Loading...
SP 2004-071 La Paloma (2004)LA PALOMA LIBRARY COPY ° Specific Plan 4 City of La Quinta WWI T m c U F o 10 o.m FEZ S �a UU_m Ht3 1 O�OSUw® • .... 41 wo Prepared For: PACIFIC RETIREMENT WESTPORT LA QUINTA, LLC SERVICES 3801 PGA Blvd., Suite 105 1200 Mira Mar Palm Beach Gardens, Florida Medford, Oregon 98504 38410 (541)857-7215 (561)624-1225 Prepared By: MSA CONSULTING, INC. 34200 Bob Hope Drive Rancho Mirage, California 92270 (760)320-9811 LA PALOMA Specific Plan City of La Quinta Specific Plan No. 2004-071 Adopted December 7, 2004 Resolution No. 2004-152 Prepared For: PACIFIC RETIREMENT SERVICES 1200 Mira Mar Medford, Oregon 97504 (541) 857-7215 WESTPORT LA QUINTA, LLC 3801 PGA Blvd. Suite 105 Palm Beach Gardens, Florida 33410 (561) 624-1225 Prepared By: MSA CONSULTING, INC. 34200 Bob Hope Drive Rancho Mirage, California 92270 (760) 320-9811 LA PALOMA Specific Plan Table of Contents 1.10 Introduction 1.10.1 Purpose.................................................................................1 1.20 Executive Summary 1.20.1 The Land........................................................................................3 1.20.2 The Project...........................................................................3 1.20.3 The Process..........................................................................8 1.20.3.1 Relationship to General Plan...................................8 1.20.3.2 Relationship to Zoning/Development Process ......... 9 1.20.3.3 Relationship to Other Agencies .............................12 2.10 Project Description 2.10.1 The Site..............................................................................13 2.10.2 Site Plan..............................................................................13 2.10.3 Landscape Plan..................................................................14 2.10.4 Utilities................................................................................18 2.10.5 Art in Public Places.............................................................18 2.20 Phasing.................................................................................18 2.20.1 Infrastructure Phasing.........................................................18 2.30 Grading/Drainage/Flood Control....................................................18 2.30.1 Grading Plan.......................................................................18 2.30.2 Erosion Control...................................................................19 2.30.3 SWPPP/NPDES/PM10.......................................................19 2.30.4 Hydrology............................................................................22 2.30.5 Flood Control Master Plan..................................................22 2.30.6 On -Site Storm Water Detention..........................................22 2.30.7 Nuisance Water..................................................................22 2.40 Utilities.................................................................................23 2.40.1 Sewer Plan.........................................................................23 2.40.2 Water Plan..........................................................................23 2.40.2.1 CVWD Well Site...............................................................23 2.40.3 Electrical Plan.....................................................................23 2.40.4 Other Utilities......................................................................23 2.50 Land Use .................................................................................25 2.50.1 Land Use Plan....................................................................25 2.50.2 Development Standards......................................................25 2.50.2.1 Permitted/Conditional/Prohibited Uses ............................25 2.50.2.2 Parking Requirements.....................................................26 2.50.2.3 Signage Requirements....................................................26 2.50.3 Design Guidelines...............................................................26 2.50.3.1 General Architectural Theme...........................................26 2.50.3.2 Acceptable Building Materials..........................................26 2.50.3 3 Colors..............................................................................27 2.50.3.4 Roofs...............................................................................29 2.50.3.5 Solar Control....................................................................29 2.50.3.6 Equipment........................................................................29 2.50.3.7 Fencing and Walls...........................................................29 2.50.3.7 Site Lighting.....................................................................29 2.60 Circulation.................................................................................31 2.60.1 Overview.............................................................................31 2.60.2 Off -Site Circulation System.................................................31 2.60.3 Public Transportation/Transportation Management ............31 2.60.4 On -Site Circulation System.................................................34 2.70 Landscape Development Standards..............................................34 2.70.1 Landscape Palette..............................................................34 2.70.2 Landscape Maintenance.....................................................34 2.80 Signage.................................................................................34 3.10 Project Implementation 3.10.1 Implementation...................................................................36 I iii LIST OF EXHIBITS Exhibit 1 Aerial Photograph...................................................................5 Exhibit 2 Site Plan..................................................................................6 Exhibit 2a Setback Variation...................................................................6a Exhibit 3 Site Plan on Aerial Photograph................................................7 Exhibit 4 City General Plan...................................................................10 Exhibit 5 City Zoning Map.....................................................................11 Exhibit 6 PD 1 — Landscaped Site Plan - North....................................15 Exhibit 7 PD 2 — Landscaped Site Plan - South...................................16 Exhibit 8 PD 3 — Plant Palette..............................................................17 Exhibit 9 Existing Utilities......................................................................20 Exhibit 10 Proposed Phasing.................................................................21 Exhibit 11 Preliminary Grading...............................................................28 Exhibit 12 Architectural Features............................................................32 Exhibit 13 Street Cross-Sections............................................................33 Exhibit 14 Monument Signage................................................................35 iii APPENDIX Exhibits: General Plan Amendment Change of Zone Site Photographs I Site Photographs II Architectural Renderings North Property Line Transitions Site Sections A Site Sections B/C/D Site Section E Site Photograph — North Property Line Architectural Perspective 1 Architectural Perspective 2 Cottage Setbacks — G8 Cottage Setbacks — G9 Resolution/Ordinance: Resolution No. 2004-149 Environmental Assessment 2003-470 Resolution No. 2004-150 General Plan Amendment 2003-091 Ordinance No. 411 Zone Change 2003-112 Resolution No. 2004-152 Specific Plan 2004-071 iv SPECIFIC PLAN LA PALOMA 1.10 INTRODUCTION 1.10.1 PURPOSE The purpose of this Specific Plan is to set forth the detailed development principles, guidelines, and programs to facilitate the development of a 20 acre net site located on the east side of Washington Street and split by Avenue 50. The project is called La Paloma which is a continuing care retirement community consisting of independent, assisted living, memory care and skilled nursing units. The project also includes independent cottages and garden apartments both located on the southerly site and proposed to be connected by a tunnel under 50th Avenue. This Specific Plan is intended to meet the requirements for a Specific Plan as set forth in State law and City of La Quinta regulations. The State authorizes cities and counties to adopt Specific Plans as appropriate in implementing their General Plans. Such a plan is to include the detailed regulations, conditions, programs, and any proposed legislation that is necessary for the systematic implementation of the General Plan. The Specific Plan provides the linkage between the General Plan (and the general goals and policies of the City) and the detailed implementation of that plan with tools such as zoning ordinances, subdivision ordinances, and the like. The Government Code (Section 65451) sets forth the minimum requirements of a Specific Plan and states: "A Specific Plan shall include a text and diagram or diagrams which specify all of the following in detail: 1). The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. 2). The proposed distribution, location and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described by the plan. 3). Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable. 4). A program of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out paragraphs (1), (2), and (3)." - 1 - Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA The Specific Plan shall include a statement of the relationship of the specific plan to the General Plan. The establishment of specific performance, design, and development standards is set forth to guide the development of the subject property in such a way as to implement the General Plan while maintaining some flexibility to respond to changing conditions which may be a factor in any long term development program. The document also acts to augment the City's Zoning Ordinance by providing particular design guidelines, a tailored list of allowable, conditionally allowable, and prohibited uses for the site, and unique development standards. - 2 - Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 1.20 EXECUTIVE SUMMARY 1.20.1 THE LAND The site for La Paloma is actually two separate properties totaling approximately 21 acres located on the east side of Washington Street on both the north and south sides of 50th Avenue. The northerly site (14 acres) is currently delineated on the City's General Plan as Low Density Residential and zoned Low Density Residential (RL 17/1); the southerly property (seven acres) is designated as Office and zoned Office Commercial. This application is being accompanied by a General Plan Amendment to change the sites' designations to Medium High Density Residential for the northern parcel and Medium Density for the southern parcel, a Change of Zone application for Medium High Density and Medium Density Residential respectively, and a Conditional Use Permit to facilitate the congregate care operation. The sites are both vacant and are generally flat and have been grubbed and leveled in the past. The Commercial -Office site was the subject of a previous application for a chain drug store that was turned down by the city in 2001. The larger site on the north side of Washington Street was entitled for single-family subdivision in the early 1990's but the entitlements were allowed to lapse. The sites front on Washington Street and straddle Avenue 50. Property to the south is part of the CVWD evacuation channel, as is property to the east. Further east, on the far side of the channel, is the City Park and Sports Complex as well as the La Quinta Middle School and single-family residential units. Property to the north is subdivided and mostly developed with single family residences. Property directly west, across Washington Street is developed residential property (La Quinta Country Club). The site is shown on an aerial photograph in Exhibit 1. The Environmental Conservation Element of the General Plan identifies the site as having no significant issues constraining the property. 