PM102016-0005PLEASE READ AND FILL OUT TMS DOCUMENT APPROPRIATELY. EVEN SMALL PROJECTS MUST DO THEIR PART. PUw DUST (POWDERY DUST OF 10 MICRONS OR SMALLER DIAMETER) HAS BEEN IDENTIFIED AS A POTENTIALLY SERIOUS HEALTH THREAT. THIS FINE DUST CAN LODGE DEEP IN THE LUNGS AND HAS BEEN ASSOCIATED MITI BRONCHITIS AND OTHER RESPIRATORY ILLNESSES. DESERT DUST CAN BE PARTICULARLY UNHEALIW6UL BEING ASSOOATEO WITH DESERT LUNG SYNDROME' MC LUNG INFECTIONS CAUSED BY FUNGAL SPORES CARRIED IN DESERT DUST. CHILDREN, THE ELDERLY, AN0 PERSONS MTM RESPIRATORY CONDITIONS ARE PARTICULARLY SENSITIVE TO FINE DUST, BUT EVERYONE IS ADVERSELY AFFECTED 8Y THE RELAT1i1Y HIGH LEVELS OF PMp THAT OCCUR IN TIE COACHELLA VALLEY. LARGER SAND PARTICLES CAN BE TURNED 10ITO THIS DUST THROUGH THE GRINDING AC10N CF TIRES ON ROADWAYS AND THROWN REPETITIVE PLOWING AND DISKING OPERATIONS. PROJECT DATA: DATE:JANUARY 25. 2016 PROJECT NAI& PARCEL A OF PARCEL MERGER NO. 2013-535 DF MADISON 01118 STREET ADDRESS/91E LOCATION: 53119 ROSS AVENUE. LA GUINEA. CA ADJOINING PROPERTY INFO. (FOR SENSITIVITY, TIP. MINDS BLOW N.W::) EASTERLY: STREET - ROSS AVENUE VACANT RESIDENTIAL LOTS SOUTHEASTERLY: STREET - ROSS AVENUE. RESQUITAL LOTS SOUTHERLY: RE.9DEWNTIAL LOT SOUTHWESTERLY: RESIDENTIAL 1 OT. frill F C" - WESTERIY: 9OLF COURT. NORTHWESTERLY: RESIDENTIAL LOT. GOLF COURSE NORTHERLY: RESIDENTIAL LOT NORTHEASTERLY: STREET - ROSS AVENUE RESIDENTIAL LOTS CURRENT LAND USAGE: VACANT CUSTOM LOT PAD PROPOSED LAND USAGE: CINMI FAMILY RE DENCF_ PARCEL A OF PARCEL MERGER NO, 2013-535 A.P.N.:767-680-003. 767-680-004 PARCEL SIZE: 1,9 ACRES Ilan, SQFT. EARTHWORK QUANTITIES ESTIMATE : (BALANCE SITE PREFERRED TOTAL AREA TO BE DISTURBED: la ACRES 91.143 SOFT. STRPPING dW SUBSIDENCE LOSSES (TYP. XX' X AREA/27CF,/CY.) MW CUT VOLUME: 590 CY FAN FILL VOLUME: 500 CY RAW IMPORT VOLUME: 0 CY RAW EXPORT VOLUME: 90 CY PHASING OF GRADING ACTIVITIES: THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE WATERED AS REQUIRED PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS LARGER PROJECTS MUST HAW MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE TIME, AREAS ALREADY GRADED OR STOCI<PILED MUST BE STABIUZED WITH GHEWICALS, HYDROMULCH, OR VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING, THE PHASING PATTERN BELOW SHALL BE SHOWRI IN THE REFERENCE MAP ON THS SHEET AT THE UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT SITE MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER, IT IS BETTER TO TREAT THEM WITH AN APPROVED 'OIL" (LIKE ENVIROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLIATIVE, TO SAVE WATER. PHASE "A" ROUGH GRADING (SITE PREPARATION & MOBILIZATION) APPROX. START APPROX. ENO WATER TRUCK SUB -PHASE DATE DATE DISTURBED AC. SPRINKLER AC. AC. GALL Al JUNE 2018 DEC. 2017 1.9 1.9 1.9 2000 TRUCKS PHASE "B" ROUGH GRADING (MASS GRADING OF PADS, PERIMETER WALLS) APPROX. START APPROX. END WATER TRUCK / OF 2000 SUB -PHASE DATE DATE DISTURBED AC. SPRINKLER AC. AC. GABON TRUCKS P11 81 JUNE 2016 DEC, 2017 1.9 1.9 1.9 ASE "C" FINISH GRADING (UTILITY & STREET CONSTRUCTION) APPROX START APPROX. END WATER TRUCK. SUB -PHASE DATE DATE DISTURBED C. SPRINKLER AC, c1 JUNE 2016 DEC. 2017 1.9 1.9 1.9 PHASE "D" FINISH GRADING (BLDG. UTIL., BLDG, CONST., LANDSCA 2000 TRUCKS 1 PING) APPROX. START APPROX. END WATER TRUCK / OF 2000 SUB -PHASE DATE DATE DISTURBED AC. SPRINKLER AC. AC, GALLON TRUCKS 01 JUNE 2016 DEC. 2017 