIED FOR SWPPP INSPECTION / QUALIFIED SWPPP PRACTITIONER QSP CREDENTIAL COMPANY ADDRESS SIGNATURE NICK WALKER #26093 MVN ENVIRONMENTAL CONSULTING, LLC 5973 AVENIDA ENCINAS, SUITE 220, CARLSBAD, CA 92008 APPLY SOIL BINDER AS NEEDED FOR EROSION AND DUST CONTROL PURPOSES FLOW DIRECTION /S/DRP CA 3, LLC, A DELAWARE LIMITED LIABILITY COMPANY BY: BEAZER HOMES HOLDINGS, LLC, A DELAWARE LIMITED LIABILITY COMPANY ITS ATTORNEY-IN-FACT BY: PRINT NAME: TITLE:                   Jesus Herrera-Cortes 8/11/2021 DocuSign Envelope ID: B7D05D19-5907-4A18-8657-14700026519A GOOD SITE MANAGEMENT PRACTICES FOR A RISK LEVEL 1 PROJECT ALL INSPECTION, MAINTENANCE, REPAIR AND GENERAL IMPLEMENTATION ACTIVITIES OF THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PERFORMED OR SUPERVISED BY A QUALIFIED SWPPP PRACTITIONER (QSP) REPRESENTING THE DISCHARGER. THE QUALIFIED SWPPP PRACTITIONER MAY DELEGATE ANY OR ALL OF THESE ACTIVITIES TO AN EMPLOYEE PROPERLY TRAINED TO PERFORM THE ENCLOSED TASKS (PRACTITIONER), BUT SHALL PROVIDED SUFFICIENT DOCUMENTATION OF TRAINING AND ENSURE ADEQUATE DEPLOYMENT (REFER TO THE TRAINING DOCUMENTATION LOG ON SHEET 4) 1.0 CONSTRUCTION MATERIALS THE PRACTITIONER OR CONTRACTOR SHALL CONDUCT AN INVENTORY OF PRODUCTS USED AND/OR EXPECTED TO BE USED AND THE END PRODUCTS THAT ARE PRODUCED AND/OR ARE EXPECTED TO BE PRODUCED. THIS DOES NOT INCLUDE MATERIALS AND EQUIPMENT THAT ARE DESIGNED TO BE OUTDOORS AND EXPOSED TO ENVIRONMENTAL CONDITIONS (I.E. POLES, EQUIPMENT PADS, CABINETS, CONDUCTORS, INSULATORS, BRICKS, ETC.) 2.0 WASTE MANAGEMENT A.PREVENT DISPOSAL OF ANY RINSE OR WASH WATERS OR MATERIALS ON IMPERVIOUS OR PERVIOUS SITE SURFACES OR INTO THE STORM DRAIN SYSTEM. B.ENSURE THE CONTAINMENT OF SANITATION FACILITIES (E.G., PORTABLE TOILETS) TO PREVENT DISCHARGES OF POLLUTANTS TO THE STORM WATER DRAINAGE SYSTEM OR RECEIVING WATER. C.CLEAN OR REPLACE SANITATION FACILITIES AND INSPECT THEM REGULARLY FOR LEAKS AND SPILLS. D.COVER WASTE DISPOSAL CONTAINERS AT THE END OF EVERY BUSINESS DAY AND DURING A RAIN EVENT. E.PREVENT DISCHARGES FROM WASTE DISPOSAL CONTAINERS TO THE STORM WATER DRAINAGE SYSTEM OR RECEIVING WATER. F.CONTAIN AND SECURELY PROTECT STOCKPILED WASTE MATERIAL FROM WIND AND RAIN AT ALL TIMES UNLESS ACTIVELY BEING USED. G.IMPLEMENT PROCEDURES TO EFFECTIVELY ADDRESS HAZARDOUS AND NONHAZARDOUS SPILLS. 3.0 SPILL RESPONSE MEASURES THE SWPPP PRACTITIONER SHOULD DEVELOP A SPILL RESPONSE AND IMPLEMENTATION PROCESS PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. THE PROCEDURE SHOULD INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING MEASURES: A.APPROPRIATE SPILL RESPONSE PERSONNEL SHALL BE ASSIGNED AND TRAINED. B.EQUIPMENT AND MATERIALS FOR CLEANUP OF SPILLS SHALL BE AVAILABLE ON SITE. C.SPILLS AND LEAKS SHALL BE CLEANED UP IMMEDIATELY AND DISPOSED OF PROPERLY. D.CONCRETE AND OTHER WASHOUT AREAS SHALL BE CONTAINED TO MAINTAIN ADDITIONAL POLLUTANTS AND PREVENT THE DISCHARGE INTO THE UNDERLYING SOIL OR ONTO THE SURROUNDING AREAS. 4.0 LANDSCAPE MATERIALS A.CONTAIN STOCKPILED MATERIALS SUCH AS MULCHES AND TOPSOIL WHEN THEY ARE NOT ACTIVELY BEING USED. B.CONTAIN FERTILIZERS AND OTHER LANDSCAPE MATERIALS WHEN THEY ARE NOT ACTIVELY BEING USED. C.DISCONTINUE THE APPLICATION OF ANY ERODIBLE LANDSCAPE MATERIAL WITHIN 2 DAYS BEFORE A FORECASTED 50% RAIN EVENT OR DURING PERIODS OF PRECIPITATION. NOTE: SEE GLOSSARY FOR THE DEFINITION OF A QUALIFYING RAIN EVENT. D.APPLY ERODIBLE LANDSCAPE MATERIAL AT QUANTITIES AND APPLICATION RATES ACCORDING TO MANUFACTURER RECOMMENDATIONS OR BASED ON WRITTEN SPECIFICATIONS BY KNOWLEDGEABLE AND EXPERIENCED FIELD PERSONNEL. E.STACK ERODIBLE LANDSCAPE MATERIAL ON PALLETS AND COVER OR STORE SUCH MATERIALS WHEN NOT BEING USED OR APPLIED. 5.0 ASSESSMENT OF POTENTIAL SOURCES OF POLLUTION THE SWPPP PRACTITIONER SHALL CONDUCT AN ASSESSMENT AND CREATE A LIST OF POTENTIAL POLLUTANT SOURCES AND IDENTIFY ANY AREAS OF THE SITE WHERE ADDITIONAL BMPS ARE NECESSARY TO REDUCE OR PREVENT POLLUTANTS IN STORM WATER DISCHARGES AND AUTHORIZED NON-STORM WATER DISCHARGES. THIS POTENTIAL POLLUTANT LIST SHALL BE KEPT WITH THE SWPPP AND SHALL IDENTIFY ALL NON-VISIBLE POLLUTANTS WHICH ARE KNOWN, OR SHOULD BE KNOWN, TO OCCUR ON THE CONSTRUCTION SITE. AT A MINIMUM, THE ASSESSMENT SHALL CONTAIN THE FOLLOWING: A.THE QUANTITY, PHYSICAL CHARACTERISTICS (E.G., LIQUID, POWDER, SOLID), AND LOCATIONS OF EACH POTENTIAL POLLUTANT SOURCE HANDLED, PRODUCED, STORED, RECYCLED, OR DISPOSED OF AT THE SITE. B.THE DEGREE TO WHICH POLLUTANTS ASSOCIATED WITH THOSE MATERIALS MAY BE EXPOSED TO AND MOBILIZED BY CONTACT WITH STORM WATER. C.THE DIRECT AND INDIRECT PATHWAYS THAT POLLUTANTS MAY BE EXPOSED TO STORM WATER OR AUTHORIZED NON-STORM WATER DISCHARGES. THIS SHALL INCLUDE AN ASSESSMENT OF PAST SPILLS OR LEAKS, NON-STORM WATER DISCHARGES, AND DISCHARGES FROM ADJOINING AREAS. D.ENSURE RETENTION OF SAMPLING, VISUAL OBSERVATION, AND INSPECTION RECORDS. E.ENSURE EFFECTIVENESS OF EXISTING BMPS TO REDUCE OR PREVENT POLLUTANTS IN STORM WATER DISCHARGES AND AUTHORIZED NON-STORM WATER DISCHARGES. F.THE SWPPP PRACTITIONER SHALL IMPLEMENT GOOD HOUSEKEEPING MEASURES ON THE CONSTRUCTION SITE TO CONTROL THE AIR DEPOSITION OF SITE MATERIALS AND FROM SITE OPERATIONS. SUCH PARTICULATES CAN INCLUDE, BUT ARE NOT LIMITED TO, SEDIMENT, NUTRIENTS, TRASH, METALS, BACTERIA, OIL AND GREASE AND ORGANICS. 6.0 NON-STORM WATER MANAGEMENT A.THE PRACTITIONER SHALL IMPLEMENT MEASURES TO CONTROL NON-STORM WATER DISCHARGES DURING CONSTRUCTION. B.THE PRACTITIONER SHALL ENSURE THAT VEHICLES ARE WASHED IN SUCH A MANNER AS TO PREVENT NON-STORM WATER DISCHARGES TO SURFACE WATERS OR MS4 DRAINAGE SYSTEMS C.THE PRACTITIONER SHALL ENSURE THAT STREETS ARE CLEANED IN SUCH A MANNER AS TO PREVENT UNAUTHORIZED NON-STORM WATER DISCHARGES FROM REACHING SURFACE WATERS OR MS4 DRAINAGE SYSTEMS. 