Loading...
RCTC - Time Extension for Project 2019-23 Wash. St. at Ave 50 & Tampico - ADA Improv August 15, 2022 Mr. Bryan McKinney Public Works Director City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Subject: SB 821 FY 2019/20 Extension of Time for Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project Dear Mr. McKinney: The Riverside County Transportation Commission (Commission) received the City of La Quinta’s (City) letter dated August 10, 2022, requesting a second 6-month time extension for the Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project funded through SB 821 FY 19/20 Call for Projects. The Commission understands the City did not receive any bids and is requesting additional time to re-bid the project. Pursuant to the Commission’s adopted Article 3 Bicycle and Pedestrian Facilities Program policy, its Executive Director is authorized to grant a maximum of a 12-month time extension for projects with compelling reasons. This letter serves as the Commission’s approval of the requested six-month extension. The new deadline to submit the final claim form is April 23, 2023. Please contact Jenny Chan at (951) 787-7924 if you have any questions. Sincerely, Anne Mayer Executive Director Enclosure: La Quinta FY 19/20 Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project – Extension Request August 10, 2022 Anne Mayer Executive Director Riverside County Transportation Department 4080 Lemon Street, 3rd Floor Riverside, CA 92502-2208 Subject: Second Time Extension Request – SB821 FY 19/20– Washington St. at Avenue 50 and Calle Tampico and ADA Improvements Dear Mrs. Mayer, The City of La Quinta respectfully requests an additional six (6) month time extension to complete the proposed street and ADA improvements along Washington Street at Avenue 50 and Calle Tampico and submit our claim for reimbursement under the TDA Article 3 (SB821) Bicycle and Pedestrian Facilities Biennial Call for Projects for Fiscal Year 19/20. As stated in the grant application, the project will commence improvements within two locations along the Washington Street Corridor. The first location’s proposed work involves constructing a new accessible curb that is compliant with the current Americans with Disabilities Act (ADA) guidelines. This location is heavily used by students who need access to their communities just north and west of the school together residents accessing the La Quinta Village. The second location’s proposed work includes constructing a sidewalk approximately 400 feet long to allow safe and easy accessibility a resident whose primary transportation is a wheelchair. These two projects were proposed together to reduce project administration costs and increase to increase the quantities to help lower construction costs. The City of La Quinta has a completed set of plans and specifications and had completed the utility coordination. The project was posted to bid on July 18, 2022 and a pre-bid conference was held on July 28, 2022. The bids opened today, August 10, 2022, and no bids were received. An additional six-month time extension would allow staff to review the plans and specifications, reach out to contractors and re-bid the project. The time requested is sufficient to re-bid, award, and construct the improvements. If you have any questions or concerns, please do not hesitate to contact Lorissa Gruehl, P.E. Designer, at (760) 323-5344 (lgruehl@naiconsulting.com) or myself at (760) 777-7041. Sincerely, CITY OF LA QUINTA Bryan McKinney, P.E. Public Works Director/City Engineer January 25, 2022 Mr. Bryan McKinney Public Works Director City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Subject: SB 821 FY 2019/20 Extension of Time for Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project Dear M r. McKinney: The Riverside County Transportation Commission (Commission) received the City of LaQuinta’s (City ) letter dated January 25, 2022, requesting a six -month time extension for the Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project funded through the SB 821 FY 19/20 Call for Projects . The Commission understands the City revised its construction schedule to minimize disturbance during the remaining school ye ar. The City completed the utility coordination work and the additional time would allow all conflicting utility purveyors the time to relocate their facilities. Additionally, at this time the City has a biddable set of plans and specifications. Based on the new project schedule , the City expects to close out the project by October 2022. Pursuant to the Commission’s adopted Article 3 Bicycle and Pedestrian Facilities Program policy, its Executive Director is authorized to grant a maximum of a 12-month time extension for projects with compelling reasons. This letter serves as the Commission’s approval of the requested six -month extension. The new deadline to submit the final claim form is October 23, 2022. Please contact Jenny Chan at (951) 787-7924 if you have any questions. Sincerely, Anne Mayer Executive Director Enclosure: La Quinta FY 19/20 Washington Street at Avenue 50 and Calle Tampico and ADA Improvements Project – Extension Request January 25, 2022 Jillian Guizado Director of Planning and Programming Riverside County Transportation Department 4080 Lemon Street, 3rd Floor Riverside, CA 92502-2208 Subject: Time Extension Request – SB821 FY 19/20– Washington St. at Avenue 50 and Calle Tampico and ADA Improvements Dear