1.9 1.9 1.9 1 FUGITIVE PM70 DUST CONTROL MEASURES: HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE: ABCD X N/A N/A N/A X XX X x XX X X X XX X x x X x x x X X X x X X x x x x X X X x x x x PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FCR MIN. 72 HRS.) SIGNS POSTED ON SITE WITH 24 NR, PHONENUMBERS) FOR DUST CONTROLLER SAND FENCING (ON ALL. SIDES Cf PROJECT LICKING EXISTING MASONRY WALLS) SITE WATERING AS REQUIRED PERIMETER SPRINKLER SYSTEM (ALL. SIDES, CONTINUOUS NIGHT WATERING MEN WINDY) GRAVEL (MIN, 1.5' DRAM, X 4' DEEP AT CFF -STREET STORAGE AND PARKING AREAS) WHEEL CLEANING AT TRUCK EXITS, ('RUMBLE STRIPS", DRIVE-THROUGH PONDS, GRAVEL AREAS, ETC, DETAIL METHOD ON REFERENCE MAP AT RIGHT) INACTIVE AREA SOL STABILIZERS (POLYMER, HYDRCMULCH, APPROVED OIL OR PLANTS) ACTIVE AREA SOIL STABIUZERS (ENVIROKLEEN "011', OR SIMILAR NETTING AGENTS) STOP AU. VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH X X X X STREET SWEEPING MENEVER NEEDED N/A X X X PERMANENT VEGETA110NAANDSCAPING N/A x x x..._. BLOCK WALLS N/A N/A X X ROAD PAVING NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE 'OUST CCNTROL PLAN REVIEW GUIDANCE FOR LOCAL GOVERNMENT FROM THE SOUTH COAST AIR QUALITY MANAGEMENTOISIRICT, AVAILABLE FROM THE S,C,AQ.M.D. PROJECT RECOROKEEPING/REPORT: RECORD ALL ACTIVITIES, CONTRACTS AID MATERIALS PURCHASES ASSOCIATED PITH 8L0WSAND/FUGITVE OUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT FOR REVIEW. THIS 'FEEDBACK WLL EVENTUALLY HELP THE CITY TO DETERMINE WHAT ETHODS OF DUST CO11110. ARE MOST COST EFFECTIVE IN 8011 SHORT TERM AND LOMG TERM SITUATIONS. SEE THE REPORT FORM THArs AVAILABLE FROM THE CITY CR IN THE AFORESAID DOCUMENT. FUGITIVE PMr, PROGRAM DETAILS: EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PUN EXHIBIT (AT RIGHT) TO INDICATE THE LOCATION OF ON-9TE WATER AVAILABILITY, 1RUCK/YMEEL WASHERS, TEMPORARY SAND FENCING, GRAVELED ENTRANCE/EXIT, AND OTHER TH1NGS AS NEEDED. DIAL TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNOEROR<XUND SERVICE ALERT OF SOUTHERN CALIFORNIA REVISIONS DATE NO PHASE "A": ROUGH GRADING (SITE PREPARATION & MOBILIZATION): GENERAL REQUIREMENTS T. BRITTEN AND NOTARIZED PER$S9OH LETTERS SHALL BE SUBMITTED TO THE PUBUC WORKS DEPARTMENT FROM ANY ADJACENT LAID OWNERS NHOSE PROPERTY MILL BE USED IN ANY MANNER FOR CONSTRUCTION, STAGING, ACCESS, ETC„ PRIOR TO ANY SUCH USAGE,. THE OWNER AND AUTHORIZED OUST CONTROLLER FOR THIS PROJECT *11. BE RESPONSIBLE FOR THE DUST CONTROL SECURITY OF 124000 PER ACRE, OR AS OTHERMSE APPROVED BY 111E CITY ENGINEER, SHALL BE POSTED FOR ALL AREAS TO 8E DISTURBED BY THE PROJECT, 80111 ON-SITE ND OFF-9TE. DISTURBANCE OF SITE AREAS NOT INCLUDED IN THIS AGREEMENT SHALL BE REASON FOR THE CITY TO ASSESS ADDITIONAL CHARGES, AND POSSIBLY STOP ALL WORK AT THE SITE UNTIL THE EXTENT OF THE DISTURBANCE iS MEASURED, THEREFORE, IF IT IS SUSPECTED THAT OFF-9TE AREAS MAY BE DISTURBED DURING THE WORK, 910W 1)04 ON THIS PLAN AND MAKE THE APPROPRIATE ARRANGEMENTS 114 ADVANCE, 2. SAND FENCING, OF EITHER THE WOCD AND WIRE OR THE PLASTIC TYPE, SHALL BE INSTALLED AROUND 7HE PERIMETER OF THE PROJECT ON ALL SIDES THAT DO NOT HAVE EXISTING MASONRY WALLS OR SIMILAR SOLID FENCING OR HEDGES. THIS SERVES THE MULTIPLE PURPOSES OF: CATCHING SOME SQIDBLOWM DUST; REDUCING WINO SPEEDS ON THE PROJECT PERIMETER, AND RESTRICTING VEHICULAR ACCESS POINTS INTO THE PROJECT. THIS RESTRICTED ACCESS HELPS REDUCE DAMAGE TO ANY "CRUST' OF STABILIZED SOIL ON THE PROJECT, AND ALLOWS PLACING Of THE EXIT WHERE 'TRACK Our CAN BE STOPPED PER /5 BELOW. 