7.0 EROSION, SEDIMENT AND RUNOFF CONTROLS A.THE SWPPP PRACTITIONER SHALL IMPLEMENT EFFECTIVE WIND EROSION CONTROL AS OUTLINED IN THE PROJECT SPECIFIC DUST CONTROL PLAN. B.THE SWPPP PRACTITIONER SHALL PROVIDE EFFECTIVE SOIL COVER FOR INACTIVE AREAS AND ALL FINISHED SLOPES, OPEN SPACE, UTILITY BACKFILL, AND COMPLETED LOTS. C.THE SWPPP PRACTITIONER SHALL LIMIT THE USE OF PLASTIC MATERIALS WHEN MORE SUSTAINABLE, ENVIRONMENTALLY FRIENDLY ALTERNATIVES EXIST. WHERE PLASTIC MATERIALS ARE DEEMED NECESSARY, THE DISCHARGER SHALL CONSIDER THE USE OF PLASTIC MATERIALS RESISTANT TO SOLAR DEGRADATION. D.IF A SEDIMENT BASIN IS USED, IT SHOULD BE DESIGNED ACCORDING TO THE METHOD PROVIDED IN THE CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) CONSTRUCTION BMP GUIDANCE HANDBOOK (SECTION 3: SE-2). 3.0 NON-STORM WATER DISCHARGE MONITORING REQUIREMENTS VISUAL MONITORING REQUIREMENTS: A.THE SWPPP PRACTITIONER SHALL VISUALLY OBSERVE (INSPECT) EACH DRAINAGE AREA FOR THE PRESENCE OF (OR INDICATIONS OF PRIOR) UNAUTHORIZED AND AUTHORIZED NON-STORM WATER DISCHARGES AND THEIR SOURCES. B.THE SWPPP PRACTITIONER SHALL CONDUCT ONE VISUAL OBSERVATION (INSPECTION) QUARTERLY IN EACH OF THE FOLLOWING PERIODS: JANUARY-MARCH, APRIL-JUNE, JULY-SEPTEMBER, AND OCTOBER-DECEMBER. VISUAL OBSERVATION (INSPECTIONS) ARE ONLY REQUIRED DURING DAYLIGHT HOURS (SUNRISE TO SUNSET). C.THE SWPPP PRACTITIONER SHALL ENSURE THAT VISUAL OBSERVATIONS (INSPECTIONS) DOCUMENT THE PRESENCE OR EVIDENCE OF ANY NON-STORM WATER DISCHARGE (AUTHORIZED OR UNAUTHORIZED), POLLUTANT CHARACTERISTICS (FLOATING AND SUSPENDED MATERIAL, SHEEN, DISCOLORATION, TURBIDITY, ODOR, ETC.), AND SOURCE. THE RISK LEVEL 1 SWPPP PRACTITIONER SHALL MAINTAIN ON-SITE RECORDS INDICATING THE PERSONNEL PERFORMING THE VISUAL OBSERVATION (INSPECTIONS), THE DATES AND APPROXIMATE TIME EACH DRAINAGE AREA AND NON-STORM WATER DISCHARGE WAS OBSERVED, AND THE RESPONSE TAKEN TO ELIMINATE UNAUTHORIZED NON-STORM WATER DISCHARGES AND TO REDUCE OR PREVENT POLLUTANTS FROM CONTACTING NON-STORM WATER DISCHARGES. 4.0 NON-VISIBLE POLLUTANT MONITORING REQUIREMENTS A.THE SWPPP PRACTITIONER SHALL COLLECT ONE OR MORE SAMPLES DURING ANY BREACH, MALFUNCTION, LEAKAGE, OR SPILL OBSERVED DURING A VISUAL INSPECTION WHICH COULD RESULT IN THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS THAT WOULD NOT BE VISUALLY DETECTABLE IN STORM WATER. B.THE SWPPP PRACTITIONER SHALL ENSURE THAT WATER SAMPLES ARE LARGE ENOUGH TO CHARACTERIZE THE SITE CONDITIONS. C.THE SWPPP PRACTITIONER SHALL COLLECT SAMPLES AT ALL DISCHARGE LOCATIONS THAT CAN BE SAFELY ACCESSED. D.THE SWPPP PRACTITIONER SHALL COLLECT SAMPLES DURING THE FIRST TWO HOURS OF DISCHARGE FROM RAIN EVENTS THAT OCCUR DURING BUSINESS HOURS AND WHICH GENERATE RUNOFF. E.THE SWPPP PRACTITIONER SHALL ANALYZE SAMPLES FOR ALL NON-VISIBLE POLLUTANT PARAMETERS (IF APPLICABLE) - PARAMETERS INDICATING THE PRESENCE OF POLLUTANTS IDENTIFIED IN THE POLLUTANT SOURCE ASSESSMENT REQUIRED (THE RISK LEVEL 1 SWPPP PRACTITIONER SHALL MODIFY THEIR CSMPS TO ADDRESS THESE ADDITIONAL PARAMETERS IN ACCORDANCE WITH ANY UPDATED SWPPP POLLUTANT SOURCE ASSESSMENT). F.THE SWPPP PRACTITIONER SHALL COLLECT A SAMPLE OF STORM WATER THAT HAS NOT COME IN CONTACT WITH THE DISTURBED SOIL OR THE MATERIALS STORED OR USED ON-SITE (UNCONTAMINATED SAMPLE) FOR COMPARISON WITH THE DISCHARGE SAMPLE. G.THE SWPPP PRACTITIONER SHALL COMPARE THE UNCONTAMINATED SAMPLE TO THE SAMPLES OF DISCHARGE USING FIELD ANALYSIS OR THROUGH LABORATORY ANALYSIS. H.THE SWPPP PRACTITIONER SHALL KEEP ALL FIELD /OR ANALYTICAL DATA IN THE SWPPP DOCUMENT. RISK LEVEL 1 DISCHARGERS JUSTIFYING AN ALTERNATIVE PROJECT RISK SHALL REPORT A SOIL PARTICLE SIZE ANALYSIS USED TO DETERMINE THE RUSLE K-FACTOR. ASTM D-422 (STANDARD TEST METHOD FOR PARTICLE-SIZE ANALYSIS OF SOILS), AS REVISED, SHALL BE USED TO DETERMINE THE PERCENTAGES OF SAND, VERY FINE SAND, SILT, AND CLAY ON THE SITE. THE SWPPP PRACTITIONER SHALL RETAIN RECORDS OF ALL STORM WATER MONITORING INFORMATION AND COPIES OF ALL REPORTS (INCLUDING ANNUAL REPORTS) FOR A PERIOD OF AT LEAST THREE YEARS. RISK LEVEL 1 DISCHARGERS SHALL RETAIN ALL RECORDS ON-SITE WHILE CONSTRUCTION IS ONGOING. THESE RECORDS INCLUDE: ·THE DATE, PLACE, TIME OF FACILITY INSPECTIONS, SAMPLING, VISUAL OBSERVATION (INSPECTIONS), AND/OR MEASUREMENTS, INCLUDING PRECIPITATION. ·THE INDIVIDUAL(S) WHO PERFORMED THE FACILITY INSPECTIONS, SAMPLING, VISUAL OBSERVATION (INSPECTIONS), AND OR MEASUREMENTS. ·THE DATE AND APPROXIMATE TIME OF ANALYSES. ·THE INDIVIDUAL(S) WHO PERFORMED THE ANALYSES. ·A SUMMARY OF ALL ANALYTICAL RESULTS FROM THE LAST THREE YEARS, THE METHOD DETECTION LIMITS AND REPORTING UNITS, AND THE ANALYTICAL TECHNIQUES OR METHODS USED. ·RAIN GAUGE READINGS FROM SITE INSPECTIONS. ·QUALITY ASSURANCE/QUALITY CONTROL RECORDS AND RESULTS. ·NON-STORM WATER DISCHARGE INSPECTIONS AND VISUAL OBSERVATION (INSPECTIONS) AND STORM WATER DISCHARGE VISUAL OBSERVATION RECORDS. ·VISUAL OBSERVATION AND SAMPLE COLLECTION EXCEPTION RECORDS. ·THE RECORDS OF ANY CORRECTIVE ACTIONS AND FOLLOW-UP ACTIVITIES THAT RESULTED FROM ANALYTICAL RESULTS, VISUAL OBSERVATION (INSPECTIONS), OR INSPECTIONS. HAZARDOUS MATERIAL AND WASTE MANAGEMENT THE PRACTITIONER MUST ENSURE THE PREVENTION AND REDUCTION OF DISCHARGE OF POLLUTANTS TO STORMWATER FROM HAZARDOUS WASTE THROUGH PROPER MATERIAL USE, WASTE DISPOSAL, AND TRAINING OF EMPLOYEES AND SUB-CONTRACTORS. HAZARDOUS WASTE MANAGEMENT PRACTICES MUST BE IMPLEMENTED ON CONSTRUCTION PROJECTS THAT GENERATE WASTE FROM THE USE OF: ·PETROLEUM PRODUCTS ·CONCRETE CURING COMPOUNDS ·PALLIATIVES ·SEPTIC WASTES ·STAINS ·WOOD PRESERVATIVES ·ASPHALT PRODUCTS ·PESTICIDES ·ACIDES ·PAINTS ·SOLVENTS ·ROOFING TAR ·ANY MATERIALS DEEMED HAZARDOUS WASTE IN CALIFORNIA, TITLE 22 DIVISION 4.5, OR LISTED IN 40 CFR PARTS 110, 117, 261, OR 302. ·IN ADDITION, ANY WASTES RESULTING FROM CONSTRUCTION MUST BE DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. 