1.20.2 THE PROJECT La Paloma is a proposed full service retirement community complex of 216 independent and assisted living units (166 units on the north site and 50 units on the south site) plus 20 assisted living, 18 dementia care beds and 20 skilled nursing beds on 21 acres of property located at the northeast and southeast corners of Washington Street and 50th Avenue in the City of La Quinta. The property will operate as a senior residential community with independent, assisted and skilled nursing components which will be licensed by the State of California. The project is planned to be built out in three phases. The project will have the appearance of a high quality condominium or hotel complex with predominantly two story buildings on the campus (north) site. - 3 - Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA The cottage (south) site portion of the complex will include both single story and two story structures. The site plan is shown on Exhibits 2 and 3. La Paloma is a "life lease" purchased by its residents that entitles them to full use of the facilities, including their residence, meals, housekeeping services, laundry services, club activities. Residents are also guaranteed access to higher levels of care at the facility including assisted living, dementia care, and skilled nursing for life. Upon entry, residents generally will reside in the independent living area. Their lifestyle will be indistinguishable from other La Quinta residents choosing an attached residential housing unit. At some point, these residents may need a degree of assistance in their daily lives and they can move to the assisted living portion of the complex. A skilled nursing center is also available when a resident requires a higher degree of help. Residents may receive all of their meals and will have access to several on-site amenities including an auditorium, pool and fitness center, craft area, library, computer learning center, and private dining rooms. A medical clinic will provide basic health care services under the direction of a licensed nurse, as well as individual consultation on wellness matters such as nutrition, diet and exercise. Residential units will not be subdivided for individual ownership. The complex will have a staff of approximately 100 employees with a maximum shift of 50. Staff positions will include administration, activities, housekeeping, dining services, building and grounds maintenance and nursing. Community busses will be available for resident's transportation needs. A full range of activities will be programmed for the residents, both on and off-site. On-site facilities planned include a dining room, recreational space that will house a fitness center, private library, lounges and an auditorium. Other conveniences for residents include a swimming pool, putting green and a bocce court. Parking for the northerly campus -like facility is primarily located directly off the perimeter drive. The perimeter drive is proposed to provide fire and safety equipment access as well as servicing to the complex. Access to each site will be limited to one access from each adjacent street. In addition, the two sites are proposed to be linked by a tunnel connecting the sites under 50th Avenue. The final determination will be made after a detailed analysis of the subsurface utilities, project costs and an evaluation of the overall circulation characteristics of the two properties. Due to the manner in which residents buy into La Paloma ("life lease"), the State of California Department of Social Services requires that 50% of the apartments must be reserved prior to commencement of construction of any of the complex. Thus, the success of the development is relatively assured. - 4 - Adopted December 7, 2004 N *',-;••.�r,- fir', ' 'C ` .. A A Ole ' t P ! . r� .n, '/. � �` �• � � : ;r r.,�� sip,, �--» r .Iq - s a F•• � � of p� r! ..r.. . r_ .41 Ott. IL 4F) . _ welt � p;�l �� �..h� r • 1000 `^ I • � y• '9� �` %' 14" p �`` ..� , t '!s"e,.r"r +sr _:^- n–� r-� -a1'� ... r. "i 'J.� .f • . �.� N � � � � �� � � �. � � mor • i — - a � n �- z SITE } �+ �AL- A i lip 1 . +.• + , .. - -AVENUE 50 irk.. `arm a SITE v- -111-4 !_ R N.T.S 4. ,o 0 d 6 � 00. J0 0 < LL +r lo 0 W Baa L Q 0 � 00 r U ■M $ d0 5w ■ a o gz V o ot� N LkAE,i31Dr wlw.1 - Ltl6whG 11wT RM'DWL - LC6Adc C'mifdgf �g - f]RIWC Cc:LP4w 4610 - >^wlo9 RCCTIct - Q-1T-4-lAw4-I - OriR15 wC1T111 -1'x"01 m AROBF-YIATIQN$7 - DHA -D Eaw P' YYw AC. dffnwt 141-W - Q�TAC luT lF[ t!°L • C[weWrl PRbP. FADPpFIw _ In�nol-- E . L n Pu e. - TV46C yam ux1A-r -- _ alQ1F4 fiLTQeµT Fx - m w/ FA[NDR R . WN.4 L = Q44tIWD Vw wlp�n uF tiw c.uwm i - 5'AYDILw Ali Effi'D-D SRR uR W-. = INbnr 'ke - SONw.i reatKi - 6AOP2an fowl' x wnr vA - Nuawl w - wTST A,Z ek NORTH.A)TE T3rTF APLA rg7A� GUIL MLA P Dt] —Nt ww L3VNi0 PAC0. AREA A BSWTEB LeYN4O I A XNEEMAIEWO AREA EwLLLLR dNR8R46 PACiLFFY APP L.:ANMGCA. APNEA 14AM60A1•E ARRA IiEOV WEW PASXWO TOTAL PARKNNQ OPACE S PNOY 10 ON-FRTREET PANIONI? SPACOO CAPTORT PAFdUNQ erACES AC COAe6LR PAfCCEJO SPACES PEC 0105-M ACCE696LE PAPMEwO ul•ACES PHQYWDEm we,sw a 7tV5 B 55.Wa e 54.641 B .7026 B ]0,620 6F 241,635 w 224 SPACES 240 BPACRS a4. SPACQ8 166 6PACE8 6 SPACER 10 WACE9 AMUT.H.-SITE amL AREA TOTALg1m m ^PEA SOAP APAR'fhF:NTd CdTTAaRa LAN APE ARBA WWga6CAi'@ ANSA TOTAL PAMi"O SPACR13 PAOvhWEID ON-SSREET PAM" SPACE$ CARPORT PAMC MP E6 11APt" R PARK SPACES W COWAO 8 ACCEiig& E PANKEIO. 8PA� PAULA W A� PAMN40 SPACLS PTIOYIQEm *m0 aP m.a2n aP n,54Q W Y9,3M1 BP 4a; 8P 47 cm O}y QP e0. UPACSWWAGS6 Z BAC Ea 28 P ES s ACEs 2 2 B AC 2 BPnCdiBeS MAY 94, 2944 IN THE CITY OF LA C UINTA COUNTY OF nIVEFisims, STATE OF CALIFORNIA SITE PLAN L.E91]L.J4�BFAI�TJ4N A FORTON OF THE BOM v2 OF TWE SCUT—EST QVARTCO Of TIe 40VHEAST OUARM or $90mm 4t TO*NW 4 4Twr:t wLa�aE r rAST, OW a6RtlIM%DM wr4olAIL A:!a£4dl YAW CRS 048-070-017 A 770-O40-012 DEVELOPER TA4ETPCPT t QMS LA W WIA. LLC. 4401 POA am"ARD. SWE 686 PAW BEApo OAROEILB. FLOW* 7340 TELEP1 W, nM4.1224 FU, fa40F4A•463e PAiW)C RETTREV1ElR URYICEt, WC 5EQ4 Ip1A I AELepFol OAEOQN pT4Df e. PAY, 44406 16.Bsi-04W PAY, Nwawe4T4S rruralr.�eco N4A "N"701Q oea a ww "a WE neve IUJiC/1O WIA[ _CAL OWA 2$214 � I74G M R4Tt PA* 9KMO-740a nomm 6 Sonat Rte 24401 ARCHITECT ANO&A MOWN A4400 ?ED A IeCT4 4120 OWTNWEW WACADALI AVTTFI4 WAIS e PORn,06 OWdON 012V maww. 1wD3124a•TCQ PAw M"246.1710 Q9N9HAL..N0-T9S 6A14TAw0 CFY xCpWD NQATN ME Ife. eRE4QENT1dL LO1W SMMI WE r Co NDF]ICX UW�"AU PROPQRFD GTT IONNO NOB'H we I 66aR ONEDAIw-tEOtl DEW4aY 1E4OEWf D samt an I son 04DW ovw v WSw v ODETNQ LAM 1146 NACANI PRWQWD Ld1O UN, RDRTW WE rW4TMM COWRETRnaET4T Wa IY 4081H SITE I CONIPAINQ CARE ReTFEHENT 00M A.HTY EXWRG 0" QEielAL FLAK NIXRN WE 1LOA 0.0W OeNWY RE4aeR U 4OLNN ERE e W mrmE �L1Lt P68P0'A'Q CITY 4E223NL PLAN Nom ERE I NMR Dlmw,MIIEN BENAtTY nFmlamac AOIITIt OR[ I NCO MEDIWF 4w omwv IIQ omw uRO48 kCRA04 NC61TI Bf1E SHQI dLRlEI 14rwmN Sae f1.a! ACES} W( ACREAGE• NORM eW 1*450 ACRE4t I SQYTN 4RE 11Qe A' WW 4.TII. WE9, tLWTW. NE4R.IL B T*4 WT T 11W12ea•nea4 OAF n. Q 11 ""ANY 1r401535."v TELE..Q'E YEW COVPANY 11aDnP0+n-erne WATEW CDAOELLA VAURY WAFER O4TWI114w,DO 4a, CABLE- IPE WAR" . Sla-wo $EWER• COACYE U YAL Y WAT W6TN4CT 1,3u4 dbl WA• IRQEAQRutM AERYICE ALEFT 'SWIM -2w NOT[. 6 ARORECT" PLANE FO{ &AJ W0 FUNCTION QETAL �� IN',T.i. �� ti � o v %41 %'-W MSA C'ONSULTIWOID, INC MAaNBIL0. $dRSll k AfA7C7AT8lt 1247. R+IWFn E CM. dxm®sa w lAx�a axnaw $00EOE W.. ERTFF R—U -CA !d ��n I'" 3405x1 w I," M3t w N N.T.S M/2 M/H M/8 i r s —WASHING—T614 STREET r r R/W XR- d N i 4 £r7 a i WQ Z �2< .� o a ca J L Q LL > W ,e Q 0. 0JU) ca VJ O y : M v a � ■ ■ 0 0 w� dki A M`7 ITC, .- vs* 4-1 lL V Ali AP 1w IL ZA N.T-S. pre t 'd, a. -7- 4F'O 4+: - ffi� f � AP 1w IL ZA N.T-S. pre t 'd, a. -7- SPECIFIC PLAID LA PALQMA 1.20.3 THE PROCESS 1.20.3.1 RELATIONSHIP TO THE GENERAL PLAN Implementation of development within the La Paloma Specific Plan area is intended to carry out the goals and policies contained in the General Plan of the City of La Quinta in a planned and orderly fashion. All development within La Paloma Specific Plan shall be consistent with the provisions of the La Quinta General Plan. The proposed General Plan Land Use for the site is shown in Exhibit 4. Among the important provisions of the General Plan that will be implemented upon the development of La Paloma include: • Land Use -The General Plan suggests that the appropriate locations for Medium High Density and Medium Density Residential Uses include areas where planned community facilities, major vehicular transportation system access, appropriately sized utilities, commercial services and employment uses are easily available, and where adjacent development is compatible. • Land Use- Medium High Density and Medium Density Residential uses should be located close to park/open space uses such as neighborhood and community parks, schools or other recreational facilities. • Land Use- Medium High Density and Medium Density Uses can be used to buffer lower density residential uses from commercial facilities and arterial roadways. • Circulation -The Circulation Element of the General Plan outlines the design and location of required street improvements to complete the transportation system in the City. La Paloma will complete the unfinished portions of two important links in the City's circulation network: Washington Street and Avenue 50. Possible improvements may be sidewalks, bicycle links, bus stops, and signal improvements. • Roadway Image Corridors -In addition to roadway improvements, the project will implement special roadway corridor improvements which will evoke the unique identity and character sought by the City of La Quinta. Washington Street is identified as a Primary Image Corridor and Avenue 50 is shown as a Secondary Image Corridor. • Water Quantity and Quality -The Specific Plan outlines the use of drought tolerant planting and irrigation techniques and incorporates a grading concept designed to detain stormwater on site. • Infrastructure -The Specific Plan incorporates plans to complete the infrastructure that lies adiacent to the project site. - 8 - Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 1.20.3.2 RELATIONSHIP TO ZONING/DEVELOPMENT PROCESSES The property requires a General Plan Amendment and Change of Zone to be properly planned and zoned for the uses projected for the site. Exhibit 5 depicts the zoning on and surrounding the site. The City of La Quinta requires a Specific Plan to establish an overall master development plan in the circumstance of the Medium High Density and Medium Density Residential zoning classification. In addition to the Specific Plan, the processing for entitlements includes a General Plan Amendment, a Change of Zone, a Conditional Use Permit, and a Site Development Permit. - 9 - Adopted December 7, 2004 LEGEND Roads Township Lange Sections Railroads City Limits • Planning Area #1 • ••••• Planning Area #2 • • • City Sphere of Influence Residential Land Uses WOR Wry low Density up to 2 dulac LDR Low Density up to 4 dulac MDR Medium Density up to a dulac MHDR Medium -High Density up to 12 du/ac HDR High Density up to 16 dulac Hillside Overlay ® Agricultum/Equestrian Overlay Commercial Land Uses M/RC MizeNRegional Commercial CC Community Commercial �! NC Neigldmdw)od Commercial CP Commercial Park D O Office TC Tourist Commercial VC Village Commercial Other Land Uses I Induswal MC Major Community Facilities P Park Facilities 05 Open Space " G Goff Cause Open Space W Watercourse/Fload Control Q Floating Park Designation SITE I I� 1 f LL M- N.T.S. -10- 9 0 N O O 0 �V WQ C Z Q 0J ,Jpp U `� LL W C Qa JU) V 1L U 0 0 PL, 0 ■ CIS � � ado z a O on m,.a r ►�►��►^�r■►a'��'M'I ' �r�r�r�►iii�.fifw.I�.