3. PRE -WATERING SHALL COMMENCE AT LEAST THREE (3) DAYS PRIOR TO ACTUAL GRADING USING A TEMPORARY ON-SITE IRRIGATION SYSTEM, CONNECTION TO ANY EXMSING WATER SYSTEM SHALL BE DONE IN COMPLIANCE NTH CVL). TEMPORARY WATER LINES SHALL BE INSTALLED WITH A INITIAL. DISTURBANCE GF ANY OFF-SITE AREAS THEY PASS THROUGH. WEEN THE GRADING BEGINS, A SPRINKLER SYSTEM SHALL BE PLACED AROUND THE PERIMETER OF THE PROJECT, *TN FREQUENT WATERING, ESPECIALLY IN THE TYPICALLY WINDY EVENINGS. PLACING THE PERIMETER SPRINKLERS ON INC RANO FENCE KEEPS THEM SAFE AND EFFECTIVE. WATERING FOR AREAS NOT COVERED BY THE SPRINKLERS SHALL BE PROVIDED BY WATER TRUCKS. 4, ACTIVITY AREAS SUCH AS: EQUIPMENT STORAGE AREA, MATERIALS STORAGE AREA, TEMPORARY OFFICE TRAILERS, AND EMPLOYEE PARKING, SHOULD BE LOCATED IF POSSIBLE ON EXISTING PAVED SURFACES, IF TRAFFIC WOULD NOT BE AFFECTED. 1N UEU OF EXISTING PAMNG, A SOIL STASIUZER THAT 00ES N0T REQUIRE CONSTANT WATERING, SUCH AS A WASHED GRAVEL, 0R 'BIODEGRADABLE 011' COULD BE USED FOR THE MIME STAGING AREA ANY CHEMICALS USED MUST BE CLEARED 'AITH THE CITY AND REGIONAL WATER EQUALITY CONTROL BOARD, 5. THE TIRES OF VEHICLES BEING USED 014-SI1E SHOULD BE INSPECTED ANO WASHED IF NECESSARY TO STOP TRACKING OF DIRT ONTO PUBLIC STREETS IF EXTENSIVE EXPORT OR IMPORT OF DIRT 15 TO BE DONE, A PAVED 0R GRAVELED WHEEL 10149111C AREA AT LEAST 30' WIDE BY 50' LONG SHOULD BE PROVIDED AT THE EXIT, TO FACILITATE THE INSPECTION AND CLEANING OF TIRES. "RUMBLE STRIPS' MADE FROM LUMBER, RAILROAD TRACK, OR SIMILAR MATERIALS CAN HELP REDUCE THE MUD GETTING ONTO THE CLEANING AREA. STREET SWEEPING AND WASHING 15 ST11.1. TYPICALLY REQUIRED, BUT MAY BE REDUCED BY PROPER USE OF A "WEE WASHING AREA' LIKE THIS. THEY ARE REQUIRED ON PROJECTS OVER 5 ACRES OR WITH OVER 5,000 CUBIC YARDS GDF IMPORT OR EXPORT. 6, A STANDARD SIGN WITH THE FOLLOWING INFORMATION MUST BE POSTED ON THE SITE, Al LEAST ONE 510t4 PER FRONTING STREET. THE 9614 MUST INCLUDE THE GRADING PERMIT NUMBER, THE PRO ECT NAME, 11E AUTHOR/ID DUST CONTRO L FR PHONE NUMBER(S), ME CITY PHCNE NUMBER, AND THE 50011 COAST NR QUALITY MANAGEMENT DISTRICT PHONE NUMBER, DAMAGED OR LOST SIGNS MUST BE REPLACED BEFORE GRADING CAN CONTINUE. 7. VEHICLES TRAVELING ON DIRTY ANO/OR ON UNPAVED ROADS SHOULD RESTRICT THEiR SPEED TO 15 M.P.11 MAXIMUM, SIGNS TO THAT EFFECT SHOULD BE PLACED AT TIE PROJECT ENTRANCE ON PROJECTS OVER 5 ACRES TO IMPROVE COMPUANCE. 8. MEN WIND SPEEDS EXCEED 25 MPH, 8Y CONTINUOUS ANEMOMETER READING OR IN GUSTS AT LEAST TRICE WITHIN A THIRTY MINUTE PERIOD, MEASURED ON THE SITE. VEHICULAR ACTINTY ON /HE SITE SHALL CEASE, EITHER VOLUNTARILY, CR BY CITY OR A.Q.M.D.INSPECTOR NOTIFICATION, EXCEPT FOR WATER 1RUOKS AND SPRINKLER -TENDING VENOUS, W ANY SITE SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) t, PRE -WATERING METHOD (AS SHOWN IN 1. OR A5 DETAILED /ERE): ONE 2.000 GALLON TRUCK. WATERING FOUR TIMES PFR DAY. WATER AVNLABIUTY, INITIAL STAGE F.L7$TING HYDRANT ON ROSS AVE. 2, OFF SITE WORK PERMISSION NEEDED: NONE ..r s P i.'Ix M _i 4,(.. t 0As' A Si ; 3. ACCESS WILL BE CONTROLLED BY: ' 4. INITIAL STA4T46 AREA: EQUIPMENT STORAGE: TEMPORARY OFFICE: EMPLOYEE PARKING: 5. *EEL WA9IING PROVISIONS: STABIUZED CONSTRUCTION ENTRANCE PROMOFD CFF 6. SPEED RESTRICTION SIGN L0CATION:15 