Ms. Guizado, The City of La Quinta respectfully requests a six (6) month time extension to complete the proposed street and ADA improvements along Washington Street at Avenue 50 and Calle Tampico and submit our claim for reimbursement under the TDA Article 3 (SB821) Bicycle and Pedestrian Facilities Biennial Call for Projects for Fiscal Year 19/20. As stated in the grant application, the project will commence improvements within two locations along the Washington Street Corridor. The first location’s proposed work involves constructing a new accessible curb that is compliant with the current Americans with Disabilities Act (ADA) guidelines. This location is heavily used by students who need access to their communities just north and west of the school, together with residents accessing the La Quinta Village. The second location’s proposed work includes constructing a sidewalk approximately 400 feet long to allow safe and easy accessibility to a resident whose primary transportation is a wheelchair. These two projects were proposed together to reduce project administration costs and increase to increase the quantities to help lower construction costs. Our proposed time extension would allow the City to mitigate the community disturbance from construction for the duration of the remaining school year. The City of La Quinta has completed the utility coordination and this request would also allow all conflicting utility purveyors the time to relocate their facilities accordingly. At this point, the City has a biddable set of plans and project specifications. The six-month time extension would include time to bid, award, and construct the improvements. If you have any questions or concerns, please do not hesitate to contact Lorissa Gruehl, P.E. Designer, at (760) 323-5344 (lgruehl@naiconsulting.com) or myself at (760) 777-7045. Sincerely, CITY OF LA QUINTA Bryan McKinney, P.E. Public Works Director/City Engineer 1 From:Julie Mignogna Sent:Monday, August 15, 2022 10:31 AM To:Monika Radeva; Laurie McGinley Cc:Bryan McKinney; Carley Escarrega; Lorissa Gruehl Subject:Fwd: [EXTERNAL] City of La Quinta Second Time Extension Request – SB821 FY 19/20– Washington St. at Avenue 50 and Calle Tampico and ADA Improvements Project Attachments:image001.png; AM JC La Quinta Washington Stree_second time extension request.pdf Follow Up Flag:Follow up Flag Status:Flagged Good morning Monika and Laurie!  Please find the attached contract extension notice from RCTC for the SB821 funding project 2019‐23 for laserfische and  your records. We are going to re‐bid the project after receiving no construction bids last week.  Please let me know if you have any questions.  Much appreciation,  Julie  Begin forwarded message:  From: Jenny Chan <JChan@rctc.org>  Date: August 15, 2022 at 9:59:26 AM PDT  To: Julie Mignogna <jmignogna@laquintaca.gov>  Cc: Martha Masters <MMasters@rctc.org>, Bryan McKinney <Bmckinney@laquintaca.gov>, Lorissa  Gruehl <lgruehl@naiconsulting.com>, Ubaldo Ayon <uayon@laquintaca.gov>  Subject: RE: [EXTERNAL] City of La Quinta Second Time Extension Request – SB821 FY 19/20–  Washington St. at Avenue 50 and Calle Tampico and ADA Improvements Project  ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution  when opening attachments, clicking links or responding to requests for information. **  Hello,   See attached approval for the second time extension. Thank you.   From: Julie Mignogna <jmignogna@laquintaca.gov>   Sent: Wednesday, August 10, 2022 3:01 PM  To: Jenny Chan <JChan@RCTC.org>  Cc: Martha Masters <MMasters@RCTC.org>; Bryan McKinney <Bmckinney@laquintaca.gov>; Lorissa  Gruehl <lgruehl@naiconsulting.com>; Ubaldo Ayon <uayon@laquintaca.gov>  Subject: [EXTERNAL] City of La Quinta Second Time Extension Request – SB821 FY 19/20– Washington  St. at Avenue 50 and Calle Tampico and ADA Improvements Project  Importance: High  2 Good afternoon, Jenny!     The City of La Quinta respectfully requests an additional six (6) month time extension to complete the  proposed street and ADA improvements along Washington Street at Avenue 50 and Calle Tampico and  submit our claim for reimbursement under the TDA Article 3 (SB821) Bicycle and Pedestrian Facilities  Biennial Call for Projects for Fiscal Year 19/20.       The City of La Quinta has a completed set of plans and specifications and had completed the utility  coordination for the project. The project was posted to bid on July 18, 2022, and a pre‐bid conference  was held on July 28, 2022. The bids opened today, August 10, 2022, and no bids were received. An  additional six‐month time extension would allow staff to review the plans and specifications, reach out  to contractors, and re‐bid the project. The time requested is sufficient to re‐bid, award, and construct  the improvements.     Please do not hesitate to reach out should you have any questions or want to discuss the extension  request further.      Much appreciation,   Julie          Julie Mignogna | Management Analyst  Public Works Department  City of La Quinta  78495 Calle Tampico | La Quinta, CA 92253  Ph. 760.777.7041  www.laquintaca.gov   www.playinlaquinta.com      Issues or questions for Public Works can be submitted through GoRequest. I will be working remotely until further notice, but will be conducting business during regular business hours and will be available via phone and email. Thank you for your understanding.  For additional updates visit: www.laquintaca.gov/COVID19