8.0 INSPECTION, MAINTENANCE, AND REPAIR A.THE SWPPP PRACTITIONER SHALL PERFORM WEEKLY INSPECTIONS AND OBSERVATIONS, AND AT LEAST ONCE EACH 24-HOUR PERIOD DURING EXTENDED STORM EVENTS, TO IDENTIFY AND RECORD BMPS THAT NEED MAINTENANCE TO OPERATE EFFECTIVELY, THAT HAVE FAILED, OR THAT COULD FAIL TO OPERATE AS INTENDED. INSPECTORS SHALL BE THE QSP OR BE TRAINED BY THE QSP. B.THE SWPPP PRACTITIONER SHALL ENSURE THAT INACTIVE AREAS ARE PROPERLY STABILIZED OR COVERED. C.UPON IDENTIFYING FAILURES OR OTHER SHORTCOMINGS, THE PRACTITIONER SHALL BEGIN IMPLEMENTING REPAIRS OR DESIGN CHANGES TO BMPS WITHIN 72 HOURS OF IDENTIFICATION AND COMPLETE THE CHANGES AS SOON AS POSSIBLE. D.FOR EACH INSPECTION REQUIRED, THE SWPPP PRACTITIONER SHALL COMPLETE AN INSPECTION CHECKLIST, USING A FORM PROVIDED BY THE STATE WATER BOARD OR REGIONAL WATER BOARD OR IN AN ALTERNATIVE FORMAT. E.THE SWPPP PRACTITIONER SHALL ENSURE THAT CHECKLISTS SHALL REMAIN ONSITE WITH THE SWPPP AND AT A MINIMUM, SHALL INCLUDE: ·INSPECTION DATE AND DATE THE INSPECTION REPORT WAS WRITTEN. ·WEATHER INFORMATION, INCLUDING PRESENCE OR ABSENCE OF PRECIPITATION, ESTIMATE OF BEGINNING OF QUALIFYING STORM EVENT, DURATION OF EVENT, TIME ELAPSED SINCE LAST STORM, AND APPROXIMATE AMOUNT OF RAINFALL IN INCHES. ·SITE INFORMATION, INCLUDING STAGE OF CONSTRUCTION, ACTIVITIES COMPLETED, AND APPROXIMATE AREA OF THE SITE EXPOSED. A DESCRIPTION OF ANY BMPS EVALUATED AND ANY DEFICIENCIES NOTED. ·IF THE CONSTRUCTION SITE IS SAFELY ACCESSIBLE DURING INCLEMENT WEATHER, LIST THE OBSERVATIONS OF ALL BMPS: EROSION CONTROLS, SEDIMENT CONTROLS, CHEMICAL AND WASTE CONTROLS, AND NON-STORM WATER CONTROLS. OTHERWISE, LIST THE RESULTS OF VISUAL INSPECTIONS AT ALL RELEVANT OUTFALLS, DISCHARGE POINTS, DOWNSTREAM LOCATIONS AND ANY PROJECTED MAINTENANCE ACTIVITIES. ·REPORT THE PRESENCE OF NOTICEABLE ODORS OR OF ANY VISIBLE SHEEN ON THE SURFACE OF ANY DISCHARGES. ·ANY CORRECTIVE ACTIONS REQUIRED, INCLUDING ANY NECESSARY CHANGES TO THE SWPPP AND THE ASSOCIATED IMPLEMENTATION DATES. ·PHOTOGRAPHS TAKEN DURING THE INSPECTION, IF ANY. ·INSPECTOR'S NAME, TITLE, AND SIGNATURE. MONITORING FOR NON-VISIBLE POLLUTANTS THE SWPPP PRACTITIONER MUST LIST ALL NON-VISIBLE POLLUTANTS THAT ARE KNOWN OR SHOULD BE KNOWN TO OCCUR ON THE CONSTRUCTION SITE INCLUDING, BUT NOT LIMITED TO, MATERIALS THAT: ·ARE BEING USED IN CONSTRUCTION ACTIVITIES ·ARE BEING STORED ON THE CONSTRUCTION SITE ·WERE SPILLED DURING CONSTRUCTION OPERATIONS AND NOT CLEANED UP ·WERE STORED (OR USED) IN A MANNER THAT CREATED THE POTENTIAL FOR A RELEASE OF THE MATERIALS DURING PAST LAND USE ACTIVITIES ·WERE SPILLED DURING PREVIOUS LAND USE ACTIVITIES AND NOT CLEANED UP ·WERE APPLIED TO THE SOIL AS PART OF PAST LAND USE ACTIVITIES CONSTRUCTION SITE MONITORING PROGRAM (CSMP) THE CSMP SHALL BE IMPLEMENTED TO ADDRESS THE FOLLOWING OBJECTIVES: ·TO DEMONSTRATE THAT THE SITE IS IN COMPLIANCE WITH THE DISCHARGE PROHIBITIONS ·TO DETERMINE WHETHER NON-VISIBLE POLLUTANTS ARE PRESENT AT THE CONSTRUCTION SITE AND ARE CAUSING OR CONTRIBUTING TO EXCEEDANCES OF WATER QUALITY OBJECTIVES ·TO DETERMINE WHETHER IMMEDIATE CORRECTIVE ACTIONS, ADDITIONAL BEST MANAGEMENT PRACTICE (BMP) IMPLEMENTATION, OR SWPPP REVISIONS ARE NECESSARY TO REDUCE POLLUTANTS IN STORM WATER DISCHARGES AND AUTHORIZED NON-STORM WATER DISCHARGES ·TO DETERMINE WHETHER BMPS INCLUDED IN THE SWPPP ARE EFFECTIVE IN PREVENTING OR REDUCING POLLUTANTS IN STORM WATER DISCHARGES AND AUTHORIZED NON-STORM WATER DISCHARGES THE CSMP SHALL INCLUDE ALL MONITORING PROCEDURES AND INSTRUCTIONS, LOCATION MAPS, FORMS, AND CHECKLISTS AS REQUIRED IN THIS SWPPP AND IN ATTACHMENT C OF THE CONSTRUCTION GENERAL PERMIT. THE CSMP SHALL BE DEVELOPED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES, AND REVISED AS NECESSARY TO REFLECT PROJECT REVISIONS. WHEN A CHANGE OF OWNERSHIP OCCURS FOR ALL OR ANY PORTION OF THE CONSTRUCTION SITE PRIOR TO COMPLETION OR FINAL STABILIZATION, THE NEW DISCHARGER SHALL COMPLY WITH THESE REQUIREMENTS AS OF THE DATE THE OWNERSHIP CHANGE OCCURS. 1.0 VISUAL MONITORING FOR QUALIFYING RAIN EVENTS A LIKELY PRECIPITATION EVENT IS ANY WEATHER PATTERN THAT IS FORECAST TO HAVE A 50% OR GREATER PROBABILITY OF PRODUCING PRECIPITATION IN THE PROJECT AREA. A QUALIFYING RAIN EVENT IS ANY EVENT THAT PRODUCES 0.5 INCHES OR MORE PRECIPITATION WITH A 48 HOUR OR GREATER PERIOD BETWEEN RAIN EVENTS. <HTTP://WWW.SRH.NOAA.GOV/FORECAST> A.THE SWPPP PRACTITIONER SHALL CONDUCT A PRE-STORM EVENT (BASELINE) VISUAL INSPECTION OF THE SITE. B.THE SWPPP PRACTITIONER SHALL VISUALLY OBSERVE (INSPECT) STORM WATER DISCHARGES AT ALL DISCHARGE LOCATIONS WITHIN TWO BUSINESS DAYS (48 HOURS) AFTER EACH QUALIFYING RAIN EVENT. C.THE SWPPP PRACTITIONER SHALL VISUALLY OBSERVE (INSPECT) THE DISCHARGE OF STORED OR CONTAINED STORM WATER THAT IS DERIVED FROM AND DISCHARGED SUBSEQUENT TO A QUALIFYING RAIN EVENT PRODUCING PRECIPITATION OF ½ INCH OR MORE AT THE TIME OF DISCHARGE. STORED OR CONTAINED STORM WATER THAT WILL LIKELY DISCHARGE AFTER OPERATING HOURS DUE TO ANTICIPATED PRECIPITATION SHALL BE OBSERVED PRIOR TO THE DISCHARGE DURING OPERATING HOURS. D.THE SWPPP PRACTITIONER SHALL CONDUCT VISUAL OBSERVATIONS (INSPECTIONS) DURING BUSINESS HOURS (CONSTRUCTION ACTIVITY) ONLY. E.THE SWPPP PRACTITIONER SHALL RECORD THE TIME, DATE AND RAIN GAUGE READING OF ALL QUALIFYING RAIN EVENTS. F.WITHIN 2 BUSINESS DAYS (48 HOURS) PRIOR TO EACH QUALIFYING RAIN EVENT, THE RISK LEVEL 1 SWPPP PRACTITIONER SHALL VISUALLY OBSERVE (INSPECT): ·ALL STORM WATER DRAINAGE AREAS TO IDENTIFY ANY