Loading...
2023 Ace Electric - Change Order No.1 - Sports Complex Lighting Project 2022-04W +�vsNW CALIFORNIA CONTRACT: SPORTS COMPLEX LIGHTING REPLACEMENT PROJECT #: 2022-04 CONTRACTOR: ACE ELECTRIC, INC. 6061 FAIRMOUNT AVENUE SAN DIEGO, CA 92120 CONTRACT CHANGE ORDER NO. 1 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for removal of the Geotech services Total ($ 11,948.00) This Contract Change Order allows for the cost of the bonds Total $2,548.00 Original Contract Amount $ 254,800.00 Add This Change Order No. 1 ($9,400.00) Revised Contract Total $ 245,400.00 By reason of this contract change order the time of completion is adjusted as follows: - 0- days added to contract time. Submitted By: Approved By. Digitally signed by Ubaldo Ayon Jr 3/27/23 Date: 2023.03.27 15:46:37-07'00' Date: Digitally signed by Bryan McKinney 3/27/23 Date: 2023.03.27 15:56:15-07'00' Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By: Title: Project Manager Contractor:Ace Electric, Inc. Date:03/27/23 QACE ELECTRIC To: From: City of La Quinta 78495 Calle Tampico La Quinta, Ca 92253 Telephone: (760) 777-7041 Contact: Julie Mignogna E-mail: jmignogna@laquintaca.gov Total: $-9,400.00 CHANGE REQUEST CR # 01 CR Date 3/22/2023 Description Geotech Deduct and Bond Adder Project Name: La Quinta Sports Complex Project Number: 2223 Ace Electric, Inc. 6061 Fairmount Avenue San Diego, CA 92120 Telephone: (619) 814-4782 Contact: Jovany Galindo E-mail: jovany.g@AceElectriclnc.com Description: Geotech Deduct and Bond Adder Reason for Change: City Request Please refer to the below pricing. Call if you have any questions or need additional information. Thank you. Bid Item rkdn Fct %Material($) Mat(%) Labor Hrs Lab(%) Normal Deduct 0.000 0.000 2,548.00 -11,948.00 -27.11 127.11 0.00 0.00 0.00 0.00 Total 1 1 -9,400.001 100.001 0.001 100.00 Description I QtY1 Net Price U I Total Mat.1 Labor U I Total Hrs. BOND 1 11 2,548.00E 1 2,548.001 0.00E 1 0.00 Totals 2,548.001 1 10.00 Description I Qtyl Net Price U I Total Mat.1 Labor U I Total Hrs. GEOTECHNICAL INVESTIGATION -11 11,948.00E 1 -11,948.00 0.00E 1 -0.00 Totals -11,948.001 1 10.00 GENERAL MATERIALS-9,400.00 SUBTOTAL-9,400.00 FINAL AMOUNTS FINAL AMOUNT $-9,400.00 P.O. Box 601071 Lic. No. 835109 A, C10 - DIR #1000001519 Tel (619) 521-9740 San (Diego, CA 92160-1071 www.AceElectricinc.com Fax (619) 521-9742 CHANGE REQUEST CR # 01 Final Amount: $-9,400.00 Name: Date: Signature: Change Order M I hereby accept this quotation and authorize the contractor to complete the above described work. CR # 01 Page Number: 2 P.O. Box 601071 San Diego, CA 92160-1071 Lic. No. 835109 A, C10 - DIR #10004C1519 www.AceElectricinc.com Tel (619) 521-9740 Fax (619) 521-9742