Loading...
PM102016-0003CITY OF LA QUINTA PERMIT NO. TRACT 31732, AMEND. NO. 2 IF YOU SEE DUST COMING FROM THIS PROJECT PLEASE CALL: 760- 601- 7437 F YOU DONT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL: TIE CITY OF LA QUNTA PUBLIC WORKS DEPARTMENT 760-416-5315 REPORT THE PERMIT OR PROJECT NUMBER AND THE PHONE NUMBER ABOVE, OR CALL AR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-7684 6' -J- 96" MIN. I ti DUST CONTROL SIGN DETAIL NOT TO SCALE PROJECT INFORMATION GROUND LEVEL PROJECT NAME: BELLASENO STREET ADDRESS: SOUTHEAST CORNER MONROE STREET AND AVENUE 60 TRACT/PARCEL NUMBER: 31732, AMENDMENT NO. 2 TOTAL PROJECT ACREAGE: 43.8 (DISTURBED AREA) LOCATION OF WATER SOURCE AND FLOW RATE: EX. FDC, CVWD WATER (1500 GPM, MIN.) LOCATION OF BACKUP SOURCE AND FLOW: CVWD WATER MANN (1500 GPM, MW.) MAX CUBIC YARDS OF EARTH MOVEMENT: 62,800 C.Y. MASS EXCAVATION AMOUNT OF EXPORT: 0 CY DISPOSAL S/TE/S: N/A ON SITE STORAGE PILES: TBD BY C/TY/CONTRACTOR (NOTE: NO STOCKPILING WITHOUT CITY ENG/NEER APPROVAL. PRIMARY SOIL TYPE: SILTY SANDS & SANDY SILTS CONTROL BUDGET: $100,000 OWNER REPRESENTATIVE INFORMATION OWNERS REPRESENTATIVE NAME: DAVE LIPPERT OWNERS REPRESENTATIVE ADDRESS:: P.O. BOX 5477 L4 QUINTA, CA 92248 CONTACT PHONE NUMBER (24 HOURS): 760-601-7437 OWNER'S REPRESENTATIVE'S AQMD CERTIF/CATICt'&NUMBER: CV1601-003011-3095 OWNERS REPRESENTATIVE SIGNATURE AND DATE: PHASING OF GRADING ACTIVITIES THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED 4 TIMES PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS. TYPICAL 2000 GALLON WATER TRUCKS CAN EFFECTIVELY WATER ABOUT 4 ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIVIDED BY 4 WATER/NGS PER DAY T/MES 4 AC./HR. = 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN SOME LOCATIONS, UP TO 24 AC. PER TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER PROJECTS MUST HAVE MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE TIME. AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED W/TH CHEMICALS, HYDROMULCH, 0!d VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN BELOW SHALL BE SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER. IT /S BETTER TO TREAT THEM WITH AN APPROVED "O/L" (LIKE ENV/ROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLIATIVE, TO SAVE WATER. ASSUME 1 2000 GALLON WATER TRUCK CAN EFFECTIVELY WATER 8 ACRES PER DAY ON NON HIGH WIND DAYS. DURING HIGH W/ND DAYS, THE NUMBER OF TRUCKS MAY INCREASE DEPENDING ON THE SITUATION. THE UTILITY TRENCHING PHASE AND STREET IMPROVEMENT PHASE WILL OBTAIN ITS OWN WATER TRUCK. PHASE A CLEAR AND GRUB START DATE END DATE DISTURBED ACREAGE 7/1/16 7/15/16 43.8 PHASE B START DATE 7/16/16 PHASE C START DATE 11/1/16 PHASE D START DATE 4/1/17 STABIL/ZED ACRES 0.0 ROUGH GRADING END DATE DISTURBED ACREAGE STABIL/ZED ACRES 10/30/16 43.8 0.0 UTILITY TRENCHING AND STREET IMPROVEMENTS END DATE DISTURBED ACREAGE STABIL/ZED ACRES 6/30/17 10.0 33.8 BUILDING AND LANDSCAPING END DATE DISTURBED ACREAGE STABIL/ZED ACRES UNKNOWN 5.0 38.8 FUGITIVE PM 10 DUST CONTROL MEASURES SPR/NKLER ACRES 0 SPR/NKLER ACRES 0 SPRINKLER ACRES 0 SPRINKLER ACRES 0 2,000 GAL WATER TRUCKS 0 2,000 GAL WATER TRUCKS 0 2,000 GAL WATER TRUCKS 2 2,000 GAL WATER TRUCKS 1 4,000 GAL WATER TRUCKS 3 4,000 GAL WATER TRUCKS 3 4,000 GAL WATER TRUCKS 0 4,000 