�..� so, . l s +.. w[rii, ■ �mmmmmmfl /ti itfl •�1 itr r �r a..lww tfw ww US ww[ w •wLrlr ■..#Mo am 0 wQ Half Iw`fr. .i awn, wom !111 "ON. 1. i1-1164 ► .. Ltor• 1.0 .�■.1! Val ar a .nr w IL IL i L,+I� �l�1�Iiilirl�N■I s a 11 SPECIFIC PLAN LA PAL OMA 1.20.3.3 RELATIONSHIP TO OTHER AGENCIES In addition to City approvals, permits will be needed from the Coachella Valley Water District (CVWD) for connection to water and sewer lines. Other infrastructure extensions or connections will be required by the Imperial Irrigation District for electrical power, Verizon for telephone service, Southern California Gas Company for natural gas, and Warner Cable for cable TV service. The drainage characteristic of the adjacent evacuation channel has induced the Coachella Valley Water District to secure easements over the slope areas of the site adjacent to 50th Avenue. Permission will have to be secured from CVWD both for accessing the site from 50th Avenue as well as to landscape the slope areas. At the State level, approvals are required by the State Department of Social Services through the Office of Statewide Health Planning and Development. -12- Adopted December 7, 2004 SPECIFIC PLAN LA PAL OMA 2.10 PROJECT DESCRIPTION 2.10.1 THE SITE The site consists of a 14 acre parcel located on the northeast corner and a 7 acre parcel on the southeast corner of Washington Street and Avenue 50 in the City of La Quinta. The site is currently vacant but has been cleared and grubbed and the northerly site has received some fill material in the past in anticipation of development. The northerly site was previously approved for the development of a single family tract of houses (Tentative Tract Map 26148) in the late 1980's and the approval was extended into the early 1990's. The site abuts a partially built out established tract of single family homes which take access from Washington Street at Sagebrush Avenue. To the immediate east of the subject property is the La Quinta Evacuation Channel. The bottom of this drainage course is approximately 37 feet below the existing grade of the subject site. Further to the east, the land uses include the La Quinta Sports Park and La Quinta Middle School. The middle school site is approximately 1100 feet to the east of the subject property. The project and the surroundings are shown on Exhibit 2. 2.10.2 SITE PLAN The site plan complies with required landscape setbacks on both Washington Street and Avenue 50 and employs a single vehicular access from each street to each of the two sites (access to south site from Washington Street is limited to right out and emergency vehicles only). These standards are consistent with the adopted image corridors established in the General Plan. The building form on the northerly parcel is campus -like, with a porte cochere at the end of a formal entry approach lined with palm trees and extensive landscaping. Building massing will be primarily two stories with some single story elements located on the cottage site. The two story buildings are located approximately 85 feet from the existing single-family homes located on the south side of Saguaro Street. A tunnel under 50th Avenue is proposed to connect the two sites without requiring residents to use public streets. The proposed cottage site plan is requesting a minor variation from the aggregate 45 foot setback to the rear of the housing units by asking for a total setback of 41 feet in several locations and a setback to patio covers of 35 feet in two instances. The site is irregular in shape and the development is constrained by the shape, as well as the additional street dedication on Washington to comply with the General Plan as well as the staff request for additional right-of- way to accommodate a dedicated right turn lane. -13- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 2.10.3 LANDSCAPE PLAN The landscape concept follows a 'lush oasis" theme but emphasizing water efficient materials exhibiting color and form. A planting palette is shown in Exhibit 8 - PD -3 Plant Palette. Pathway areas are planted with a combination of Acacia, Cercidium and Ironwood trees with under plantings of desert shrubs and groundcovers which will include Agave species Bougainvillea, Cassia, Red bird of paradise and varied Texas Ranger species. Groundcovers include Acacia desert carpet, Spreading Lantana and Mexican Primrose. Palm trees are used as accents in parking medians corner treatments and entry areas. Courtyards are all treated individually with separate themes and activities to differentiate spaces. Overall courtyards may be treated with a more lush plant palette due to shaded conditions brought about by the two-story buildings. Lawn is limited to primary impact and/or entry areas in an effort to keep water use to a minimum. The landscape concept is shown in Exhibit PD -1 and PD -2. -14- Adopted December 7, 2004 0 'iO R N.T.S. -15- C) i O O L^' 4 W O 0 ^^L f+ L 0 Z �Z I Q o _j cc a EL- JU .a? Q LL W Qa (DU) CL �J c J r I 0 V �{� NM F M w� C7 � Ni UMENT 1 1 low W 0 0 Ffi1+QF ON WlF Ci S ICN: P� GOLF COURSE L.AKWAPE ARCHIEC7S, NC. 74020 NFBSA)DRO. SURE E PALM DESERT CA 92200 (700) 566-3024 FAX (760) 773-5815 E4AAL RQA-ROA-PD.COM w 0 0 n L a 0 O ^^L 6-6 O Q f 1 Q � J oft. cu J0 +? Q LL cn 10 W Qa cu J� v c J N 0 d4�� W ,^� ■ U A� V1 x� x0 I �• IL ' k 0 0 Ffi1+QF ON WlF Ci S ICN: P� GOLF COURSE L.AKWAPE ARCHIEC7S, NC. 74020 NFBSA)DRO. SURE E PALM DESERT CA 92200 (700) 566-3024 FAX (760) 773-5815 E4AAL RQA-ROA-PD.COM w 0 0 n L a 0 O ^^L 6-6 O Q f 1 Q � J oft. cu J0 +? Q LL cn 10 W Qa cu J� v c J N 0 d4�� W ,^� ■ U A� V1 x� x0 Di SPECIFIC PLAN LA PAL OMA 2.10.4 UTILITIES Utility extensions will be minimal with most utilities existing at the perimeter of the site. Some upgrades will be required by the individual utility companies providing service to the property; however no major line extensions are expected. Street widening implementing the General Plan will be installed concurrently with the construction of the project and will be completed prior to occupancy of the facility. All adjacent, overhead utility lines are proposed to be under -grounded with the exception of the transmission lines following the alignment of the evacuation channel. Existing utilities are shown in Exhibit 9. 2.10.5 ART IN PUBLIC PLACES The requirement for Art in Public Places may be fulfilled either by an on-site installation or by payment of a fee. 2.20 PHASING The project is anticipated to be built in three phases. The projected phasing is shown in Exhibit 10. 2.20.1 INFRASTRUCTURE PHASING The infrastructure improvements required in conjunction with this development will all be installed and completed prior to occupancy of the facility. All of the adjacent infrastructure improvements adjacent to each of the two sites will be improved with the initial development of the property. 2.30 GRADING / DRAINAGE / FLOOD CONTROL 2.30.1 GRADING PLAN The sites will be mass graded to allow for the export of material from the northerly site to the southerly parcel. Due to the sensitivity of the neighbors along Saguaro Street, the building pad elevations will be established at an elevation of 47 feet, which ranges from level with up to 5 feet lower than the adjacent homes to the north of the campus site. Overall it is anticipated that approximately 10,000 cubic yards of export material will be moved to the southern site. Stormwater, including that from a 100 -year event will be drained inLU the evacuation channel before storm Tows have peaked. -18- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA Due to the adjacent Evacuation Channel, CVWD has noted that the channel water surface elevation is established at 48 feet (above sea level). They will require that the site development plan and street improvement plans for 50th Avenue designed and constructed to contain a water surface elevation of 50 feet in order to maintain channel integrity. The Preliminary Grading Plan is shown in Exhibit 11. 2.30.2 EROSION CONTROL The grading operations shall include adequate provisions for wind and water erosion control both during as well as after grading operations have ceased. The details of erosion control shall be included in the project's Storm Water Pollution Prevention Plan (SWPPP) and PM 10 Plan. • Prewatering--The site shall be prewatered to a depth of three feet prior to the onset of grading operations. • During Grading --Once grading has commenced, and until grading has been completed, watering of the site and/or other treatment(s) determined to be appropriate shall be ongoing. • Post Grading --All disturbed areas shall be treated to prevent erosion for the term that the area will remain undeveloped. Wherever feasible, final landscape and irrigation shall be installed as soon as feasible after grading operations have been completed. 2.30.3 SWPPP/NPDES/PM 10 Since the Coachella Valley experiences periods of moderate to heavy wind conditions, wind-blown dust and sand is a concern with mass grading operations, especially those in excess of five acres in size. Because of health concerns, the Environmental Protection Agency has instituted a plan in the valley to curb excess PM 10 (small particle dust). The City also participates in the National Pollutant Discharge Elimination System program. The City of La Quinta requires SWPPP, NPDES and PM 10 plans to control the wind and water born erosion associated with such grading operations. The project will comply with the City's requirements relative to these programs. _19- Adopted December 7, 2004 42' STEEL TRANSMISSION TOWER — _ _p— R —0._.. — — R�p.— 0 0 n r 0 ei W Z NVQ .� 0 a +r J U QLL D w Q (I C JU) N x w r r a n U w� P � F� a y lyrn ■ d U� �0 t� V� ■ x o �x 4 R O O x W 7 C2Q 00 co JU -C QLL W Qa JU) 0 0 0 ^^L LCL 0 � N M .g$ All SPECIFIC PLAN LA PALOMA 2.30.4 HYDROLOGY La Paloma lies in a Zone X flood zone as determined by FEMA, Community Panel Number 060709 000513, revised August 19, 1991. Zone X includes areas to be outside the 500 -year event. There are no tributary flows that have to be accommodated in the development of the site. 2.30.5 FLOOD CONTROL MASTER PLAN The stormwater drainage system in the City of La Quinta is administered by the CVWD. Generally speaking, the system consists of improvements to the natural drainage channels that run through the City. There is an existing storm drain located in Washington Street that collects storm water and conducts that flow into the evacuation channel via a storm drain in 50th Avenue. Projects located adjacent to the evacuation channel formerly had to detain storm flows and release the water after the level of water in the evacuation channel ebbed. More recently it has been determined that due to the time delay in storm water actually reaching the evacuation channel that the storm flows from adjacent development do not have to be detained and can be directed to the channel directly. 