SPILLS, LEAKS, OR UNCONTROLLED POLLUTANT SOURCES. IF NEEDED, THE SWPPP PRACTITIONER SHALL IMPLEMENT APPROPRIATE CORRECTIVE ACTIONS. ·ALL BMPS TO IDENTIFY WHETHER THEY HAVE BEEN PROPERLY IMPLEMENTED IN ACCORDANCE WITH THE SWPPP. IF NEEDED, THE SWPPP PRACTITIONER SHALL IMPLEMENT APPROPRIATE CORRECTIVE ACTIONS. ·ANY STORM WATER STORAGE AND CONTAINMENT AREAS TO DETECT LEAKS AND ENSURE MAINTENANCE OF ADEQUATE FREEBOARD. G.FOR THE VISUAL OBSERVATIONS (INSPECTIONS), THE RISK LEVEL 1 SWPPP PRACTITIONER SHALL OBSERVE THE PRESENCE OR ABSENCE OF FLOATING AND SUSPENDED MATERIALS, A SHEEN ON THE SURFACE, DISCOLORATIONS, TURBIDITY, ODORS, AND SOURCE(S) OF ANY OBSERVED POLLUTANTS. H.WITHIN TWO BUSINESS DAYS (48 HOURS) AFTER EACH QUALIFYING RAIN EVENT, THE RISK LEVEL 1 SWPPP PRACTITIONER SHALL CONDUCT POST RAIN EVENT VISUAL OBSERVATIONS (INSPECTIONS) TO (1) IDENTIFY WHETHER BMPS WERE ADEQUATELY DESIGNED, IMPLEMENTED, AND EFFECTIVE, AND (2) IDENTIFY ADDITIONAL BMPS AND REVISE THE SWPPP ACCORDINGLY. I.THE SWPPP PRACTITIONER SHALL MAINTAIN ON-SITE RECORDS OF ALL VISUAL OBSERVATIONS (INSPECTIONS), PERSONNEL PERFORMING THE OBSERVATIONS, OBSERVATION DATES, WEATHER CONDITIONS, LOCATIONS OBSERVED, AND CORRECTIVE ACTIONS TAKEN IN RESPONSE TO THE OBSERVATIONS. 2.0 VISUAL OBSERVATION EXEMPTIONS A.THE SWPPP PRACTITIONER SHALL BE PREPARED TO CONDUCT VISUAL OBSERVATION (INSPECTIONS) UNTIL THE MINIMUM REQUIREMENTS ARE COMPLETED. THE SWPPP PRACTITIONER IS NOT REQUIRED TO CONDUCT VISUAL OBSERVATION (INSPECTIONS) UNDER THE FOLLOWING CONDITIONS: ·DURING DANGEROUS WEATHER CONDITIONS SUCH AS FLOODING AND ELECTRICAL STORMS. ·OUTSIDE OF SCHEDULED SITE BUSINESS HOURS. B.IF NO REQUIRED VISUAL OBSERVATIONS (INSPECTIONS) ARE COLLECTED DUE TO THESE EXCEPTIONS, THE SWPPP PRACTITIONER SHALL INCLUDE AN EXPLANATION IN THEIR SWPPP INSPECTION OR REPORTING DOCUMENTS AND IN THE ANNUAL REPORT DOCUMENTING WHY THE VISUAL OBSERVATIONS (INSPECTIONS) WERE NOT CONDUCTED. C.THE SWPPP PRACTITIONER SHALL INCLUDE A DESCRIPTION OF THE VISUAL OBSERVATION LOCATIONS, VISUAL OBSERVATION PROCEDURES, AND VISUAL OBSERVATION FOLLOW-UP AND TRACKING PROCEDURES IN THE CSMP. CONSTRUCTION ACTIVITIES, MATERIALS USED AND ASSOCIATED POLLUTANTS ACTIVITY/PRODUCTS WITH POTENTIAL STORMWATER POLLUTANTS ASSOCIATED VISIBLE INDICATORS ASSOCIATED NON-VISIBLE POTENTIAL POLLUTANT ADHESIVES OIL SHEEN OR OTHER DISCOLORATION PHENOLICS, FORMALDEHYDES, ASBESTOS, BENZENE, PHENOLS AND NAPHTHALENE ASPHALT PAVING/CURBS OIL SHEEN OIL, PETROLEUM DISTILLATES CLEANERS DISCOLORATION/PLUME FROM SOME PRODUCTS METALS, ACIDITY/ALKALINITY, CHROMIUM CONCRETE/MASONRY DISCOLORATION/PLUME FROM SOME PRODUCTS SEDIMENTS, ACIDITY, METALS, ASBESTOS, PARTICULATES DRYWALL DISCOLORATION/PLUME FROM DRYWALL DUST COPPER, ALUMINUM, SEDIMENTS, MINERALS AND ASBESTOS FRAMING/CARPENTRY SAWDUST, SLURRY PLUME BOD, FORMALDEHYDE, COPPER AND CREOSOTE GRADING/EARTHWORK SEDIMENT DISCHARGE/PLUME, NON-STORMWATER DISCHARGES, VEGETATION DEBRIS SOIL AMENDMENTS (GYPSUM AND LIME), HISTORIC SOIL CONTAMINANTS (LEAD) HEATING, VENTILATION, AIR CONDITIONING NONE ASBESTOS, FREON INSULATION NONE ASBESTOS, ALUMINUM, ZINC LIQUID WASTE NON-STORMWATER DISCHARGES, DETERGENTS, SEDIMENT, OILY SHEEN, CONCRETE RINSE OR OTHER PLUME MULTIPLE PAINTING PAINT PLUME VOCS, METALS, PHENOLICS AND MINERAL SPIRITS PLANTING/VEGETATION MANAGEMENT MULCH, SEDIMENT, VEGETATION BOD, FERTILIZERS, PESTICIDES, HERBICIDES, NUTRIENTS, ACIDITY/ALKALINITY, METALS, ALUMINUM SULFATE, SULFUR PLUMBING NONE LEAD, COPPER, ZINC AND TIN POOLS/FOUNTAINS NON-STORMWATER DISCHARGES CHLORINE DEMOLITION SEDIMENT, OTHER PARTICULATES TOXICS, TRACE METALS ROOFING DEBRIS, SLURRY PLUME OIL, PETROLEUM DISTILLATES SANITARY WASTE VISIBLE SANITARY WASTE BACTERIA, BOD, PATHOGENS SOIL PREPARATION MULCH, SEDIMENT SOIL AMENDMENTS SOLID WASTE PLASTIC, PAPER, CIGARETTES, WOOD PRODUCTS, STEEL, VEGETATION WASTE NONE UTILITY LINE TESTING AND FLUSHING NON-STORMWATER DISCHARGE, SEDIMENT CHLORINE VEHICLE AND EQUIPMENT USE OIL SHEEN, SEDIMENT TOTAL PETROLEUM HYDROCARBONS, COOLANTS, BENZENE AND DERIVATIVES SWPPP GLOSSARY OF TERMS APPROVED SIGNATORY: A PERSON WHO HAS LEGAL AUTHORITY TO SIGN, CERTIFY, AND ELECTRONICALLY SUBMIT PERMIT REGISTRATION DOCUMENTS AND NOTICES OF TERMINATION ON BEHALF OF THE LEGALLY RESPONSIBLE PERSON. BEST MANAGEMENT PRACTICES BMPS): BMPS ARE SCHEDULING OF ACTIVITIES, PROHIBITIONS OF PRACTICES, MAINTENANCE PROCEDURES, AND OTHER MANAGEMENT PRACTICES TO PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS. BMPS ALSO INCLUDE TREATMENT REQUIREMENTS, OPERATING PROCEDURES, AND PRACTICES TO CONTROL SITE RUNOFF, SPILLAGE OR LEAKS, SLUDGE OR WASTE DISPOSAL, OR DRAINAGE FROM RAW MATERIAL STORAGE. BEST AVAILABLE TECHNOLOGY ECONOMICALLY ACHIEVABLE (BAT): AS DEFINED BY USEPA, BAT IS A TECHNOLOGY-BASED STANDARD ESTABLISHED BY THE CLEAN WATER ACT (CWA) AS THE MOST APPROPRIATE MEANS AVAILABLE ON A NATIONAL BASIS FOR CONTROLLING THE DIRECT DISCHARGE OF TOXIC AND NONCONVENTIONAL POLLUTANTS TO NAVIGABLE WATERS. THE BAT EFFLUENT LIMITATIONS GUIDELINES, IN GENERAL, REPRESENT THE BEST EXISTING PERFORMANCE OF TREATMENT TECHNOLOGIES THAT ARE ECONOMICALLY ACHIEVABLE WITHIN AN INDUSTRIAL POINT SOURCE CATEGORY OR SUBCATEGORY. BEST CONVENTIONAL POLLUTANT CONTROL TECHNOLOGY (BCT): AS DEFINED BY USEPA, BCT IS A TECHNOLOGY-BASED STANDARD FOR THE DISCHARGE FROM EXISTING INDUSTRIAL POINT SOURCES OF CONVENTIONAL POLLUTANTS INCLUDING BIOCHEMICAL OXYGEN DEMAND (BOD), TOTAL SUSPENDED SEDIMENT (TSS), FECAL COLIFORM, PH, OIL AND GREASE. GOOD HOUSEKEEPING BMPS: BMPS DESIGNED TO REDUCE OR ELIMINATE THE ADDITION OF POLLUTANTS TO CONSTRUCTION SITE RUNOFF THROUGH ANALYSIS OF POLLUTANT SOURCES, IMPLEMENTATION OF PROPER HANDLING/DISPOSAL PRACTICES, EMPLOYEE EDUCATION, AND OTHER ACTIONS. INACTIVE AREAS OF