GAL WATER TRUCKS 0 HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE: A B C D X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. ) SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS OR W/ND BLOCK.) SITE WATERING 7 DAYS A WEEK (IRRIGATION SYSTEM, MW. 4 TIMES PER 24 HRS., 0R BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS., 1 TRUCK / 8 ACRES) PER/METER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY) GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS) WHEEL CLEANING AT TRUCK EXITS, ("RUMBLE STRIPS", DRIVE-THROUGH PONDS, GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT R/GHT) INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, 01 PLANTS) ACTIVE AREA SOIL STABILIZERS (ENV/ROKLEEN "0/L", OR SIMILAR WETTING AGENTS) STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH STREET SWEEPING WHENEVER NEEDED PERMANENT VEGETATION / LANDSCAPING BLOCK WALLS ROAD PAVING NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE "DUST CONTROL PLAN REVIEW GUIDANCE FOR LOCAL GOVERNMENT' FROM THE SOUTH COAST A/R QUALITY MANAGEMENT DISTRICT, (S.C.A.Q.M.D). AND AVAILABLE FROM THE CITY OF L4 QUINTA PUBLIC WORKS/ENGINEERING DEPARTMENT. PROJECT RECORDKEEP/NG/REPORT.• RECORD ALL ACTIVITIES, CONTRACTS AND MATERIALS PURCHASES ASSOCIATED WITH BLOWSAND/FUGIT/VE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO THE CITY OF LA QUINTA, PUBLIC WORKS DEPARTMENT F01 REVIEW. THIS "FEEDBACK' WILL EVENTUALLY HELP THE CITY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN W BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE C/TY OR /N THE AFORESAID DOCUMENT FUGITIVE PM 10 DUST CONTROL PROGRAM DETAILS EACH MITIGATION MEASURE 01 CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCT/ON PHASING, WORKER'S PARKING AREAS, GRAVELED ENTRANCE/EXIT, AND OTHER THINGS AS NEEDED. PHASE "A": CLEARING AND GRUBBING (SITE PREP. & MOBILIZATION) SPECIFIC PROCEDURES 1. PREWATERING METHODS: SPR/NKLER ENT/RE SITE TO AT LEAST 12X MINIMUM MOISTURE CONTENT OR WITHIN 70X OPTIMUM IF THE OPTIMUM MOISTURE CONTENT /S LESS THAN 129, TO OVEREXCAVATION DEPTH. VALUES BASED ON ASTM TEST METHODS D2216 AND 01557. 2. GRADING/EXCAVAT/NG DUST CONTROL METHOD: WATER WITH 4,000 GAL WATER TRUCKS (TOTAL = 3). 3. OFFSITE WORK PERMISSION NEEDED: NA 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHAINLINK AND SAND FENC/NG AROUND PER/METER OF PROJECT WITH ACCESS GATES LOCATED AT WEST AND SOUTH SIDES OF PROJECT. 5. INITIAL STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: SEE PLAN 7. WEEKEND DUST CONTROL MITIGATION: WATER W/TH 4,000 GAL WATER TRUCK MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 15 MPH MAX/MUM. LOCATIONS OF SPEED LIMIT SIGNS PER SHT. 2. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: WATER W/TH 2,000 GAL WATER TRUCKS (TOTAL = 1). 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS W 75 PERCENT GROUND COVERAGE PROV/DED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYS/CAL ACCESS RESTRICT/ON SURROUNDING THE AREA. SITE SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE). _SPRINKLER_ WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FIRE DETECTOR CHECK (FDC) LOCATED AT NW CORNER OF SITE, MINIMUM k500 GPM 2. OFF-SITE WORK PERMISSION NEEDED: NONE - 3. ACCESS WILL BE CONTROLLED BY: GATES AT CONSTRUCTION ENTRANCE PHASE "A": ROUGH GRADING (SITE PREP. & MOBILIZATION) CONTINUED SITE SPECIFIC DETAILS: 4. IN/TIAL STAGING AREA: AS SHOWN ON SHEET 2 EQUIPMENT STORAGE _A.S, _SHOWN ON SHED 2. TEMPORARY OFFICE AS SHOWN ON SHEET 2 EMPLOYEE PARKING AS SHOWN ON SHEET 2 5. WHEEL WASHING PROVISIONS -GRAVEL PAD AT CONSTRUCTION -_ENTRANCES _SEE SWPPP IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA AMENDMENT NO. 2, TRACT NO. 31732, BELLASENO PERMIT NO. FUGITIVE DUST (PM -10) MITIGATION PLAN 6. SPEED RESTRICTION SIGN LOCATION. POSTED AT CONSTRUCTION ENTRANCES 7. NUMBER OF POSTED "DUST CONTROL SIGNS" TWO (2) SIGNS INSTALLED (TYP. AT CONSTRUCTION ENTRANCE OFF FRONTING ROAD) 8. OTHER PRELIMINARY WORK: TO REDUCE JOB -SITE TRACK -OUT, INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS BEFORE INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING., SEE SWPPP PHASE "B": ROUGH GRADING (MASS GRADING, PERIMETER WALLS) SPECIFIC PROCEDURES 1. HAUL/NG PROCEDURES: SEE NOTES SHT. NO. 2 2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER W/TH 4,000 GAL WATER TRUCKS, 2,800 CY PER TRUCK (TOTAL = 3) (MINIMUM 4 TIMES PER 24 HRS.). APPLY CONTINOUSLY. 3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY OR AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING AT PROJECT BOUNDARY. 5. INITIAL STAG/NG AREA: SEE SHT. NO. 2 6. WHEEL WASH/NG PROVISIONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. NO. 2 7. WEEKEND DUST CONTROL MITIGATION: WATER WITH 4,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES 01 AS NEEDED. RESTRICT TRAVELING SPEEDS TO 15 MPH. STOP WORK AND INCREASE WATERING AS NEEDED IF MIN/MUM DUST CONTROL WATERING /S FOUND TO BE INADEQUATE. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: NO STOCK PILES ON SITE. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOW/NG LONG- TERM STABILIZATION TECHNIQUES F01 ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; 0R C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE W/TH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. (CHEMICAL STABILIZERS SHALL BE PROVIDED WITH GREEN COLORANTS) SITE SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. HAUL ROUTE: EXPORT HAUL ROUTE TBD BY DEVERLOPER/CONTRACTOR, WITH APPROVAL FROM CITY. 2. SOIL STAB/LIZATTON METHODS: ACTIVE AREA WATER SCHEDULE:: (MIN. 4 TIMES PER 24 HRS.) THREE (3) 4,000 GAL WATER TRUCK 4 TIMES/24 HRS. WEEKEND WATERING SCHEDULE.: (MIN. 4 TIMES PER 24 HRS. ) THREE (3) 4,000 GAL WATER TRUCKS 4 TIMES/24 HRS. INACTIVE AREA STABILIZATION METHOD(S): (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE) 3. PERIMETER BLOCK WALL SCHEDULE: WEST AND SOUTH WALL TO BE BUILT AS SOON AS SUFFICIENT GRADING HAS BEEN COMPLETED 4. OTHER: A) INSTALL SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS IMMEDIATELY UPON INITIATION OF THIS PHASE OF GRADING. B) TO REDUCE JOB -SITE TRACK -OUT, INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS BEFORE INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING. PHASE "C": FINISH GRADING (UTILITY & STREET CONST) SPECIFIC PROCEDURES 1. HAULING PROCEDURES: SEE NOTES ON SHEET 2 2 GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK (TOTAL = 2). 