2.30.6 ON-SITE STORM WATER DESIGN The City of La Quinta in conjunction with the CVWD requires each development to include provisions for handling storm water attributed to the site. The design storm which creates the worst case scenario is a 100 -year, 24-hour event. The nature of the runoff build up in the adjacent Evacuation Channel is such that the site drainage can be piped directly into the channel and will not be required to be retained/detained on site. The on-site design and outlet into the channel will require approval from CVWD. 2.30.7 NUISANCE WATER Nuisance water attributed to the project will be collected and directed to areas within the landscape. A series of dry wells will be installed to percolate this water prior to the water being collected in the storm drain system in order to prevent the development of wetlands environments. The amount of nuisance water is expected to be reduced due to the use of water efficient landscape and irrigation materials. -22- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 2.40 UTILITIES La Paloma is well served by utilities and is situated in a corridor planned for a relatively intense scope of urban development. No major utility extensions are anticipated in conjunction with the project. Several overhead utility lines exist along Washington Street, 50th Avenue and along the evacuation channel. It is the intent of the development to underground all of the adjacent overhead utility lines as required by the City of La Quinta and Imperial Irrigation District. 2.40.1 SEWER PLAN Sanitary sewer facilities for La Quinta are provided by CVWD. Sewer mains are located on the west side of the site in Washington Street, in Avenue 50 and also in the Evacuation Channel at the southeast corner of the site. Sewage will flow by gravity to the main. No upsizing of facilities will be required. The on-site sewer system will be private. 2.40.2 WATER PLAN Water facilities for La Quinta are provided by CVWD. An 18" main exists in Washington Street and there is also an 18" main in Avenue 50. The on-site water lines will be connected into the existing infrastructure network in at least two places to avoid "dead-end" lines. 2.40.2.1 CVWD WELL SITE No well site is being required for this site. The nearest well is located outside the site near the northeast corner of the site. 2.40.3 ELECTRICAL PLAN The Imperial Irrigation District provides electric facilities in the City of La Quinta. The District indicates that the design of the electrical service will depend on final load calculations for the overall project. The District will require the installation of underground facilities throughout the project. Existing power poles located on Washington Street, Avenue 50 and the north property line will also be under - grounded as allowed by I.I.D. 2.40.4 OTHER UTILITIES Natural gas is provided by the Southern California Gas Company. The nearest facility is a 6" line located in Washington Street. Each of the two project sites will independently connect into the gas line. -23- Adopted December 7, 2004 SPECIFIC PMN LA PALOMA Television cable service is provided by Warner Cable with the nearest facilities located in Washington Street at Saguaro Drive abutting the site. Telephone service will be provided by Verizon. Existing facilities exist in both Washington Street and in Avenue 50. Verizon expects to serve the project from these locations. Waste disposal service is provided by Waste Management of the Desert. Plans for incorporating recycling facilities shall be demonstrated for this development upon application for a Site Development Permit. -24- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 2.50 LAND USE 2.50.1 LAND USE PLAN The land use designations proposed for the site are medium high density and medium density residential. This will facilitate the proposed continuing care retirement community complex. The Specific Plan establishes development standards for the entire site including an integrated design for the Washington Street and Avenue 50 frontages. These standards will include considerations for building siting, architecture, lighting, landscape, public art, and signage. These guidelines are intended to be consistent with the La Quinta General Plan goals, policies, and objectives. Statistical Breakdown North Site South Site Building Coverage 28.6% 26.7% Landscape/Open Space 29.2% 47.1% Parking/Drives/Hardscape 42.2% 26.2% 2.50.2 DEVELOPMENT STANDARDS The RMH and RM zoning development standards contained in the City of La Quinta Zoning ordinance shall be followed except where specifically modified by this Specific Plan. The only change proposed to the development standards for the RM zone would be to allow units along Washington Street to have a 41 foot rather than a 45 foot setback (20 foot landscape parkway + a 21 foot setback from the wall to the closest building) and also to allow a 35 foot setback to open patio covers. The requested reductions only involve the cottages on the south site. 2.50.2.1 PERMITTED/CONDITIONAL/PROHIBITED USES The City's Zoning Ordinance delineates the range of allowed, conditionally allowable and prohibited uses for each zoning classification. No deviations from these standards are proposed within this Specific Plan. The following uses may be approved by the Planning Commission under Conditional Use Permit procedures: 1. Senior Group Housing, 7 or more persons, subject to the provisions of Section 9.40.040 of the La Quinta Zoning Ordinance. -25- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 2.50.2.2 PARKING REQUIREMENTS The City of La Quinta Zoning Ordinance prescribes a total of 1 space per unit (.5 spaces per unit primary parking and .5 spaces per unit for guest parking) for senior housing projects. The Ordinance further requires one parking space per each four beds in convalescent hospitals, nursing homes and the like. These standards cover parking needed both by the residents as well as the staff for the facility. Using the current city standards the required parking would be 226 spaces for the various independent and assisted units and 10 spaces (9.5) for the skilled nursing and memory units. The total parking provided is 325 spaces which leaves an excess of 89 spaces to help with peak periods of parking overlap during shift changes, occasional visitor spikes during holidays and the like. The applicants are comfortable with these ratios based on extensive experience with this land use type. 2.50.2.3 SIGNAGE REQUIREMENTS The project shall be allowed a corner monument sign in addition to the allowable signage at each entry. Such signs shall be architecturally integrated with the wall and landscape designs and limited to one sign on each corner with no more than 15 square feet of sign face per sign. 2.50.3 DESIGN GUIDELINES 2.50.3.1 GENERAL ARCHITECTURAL THEME The desired architectural style of the project and its various components is based on early traditional Mediterranean, California Mission, Spanish, Southwest and similar themes found in La Quinta. These styles are exemplified by articulated building forms, multiple roof forms, thick walls, covered walkways, and building orientation to courtyards and gardens. The desired range of architectural character is shown in Exhibit 12. 2.50.3.2 ACCEPTABLE BUILDING MATERIALS A. Stucco (hand smoothed or vertical -raked textures preferred). Building corners should be rounded using a bull -nose corner detail or larger radius construction techniques. B. Masonry: flagstone, adobe, Spanish style brick, or split faced block. C. Wood: Exposed, heavy timber, rough sawn beams, and glue -laminated beams with stain finish (transparent or opaque). Exposed wood may be used in protected applications such as soffits, -26- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA D. Glass Block. E. Weathering Metals: Copper, iron, bronze used as building accents and detail areas. 2.50.3.3 COLORS The general color scheme shall be a range typically associated with Mediterranean architectural styles from off-white to medium earth tones. Stark white colors, while traditionally used, are discouraged due to glare considerations. Wood shall be stained using medium to dark earth tones and complementary southwest colors (e.g., aqua, teal, terra cotta, whitewash). 2.50.3.4 CARPORTS Sloped and flat roof carports shall be utilized on the project site. Sloped concrete "S" roof carports shall be constructed on the north property line and along 50th Avenue on the north site. Flat roof carports shall be constructed on all other locations. Carports on north property line facing the existing single-family residences shall also be enclosed on the north elevation with architecturally compatible materials. -27- Adopted December 7, 2004 NOTE: SEE SPECIFIC PLAN APPENDICES SITE SECTION A & SITE SECTIONS B, C, & D (TYPICAL) 'ioo R N.T.S. _28_ SPECIFIC PLAN LA PALOMA 2.50.3.4 ROOFS Hip, gable, flat and shed roof designs or combinations thereof consistent with the general architectural theme are acceptable and encouraged for main building masses. Acceptable roofing materials for pitched roofs include clay tile, and weathering metals. Where clay tile materials are used, a multi -hued mixture of earth tones (terra cotta, buff, olive, and the like) shall be used. Although the use of mudded, clay tile and weathering metal roofs is recommended throughout, flat roofs may be used if cornice and parapet detailing is consistent with the overall architectural approach. 2.50.3.5 SOLAR CONTROL Passive solar control techniques shall be employed in the overall design in order to achieve an energy conserving building. Roof overhangs, canopies, deep-set windows, balconies, and ground level trellises and porticos should be used as possible to shade glass areas. 2.50.3.6 EQUIPMENT SCREENING Consistent with City of La Quinta regulations, roof mounted mechanical equipment; ductwork and vents shall be completely screened from all possible views by the forms of the architecture. 