Loading...
2020 Onyx Paving Co - Washington St Pavement Rehabilitation Project 2020-04 Contract 1300-1 SECTION 1300 CONTRACT THIS CONTRACT, by and between the CITY OF LA QUINTA, a municipal corporation, herein referred to as "City,” and Onyx Paving Company, herein referred to as, "Contractor." W I T N E S S E T H: In consideration of their mutual covenants, the parties hereto agree as follows: 1. Contractor shall furnish all necessary labor, material, equipment, transportation and services for Project No. 2020-04, Washington Street Pavement Rehabilitation in the City of La Quinta, California pursuant to the Invitation to Bid, dated July 2020, the project Specifications, and Contractor's Bid, all of which documents shall be considered a part hereof as though fully set herein. Should any provisions of Contractor's Bid be in conflict with the Notice Inviting Bids, Specifications, or this Contract, then the provisions of said Contract, Specifications, and Invitation to Bid shall be controlling, in that order of precedence. The time frame for construction work shall be in accordance with that specified in the Invitation to Bid. 2. Contractor will comply with all Federal, State, County, and La Quinta Municipal Code, which are, as amended from time to time, incorporated herein by reference. 3. All work shall be done in a manner satisfactory to the City Engineer. 4. Contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have the pavement rehabilitation (grind, overlay, dig-outs, and curb ramps) on Washington Street and the 1st striping coat on Washington Street shall be completed within 20 working days from the date specified in the Notice to Proceed. All striping shall be completed within 40 working days from the date specified in the Notice to Proceed. 5. In consideration of said work, City agrees to pay Contractor such sums as shall be approved by the City Engineer at lump sums and/or unit prices stated in the Contractor's Bid, the base consideration Seven-hundred Twenty Thousand Dollars and Zero Cents ($720,000.00). All payments shall be subject to approval by the City Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Specifications. 6. The Contractor shall not knowingly pay less than the general prevailing rate for per diem wages, as determined by the State of California Departmen t of Industrial Relations and referred to in the Invitation to Bid, to any workman employed for the work to be performed under this contract; and the Contractor shall forfeit as a penalty to the City the sum of Twenty-Five Dollars ($25.00) for each calendar day, or fraction thereof, for such workman paid by him or by any subcontractor under him in violation of this provision (Sections 1770-1777, Labor Code of California).