3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY 0R AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY 4. PERIMLILR DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING ON NORTH AND EAST PROPERTY LINE. 5. STAG/NG AREA: SEE SHT. NO. 2 6. WHEEL WASH/NG PROV/S/ONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. NO 2 7. WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MIN/MUM OF 2 PASSES PER DAY 0R AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MIN/MUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 15 MPH. 9. STORAGE, STOCKPILE, 0R TRENCHING DUST CONTROL MITIGATION METHOD: ONE 2,000 GAL WATER TRUCK MINIMUM 4 TIMES PER 24 HRS. 10. WITHIN 10 DAYS OF CEASING ACTNITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETAT/ON THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATER/NG WITH PHYSICAL ACCESS RESTRICTION SURROUND/NG THE AREA; OR C. USE OF CHEMICAL STABIL/ZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. (CHEMICAL STAB/LIZERS SHALL BE PROVIDED WITH GREEN COLORANTS) SITE SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPEC/FIC 01 ADDITIONAL CONTROL MEASURE PROPOSED.) 1. TRENCH STOCKPILE TREATMENT. WATER AS NECESSARY 2. INACTIVE AREA TREATMENT (ACRYLIC POLYMER, HYDROMULCH, PL ANT/NGS BIODEGRADABLE "0/LOR AS DESCRIBED HERE) 3. STREET PAVING SCHEDULE: TBD BY DEVELOPER/CONTRACTOR 4. STAGING AREA MOVEMENT SCHEDULE.: TBD BY DEVELOPER/CONTRACTOR 5. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS 8) TO REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS C) MAINTAIN THREE (3) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED PHASE "D": FINISH GRADING (BLDG. UTIL., BLDG. CONST, LANDSCAPING) SITE SPECIFIC DETAILS: 1. HAULING PROCEDURES: SEE NOTES ON SHEET 2 2. DISTURBED AREA DUST CONTROL METHOD: (TOTAL 1 TRUCK REQUIRED) WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 2 PASSES 0R AS NEEDED. 3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED. 5. STAGING AREA: SEE SHT. NO, 2 6. WHEEL WASHING PROVISIONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. N0. 2 7. WEEKEND DUST CONTROL MITIGATION: WATER W/TH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY 01? AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACT/VE WATERING SYSTEM IS /N PLACE AT ALL TIMES OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING W/TH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; 01? C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE WITH PHYSICAL ACCESS RESTR/CTION SURROUNDING THE AREA. (CHEMICAL STABILIZERS SHALL BE PROVIDED WITH GREEN COLORANTS) SIZE SPECIFIC DETAILS (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1, BUILDING PAD WATERING HAND WATERING 2. FORMWORK AND TRENCH WATERING HAND WATERING 3. PERIMETER LANDSCAPE SCHEDULE: (AS SOON AS POSSIBLE) 4. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS B) TO REDUCE JOB -SITE C) MAINTAIN F/VE (5) 2,000 TRACK -OUT, MAINTAIN GALLON WATER TRUCKS "TRACKCLEAN" OR SIMILAR WATER/NG AS NEEDED TYPE RUMBLE STRIPS LOTS 1 THROUGH 196, INCLUSIVE, AND LETTERED LOTS A THROUGH ZZ, INCLUSIVE, OF AMENDED TRACT NO. 31732, IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 423 PAGES 48 THROUGH 60, INCLUSIVE, OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. PHASE "E" FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING) SPECIFIC PROCEDURES 1. HAUL/NG PROCEDURES: SEE NOTES SHT. NO. 2 2. DISTURBED AREA DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 4 PASSES OR AS