2.50.3.7 FENCING AND WALLS The service areas shall be effectively screened from view by masonry walls of the same or complementary materials as the main building walls. A uniform perimeter masonry wall shall be constructed along the northerly property line of the northern parcel. In those areas where existing masonry walls are present and in good condition, the walls will be stuccoed and painted to match. In areas where there is either no wall or a wood fence, a new 6 foot high masonry wall will be erected. If requested by any of the property owners abutting the project, the perimeter masonry wall may be up to 8 feet in height. A combination of solid walls and view fencing may be used along the street and channel frontages. Parking areas may be screened from view from the street by either solid walls or landscape materials. A minimum six foot high, decorative masonry wall will be necessary along both public streets to reduce the noise levels impinging on the residential uses. el 00 ZM.3.8 SI T E LIGHT ING On-site lighting shall be designed to be consistent with the City's "Dark Sky" ordinance. Vehicular entries from both Washington Street and Avenue 50 shall be lighted in a manner that will make them apparent and stand out at night. -29- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA Pedestrian walkways and entries shall be lighted using either decorative fixtures or landscape lighting. All lighting shall be designed and located so as to confine direct light within the project boundaries (including landscape buffer areas located along Washington Street and Avenue 50.) Landscape lighting is preferable to area light standards. -30- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA 2.60 CIRCULATION 2.60.1 OVERVIEW La Paloma proposes to develop the adjacent street system in a manner consistent with the City of La Quinta General Plan Circulation. The property is located on Washington Street, designated by the City's General Plan as a Major Arterial requiring a half street of 60 feet. The site also abuts Avenue 50 designated as a Primary Arterial for which the General Plan calls for a half street of 55 feet. 2.60.2 OFF-SITE CIRCULATION SYSTEM The existing conditions around the site include partial improvements on both abutting public streets. The General Plan standards for improvements which will be required in conjunction with this project are consistent with other recent road improvements for both Washington Street and Avenue 50. The construction of the required improvements will continue the process of implementing the adopted General Plan Circulation Plan. Expanded pavement, curb, gutter, median and sidewalk/bikepath improvements are planned for the project's two street frontages. Signal upgrades may be required in addition to relocation to the ultimate improvement location. Exhibit 13 shows the proposed cross sections for the streets affecting the project. 2.60.3 PUBLIC TRANSPORTATION/TRANSPORTATION DEMAND MANAGEMENT Bus turnouts and shelters may be required as a part of the project's public street improvements pursuant to requirements of Sunline Transit, the Public Works Director and Caltrans. Prior to issuance of building permits for individual Site Development Permits, applicants shall submit a Transportation Demand Management (TDM) Plan to the Public Works and Community Development Departments. The plans shall address capital improvement and operational standards as set forth in the City's TDM Ordinance. Any transit related improvements required by the Sunline Transit Agency as a condition to development will not constitute compliance with LL_ 1_� V 11_1 Me puri submival requirements. - 31 - Adopted December 7, 2004 fir J". N.T.S. -32- EXISTING R/W 120' 60' 60' 9' 44' 7' 7' 44' BARRIER BARRIER CURD CURB 1= STD. CURB STD. CURB 1 & GUTTER EX • A. C. & GUTTER A.C. I1-111 _- 2% 2:1 - 2% 111-111—III-1 1-111-� ---� MAX rrQ? IT ^� Ij LANDSCAPED I � BASE COURSE MEDIAN COMPACTED SUBGRADE 6' MEANDE- RING SIDEWALK SECTION A -A WASHINGTON STREET N.T.S. EXISTING R/W ,50 12' 32' BARRIER u-� CURB T- STD. CURB l & GUTTER EX. 2:1 - 2% A. C. MAX � l -11f.,11--11=11 ,. -III- ' al- F-1II-111=11 111 '=IIh11-11-111 LANDSCAPED - f. BASE COURSE MEDIAN COMPACTED SUB RADE 6' MEANDE- RING SIDEWALK SECTION B -B AVENUE 50 N.T.S. 50' 32' BARRIER CURB STD. CURB A.C.-\ & GUTTER 2% a 12' EXISTING R/W EXISTING R/W 2:1 MAX 2:1 MAX N.T.S. -33- SPECIFIC PLAN LA PAL OMA 2.60.4 ON-SITE CIRCULATION SYSTEM The 14 acre northerly site will be serviced by a perimeter drive which has two basic functions: fire department access to all buildings and service vehicle access to the projects delivery area located on the north side of the facility. The nature of the operation of this complex will entail approximately five delivery trucks per day with all deliveries being scheduled during normal working hours (9:00 a.m. to 5:00 p.m). The southerly site has an interior drive with buildings located on both sides. 2.70 LANDSCAPE DEVELOPMENT STANDARDS La Paloma will meet the minimum standards for landscape as set forth in the Zoning Ordinance. The Site Development Permit Application shall set forth the landscape concept consistent with the Specific Plan. 2.70.1 LANDSCAPE PALLETTE Landscape materials selected for detailed landscape plans will be chosen from the Master Plant List shown in Exhibit PD -3: 2.70.2 LANDSCAPE MAINTENANCE Since the project is under a single management entity, landscape maintenance will be under a single control. A particular concern is to allow tree forms to fully develop in the parking lot areas in order to achieve the required percentage of shading as set forth in the Zoning Ordinance. 2.80 SIGNAGE Major project signs are anticipated at each entry and on the corner of Washington Street and Avenue 50 in conjunction with the landscape. The signage will be consistent with City of La Quinta sign ordinance requirements with the exception of the corner signage being requested for each site to complement the signage located at the project entries. The corner signage is being requested due to the nature of the limited access to each of the two sites. Since there are two separate sites and raised landscaped medians limiting access into each of the project entries, it is felt that the corner identification signs will help guide users into the site and hopefully eliminate the need for a large number of u -turns on both Washington Street and Avenue 50. Exhibit 14. -34- Adopted December 7, 2004 SIGN AREA OTWO SIDED ENTRY SIGN 9.2 SF SIGN AREA PER SIDE 18.4 SF TOTAL PER SIGN A It�,AL0MA i $�It4R T..IVIIiQ '�'Olf�l[U11gY ._. v..! ( CO NT Y SIGN ' 14.4 SF SIGN AREA SIGN AREA It T N.T.S -35- w 0 N N n J Q \mv m Z �2< OIL J J U QLL 4-1 lo C 0. Q 0 � J E 0 c 0 0 a�U � M ■ SPECIFIC PLAN LA PALOMA 3.10 PROJECT IMPLEMENTATION La Paloma will require approvals from the City of La Quinta for a General Plan Amendment, a Change of Zone, a Site Development Plan, and an Environmental Assessment in addition to the Specific Plan. Each of these applications shall be consistent with the approved Specific Plan document. In addition the City will review the building construction documents which must also be consistent with the Specific Plan and Site Development Plan approvals. One issue that arises out of the proposed General Plan Amendment and Change of Zone is the residual impact of increasing the base densities for the project site and the possibility that the proposed Continuing Care Retirement Community (CCRC) is not built. It is proposed that the General Plan Amendment for the project include the requirement that a Specific Plan be required for the portion of the project located on the northeast corner of Washington Street and 50th Avenue. Thus if the proposed CCRC does not come to fruition, a revised Specific Plan will need to be processed in order to develop the property. This provision will eliminate the normal "right -of -zone" land uses and development standards and mandate the involvement of the neighborhood, Planning Commission and City Council in any future development proposal. The project and the various applications that are necessary to complete the entitlement process shall be consistent with the ordinances, policies, and regulations of the City of La Quinta unless otherwise approved within this Specific Plan. In addition to the approvals and actions on the part of the City, the project must also be approved by the State of California Department of Social Services, Continuing Care Division due to its oversight of this type of senior housing project. These approvals must be in place prior to issuance of building permits. As previously stated, the project is required by State regulations to have taken reservations for at least 50% of the apartment units prior to commencing construction. Finally, the project must receive approvals from the various utility providers on the improvement and connection permits necessary to service the facility. These approvals shall be in place prior to occupancy of the development. -36- Adopted December 7, 2004 SPECIFIC PLAN LA PALOMA APPENDIX Exhibits: General Plan Amendment Change of Zone Site Photographs I Site Photographs II Architectural Renderings North Property Line Transition Site Sections A Site Sections B, C, and D Site Section E Site Photograph — North Property Line Architectural Perspective I Architectural Perspective II Cottage Setbacks Resolution/Ordinance: Resolution No. 2004-149 Resolution No. 2004-150 Ordinance No. 411 Resolution No. 2004-152 Environmental Assessment 2003-470 General Plan Amendment 2003-091 Zone Change 2003-112 Specific Plan 2004-071 -37- Adopted December 7, 2004 GENERAL PLAN AMENDMENT LAND USE LAND USE PARCEL 1 PARCEL 2 ELEMENT FROM LD ELEMENT FROM CO (14.01 ACRES / APN- (7.67 ACRES / APN- R TO MHDR - PARCEL TO MDR - PARCEL 2 646-070-013) 770-040-012) 1 N.T.S. CHANGE OF ZONE FROM RL 17/1 TO MHDR - PARCEL 1 FROM CO TO MDR - PARCEL 2 PARCEL 1 (14.01 ACRES / APN- 646-070-013) PARCEL 2 (7.67 ACRES / APN- 770-040-012) OR N.T.S. Q N . � n O d x W 02< c 0 of a Jo QLL 0 W Qa U) �J C 01 0 all �i z uN W r^� a ■ 961- y �f .+• iw . ..-s NORTHWEST CORNER OF PROJECT BOUNDARY .,ik 0, — N.T.S. AA NORTHEAST CORNER OF PROJECT BOUNDARY SOUTHEAST CORNER OF PROJECT BOUNDARY N.T.S. MAIN ENTRY — INDEPENDENT LIVING FACILITY SOUTHWEST CORNER OF THE INDEPENDENT LIVING FACILITY �y ioi1/1 llIf �w� SOUTH ELEVATION OF THE INDEPENDENT LIVING FACILITY La Paloma Retirement Community "ad,tuw Renderings Mluom Naan Afsaiatm item C r --Nm R R a O ae t26Q 3 c a.r E O a.� q a a.r O 1 F� c t o x d G= .r r' 1 iwi; WO33.IIN M W --IWS mu.d •,W,M.up �; ua+tl Vb5 M1"4 W18u�M �iunwwo� luawaJilallewoled el �O U v L La Paloma Retirement Community mad 18,2M4 Site Photo MInm Mohan ksodated Atthhch �I ' r 1t,�-,�'r �': ,��►` :\`i` ��p'4�+�`: mer . � /]S. iii. ''� ,i = � �+•' ,JAM, ry i •`tis r 1 ,JAM, ry i •`tis r P .�,(j '� ,, / la Vii.♦ I�iV'�y N LIGHTED MONUMENT SIGN (SINGLE SIDED) f b' NIGH PERIMETER i WALL (SOUND WALL) W W Cie � Z O V Z T_ Q LANDSCAPE LIGHTED MONUMENT SETBACK SIGN (DOUBLE SIDED)Ln I TYPICAL PROPERTY LINE LOCATION (FOR REFERENCE ONLY) Z Z QZ Z (A Q OCL Nou Z p 3 ce 00 V HIGH METAL FENCE AND GATE FLAT ROOF f 4 I CARPORTS 9 R r W P o '^ Z a N 9■ 0 0 r r L. Ln _ 04 w x L.[. D r V HIGH D_ 1110 METAL FENCE Z= rAGE. GC7TTf�CiS I �.- FFL:4S LANDSCAPETYFYTYP.SETBACK 9 i 0`-sZ�r Z' -PJB` it w AUT MATED 1 SLIC ING GAT LIGHTED McWl IMRN COTTAGE 5ET5ACK PARTIAL SITE FLAN. a s r u w sr.r in IS DETENTION POND 1.300 SF f �.." O_ z 9 R r W P o '^ Z a N 0 0 r r L. Ln _ 04 w x L.[. D r V HIGH D_ 1110 METAL FENCE Z= rAGE. on ce S 1 ¢ Ih 30 Lo 1 { f 1 � + V N O Z TYPE N 0 a CPI AUTOMATED U --TRASH ENCLOSURE SLIDING GATE — C V7 I / I✓ Q a) O i C AGE' d--+ L- U^ TYF? " O r U ci- c o 2� c C _ O LE `.J C TACE TYP DATE: 07.16.04 FFL .4 JOB: 036575 TYP. COT E FILE Al -2 TYPE DRAWN: JT CHECKED: CD COPYRIGHT ANKROM MOISAN ASSOCIATED ARCHITECTS 2004 GY iE 6' NIGI.4 METAL FENCE AND GATE FN 6'-P@r 7' FFL.41b.