MPH SIGN LOCATED AT CONSTR4CTON_ENTjRANGE CFF OF ROSS AVE 7, NUMBER OF POSTED 'DUST CONTROL SIGNS* 1 9014 POSER) CM ROSS AVE (TYP. 1 PER FRONTING ROAD OR 1 PER 660 FEET OF FRONTAGE) 8 INACTIVE AREA: WENN 10 DAYS OF CEASING ACTIVITY , AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF INC FOLLOWING LONG -TERN STABILIZATION TECHNIQUES FOR A1Y DISTURBED SURFACE AREA MERE COISTRUCION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A REWGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED 11AT AN ACTIVE WATERING SYSTEM 15 IN PUCE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING MITI PHYSICAL ACCESS RESTRICTION SURROUNOWIG THE AREA; OR 0, USE OE CHEMICAL. STABILIZERS TO ESTABLISH A STABIUZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. ALL. STABILIZERS SHALL HAVE MIXED *1N THEM A BROWN/TAN COLORANT PER MANUFACTURER'S RECOMMENDATIONS AND SATISFACTION OF THE CITY STAFF INSPECTION. R PHASE "B": ROUGH GRADING (MASS GRADING, PERIMETER WALLS): GENERAL REQUIREMENTS 1, HAULING PROCEDURES: A, ALL VEHICLES GOING FROM DINT AREAS ONTO PAVED STREET SHALL HAVE TIRES ANO WHEELS INSPECTED AND WASHED IF NECESSARY TO AVOID "TRACx1NG-OUT" OPT. 8. TRUCKS HAULING DIRT ON PAVED STREETS SHALL 'MAINTAIN AT LEAST A HALF FOOT "FREEBOARD' FROM RIM TO DIRT, AND COVER ALL DIRT OR DUSTY DEBRIS LOADS MITI AN APPROPRIATE TARP, C. THE IMPORT OR EXPORT SITE MUST HAVE A VALID GRADING PERMIT ALSO, AND SHOULD BE COMPLYING PITH ALL APPROPRIATE DIST METGAION MEASURES ALSO, D. MEN PRACTICAL. TRUCKS AND EQUIPMENT, SHOULD SHUT OFF ENGINES RATHER MAN IDLING FOR EXTENDED PERIODS, TO MINIMIZE EXHAUST EMISSIONS ANO NOISE. THIS BECOMES MORE CRITICAL AS ME SIZE AND NUMBERS OF VEHICLES INCREASES 2. ALL STRIPPED, GRADED OR OTHERWISE DISTURBED AREAS SHALL BE STABIUZED BY SOME APPROPRIATE MEANS. AREAS ACTIVELY BEING GRADED CAN USUALLY BE STABILIZED BY APPLYING LOTS OF WATER, DISTURBED ARES NOT ACTIVELY BEING WORKED MAY BE EFFECTIVELY TREATED '0TH SOME MORE DURABLE SOIL STABILIZER, SUCH AS HYDROMULCH, TO AVOID CONSTANT WATERING. THE PREFERRED METHOD OF SITE WATERING I5 BY SPRINKLER, ESPECIALLY AROUND THE PERIMETER, SPRINKLERS MUST BE SET TO RUN ON WEEKENDS AND EVENINGS WHEN WATER TRUCK DRIVERS ARE NOT AVAILABLE. A TYPICAL WATER TRUCK CAN ONLY HANDLE WELL ABOUT 4 ACRES PER HOUR. 3. IF PERIMETER BLOCK WALLS ARE TO BE BUILT THEY SHOULD BE GIVEN A HIGH PRIORITY SINCE THEY WELL HELP TO CATCH BLOWSAND AND COULD THEREBY REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED. SITE SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR AfX1ONAL CONTROL MEASURE PROPOSED.) i. HAULING PROCEDURES: (A5 SHORN ABM ONLF53 OTHER WISE DETALEO) 2. 501L STABILIZATION METHODS: ACTIVE AREA WATER SCHEDULE: (MILL 4 TIMES PER 24 HRS) ONE 2000 GALLONTRUCK, WATERT NG FOUR TIMES BEB DAY. INACTIVE AREA STABIJ2ATION METHOD(S): WITHIN 10 DAYS OF CEASING AC11VIITY, AN OPERATOR SHAH IMPLEMENT AT CEHST ONE OF THE F0110WWNG LONG-ttKM STA81U2ATDN TECHNIQUES FOR ANY DISTURBED SURFACE AREA 'WERE CONSTRUCTION, ACTIMIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A, REVEGETATCIN THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED MAT A14 ACTIVE WATERING SYSTEM 15 IN PLACE AT ALL TIMES; OR 8. ESTABUSHMENT OF STN3JUZED SURFACE THROUGH WAT RING WTH P1119CAL ACCESS RESTRICTION SURROUNDING IN G THE AREA: OR C. USE OF CHEMICAL STABI)ZERS TO ESTABLISH A STABIUZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA ALL