NEEDED. (TOTAL 2 TRUCK REQUIRED) 3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED. 4, PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED. 5 STAGING AREA: SEE SHT. NO. 2 6. WHEEL WASHING PROVISIONS: REMOVED 7. WEEKEND DUST CONTROL MITIGATION: WATER W/TH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES F01 ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTII4T/ES ARE NOT SCHEDULED TO OCCUR F01 AT LEAST 30 DAYS: A. REVEGETAT/ON THAT RESULTS W 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUND/NG THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUND/NG THE AREA. ABATEMENT OF DUST MITIGATION FAILURE AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF L4 QUINTA TO PERMIT THE ENTRY UPON THE S/TE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES: A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST A/R QUALITY MANAGEMENT DISTRICT (SCAQMD) F01 A PARTICULAR DAY; B. IN THE EVENT OF AN ON-SITE ANEMOML /tR THAT CONFORMS TO ALL SCAQMD STANDARDS REGISTERING 2 WIND GUSTS /N EXCESS OF 25 M.P. H WITHIN CONSECUTIVE 30 MINUTE PERIODS OR C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE; AND D. THE C/TY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR THE RESPONSIBLE DUST CONTROL PERSON AFTER A 60 MINUTE CONSECUTIVE PER/OD WHICH SHALL COMMENCE W/TH THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT. THE CITY MAY THEN, WITHOUT PREJUDICE, INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS: 1. THE C/TY MAY CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION 0R VEHICULAR MOVEMENT AND MANEUVERING. EXISTING FUG/T/VE DUST MITIGATION MEASURES SHALL CONTINUE. 2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROV/DER/OPERATOR, THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF ORDERING OR CALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE MADE OPERATION. SHOULD THE GENERAL CONTRACTOR NOT HAVE SUCH A CONTRACT OR HAVE FAILED TO DESIGNATE THE CITY AND THE RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INFORMED THE CITY OF THE CONTRACTOR'S NAME, ADDRESS AND PHONE NUMBER, OR THE CITY IS UNABLE TO CONTACT THE CONTRACTOR AFTER A REASONABLE EFFORT ISMADE TO DO S0, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS IT'S AGENT FOR PURPOSED OF ENTRY UPON THE SITE TO ATTEMPT TO MIT/GATE ANY POTENT/AL DUST CONTROL PROBLEMS. 3. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, THE C/TY W/LL CAUSE THE IRR/GAT/ON SYSTEM TO OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY STEMS TO ENSURE THE THE CITY HAS THE MEANS TO ACCESSES' THE SITE AND THE VALVES OF THE IRRIGATION SYSTEM; THAT IS, THE KEYS TO ANY AND LLALOCKES PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOWING THE INSTALLATION OF ANY SUCH LOCK. EACH KEY SHALL BE PLAINLY AND CLEARLY MARKED WITH THE PROJECT NAME AND CORRESPONDING LOCK (MAIN GATE, SO THE IRRIGATION SYSTEM, ETC). E. IF, 1N THE OPINION OF THE C/T'Y ENGINEER OR HIS DESIGNEE, THE INTENS/TY, FREQUENCY OR DURATION OF FUGITIVE DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOND THE PROJECT BOUNDARY, THE CITY ENGINEER 0R HIS DESIGNEE 01 AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACT/ON AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE OR ORDER/NG THE CESATION OF ANY EMISSION -GENERATING ACTIVITY OCCURRING ON-SITE. F. ANY OF THE ABOVE