( TYP. PFF.1 I 50TH AVENUE LANDSCAPE LIGHTED MONUMENT SETBACK SIGN (DOUBLE n FLAT -•• CARPORTS AR ullull� ■ rJ �� _ .............. l:t �. TYPICAL PROPERTY LINE LOCATION (FOR REFERENCE ONLY) N b' WIGH I METAL FENCE AGE _NL_J� AUTOMATED --TRASH ENCLOSURE SLIDING GATE COTTAGE SETBACK PARTIAL SITE FLAN. 2 7 U 0 jz N o z Q�g z v� g o a O °_ W � 0 9 o 0 i �� Z� W 1 �z N w 00In _r__�INTUNNEL � D ? D_ w a'. o F -Ln o Zi on V ...r 6' HIGH< U m 1 \; PERIMETER o WALLLh '^ (SOUND GALL) `� N o .51 6l F4 V Q.3 c L) AGE > C C TAGaE Q? TYP Ln '+-+ (11 ru�4--} • 1-- U 2 N 4 `-- V! co c E CUD— tQ + C C d 1 CL yy CO E TYPE.. J DATE: 07.16.04 103: 036575 FIEF: A3-2 DRAWN: JT CHECKED: CD COPYRIGHT ANKROM MOISAN ASSOCIATED ARCHITECTS 2004 G9 RESOLUTION NO. 2004-149 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, CERTIFYING A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT PREPARED FOR GENERAL PLAN AMENDMENT 2003-091, ZONE CHANGE 2003-112, SPECIFIC PLAN 2004-071, CONDITIONAL USE PERMIT 2003-074 AND SITE DEVELOPMENT PERMIT 2003-762 ENVIRONMENTAL ASSESSMENT 2003-470 PACIFIC RETIREMENT SERVICES AND WESTPORT LA QUINTA, L.P.. WHEREAS, the City Council of the City of La Quinta, California, did, on the 7' day of December, 2004 hold a duly noticed Public Hearing to consider the request of Pacific Retirement Services and Westport La Quinta, L.P. for Environmental Assessment 2003-470 prepared for General Plan Amendment 2003-091, Zone Change 2003-112, Conditional Use Permit 2003-074, Specific Plan 2004-071 and Site Development Permit 2003-762 which allows a senior retirement community, located at the northeast and southeast corners of Washington Street and Avenue 50, more --- particularly described as: APN'S 646-070-013 AND 770-040-012 WHEREAS, the Planning Commission of the City of La Quinta, California, did, on the 9"' day of November, 2004 hold a duly noticed Public Hearing to consider the request of Pacific Retirement Services and Westport La Quinta, L.P. for Environmental Assessment 2003-470 prepared for General Plan Amendment 2003- 091, Zone Change 2003-112, Conditional Use Permit 2003-074, Specific Plan 2004- 071 and Site Development Permit 2003-762 and recommended certification by adoption of Resolution 2004-084; and WHEREAS, the Community Development Department published the public hearing notice in the Desert Sun newspaper on November 27, 2004, for the City Council meeting as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and WHEREAS, upon hearing and considering all testimony and arguments, if, any, of all interested persons desiring to be heard, said City Council did find the following facts, findings, and reasons to justify certification of said Environmental Assessment: R000lutlon No. 2004-149 Environmental Assessment 2003-470 Pacilk Retirement Snrvkee and Westport La Quints, L.P. Adopted: December 7. 2004 Page 2 1 • The proposed applications will not be detrimental to the health, safety, or general welfare of the community, either indirectly, or directly, 'in that no significant unmitigated impacts were identified by Environmental Assessment 2003-470. 2. The proposed project will not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife population to drop below self sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of rare or endangered plants or animals or eliminate important examples of the major periods of California history or prehistory. Potential impacts associated with cultural and paleontologic resources can be mitigated to a less than significant level. 3. There is no evidence before the City that the proposed project will have the Potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends. 4. The proposed project does not have the potential to achieve short-trm environmental goals, to the disadvantage of long-term environmental g alse as the proposed project supports the long term goals of the General Plan by providing a variety of housing opportunities for City residents. No significant effects on environmental factors have been identified by the Environmental Assessment. 5. The proposed project will not result in impacts which are individually limited or cumulatively considerable when considering planned or proposed, development in the immediate vicinity, as development patterns in the area will not be significantly affected by the proposed project. The construction of senior residential housing will not have considerable cumulative impacts. The project is consistent with the General Plan, and the potential impacts associated with General Plan build -out. 6. The proposed project will not have environmental effects that will adversely affect the human population, either directly or indirectly. The proposed project has the potential to adversely affect human beings, due to air quality and noise impacts. The Coachella Valley is in a non -attainment area for PM 10, and the -bite will generate PM 10; however, there are a number of mitigation measures to reduce the potential impacts on air quality. Noise impacts have been addressed through a series of mitigation measures, which will lower the potential for significant impacts to less than significant levels. Raolutlpn No. 2004-149 - EnvkOnm*ntd A46088nwnt 2002-470 Pedit Red n wt S_flc" and WNtport Ln Gubum. L.P. Ad*Pt d: Dvicembw 7, 2004 Pap 3 7. There is no substantial evidence in light of the entire record that the project may have a significant effect on the environment. 8. The Planning Commission has considered Environmental Assessment 2003-470 and said reflects their independent judgment. 9. The City has on the basis of substantial evidence, rebutted the presumption of adverse effect set forth in 14 CAL Code Regulations 753.5(d). 10. The location and custodian of the City's records relating to this project is the Community Development Department located at 78-495 Calle Tampico, La Quinta, California. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: 1. That the above recitations are true and correct and constitute the findings of the City Council for this Environmental Assessment. 2. That it does hereby certify Environmental Assessment 2003-470 for the reasons set forth in this Resolution and as stated in the Environmental Assessment Checklist and Mitigation Monitoring Program, attached and on file in the Community Development Department. 3. That Environmental Assessment 2003-470 reflects the Council's independent judgment. PASSED, APPROVED and ADOPTED at a regular meeting of the La Quinta City Council held on this 7 t day of December, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Mayor Adolph NOES: Council Member Sniff ABSENT: None ABSTAIN: None Resolution No. 2004149 Envkon mental Assessment 2003470 PecMe Retirement Servlces and Westport La Quints, L.P. Adopted: December 7. 2004 Pape 4 ata -a DON ADOLP , Mayo City of La Quinta, California ATTEST: �7 JU S. GREEK, C C, City lark. City of La Quinta, California (CITY SEAL) APPROVED AS TO FORM: r-- 4A�TE JENSON, Q.ity Attorney City of La Quinta, California Environmental Checklist Form 1. Project title: General Plan Amendment 03-091, Zone Change 03-112, Specific Plan 04-071, Conditional Use Permit 03-074, Site Development Permit 03-762, La Paloma Project 2. Lead agency name and address: City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 3. Contact person and phone number: Stan Sawa 760-777-7125 4. Project location: The Northeast and Southeast corners of Washington Street and Avenue 50. APN: 646-070-013 and 770-040-012 5. Project sponsor's name and address: Westport La Quinta LP 3801 PGA Boulevard, Suite 805 Palm Beach Gardens, FL 33410 Pacific Retirement Services 1200 Mira Mar Medford OR 97504 6. General plan designation: Current, northeast 7. Zoning: Current, northeast comer: Low corner: Low Density Residential Density Residential Proposed, northeast comer: Medium High Proposed, northeast corner: Medium Density Residential High Density Residential :Current, southeast corner: Office :Current, southeast comer: Office Proposed, southeast corner: Medium Density Commercial Residential Proposed, southeast corner: Medium Density Residential Description of project: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off-site features necessary for its implementation. Attach additional sheets if necessary.) The proposed project includes lands on the east side of Washington Street, both north and south of Avenue 50. The project proposes the development of 216 assisting living units, 20 skilled nursing beds and 18 dementia care beds on a total of 21 acres. A number of applications have been filed, as follows: General PIan Amendments (GPA) and Zone Changes (ZC) On the northeast corner of Washington Street, a GPA and ZC from the current designation of Low Density Residential to Medium High Density Residential on 14.01 acres of land. On the southeast corner of Washington Street and Avenue 50, a GPA and ZC from the current designation of Office to Medium Density residential on 7.67 acres of land. Specific Plan: A Specific Plan which establishes the design standards and guidelines for a 254 unit retirement community, consisting of independent and assisted living units, skilled nursing units, and a dementia unit. Most of the buildings are proposed to be two story in height. Access to the northeast portion of the site is piroposed on booth Washington Street and Avenue 50. Access to the southeastern site is also proposed on both streets. The access points on Avenue 50 are offset, and would be separated by a median on Avenue 50, so that direct vehicular access could not be gained from one side to the other. Interior driveways circle each site, and are proposed to be 26 feet wide. Conditional Use Permit: A conditional use permit is required to allow "congregate care facilities" in the Medium High and Medium Density Residential category. Site Development Permit• A site development permit is required to allow the construction of the facility based on the standards and guidelines of the Specific Plan 9. Surrounding land uses and setting: Briefly describe the project's surroundings: Northeast Corner: North: Existing single family homes (Low Density Residential) South: Avenue 50, Vacant desert lands included in project (Office) West: Washington Street, Existing single farnily residential, golf course (Low Density Residential, Golf Course Open Space) East: La Quinta Evacuation Channel (Watercourse/Flood Control) Southeast Corner: North: Avenue 50, Vacant desert land included in project (Low Density Residential) South: Vacant desert land, La Quinta Evacuation Channel (Office, Watercourse/Flood Control) West: Washington Street, Existing single family residential, golf course (Low Density Residential, Golf Course Open Space) East: Avenue 50 and La Quinta Evacuation Channel (Watercourse/Flood Control) 10. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement.) Coachella Valley Water District -2- ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Biological Resources Hazards & Hazardous Materials Mineral Resources Public Services Utilities / Service Systems Agriculture Resources Air Quality Cultural Resources Geology /Soils Hydrology / Water Land Use / Planning Quality Noise Population / Housing Recreation Transportation/Traffic Mandatory Findings of Significance . DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a si0ficanit effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT. is required, but it must analyze only the effects that remain to be addressed. [ find that although the proposed project could have a significant effect on the mvironment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or qEGJA-1IVE t?RCr Aum ATION, including .revisions or mitigation measures that are reposed upon the proposed project, nothing further is required. Signature -3- October 31 2004 Date EVALUATION OF ENVIRONMENTAL, IMPACTS: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e -g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. if there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were I within the scope of and adequately analyzed in an earlier document pursuant to applicabe legal standards, and state whether such effects were addressed by mitigation based on the earlier analysis. measures C) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a nrP.A„or., - r epareu "01Y F or outside dccuinent should, where appropriate, include a reference to the page•or pa swhere the statement is substantiated. 