STABILIZERS SHALL HAW MIXED *1111 THEM A BROWN/TAN COLORANT PER MANUFACTURER'S RECOMMENDATIONS AND SATISFACTION OF THE CITY STAFF INSPECTION, 3. PERMIETER BLOCK WALL. SCHEDULE: R CONSULTANTS, INC. C46559 06.30.17 P,E. EXP. PHASE "C": FINISH GRADING (UTILITY & STREET CONSTRUCTION): GENERAL REQUIREMENTS t. DIRT STOCKPILED NEXT TO UTILITY TRENCHES SMALL BE KEPT WATERED OR OTHERWISE STA81UZE0 OR COVERED TO HELP COUNTERACT THEIR HIGH PROFILE EXPOSURE TO INC WIND. 2. ALL PREVIOUSLY ROUGH GRADED AREAS THAT *1. BE INACTIVE IN THIS PHASE SHOULD BE TREATED STH A DURABLE SOIL 5TA81UZER CR GROUND COVER SYSTEM. IF A VEGETATED GROUND COVERED IS UTILIZED IT IS ONLY NECESSARY TO GET IT INMALLY ESTABLISHED. THE ROOT SYSTEM AND TOP STUBBLE MAY BE SUFFICIENT TO HOLD INC DUST EVEN IF WATERRIG IS DISCONTINUED. 3, FCR TRACTS, MULTIPLE PARCELS, AN EXTENSIVE COMMERCIAL SITES, PAVED ACCESS TO THE BUXOM SITES WILL BE REQUIRED PRICK TO CRANING CF THE WILDIINGS. TINS CONSTRUCTION STAGE USUALLY INDICATES'S() INCREASE IN THE NUMBERS OF PORKERS AND THEIR VEHICLES. ALSO, THE PAVEDM0(55 IS RECOMMENDED FOR FIRE FIGHTING PROPOSES. IF PAVING 15 DESIRED BEFORE AU. UTILITIES AND/OR LATERALS ARE INSTALLED. Bit BASE UFT OF ASPHALT 15 SUFFICIENT FOR ACCESS, TIE A..C. CAN BE 'CAPPED" LATER, LEAVING A FINAL SURFACE THAT I5 FREE Of UTIUTY CUTS AND PATCHES, 4. AS PAVED ACCESS IS EXTENDED, THE STAGING AREA CAN BE MOVED CLOSER TO THE BUILDING SITES. THE STORAGE AND OFFICE TRAILERS, EQUIPMENT, AND EMPLOYEE PARKING CAN 8E MOVED ONTO PAVED PORTIONS OF THE 9TE. 511E SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. TREN01 STOCKPILE TREATMENT (WATER A5 NECESSARY): 2. INACTIVE AREA TREATMENT: WITHIN 10 DAYS OF fEA9NG ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWNG 1014E -TERM STABiLIZAT10N TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACIViTIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS. A. REVEGETATON THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES; CXR 8, ESTABUSHMENT OF A STABIUZED SURFACE THROUGH WATERING WITH P119CAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C, USE OF CHEMICAL STABIU2ERS TO ESTABLISH A STABILIZED SURFACE 10TH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA All STABILIZERS SHALL HAVE MIXED WITH THEM A BROWN/TAN COLORANT PER MANUFACTURERS RECOMMENDATIONS AND SATISFACTION OF THE CITY STAFF INSPECTION, PHASE "D": FINISH GRADING (BLDG. UTIL„ BLDG. CONST„ LANDSCAPING): GENERAL REQUIREMENTS i, ALL INACTIVE AREAS SHOULD HAVE BEEN STABIMZED 8Y THIS STAGE. ff PREVIOUSLY COVERED, THE ACTUAL BUILDING PADS MAY NOW NEED TO BE STRIPPED, SCARIFIED, AND RECO/RACTED FOR BUILDING PAD COMPACTION AND ELEVATION CERTIFICATIONS, DUST WOIAD BE KEPT DOWN BY WATERING, USUAU.Y BE TEMPORARY SPRINKLERS. 2. TRENCHING FOR BUILDING UTx1E5, DRYWEU. CONSTRUCTION, POOLS, AND TENNIS COURT CONSTRUCTION FROM THE BULK a EARTHWORK AFTER THE PADS KME BEEN CERTIFIED, TEMPORARY SPRINKLERS MAY STILL BE USED ON THE BUILDING SITE FOR DUST CONTROL PRIOR TO 11* BECOMING OF FRAMING. TREATMENT W111 A BIODEGRADABLE '011' APPROVED FOR DUST CONTROL 15 RECOMMENDED MERE 1T IS DIFFICULT TO PLATER.. 