ACTIONS SHALL BE CONSTRUED AS AN ABATEMENT FOR WH/CH THE C/TY WILL "BACK CHARGE' THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE C/TY SHALL DEEM APPROPRIATE. PROJ AMEND. NO. 2, TRA CT SITE CT 31732 AIRPORT BOULEVARD a\ AVENUE 60 vs, AVENUE 61 AVENUE 62 HAR VICINITY MAP NOT TO SCALE MARK REVISIONS APPR. DATE DESIGNED BY: BJB 90 ESS /p tiQpN 3 " No. 20596 r" z Exp. 9-30-17 7 *U'l• CIVIL Ril'e OP COW - DRAWN BY: BJB CHECKED BY: SCM PREPAREUNDER THE DIRECTION OF: '/ ATE: ‘„,est TANLEY C. MOR R.C.E. 20596 E P.DATE 9/30/17 PM -10 DUST CONTROL SECURITY PM -10 DUST CONTROL SECURITY /S $65,700 BOND WITH $21,900 CASH 01 ALL CASH AT $87,600. APPROVED BY: OTHY R. J CITY ENGINE DATE: 7/Z b'I L. N EXP. DATE 12/31/16 R.C.E. 45843 CONSULTING PLANNERS APPLICATION CONSENT UNDERGROUND SERVICE ALERT CALL TOLL FREE: 811 TWO WORKNG DAYS BEFORE YOU DIG (CLEARING AND GRUB/NG CONTRACTOR) I HAVE READ THE COND/TIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF ALL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT NAME: COMPANY NAME: TRADE CLEAR/NG A GRUBBING LICENS CLASS: /4 0.: DAVE LIPPERT LIPPERT CONSTRUCTION, INC. 760-863-5700 DATE.. 1 fro/ 60 (GRADING CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: COMPANY NAME: TRADE GRAD/NG ICENSF, CZASS SCNATU `I'l DjQ 7VUM: rev DAVE LIPPERT LIPPERT CONSTRUCT/ON, INC. 760-863-5700 DATE- 1120(ru (WATER TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHOR/ZED THE /MPLEMENTAT/ON OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: COMPANY NAME: TRADE LICENSE CLASS: NO.: CONTACT PHONE NUMBER: (SEWER TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHOR/ZED THE IMPLEMENTATION OF AL ITS PROV/S/ONS THROUGHOUT PROJECT BUILDOUT. NAME: COMPANY NAME: TRADE: LICENSE CLASS: NO.: CONTACT PHONE NUMBER: SIGNATURE.: DATE:: (STORM DRAIN TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: COMPANY NAME: TRADE: LICENSE CLASS: NO.: CONTACT PHONE NUMBER SIGNATURE: DATE: (PAVING CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGIT/VE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT NAME: COMPANY NAME: TRADE: LICENSE CLASS: NO.: CONTACT PHONE NUMBER: DATE. DATE: SIGNATURE:: SIGNATURE.: OWNER'S CERTIFICATION TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURES, A FINANCIAL SECURITY OF $2000/PROJECT ACREAGE SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERM/T. ANY FINANCIAL SECURITIES COLLECTED UNDER THE PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY OF L4 QUINTA FOR POTENT/AL USE IN MITIGATING SOURCES OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THE PROPERTY OWNER/S OR RESPONSIBLE DUST CONTROL PERSON. ALL UNUSED SECURITY SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE C/TY HAS ACCEPTED THE FINAL IMPROVEMENT AND ISSUED CERTIFICATES OF OCCUPANCY. I CERTIFY THAT l HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT / AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. I UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED W/TH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, AND ADDITONAL CHARGES, /F NEEDED, TO MITIGATE ANY VISIBLE EMISSIONS OR FUGITIVE DUST, IF l FAIL TO KEEP THE DUST UNDER CONTROL. I UNDERSTAND THAT DUST CONTRTOL /S REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS SITE IS DISTURBED /N ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, 0R OWNERS. A REPLACEMENT PM -10 PLAN AND DUST CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED PORTION OF THE PROJECT. 