CONSTRUCTION: AREAS OF CONSTRUCTION ACTIVITY THAT ARE NOT ACTIVE AND THOSE THAT HAVE BEEN ACTIVE AND ARE NOT SCHEDULED TO BE RE-DISTURBED FOR AT LEAST 14 DAYS. LEGALLY RESPONSIBLE PERSON: THE PERSON WHO POSSESSES THE TITLE OF THE LAND OR THE LEASEHOLD INTEREST OF A MINERAL ESTATE UPON WHICH THE CONSTRUCTION ACTIVITIES WILL OCCUR FOR THE REGULATED SITE. LIKELY PRECIPITATION EVENT: ANY WEATHER PATTERN THAT IS FORECASTED TO HAVE A 50% OR GREATER CHANCE OF PRODUCING PRECIPITATION IN THE PROJECT AREA. THE DISCHARGER SHALL OBTAIN LIKELY PRECIPITATION FORECAST INFORMATION FROM THE NATIONAL WEATHER SERVICE FORECAST OFFICE (E.G., BY ENTERING THE ZIP CODE OF THE PROJECT'S LOCATION AT <HTTP://WWW.SRH.NOAA.GOV/FORECAST>. NON-STORM WATER DISCHARGES: DISCHARGES ARE DISCHARGES THAT DO NOT ORIGINATE FROM PRECIPITATION EVENTS. THEY CAN INCLUDE, BUT ARE NOT LIMITED TO, DISCHARGES OF PROCESS WATER, AIR CONDITIONER CONDENSATE, NON-CONTACT COOLING WATER, VEHICLE WASH WATER, SANITARY WASTES, CONCRETE WASHOUT WATER, PAINT WASH WATER, IRRIGATION WATER, OR PIPE TESTING WATER. NON-VISIBLE POLLUTANTS: POLLUTANTS ASSOCIATED WITH A SPECIFIC SITE OR ACTIVITY THAT CAN HAVE A NEGATIVE IMPACT ON WATER QUALITY, BUT CANNOT BE SEEN THOUGH OBSERVATION. EXAMPLES INCLUDE CHLORINE, FLYASH, HERBICIDES, PESTICIDES, NUTRIENTS AND LUBRICANTS. THE DISCHARGE OF SUCH POLLUTANTS IS NOT AUTHORIZED. QUALIFIED SWPPP DEVELOPER: INDIVIDUAL WHO IS AUTHORIZED TO DEVELOP AND REVISE SWPPPS. QUALIFIED SWPPP PRACTITIONER (QSP): INDIVIDUAL ASSIGNED RESPONSIBILITY FOR NON-STORM WATER AND STORM WATER VISUAL OBSERVATIONS, SAMPLING AND ANALYSIS, AND RESPONSIBILITY TO ENSURE FULL COMPLIANCE WITH THE PERMIT AND IMPLEMENTATION OF ALL ELEMENTS OF THE SWPPP, INCLUDING THE PREPARATION OF THE ANNUAL COMPLIANCE EVALUATION AND THE ELIMINATION OF ALL UNAUTHORIZED DISCHARGES. THE QUALIFIED SWPPP PRACTITIONER MAY DELEGATE ANY OR ALL OF THESE ACTIVITIES TO AN EMPLOYEE PROPERLY TRAINED TO PERFORM THE ENCLOSED TASKS (PRACTITIONER), BUT SHALL PROVIDED SUFFICIENT DOCUMENTATION OF TRAINING AND ENSURE ADEQUATE DEPLOYMENT. QUALIFYING RAIN EVENT: ANY EVENT THAT PRODUCES 0.5 INCHES OR MORE PRECIPITATION WITH A 48 HOUR OR GREATER PERIOD BETWEEN RAIN EVENTS. NOTE: FOR A COMPLETE LIST OF TERM DEFINITIONS, SEE THE CONSTRUCTION GENERAL PERMIT ORDER NO. 2009-0009-DWQ 2 DATE SHEET OF STORM WATER POLLUTION PREVENTION PLAN (SWPPP) TRACT NO. 31249 - CANTERA AT CORAL MOUNTAIN BEING A PORTION OF THE NORHTEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.M. CITY OF LA QUINTA, CALIFORNIAMSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com 3 SHEETS APPROVEDREVISIONSNO. EROSION CONTROL AND BM #655 3.5" BRASS DISK IN CURB, FLUSH, 270 FEET WEST OF THE E.C.R. OF THE NORTHWEST CURB RETURN AT THE INTERSECTION OF STONE CREEK WAY AND AVENUE 58. ELEV = -26.431 (DATUM NAVD88 + 500.00= 473.60) LOCATION BENCH MARK 473.60ELEV.JHC DESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OF DRAWN BY CHECKED BY DG JHC Jesus Herrera-Cortes 8/11/2021 DocuSign Envelope ID: B7D05D19-5907-4A18-8657-14700026519A -STORM DRAIN INLET PROTECTION -LINEAR SEDIMENT BARRIERS (CURB CUT-BACK, GRAVEL BAGS, STRAW WATTLES) -STREET SWEEPING WHENEVER NEEDED -STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH -ACTIVE AREA SOIL STABILIZERS (ENVIROKLEEN "OIL", OR SIMILAR WETTING AGENTS) -PERMANENT VEGETATION / LANDSCAPING -INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, OR PLANTS) OR BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS., 1 TRUCK / 13.75 ACRES MAX.) -GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS) -PRE-GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. ) -SITE WATERING 7 DAYS A WEEK (IRRIGATION SYSTEM, MIN. 4 TIMES PER 24 HRS., -WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL -SAND FENCING (INCLUDES PERIMETER FENCE) -WHEEL CLEANING AT TRUCK EXITS AS NECESSARY -BMP MAINTENANCE STORM WATER POLLUTION PREVENTION PLAN CONTROL MEASURES DEPLOYMENT SCHEDULE ADDITIONAL VEHICLE AND EQUIPMENT FUELING NOTES 1.ABSORBENT SPILL CLEANUP MATERIALS AND SPILL KITS SHOULD BE AVAILABLE IN FUELING AREAS AND ON FUELING TRUCKS, AND SHOULD BE DISPOSED OF PROPERLY AFTER USE. 2.DRIP PANS OR ABSORBENT PADS SHOULD BE USED DURING VEHICLE AND EQUIPMENT FUELING, UNLESS THE FUELING IS PERFORMED OVER AN IMPERMEABLE SURFACE IN A DEDICATED FUELING AREA. 3.USE ABSORBENT MATERIALS ON SMALL SPILLS. DO NOT HOSE DOWN OR BURY THE SPILL. REMOVE THE ABSORBENT MATERIALS PROMPTLY AND DISPOSE OF PROPERLY. 4.IMMEDIATELY CLEAN UP SPILLS AND PROPERLY DISPOSE OF CONTAMINATED SOIL AND CLEANUP MATERIALS. FUGITIVE DUST CONTROL (PM10) NOTES (MEASURES TO CONTROL FUGITIVE DUST WORK CONCURRENTLY TO CONTROL EROSION RELATED TO STORM WATER. SEE SEPARATE DUST CONTROL PLAN FOR ADDITIONAL DUST MITIGATION MEASURES.) 1.MATERIAL AND EQUIPMENT STORAGE YARD SHALL BE FENCED. 2.EQUIPMENT MAINTENANCE AND CALIBRATION SHALL BE CONDUCTED IN ACCORDANCE WITH MANUFACTURER SPECIFICATION AND REGULATORY REQUIREMENTS. 3.PRE-GRADING SITE WATERING (3 DAYS MINIMUM) SHALL BE DONE BY AGRI-TYPE WATER SYSTEM PRIOR TO BEGINNING GRADING OPERATIONS TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CONSTRUCTION AREA; THE MOISTURE CONTENT SHALL BE MAINTAINED AT LEAST 70% OF THE OPTIMUM SOIL MOISTURE CONTENT. REQUIRED DEPTH OF WATER PENETRATION TO BE DETERMINED BY GRADING CONTRACTOR'S FIELD SUPERINTENDENT AND SOILS ENGINEER, AND SHALL BE APPROVED BY THE RESPONSIBLE PERSON AND THE CITY ENGINEER. 4.PRIOR TO CLEARING AND GRUBBING, PREWATER PLANT MATERIAL TO REMOVE DUST. 5.SITE WATERING SHALL BE DONE BY WATER TRUCKS UNTIL COMPLETION OF GRADING. THIS WATERING SHALL BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CONSTRUCTION AREA; THE MOISTURE CONTENT SHALL BE MAINTAINED AT LEAST 70% OF THE OPTIMUM SOIL MOISTURE CONTENT, AND AS APPROVED BY CITY ENGINEER. 