3. ESTABLISHING THE LANDSCAPE AND SPRINKLER SYSTEM AROUND THE PERIMETER OF LARGE PROJECTS SHOULD BE DONE AT THIS STAGE. PLANTINGS AROUND THE PERIMETER SERVE AS A VANE) BUFFER AND COLLECTION SYSTEM FOR DUST AND SAND. IT IS GOOD TO NAVE DUST AND SAND NEL. UNDER C0N1R0L PRIOR TO THE BUILDING PHASE FOR THE SAKE OF CERTAIN CLUING AND PAINTING PROCESSES THAT CAN BE RUINED BY BLOWSAND OR DUST, 4. DISTURBED AREAS AROUND BUILDINGS SHOULD BE WATERED BY HAND FOR DUST CONTROL UNTIL SUCH TME NAT TIE SPRINKLER SYSTEM 15 FULLY FUNCTIONAL AND GROUND COVER ANO/0R LANDSCAPING IS ESTABUSNED. W WATERING IS DIFFICULT DUE TO BUILDING INTERFERENCE, CHEMICAL OR MULCH TREATMENTS ARE AVAILABLE THAT CAN STA/PUN THE 50K. WITN0UT FREQUENT WATERING. 5. CONSTRUCTION OUST SUCH AS FROM CEMENT, PLASTER, PANT GVER9'RAY, W00) CUTTING, GRINDING OPERATIONS, ETC„ SHOULD BE MINIMIZED ALSO. A PERIMETER BARRIER OF SPRINKLERS AND PLANTINGS CAN SERVE TO CATCH SOME OF THIS POTENTIALLY HAZARDOUS MATERIA. AS WELL AS NATURAL DUST AND BLOWSANO. CONCENTRATIONS OF CONSTRUCTION OUSTS CAN RESULT FROM WASHING OF EQUIPMENT A140 SHOULD BE PROPERLY DISPOSED OF BEFORE THEY CAN DRY OUT AND BLOW OR BE WASHED ACROSS PROJECT BOUNDARIES. 6, NOTE THAT SWAIES SHOULD BE INSPECTED BY CITY PRIOR TO SETTING OF PERMANENT GROUND COVER CR OTHER PLANTS. 3111 SPECIFIC DETAILS: (PLEASE DESCRIBE ANY SPECfflC CR ADDITIONAL CONTROL MEASURE PROPOSD.) 1. BUILDING PAD WATERING: (BY HAND WATERING A5 NECESSARY AROUND BUILDING WASTE) 2. FORMWORK AND TR(1401 WATERING: (BY HAND WATERING AS NECESSARY) 3. PERIMETER LANDSCAPE SCHEDULE: (AS 50011A5 POSSIBLE) 4. INAC1M AREA WINN 10 DAYS OF CEA9NG ACTIVITY, AN OPERATOR SHAT IMPLEMENT AT LEAST ONE CF 111E FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA *ERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS. A. REVEGtTATION MAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM 15 IN PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE W1H PHYSICAL ACCESS RESTR1C1104 SURROUNDING THE AREA ALL STABILIZERS SHAD. HAVE MIXED YAM THEM A BROMWI/TAN COLORANT PER MANUFACTURERS RECOMMENDATIONS AND SATISFACION OF INE CITY STAFF INSPECTION. ABATEMENT OF DUST MITIGATION FAILURE: AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED 70 PERMIT THE O4TY OR THEIR DESIGNEE TO ENTER UPON THE SITE UNDER INC FOLLOWING CIRCUMSTANCES: A. IN THE EVENT FIAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST MR DUALITY MANAGEMENT DISTRICT (S,C.Q.M.D.) FOR A PARTICULAR DAY; B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL S.C.A.Q.M D. STANDARDS REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H. WITHIN A CONSECUTIVE 30 MINUTE PERIOD; 0R C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FOR A DISTANCE OF 50 FEET FROM ANY BOUNDARY UNE; OR D. THE CITY I5 UNABLE, 8Y TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE 'AUTHORIZED DUST CONTROLLER' AFTER A 60 MINUTE CONSECUTIVE PERIOD 0108 SHALL START W111 THE'FIkST TELEPHONE CALL *ETHER ANSWERED OR NOT; THEN THE CITY WILL UNDERTAKE TO INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS: 1. THE CITY WILL CAUSE THE CESSATION OF ANY ON -511E ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND MANEUVERING. ANY WATER TRUCKS OR VEHICLES SERVICING SPRINKLERS WOULD CONTINUE. 2. 114 THE EVENT THAT AN ON-51TE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL, THE OTT WILL CAUSE THE SITE TO BE WATERED OR TREATED '11H DUST CONTROL CHEMICALS, THE DUST CONTROL SECURITY PILL BE 0111.1710 FIRST TO COVER ANY COSTS INCURRED, IF COSTS EXCEED MY OUST CONTROL SECURITY REMAINING, ADDITIONAL COSTS MAY BE ASSESSED AGANST THE OWNER OF THE PROJECT. 