1 CERT/FY THAT l HAVE READ TH/S APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN /S TRUE AND CORRECT. I AGREE TO COMPLY W/TH THE CITY FUGITIVE DUST ORDINANCE, AQMD RULE 403, 403.1 AND THE FINAL COACHELLA VALLEY S.LP. AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES, LANDSCAPING, AND BUILDING OPERATIONS. l AUTHORIZE REPRESENTATIVES OF THE C/TY OF LA QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR ABATEMENT PURPOSES, AND l AGREE TO HOLD HARMLESS THE C/TY OF LA QUINTA AND ITS REPRESENTATIVES FROM LIABILITY F01 ANY ACTIONS RELATED TO THIS PERMIT. OWNER'S REPRESENTATIVE NAME SUSAN LINDQUIST, SR. DIRECTOR OF COMMUNITY DEVELOPMENT OWNER'S ADDRESS: 23 CORPORATE PLAZA, SUITE 150 NEWPORT BEACH, CA 92660 CONTACT PHONE NU ER (24 HOURS): (949) 629-2480 SIGNATURE: DATE: Il RESPONSIBLE DUST CONTROL PERSON I CERTIFY THAT l HAVE READ TH/S FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE/N. AS THE AUTHOR/ZED RESPONSIBLE PERSON FOR THIS PROJECT 1 WILL LIST MY PHONE NUMBER ON THE REQU/RED SITE S/GNS, AND / WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT. 1 UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY 7 DAYS PER WEEK, FROM THE DATE THAT THE PROJECT /S FIRST DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT S/TE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE /S ACCEPTABLY RE -VEGETATED AND PAVED, I ALSO CERT/FY THAT 1 HAVE ATTENDED AN AQMO SEMINAR ON FUGITIVE DUST CONTROL. NAME: COMPANY NAME: ADDRESS: DAVE LIPPERT LIPPERT CONSTRUCTION, INC. P.O. BOX 5477 LA QUINTA, CA 92248 ONTACT PHONE NUMBER: 760-863-5700 :AT70N NUMBER: CV 1601-003011-3095/ DATE: 161 4-0 SIGNATURE:: PROJECT DATA (SEE ATTACHED PLAN ALSO) MORSE DATE 6-17-2016 PROJECT NAME. BELLASENO STREET ADDRESS / SITE LOCATION. SOUTHEAST CORNER OF MONROE AND AVENUE 60 ADJOIN/NG PROPERTY INFO. (FOR SENSITIVITY, TYP. WINDS BLOW N.W. TO S.E.) EASTERLY AGRICULTURE SOUTHEASTERLY AGRLCULTURE SOUTHERLY RESIDENTIAL (VACANT) SOUTHWESTERLY VACANT WESTERLY _RESIDENTIAL NORTHWESTERLY RESIDENT/ VACANT/ NORTHERLY VACANT NORTHEASTERLY VACANT CURRENT LAND USAGE VACANT PROPOSED LAND USAGE RESIDENTIAL LOT. 1-196 TRACT. 31732, AMENDMENT NO. 2 PERMIT NO • A.P.N. 764-720-001 THROUGH 076 PARCEL SIZE:: 43.8 ACRES (DISTURBED AREA) 7764_730-Q01 THROUGH _1282_ 784,- 740-00_ THROUGH 080 WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FDC SCHULTZ 41865 Boardwalk Suite 218 Palm Desert, CA 92211 Voice: 760-674-5776 cbergh@mdsconsulting.net ENGINEERS SURVEYORS SCALE: SEE ABOVE DATE: JUNE, 2016 BENCH M A R K; PD -109-70 ELEV. ELEV. 27. 941 109-70 CHISELED SQUARE ON CANAL BRIDGE SOUTHEAST WING WALL, 2.0 MILES SOUTH ALONG JACKSON ST. FROM HWY.111, THEN 2.0 MILES WEST ALONG AVENUE 50, 45 FT. WEST OF MADISON ST. AND 18' SOUTH OF AVENUE 50. WDID # 7 33C375613 IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA AMENDMENT NO. 2, TRACT NO. 31732 - BELLASENO FUGITIVE DUST EMISSION CONTROL PLAN, (PM10) A PORTION OF SW 1/4 OF THE THE NW 1/4 OF SECTION 35, T 6 S, R 7 E, S.B.B. & M. SHT. 1 OF 2 SHTS. FOR: VTL PALIZADA, LLC W.0 NO: -p (Lc( (a. -- 1 o I:\87502\31732\RG\PM10- 6/17/16 0 W co Q J -J LU 1m M M O z 1- sV LL N O z 2 0 1" z W z 2 O r a