6.SITE WATERING AND/OR STABILIZATION SHALL BE UTILIZED ON GRADED AREAS AFTER GRADING IS COMPLETED. THIS STABILIZATION IS TO BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CONSTRUCTION AREA; THE MOISTURE CONTENT SHALL BE MAINTAINED AT LEAST 70% OF THE OPTIMUM SOIL MOISTURE CONTENT. SITE WATERING MAY BE TERMINATED UPON SOIL STABILIZATION (MEASURES DISCUSSED IN NOTE 14, PERMANENT AUTOMATIC IRRIGATION OR COMPLETED IMPROVEMENTS) AND WHEN APPROVED BY THE CITY ENGINEER. 7.SITE WATERING SHALL BE DONE BY TRUCKS ON DIRT ROADWAYS USED BY CONSTRUCTION TRAFFIC. THIS WATERING IS TO BE DONE AS NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100 FEET BEYOND THE ACTIVE CONSTRUCTION AREA; THE MOISTURE CONTENT SHALL BE MAINTAINED AT LEAST 70% OF THE OPTIMUM SOIL MOISTURE CONTENT. 8.A SPEED LIMIT OF 15 MILES PER HOUR SHALL BE ENFORCED ON ALL DIRT ROADS FOR ALL CONSTRUCTION VEHICLES. 9.WHEN LOCAL WIND GUSTS EXCEED 25 MPH OR ARE PREDICTED BY AQMD OR DURING 1ST AND 2ND STAGE SMOG ALERTS, THE DIRECTIONS THROUGHOUT THIS PLAN RELATED TO WATERING, SOIL STABILIZATION AND COVERING OF HAUL VEHICLES SHALL BE ADHERED TO INCLUDING THE FOLLOWING ACTIONS RELATING TO THESE SPECIFIC CATEGORIES: EARTH MOVING - GRADING ACTIVITY SHALL BE SUSPENDED. WATER AND STABILIZER SHALL BE APPLIED TO ALL DESTABILIZED SOILS. DISTURBED SURFACE AREA - APPLY WATER TO ALL UNSTABILIZED DISTURBED AREAS FOUR (4) TIMES PER DAY. IF THERE IS ANY EVIDENCE OF WIND DRIVEN FUGITIVE DUST, WATERING FREQUENCY IS INCREASED AS NEEDED TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND FROM EXTENDING MORE THAN 100' BEYOND THE ACTIVE CONSTRUCTION AREA OR AS APPROVED BY THE CITY ENGINEER. UNPAVED ROADS - APPLY WATER TWICE PER HOUR DURING ACTIVE OPERATION. OPEN STORAGE PILES - APPLY WATER TWICE PER HOUR OR INSTALL TEMPORARY COVERINGS. 10.SOIL STOCKPILE AREAS SHALL BE WATERED AND COMPACTED TO FORM A CRUST UNTIL SOIL STABILIZER IS APPLIED. 11.TEMPORARY 6' CHAIN LINK FENCE WITH WINDSCREEN: STEEL POSTS TO BE 214" DIAMETER @ 8' O.C. WITH 15 8" DIAMETER STEEL TOP RAILS. POSTS TO BE EMBEDDED 3' INTO NATIVE SOIL. WINDSCREEN TO BE PLACED ON THE NORTH OR WEST SIDE OF FENCE. ATTACH WINDSCREEN TO FENCE WITH METAL GROMMETS @ 2' O.C. ON TOP AND BOTTOM. PLACE GROMMETS @ 2' O.C. VERTICALLY AT EVERY POST. 12.NOT USED 13.NO SOIL STABILIZATION/DUST MITIGATION MEASURES ARE REQUIRED ON AREAS LEFT IN THEIR NATURAL UNDISTURBED CONDITION. 14.SOIL STABILIZATION/DUST MITIGATION MEASURES SHALL BEGIN PRIOR TO THE GRADING OF EACH AREA. WATERING MEASURES SHALL BE USED FOR PERIODS UP TO 4 DAYS BEFORE AND AFTER GRADING TERMINATES UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. AFTER 4 DAYS OF NO GRADING ACTIVITY OR BUILDING ACTIVITY, SURFACE SOIL STABILIZATION SHALL BE APPLIED. ALL SOILS STABILIZATION MATERIALS SHALL BE COLORED (WHITE IS ACCEPTABLE) FOR CONFIRMATION OF APPLICATION. PRODUCT OPTIONS ARE AS FOLLOWS: 1. SOIL-SEMENT (ACRYLIC POLYMER EMULSION) 180 GALLONS OF CONCENTRATE PER ACRE. DILUTE 9 PARTS WATER TO 1 PART CONCENTRATE (6 MONTH COATING.) NO FOOT OR VEHICULAR TRAFFIC ALLOWED. 2. ENVIROTAC II (ACRYLIC POLYMER EMULSION) 150 GALLONS OF CONCENTRATE PER ACRE. DILUTE TO 10 PARTS WATER TO 1 PART CONCENTRATE (6 MONTH COATING.) NO FOOT OR VEHICULAR TRAFFIC ALLOWED. 3. ENVIROTAC II (ACRYLIC POLYMER EMULSION) 180 GALLONS OF CONCENTRATE PER ACRE. DILUTE TO 8 PARTS WATER TO 1 PART CONCENTRATE (1 YEAR COATING.) NO FOOT OR VEHICULAR TRAFFIC ALLOWED. 4. FIBER-SORB (NATURAL WOOD FIBER BY-PRODUCT) 112" LAYER, APPROXIMATELY 100 TONS PER ACRE (6 MONTH COATING.) FOOT TRAFFIC AND MINIMAL VEHICULAR TRAFFIC ALLOWED. 5. COMPOSITE OF 300 GALLONS OF ENVIROTAC II (CONCENTRATED), 600 POUNDS OF PAPER FIBER MULCH AND 8 PARTS WATER. INGREDIENTS TO BE MIXED AND APPLIED WITH A HYDRO SEED SPRAY RIG. THE AMOUNTS LISTED ARE PER ACRE. MATERIAL CERTIFICATES ARE TO BE PROVIDED BY APPLICATOR UPON COMPLETION OF STABILIZATION. 6. REVEGETATION WITH TALL GRASS SUCH AS BARLEY OR OTHER EQUAL PLANTING MATERIAL THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES. 15.THE PROJECT PROPONENT SHALL NOTIFY THE SCAQMD 24 HOURS PRIOR TO THE INITIATION OF EARTH MOVING ACTIVITIES. 16.WHEEL CLEANING DEVICES OR PROCESSES SHALL BE LOCATED AT ALL DIRT ROADWAYS TO ASPHALT TRANSITIONS AND AT ALL OTHER LOCATIONS AS DIRECTED BY THE CITY ENGINEER. 17.THE LOCATION OF THE PERIMETER FENCE SHALL BE CONSIDERED TEMPORARY, UNTIL SUCH TIME AS THE PERIMETER WALL OF THE PROJECT IS IN PLACE. THIS TEMPORARY LOCATION SHOULD PROVIDE FOR ADEQUATE SIGHT DISTANCE AT INTERSECTIONS, BY MEANS OF A SETBACK OF A SUFFICIENT ANGLE TO ALLOW FOR A SAFE STOPPING DISTANCE. AFTER A REASONABLE PERIOD OF TIME, THE TEMPORARY PERIMETER FENCING AND SAND SHIELD WILL BE MOVED BACK FROM THE PROPERTY LINE. 18.THE PROJECT OWNER WILL DESIGNATE A FULL TIME RESPONSIBLE PERSON AVAILABLE 24 HOURS A DAY 7 DAYS A WEEK. THIS INDIVIDUAL IS AVAILABLE FOR ANY ISSUES OR PROBLEMS PERTAINING TO FUGITIVE DUST MITIGATION. THE RESPONSIBLE PERSON PRIMARY DUTY IS TO OVERSEE DUST CONTROL ON THE SITE AND THEY ARE AUTHORIZED TO DEPLOY ADDITIONAL WATER TRUCKS, INSTALL WIND FENCING, CONTRACT FOR STREET SWEEPING AND CHEMICAL DUST SUPPRESSANT APPLICATION OR ANY OTHER MITIGATION MEASURES NECESSARY TO PREVENT VISIBLE EMISSIONS OF DUST FROM CROSSING THE TRACT BOUNDARY LINE AND/OR FROM EXTENDING MORE THAN 100' BEYOND THE ACTIVE CONSTRUCTION AREA. 19.THE RESPONSIBLE PERSON SHALL DOCUMENT ALL ACTIVITIES ON A DAILY BASIS. CONSTRUCTION SCHEDULING - PHASING OF ACTIVITIES "A" (SITE PREPARATION AND MOBILIZATION) "B" (GRADING) "C" (UTILITY CONSTRUCTION, OFF-SITE UTILITY, AGGREGATE BASE AND PAVING) "D" (STRUCTURES, HARDSCAPE, LANDSCAPE, FINE DRAINAGE AND PERIMETER WALLS/FENCING) 1.NON-ACTIVE AREAS SHOULD BE STABILIZED AS SOON AS PRACTICAL AFTER THE CESSATION OF SOIL DISTURBING ACTIVITIES OR ONE DAY PRIOR TO THE ONSET OF PRECIPITAION. 