3. IN TIE EVENT AN ON-9TE IRRIGATION SYSTEM 15 INSTALLED, BUT ITS CONTROL CLOW( HAS NOT TURNED THE SYSTEM ON WHEN NEEDED, THE CITY MAY TAKE ALL NECESSARY STEPS TO TUN ON THE SYSTEM. IF IT 15 INACCESSIBLE BEHIND LOCKED GATES OR LOCKED CONTROL BOXES, AND THE CITY CANNOT FIND THE APPROPRIATE KEYS, THE CITY MAY CUT OR BREAK LOCKS AS NECESSARY.' E. IF, IN THE 0PIN10N OF THE CITY ENGINEER OR 11I5 DESIGNEE, TIE INTENSITY, FREQUENCY OR DURATION OF FUGITIVE DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OR THE PUBUC, BY INTRUSION BEYOND THE PROJECT BOUNDARY, THE OTT ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT UNITED TO COMMENCING WATERING ON THE SITE OR ORDERING THE CESSATION OF ANY EMISSION -GENERATING ACTIVITY OCCURRING ON -91E. E. ANY Cf THE ABOVE ACTIONS MAY BE CONSTRUED AS AN ABATEMENT FOR *11108 THE. CITY WILL "BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/0R THE OWNER AS THE CITY SHALL DEEM APPROPRIATE, APPLICATION CONSENT: APPLICATION FOR APPRQVN. OF A LOCAL AIR QUALITY MANAGEMENT PLAN (LA.Q.M,P.) HEREBY MADE TO THE CITY ENGINEER OR HIS DESIGNEE, A5 PART OF A GRADING PERMIT APPLICATION, S I ECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN, 1. EACH PERSON UPON INOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE REQUEST AND FOR WHOSE BENEFIT WORK IS PERFORMS) UNDER AND PURSUANT TO ANY PERMIT ISSUED AS A RESULT OF THIS APRICARN, AGREES TO, AND SHALL INDEMNIFY AND HOLD HARMLESS INC CITY, ITS OFFICERS, AGENTS AND EMPLOYEES. 2. ANY PERMIT ISSUED A5 A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS NOT COMMENCED M1H1N 90 DAYS OF THE DATE OF ISSUANCE OF SUCH PERMIT. 3, THE APPLICANT, OWI4ER, CO 111401OR(5). STB-CQNTRACTOR(5), OR OTHER AGENTS. HEIRS OR ASSIGNEES SHALL CONFORM TO INC ATTACHED DOST CONTROL PLAN AS APPROVED BY THE CITY. SAID PLAN INCLUDES TO BE M PROPOSED CONTROL METHODS OR DE CES P ARY COR R P MANENT CON TEM OR E NOTES AFD OR DRAPMNGS OF USED, THIS U(1MP SHAH BE CGONSDERED AN ADDENDUM TO, AND A NECESSARY PART OF, ANY GRADING, STOCKPILE. IMPROVEMENT OR DEM0U110N PLAN OTHERWISE REQUIRED FOR GUI PERMITS. 4. 8Y ACREONG TO CONFORM TO THIS PLAN AS APPROVED BY Bit CITY, THE OWWER AND ALL CONTRACTOR(S) DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENT, RESPONSIBILITIES AND PROCEDURES AS SHOWN ABOVE. PMio SECURITY: AREA OF DISTURBANCE: 1.9 ACRES 25% = 1950 IN CASH 75% - 12850 IN BOND 100% = $3800 IN CASH AQMD EMPLOYEE TRAININ G CONTACT: (909) 396-2183 STATE WATER RESOURCES BOARD: BEND /: 7 330375597 PARCEL A OF PARCEL MERGER NO. 2013-535 INSTR. NO. 2014-0083744 PAD=1004.69 TRACT NO. 3.3076--1 m.b. 388/57-77 LOT 29 (P.AD=100 a.7) TRACT NO. 33076-1 m.b. 388/57-77 LOT 25 (PAD=1005.0) OWNER'S CERTIFICATION: REFERENCE MAP/DUST CONT I CERTIFY THAT I HAWS READ THIS APPUCAION AND UNDERSTAND MAT AM RESPONSIBLE FOR THE COMPUANCE OF MIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE. 1 UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY MAY BE USED BY THE CITY, PLUS ADDITIONAL CHARGES IF NEEDED, IF I ENL TO KEEP THE DUST UNDER CONTROL. I UNDERSTAND OUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM ME TIME THAT THIS SITE 15 DISTURBED IN ANY WAY FROM ME NATURAL VEGETATED CONDITION, AND MUST CONTINUE (ROTI THE TIME THAT THE PROJECT SITE 15 ACCEPTABLY RE -VEGETATED OR PAVED. RESPON9BNJTY P01 THE OUST CONTROL ON TRIS SITE CAN NOT BE TRANSFERRED SCUM? BY TRANSFERRING ALL CR A PORTION OF THIS PRCPERTY TO OTHER PEOPLE. A REPLACEMENT LA.Q:M.P, AND DUST CONTROL SECURITY MUST BE SUBMITTED FOR ANY