8 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. ME `^ 9) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance. -5- I. AESTHETICS -- Would the project: a) Have a substantial adverse effect on a scenic vista? (General Plan Exhibit 3.6) b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? (Aerial photograph) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Application materials) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Application materials) Potentially Significant Impact Less Than Significant wl Mitigation Uss Than Significant Impact No Impact X X X X I. a) -d) Washington Street is a Primary Image Corridor as defined by the General Plan, while .Avenue 50 is designated a Secondary Image Corridor. These designations require that enhanced landscaped setbacks be provided, Additionally, the City requires that height restrictions be implemented adjacent to the .roadways. The proposed project will include single story development closest to Washington Street, and two story development for he balance of the site. The northern site is located adjacent to single story residential development on its northern boundary. The buildings along the northern boundary will be set back at least 55 feet from the property line, and are generally not massed on this line. These buildings will be a maximum of two stories in height. Single family development, should it have occurred qn the site, could also have been two stories in height. There are no significant natural features on the site. Impacts associated with visual resources are not expected to be significant. The construction of the proposed project will cause an increase in light generation, primarily from car headlights and landscape lighting. The City regulates lighting levels and does not allow lighting to spill over onto adjacent property. Further, residential lighting is generally limited, and of low intensity. Impacts will not be significant. -6- L!"A a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? (General Plan EIR p. I11-21 ff.) b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? (Zoning Map) c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? (General Plan Land Use Map) Potentially Law Than LA= Than No sipl&ant Signiicant wl Significant Impact Impact Mitigation Impact X X X II. a) -c) The proposed project is located in an urbanized area of the City. There are no agricultural activities within several miles of the project site. There are no Williamson Act contracts on the project site. There will be no impacts to agricultural resources as a result of the proposed project. -7- III. AIR QUALITY: Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? (SCAQMD CEQA Handbook, Project Study) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (SCAQMD CEQA Handbook, Project Study) c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (SCAQMD CEQA Handbook, 2002 PM 10 Plan for the Coachella Valley, Project Study) d) Expose sensitive receptors to substantial pollutant concentrations? (Project Description, Project Study) e) Create objectionable odors affecting_ a substantial number of people? (Project Description, Aerial Photo, site inspection) Potentially Less Than Less Than No Significant Significant W, Significant Impact Impact Mitigation Impact KI X KI *4 X III. a), b) & c) The emissions from vehicles have the greatest impact on air quality in the City. The proposed project is estimated to generate up to 617 average daily vehicle trips. This trip generation level is very low due to the nature of the senior care facility. Should the project not be built, the General Plan Amendment could generate up to 260 multi -family residential units. These units could generate up to 1,724 daily trips if the project were a market project. In order to calculate the most conservative potential impacts, the calculations provided below are based on 1,724 daily trips. "La Paloma Residential Development Traffic Impact Analysis," prepared by Urban Crossroads, July 2004. -8- r--- Moving Exhaust Emission Projections at Project Buildout _ `(pounds per day) Ave. Trip Total Tota} No. Vehicle TripsMay Length (miles) milealday 1,724 x 15 — 2.5,860 PM10 PMto PMI0 Pollutant ROC CO NOX Exhaust Tire Wear Brake Wear Grams at 50 mph 2,327.40 60,512 4012,412 80 259.60 259.60 Pounds at 50 mph 5.14 133.58 27.40 - 0.57 0.57 SCAQMD Threshold (1bsJday) 75 550 100 150 Assumes 1724 ADT. Based on California Air Resources Board's EMFAC7G Emissions Model. Assumes Year 2005 summertime mming conditions at 757, light duty autos, catalytic As demonstrated above, the maximum potential units on the project site would not result in exceedances ' of the. SCAQMD thresholds of significance. Impacts associated with vehicular emissions are therefore expected to be less than significant. The City and Coachella Valley are a severe non-attainment area for PM 10 (Particulates of 10 microns or less). The Valley's 2002 PM 10 Plan adopted much stricter measures for the control of dust both during the construction process and during project operations.-These include the following, to be included in conditions of approval for the proposed project: CONTROL MEASURE TITLE & CONTROL METHOD BCM -1 Further Control of Emissions from Construction Activities: Watering, chemical stabilization, wind fencing, revegetation, track -out control BCM -2 Disturbed Vacant Lands: Chemical stabilization, wind fencing, access restriction, revegetation BCM -3 Unpaved Roads and Unpaved Parking Lots: Paving, chemical stabilization, access restriction, revegetation BCM -4 Paved Road Dust: Minimal track -out, stabilization of unpaved road shoulders, clean streets maintenance The proposed project will generate dust during grading. Under mass grading conditions, the site could generate up to 572.35 pounds of dust per day while grading is active, without mitigation. The contractor will be required to submit a PM 10 Management Plan prior to initiation of any earth moving activity. In addition, the potential impacts associated with PM 10 can be mitigated by the measures below. 1. Cons action equipment shall be properly maintained and serviced to minimize exhaust emissions. 2. Existing power sources should be utilized where feasible via temporary power poles to avoid on-site power generation. _q_ 3. Construction personnel shall be informed of ride sharing and transit opportunities. 4. Imported fill shall be adequately watered prior to transport,covered during transport, and watered prior to unloading on the project site. 5. Any portion of the site to be graded shall be pre -watered to a depth of three feet prior to the onset of grading activities. 6. Watering of the site or other soil stabilization method shall be employed on an on- going basis after the initiation of any grading activity on the site. Portions of the site that are actively being graded shall be watered regularly to ensure that a crust is formed on the ground surface, and shall be watered at the end of each work day. 7. Any area which remains undeveloped for a period of more than 30 days shall be stabilized using either chemical stabilizers or a desert wildflower mix hydroseed on the affected portion of the site. 8. SCAQMD Rule 403 shall be adhered to, insuring the clean-up of construction - related dirt on approach routes to the site. 9. All grading activities shall be suspended during first and second stage ozone episodes or when winds exceed 25 miles per hour. 10. Landscaping of the landscaped parkway on Washington Street and Avenue 50 shall be completed immediately following precise grading of the sites. Implementation of these mitigation measures will ensure that impacts associated with PM 10 are mitigated to a less than significant level. III. d) & e) The project is not expected to generate objectionable odors, nor will it expose residents to concentrations of pollutants. Would the uroiect: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service (General Plan MEA p. 74 ff.) b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the Califomia Department of Fish and Game or US Fish and Wildlife Service? (General Plan MEA p. 74 ff.) 0 Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? (General Plan MEA p. 74 ff.) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? General Plan MEA p, 74 ff.) e) Conflict with any local policies or ordinances protecting biological resources, such as'a tree preservation policy or ordinance (General Plan MEA p. 74 ff.) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state Potentially Less Than Less Than No Significant. Significant W, Significant Impact Impact Mitigation Impact P x M 91 X x habitat conservation plan? (General Plan MEA p. 74 ff.) IV. a) -f) Both sites have been significantly impacted by roadway development and surrounding development. The northern site is surrounded by roadways on two sides, existing single family development: on the north, and the La Q,uinta Evacuation Channel on the east. The southern site is triangular in shape, and has streets on two sides and the La Quinta Evacuation Channel on the third. The sites are sparsely vegetated, and isolated, and do not provide significant habitat. The sites are not within a special study area for species of concern in the General Plan. No impacts associated with biological resources are expected to result from implementation of the proposed project. Only the northern site is located within the boundary of the Coachella Valley Fringe -toed Lizard Habitat Conservation Plan's fee mitigation area. Development on that portion of the project will be required to pay the fee in place at the time of development. -12- V. CULTURAL RESOURCES the moiect: a) Cause a substantial adverse change in the significance of a historical resource as defined in '15064.5? CHlstoncal/Archaeological Resources Survey," CRM Tech, September 2044) b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to '15064, 5 ? ("HistoricaVArchaeological Resources Survey," CRM Tech, September 2004) C) Directly or indirectly destroy a unique Paleontological resource or site or unique geologic feature? (General Plan Exhibit 6.8) d) Disturb any human remains, including those interred outside of formal cemeteries? ("HistoricaVArchaeological Resources Survey," CRM Tech, September 2004) Potentially Less Tbaa Less Than No Significant Significant N/ Significant Impact Impact Mitigation Impact M:4 KI X V. a) -b) & d) Cultural resources studies were completed for both proposed project sites2. The investigations included both records searches and field investigations. Southern Site A scatter of historic/rnodern refuse and prehistoric isolates were found on the southern project site. The study further determined that although impacted, the southern site may yield sub -surface resources, and that the following mitigation measure shall be implemented: 1. A qualified archaeological monitor shall be present on site during any earth moving activities. Should the monitor identify a resource, he shall be empowered to stop or redirect earth moving activities until such time as the resource can be properly identified and processed. The archaeological monitor shall be required to prepare a report at the end of earth moving activities and file such report with the Community Development Department. 