2.MONITOR THE WEATHER FORECAST FOR RAINFALL 3.WHEN RAINFALL IS PREDICTED, ADJUST THE CONSTRUCTION SCHEDULE TO ALLOW FOR IMPLEMENTATION OF SOIL STABILIZATION AND SEDIMENT TREATMENT CONTROLS ON ALL DISTURBED AREAS PRIOR TO THE ONSET OF RAIN 4.BE PREPARED YEAR ROUND TO DEPLOY EROSION CONTROL AND SEDIMENT CONTROL BMPS. EROSION MAY BE CAUSED DURING THE DRY SEASON BY UN-SEASONAL RAINFALL, WIND, AND VEHICLE TRACKING. KEEP THE SITE STABILIZED YEAR ROUND AND RETAIN AND MAINTAIN RAINY SEASON SEDIMENT TRAPPING DEVICES IN OPERATIONAL CONDITION. ATTENDEE ROSTER NAME COMPANY NAME AND AREA OF RESPONSIBLITY DATE AND LOCATION TOPIC OF TRAINING TRAINING DOCUMENTATION - QUALIFIED SWPPP PRACTITIONER: 26093 SWPPP AMENDMENT LOG AMENDMENT NO.DATE BRIEF DESCRIPTION OF AMENDMENT PREPARED BY XXXX XXXX XXXX X XXX XX X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X DABC ADDITIONAL SWPPP MEASURES IMPLEMENTATION THIS PLAN SHALL BECOME EFFECTIVE IMMEDIATELY UPON ACCEPTANCE BY ALL APPLICABLE AGENCIES. BMPS SHALL BE IMPLEMENTED IMMEDIATELY CORRESPONDING TO SOIL DISTURBANCE AND IN THE INSTANCE OF A FORECASTED 50% OR GREATER CHANCE OF A RAINSTORM EVENT IN THE PROJECT AREA. AVAILABILITY AND RESPONSIBILITY THIS PLAN SHALL BE MADE AVAILABLE BY THE LRP TO THE CONTRACTOR (RESPONSIBLE PARTY) WHO SHALL MAINTAIN A COPY ON SITE DURING THE COURSE OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE A COPY TO ALL SUBCONTRACTORS UNDER HIS DIRECTION. THE RESPONSIBILITY FOR THE SUBCONTRACTORS' COMPLIANCE IS THAT OF THE CONTRACTOR. REQUIRED CHANGES IF, DURING THE PERIOD OF THIS PLAN, CONDITIONS CHANGE WHICH CAUSE THIS PLAN TO BE INEFFECTIVE IN MEETING THE BASIC OBJECTIVES, THE PLAN SHALL BE APPROPRIATELY AMENDED AND ALL RESPONSIBLE PARTIES SHALL BE GIVEN A COPY OF THE AMENDED PLAN WITH SPECIFIC INSTRUCTIONS ON THAT WHICH HAS CHANGED IN THE PLAN. THE CONTRACTOR IN HIS ROLE AS A RESPONSIBLE PARTY TO THIS PLAN SHALL REPORT TO THE OWNER WITHIN 24 HOURS OF DISCOVERY ANY CONDITIONS WHICH COULD CAUSE THE DISCHARGE OF POLLUTANTS FROM THE SITE IN AN AMOUNT, LOCATION, OR MANNER NOT ANTICIPATED AND DESIGNED FOR IN THIS PLAN. SOURCE IDENTIFICATION DURING THE COURSE OF GRADING OF THIS PROJECT THE FOLLOWING SOURCES OF POLLUTION MAY BE FOUND TO EXIST ON THE CONSTRUCTION SITE: 1). PETROCHEMICAL PRODUCTS, PRIMARILY GASOLINE AND MOTOR OIL, INCLUDING THOSE CONTAINED WITHIN MOTOR VEHICLES AND MACHINERY FOR THEIR INDIVIDUAL OPERATIONS, OR FOR MINOR FLEET MAINTENANCE. 2). OTHER CHEMICALS AND CHEMICAL COMPOUNDS SPILLED EITHER DURING CONSTRUCTION OR WHICH HAD BEEN PREVIOUSLY SPILLED OR DUMPED AT THE SITE. 3). ASPHALT PAVING MATERIALS BEING STORED OR AWAITING TRANSFER. 4). CONSTRUCTION DEBRIS AND TRASH GENERATED DURING THE COURSE OF CONSTRUCTION OF THE PROJECT. POLLUTION CONTROL PRACTICES MINIMIZING CONTACT--THE DEVELOPER, THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL ATTEMPT TO MINIMIZE CONTACT OF CONSTRUCTION MATERIALS, EQUIPMENT, AND VEHICLES WITH STORM WATER. THIS INCLUDES BUT IS NOT LIMITED TO NOT STORING SUCH ITEMS IN DESIGNED DRAINAGE SWALES OR DRAINAGE AREAS, THE OVERCOVERING OF SUCH MATERIALS THAT MAY BE ERODED DURING STORM EVENTS, AND THE PROHIBITION OF THE STORAGE OF CHEMICALS OR PETROCHEMICAL PRODUCTS OTHER THAN IN SECURED CONTAINERS DESIGNED TO WITHSTAND IMPACTS BY FLOODING OF UP TO 100 YEAR STORM EVENTS. CONSTRUCTION (GRADING) LOADING, UNLOADING, ACCESS AREAS--THE DEVELOPER, THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL IDENTIFY AREAS WITHIN EACH AREA OF CONSTRUCTION THAT CAN BE USED FOR LOADING AND UNLOADING WHICH WILL MINIMIZE THE CHANCES OF DISCHARGE OF POLLUTANTS FROM THE SITE. THESE AREAS SHALL BE DENOTED ON THE SITE PLAN INCLUDED IN THE SWPPP. ANY CHANGES TO THESE AREAS MUST BE APPROVED BY THE INSPECTOR IF HE FINDS THE CHANGE NECESSARY AND ALSO CONSISTENT WITH THE OBJECTIVES OF THE SWPPP. PRECONSTRUCTION PRACTICES--PRIOR TO COMMENCEMENT OF CONSTRUCTION/GRADING FOR EACH AREA, THE DEVELOPER, CONTRACTOR, AND INSPECTOR SHALL MEET TO REVIEW THE SPECIFIC CONDITIONS THAT AFFECT THAT AREA. IF ADDITIONAL CONTROL METHODS ARE NEEDED THE PLAN MAY BE AMENDED AS SET FORTH IN SECTION 5.0. EQUIPMENT STORAGE, CLEANING, AND MAINTENANCE--EQUIPMENT, INCLUDING VEHICLES, MAY BE STORED (PARKED) ON THE CONSTRUCTION SITE AS LONG AS IT IS IN GOOD REPAIR. CLEANING OF VEHICLES IS LIMITED TO THE USE OF WATER. NO SOLVENTS MAY BE APPLIED EXTERNALLY TO ANY EQUIPMENT, INCLUDING VEHICLES ON THE SITE. MINOR MAINTENANCE MAY BE CONDUCTED BUT NO OVERHAULING IS ALLOWABLE UNLESS APPROVED BY THE INSPECTOR INCLUDING A SPECIFIC PLAN FOR CONTAINMENT AND DISPOSAL OF ANY PETROCHEMICAL, OR OTHER CHEMICALS OR BYPRODUCTS INCLUDING EFFECTED SOILS RESULTING FROM THE MAINTENANCE WORK. ON-SITE STORAGE AND DISPOSAL OF CONSTRUCTION MATERIALS--CONSTRUCTION MATERIALS SHALL BE STORED IN A MANNER CONSISTENT WITH NORMAL CONSTRUCTION PRACTICES AND THIS PLAN PRIOR TO THEIR DEPLOYMENT. MATERIALS AWAITING REMOVAL FROM THE SITE SHALL BE CONTAINED WITHIN DUMPSTERS, OR IN AGGREGATED PILES/AREAS AND SHALL BE REMOVED FROM THE SITE IN NO MORE THAN 15 WORKING DAYS. ANY MATERIALS THAT ARE KNOWN TO CONTAIN ANY OF THE POLLUTANTS CITED IN SECTION 6.0 OF THIS PLAN SHALL BE SEGREGATED FROM OTHER MATERIALS. FILL MATERIALS--ALL FILL MATERIALS SHALL COME FROM SOILS EXCAVATED ON THE SITE UNLESS APPROVED BY THE INSPECTOR. ANY IMPORTED FILL MATERIALS SHALL BE INSPECTED BY THE INSPECTOR PRIOR TO PLACEMENT ON THE SITE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT SUCH IMPORTED MATERIAL IS FREE OF POLLUTION. EROSION AND SEDIMENT CONTROL THE CONTROL PRACTICES START WITH PRECONSTRUCTION PREPARATION OF THE SITE, CONTINUE THROUGH THE CONSTRUCTION PERIOD, AND END WITH PROJECT