TRANSFERRED P0R110N, 1 HEREBY AUTHORIZE THE PERSON LISTED BELOW AS 'AUTHORIZED DUST CONTROLLER' TO BE MY REPRESENTATIVE AND CONTACT PERSON FOR ALL DUST COMPLAINTS INVOLVING MIS PROJECT. is CERTIFY THAT I HAVE READ PIS APPLICATION AND THAT THE INFORMATION CONTANED HERIN 15 TRUE AND CORRECT, I AGREE TO CCMPLY WITH CITY ORDINANCE (MUNI. CODE SEC. 6.16) AND ALL LAWS RELATING TO GRADING OPERATIONS, I AUTHORIZE REPRESENTATIVES OF THE CITY OF U QUINTA TO ENTER UPON THE ABOVE-MENTIONED PROPERTY FOR INSPECTION AND/0R ABATEMENT PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY AND ITS REPRESENTATIVES FROM. LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT. OWNER'S NAME(S): RONALD BURKE OYMER'S ADDRESS: 9130 W, SUNSE;,BLVD., LOS ANGELE5, CA 90069 OMNER'S SIGNATURE(S): DATE. 6 "3 -24 AUTHORIZED DUST CONTROLLER CERTIFICATION: I CERTIFY THAT I HAVE READ THIS APPU0A10N AND UNDERSTAND THAT I AM RESPONSIBLE P011 THE COMPUANCE OF THIS PROJECT TO THE OUST CONTROL PROMSI0NS NOTED OR REFERENCED HERE. AS THE 'AUTHORIZED DUST CONTROLLER' FOR THIS PROJECT 1 WILL HAVE MY PHONE NUMBER ON THE REQUIRED SITE SIGNS, AND 'Mu. RESPOND TO DUST COMPLAINTS '*THIN THE 1 HOUR UNIT, I UNDERSTAND THAT DUST CONTROL i5 REQUIRED 24 HOURS A DAY, 7 DAYS A LEEK , FROM THE TIME THAT THIS 91E IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND MUST CONTINUE 014111INC TIME THAT PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED. DUST CONTROLLER NAME (PRINTh CHRIS CARROLL PM10 CERT, £V1408-001002-1079 OUST CONTROLLER ADDRESS; 73-660 HWY. 111. SUITE /4 U QUINTI CA 92252 0057 CONTROLLER SIGNATURE: CONTACT PHOS NUMBERS (24HR): (760) 2 MADISON CLUB - AVENUE AVENUE 54 52 VICINITY' MAP N.T.S. CALE: 1' = 50' ROL F TURES N, UNLESS OTHERMSE BY A SOILS ENGINEER CORRUGATED STEEL PANELS SECTION A -A SITS. CORRUGATED STEEL PANELS Y & HOSE: STABILIZED CONSTRUCTION ENTRANCE/EXIT N,T.S, 4' FILTER ORIGINAL FABRIC GRADE SO` MIN OR AS REQUIRE0 TO ACCOMMODATE ANTICIPATED TRAFFIC, WMCHEVER 15 GREATER TEXT HEIGHT 2.5' CITY OF LA QUINTA PERMIT NO. RNYA, LLC PARCEL A, PARCEL MERGER NO. 2013-535 IF YOU SEE DUST COMING FROM THIS PROJECT PLEASE CALL: (760) 835-2824 IF YOU DO NOT GET A RESPONSE WiTHIN ONE HOUR, PLEASE CALL THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT 2' (760) 416-5315 REPORT THE PERMIT OR PROJECT NO. AT THE PHONE NUMBER ABOVE OR CALL AIR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-7664 PROJECT 1,5" SITE 1.5' 145" BENCH MARK DATUM CORRECTION: SUBTRACT 1000.00 FEET TO ALL ELEVATIONS SHOWN HEREON TO REFLECT ACTUAL 1.451. ELEVATIONS RELATIVE TO THE BENCH' MARK DATUM. 24422 Avenida de la Carlota Suite 300 Laguna Hills, Co. 92653 Phone: 949,453.0111 BASIS OF BEARINGS BENCH MARK APPROVED BY: DUST CONTROL SIGN NTS IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA THE NORTH LINE OF THE NW 1/4 OF SECTION 9, TOWNSHIP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO MERIDIAN PER PM 44/67-.68 SAID LINE BEARS N89'46'12"E ELEV = 972.24 PD 3 301 MONUMENT IN HANDWELL AT THE INTERSECTION OF WASHINGTON ST & 42 AVENUE ELEV = 117.05' IY R. JO ASS PUBLIC WORK DIRE R.C.E. NO. 45843 P.E. DATE OR/CITY ENGINEER EXP. 12-31-16 LOCAL AIR QUALITY MANAGMENT PLAN PM10 DUST MITIGATION FOR MADISON CLUB PARCEL A OF PARCEL MERGER NO. 20133-535 SECTION 10, TOWNNSHP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO MERIDIAN DRAWING NAME: PM10 26A -27A 01 TL PROJECT No. RIAtorAtir000 SHEET 1 OF 1