CLEANUP AND COMPLETION. PRECONSTRUCTION/PREGRADING--EACH SITE SHALL BE THOROUGHLY WATERED PRIOR TO COMMENCEMENT OF GRADING AND CONSTRUCTION ACTIVITIES. CONSTRUCTION/GRADING--EACH AREA UNDER CONSTRUCTION SHALL BE MAINTAINED IN A MANNER TO MINIMIZE WIND AND WATER EROSION FROM THE DISTURBED PORTIONS OF THE SITE. THE CONTRACTOR SHALL EMPLOY THE USE OF WATERING, SAND BAG BARRIERS, CHEMICAL SOIL STABILIZATION, WIND SCREENS AND FENCING AND RETENTION BASINS AS SHOWN ON THE SWPPP EXHIBIT. THE LONGER A DISTURBED PORTION OF THE SITE IS LIKELY TO BE LEFT EXPOSED AND OUT OF THE PATH OF ONGOING WORK ACTIVITIES, THE MORE PERMANENT THE STABILIZATION TECHNIQUE THAT SHALL BE EMPLOYED. FOR ALL VEHICULAR TRIPS TO AND FROM THE SITE CARRYING SOILS, TIRE WASHING AND LOAD COVERING SHALL BE EMPLOYED. ALL STABILIZATION BMP'S (BEST MANAGEMENT PRACTICES) SHALL BE MONITORED AND REPAIRED OR REPLACED IF NEEDED. POST-CONSTRUCTION/GRADING-ALL REQUIRED LANDSCAPING SHALL BE INSTALLED BY PROJECT COMPLETION. IF THE PLANTING IS COMPLICATED BY THE WEATHER, INABILITY TO ACQUIRE PARTICULAR MATERIALS, BY EXTREME SLOPES, OR DUE TO WINDY CONDITIONS, SOIL STABILIZERS SHALL BE USED TO MINIMIZE THE EROSION. ALL LANDSCAPED AREAS WILL BE IRRIGATED BY AUTOMATIC SYSTEMS. WASTE MANAGEMENT AND DISPOSAL ALL WASTES, INCLUDING EQUIPMENT MAINTENANCE WASTE, DISPOSED AT THE SITE OR REMOVED FROM THE SITE FOR DISPOSAL SHALL BE DISPOSED OF IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, AND/OR AGENCY LAWS AND ORDINANCES AND SHALL BE IN COMPLIANCE WITH THIS PLAN. MAINTENANCE, INSPECTION AND REPAIR THE DEVELOPER IS RESPONSIBLE FOR THE MAINTENANCE OF ALL PERMANENT INSTALLATIONS NECESSARY FOR THE EFFECTIVE COMPLIANCE WITH THIS PLAN. ANY DEFECTS DISCOVERED SHALL BE CORRECTED AS QUICKLY AS POSSIBLE. TRAINING THE DEVELOPER AND THE CONTRACTOR SHALL REVIEW THE REQUIREMENTS FOR MONITORING AND REPORTING SET FORTH IN SECTION 15.0 AND SHALL DETERMINE THE PERSONNEL TO BE RESPONSIBLE. LIST OF CONTRACTORS/SUB CONTRACTORS UPON THE DETERMINATION OF THE PRIME CONTRACTOR THE DEVELOPER SHALL INCLUDE AS PART OF THIS PLAN THE NAME OF THE FIRM, THE NAME OF THE CONSTRUCTION SUPERINTENDENT, AND TELEPHONE NUMBER(S) WHERE A PERSON OF AUTHORITY IN THE FIRM MAY BE REACHED 24 HOURS A DAY. PUBLIC ACCESS THIS REPORT SHALL BE AVAILABLE FOR REVIEW BY MEMBERS OF THE PUBLIC, OR BY AFFECTED PUBLIC AGENCIES UPON REQUEST. MONITORING PROGRAM AND REPORTING REQUIREMENTS GENERAL-OWNER WILL CONDUCT, OR CAUSE TO HAVE CONDUCTED, SITE INSPECTIONS BOTH BEFORE AND AFTER A MAJOR STORM EVENT AND AT 24-HOUR INTERVALS DURING EXTENDED RAIN EVENTS TO IDENTIFY THE POINTS OF STORM WATER RUNOFF FROM THE SITE AND TO EVALUATE WHETHER THE PRACTICES SET FORTH IN THIS PLAN HAVE BEEN ADEQUATE TO PREVENT THE SIGNIFICANT DISCHARGE OF POLLUTANT LOADINGS IDENTIFIED IN THIS SWPPP. A RECORD OF THESE INSPECTIONS, INCLUDING THE DATE OF THE INSPECTION(S), ANY OBSERVATIONS, AND THE INDIVIDUAL(S) PERFORMING THE INSPECTIONS, SHALL BE MAINTAINED. IN ADDITION, OWNER SHALL ANNUALLY CERTIFY THAT THE CONSTRUCTION ACTIVITIES ARE IN COMPLIANCE WITH THESE PROVISIONS. ADDITIONALLY, REGULARLY SCHEDULED INSPECTIONS SHALL TAKE PLACE WEEKLY DURING THE RAINY SEASON AND EVERY 2 WEEKS DURING THE NON-RAINY SEASON. NONCOMPLIANCE NOTIFICATIONS MUST BE SUBMITTED TO THE REGIONAL BOARD WITHIN 30 DAYS OF IDENTIFICATION OF NONCOMPLIANCE. NOTIFICATIONS SHALL IDENTIFY THE TYPE(S) OF NONCOMPLIANCE, DESCRIBE THE ACTIONS NECESSARY TO ACHIEVE COMPLIANCE AND INCLUDE A TIME SCHEDULE, SUBJECT TO MODIFICATIONS BY THE REGIONAL BOARD, INDICATING WHEN COMPLIANCE WILL BE ACHIEVED. RECORDS--ALL RECORDS, INCLUDING INSPECTION REPORTS, COMPLIANCE CERTIFICATIONS, AND NON-COMPLIANCE REPORTING MUST BE RETAINED FOR A PERIOD OF AT LEAST FIVE YEARS. REQUIRED CHANGES--THE REGIONAL WATER QUALITY CONTROL BOARD MAY REQUIRE OWNER TO CONDUCT ADDITIONAL INSPECTIONS, SUBMIT REPORTS AND CERTIFICATIONS, OR TO PERFORM SAMPLING AND ANALYSIS. EROSION CONTROL NOTES 1.IN CASE EMERGENCY WORK IS REQUIRED, CONTACT THE QSP AT (760) 320-9811. 2.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 3.DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE CITY ENGINEERING INSPECTOR. 4.THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5.THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6.THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. 7.ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8.ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 9.ALL GRAVEL BAGS SHALL HAVE 3/4 INCH MINIMUM AGGREGRATE. ADDITIONAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES 1.THE GRADING EQUIPMENT SHALL BE CLEANED ON SITE IN TEMPORARY GRAVEL CONSTRUCTION AREA AND WHEELS CLEANED AT WHEEL WASHING AREA AT STABILIZED ENTRANCE PRIOR TO LEAVING THE SITE. 2.ALL CONCRETE VEHICLES, EQUIPMENT AND MATERIALS WASHING SHALL BE RESTRICTED TO CONCRETE TRUCK WASHOUT AND ALL MINOR MAINTENANCE OF CONSTRUCTION EQUIPMENT SHALL BE RESTRICTED TO TEMPORARY PAVED CONSTRUCTION AREA. 3.GATE-CONTROLLED TRUCK/CONSTRUCTION ACCESS POINT. 3 DATE SHEET OF STORM WATER POLLUTION PREVENTION PLAN (SWPPP) TRACT NO. 31249 - CANTERA AT CORAL MOUNTAIN BEING A PORTION OF THE NORHTEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 6 SOUTH, RANGE 7 EAST, S.B.M. CITY OF LA QUINTA, CALIFORNIAMSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com 3 SHEETS APPROVEDREVISIONSNO. EROSION CONTROL AND BM #655 3.5" BRASS DISK IN CURB, FLUSH, 270 FEET WEST OF THE E.C.R. OF THE NORTHWEST CURB RETURN AT THE INTERSECTION OF STONE CREEK WAY AND AVENUE 58. ELEV = -26.431 (DATUM NAVD88 + 500.00= 473.60) LOCATION BENCH MARK 473.60ELEV.JHC DESIGNED BYPREPARED UNDER THE DIRECT SUPERVISION OF DRAWN BY CHECKED BY DG JHC Jesus Herrera-Cortes 8/11/2021 DocuSign Envelope ID: B7D05D19-5907-4A18-8657-14700026519A