2 "A Phase I Cultural Resource Investigation of 7.63 Acres at the Southeast Comer of Avenue 50 and Washington Street, City of La Quinta," prepared by McKenna et al., January 19, 2000. Also "Cultural Resources Report Desert Club Manor Project," prepared by CRM Tech, April 1998. -13- Northern Site A potentially significant location was recorded on the site, CA-RIV-6074, which requires further investigation, in order to assure that the potential impacts are mitigated to a less than significant level. The following mitigation measure shall be implemented to assure that potential impacts to CA-RIV-6074 are reduced to less than significant levels: 1. Prior to any earth moving activities on the site, a Phase II investigation shall be conducted for CA-RIV-6074. The results of the investigation shall be provided in a report to be submitted to the City for review and approval prior to the issuance of grading permits. The implementation of these mitigation measures shall ensure that all potential impacts associated with cultural resources are mitigated to a less than significant level. V. c) Neither site occurs within the historic boundary of ancient Lake Cahuilla. No impacts to paleontologic resources are expected. -14- VI. GEOLOGY AND SOILS -- Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist- Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? (MEA Exhibit 6.2) ii) Strong seismic ground shaking? (MEA Exhibit 6.2) iii) Seismic -related ground failure, including liquefaction? (MEA Exhibit 6.3) iv) Landslides? (MEA Exhibit 6.4) b) Result in substantial soil erosion or the loss of topsoil? (MEA Exhibit 6.5) d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property (MEA Exhibit 6.1) e) Have sails incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? (General Plan Exhibit 8.1) Potentially Less Than Less Than No Sipitieaat Signitkant w/ Siguiticant Impact Impact Mitigation I Impact M X X X X X 94 VI. a) -e) The proposed project is located in a Zone III groundshaking zone. The City implements the most stringent provisicsr�s of the Uraf�r;;t I3uildir- C r scis These provisions will apply to the proposed project. Th,e s�e sonot local dnucall n anlve areazones. with a high potential for liquefaction, and is sonic distance from any hillsides, so is not subject to landslides. The mitigation measures provided under, air quality will assure that potential soil erosion from wind are mitigated. The potential impacts associated with soil -15- erosion due to rain storms will be addressed in the preparation of final grading plans for the site. The soil type on and in the vicinity of the project are not considered expansive. The proposed project will be connected to CVWD sewer systems, and will therefore not require septic tanks. Overall impacts to geology and soils are expected to be less than significant. -17- Potentially Less Tbaa Ler Tbsn No Significant Signiscaat wl sipwaat Impact Impact mmptloo impact VA. HAZARDS AND HAZARDOTJS MATERIALS --Would the roiect: a) Create a significant hazard to the X public or the environment through the routine transport, use, or disposal of hazardous materials? (Application materials) b) Create a significant hazard to the X public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? (General Plan MEA, p. 95 ff.) c) Emit hazardous emissions or handle X hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? (General Plan MEA, p. 95 ff.) d) Be located on a site which is included X on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (General Plan MEA, p: 95 ff.) e) For a project located within an airport X land use plan or, where such a plan hag not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) f) For a project within the vicinity of a X private airstrip, would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) g) Impair implementation of or X physically interfere with an adopted -17- emergency response plan or emergency evacuation plan? (General Plan MEA p. 95 ff) h) Expose people or structures to a X significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (General Plan land use map) VII. a) -h) The proposed project will consist of a senior living facility, and is not expected to generate hazardous materials. In the nursing care section of the facility, requirements imposed by the County of Riverside for health care facilities will be implemented if required. Impacts associated with hazardous materials are expected to be insignficant. The site is not located in a wild land fire area. Potentially Less Than Less Than No Significant significant W/ Significant Impact Impact Mitigation Impact VIII. HYDROLOGY AND WATER UALITY -- Would the_pro ect: a) Violate any water quality standards or X waste discharge requirements? (General Plan EIR p. III -187 ff.) b) Substantially deplete groundwater X supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? (General Plan EIR P. III -187 ff.) c) Substantially alter the existing X drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? (General Plan EIR p. 111-187 f) d) Substantially alter the existing X drainage pattern of the site or area. -Is- including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? (General Plan EIR p. UP 187 ff.) e) Create or contribute runoff water X which would exceed, the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (General Plan EIR p. III -187 ff.) f) Place housing within a 100 -year flood X hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? (General Plan EIR p. III - 187 ff.) g) Place within a 100 -year flood hazard X area structures which would impede or redirect flood flows? (Master Environmental Assessment Exhibit 6.6) VIII. a) & b) Domestic water is supplied to the project site by the Coachella Valley Water District (CVWD). The development of the site will result in the need for domestic water service. The CVWD has prepared a Water Management Plan which indicates that it has sufficient water sources to accommodate growth in its service area. The CVWD has implemented or is implementing water conservation, purchase and replenishment measures which will result in a surplus of water in the long term. The project proponent will be required to implement the City's water efficient landscaping and construction provisions, including requirements for water efficient fixtures, which will ensure that the least amount of water is utilized within the homes. The applicant will also be required to comply with the City's NPDES standards, requiring that potential pollutants not be allowed to enter surface waters. These City standards will assure that impacts to water quality and quantity will be less than significant. VIII. c) & d) Both sites are located adjacent to the La Quinta Evacuation Channel, a regional flood control facility managed by CVWD. The City will allow discharge of storm flows into the Chanmel, with approval from CVWD, without retention on the site. The project proponent is proposing to implement such a direct discharge on the project site. CVWD has standards and requirements for such discharge to assure that waters are not polluted when they enter the channel. These standards will be implemented for the proposed project, assuring that impacts are reduced to a less than significant level. -19- VIII. e) -g) The site is not located in a flood zone as designated by FEMA. IX. LAND USE AND PLANNING - Would the project: a) Physically divide an established corlimunity? (Aerial photo) b) Conflict with'any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (General Plan Land Use Element) c) Conflict with any applicable habitat conservation plan or natural community conservation plan? (Master Environmental Assessment p. 74 ff.) Potentially Less Than Less Than No Significant Significant wl Significant Impact Impact Mitigation Impact X X X IX. a) -c) The proposed project will result in 254 senior living units on 21 acres. The current General Plan designations for the two properties could result in approximately 56 single family homes on the northern site, and approximately 107,000 square feet of office space on the southern site. The proposed Medium High and Medium Density Residential land use designation could result in up to 260 apartments or similar multi -family residential land use. The intensity of the two sites will change, increasing on the north side, and decreasing on the south side. The location of the proposed project is highly impacted, and is not ideal for Low Density Residential development, due to noise and traffic. The increase in density, and the configuration of the project, are likely to result a more appropriate housing product on the northern site. The location of offices on the southern site is appropriate for a major arterial roadway. However, the development of offices on the site has not occurred, and the proposed project may be a higher and better use of the property. The General Plan supports the development of a variety of housing. types throughout the City. The proposed project does not occur elsewhere in the City, and will provided another living option for City residents. The development of apartments, should the project not go forward, would similarly provide another residential option for City residents. -20- The northern project site is within the boundary of the mitigation fee for the Coachella Valley Fringe -toed Lizard Habitat Conservation Plan, and will be required to pay the appropriate fee at the time of development. X. a) & b) The proposed project site is within the MRZ-1 Zone, and is therefore not considered to have potential for mineral resources. -21- Potentially Less Than Less Than No Significant Significant W/ significant Impact Impact Mitigation Impact X. MINERAL RESOURCES -- Would the project: a) Result in the loss of availability of a X known mineral resource that would be of value to the region and the residents of the state? (Master Environmental Assessment p. 71 ff.) b) Result in the loss of availability of a X locally -important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? (Master Environmental Assessment p. 71 ff.) X. a) & b) The proposed project site is within the MRZ-1 Zone, and is therefore not considered to have potential for mineral resources. -21- Potentially Less Than Fess Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XI. NOISE Would the project result in: a) Exposure of persons to or generation X of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? ("Preliminary Noise Study," Urban Crossroads, July 2004) b) Exposure of persons to or generation X of excessive groundbome vibration or groundborne noise levels? C'Preliminary Noise Study," Urban Crossroads, July 2004) c) A substantial permanent increase in X ambient noise levels in the project vicinity above levels existing without the project? ("Preliminary Noise Study," Urban Crossroads, July 2004) d) A substantial temporary or periodic X increase in ambient noise levels in the project vicinity above levels existing without the project? ("Preliminary Noise Study," Urban Crossroads, July 2004) e) For a project located within an airport land use plan or, where such a plan has X not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? (General Plan land use map) f) For a project within the vicinity of a private airstrip, would the project expose X people residing or working in the project area to excessive noise levels? (General Plan lased use reap) -22- wm— 3U. a) -fl A noise impact analysis was conducted forthe proposed project3. The study found that the development of the project will result in both short term (construction) and long term (operational) noise impacts which could be significant without mitigation. The study found that the current noise environment at both project sites currently exceeds the City's standards for residential development, ranging from 68.6 dBA CNEL on Avenue 50 to 71.6 dBA CNEL on Washington Street. On the northern project site, no outdoor living areas are proposed in proximity to the street, and therefore no mitigation is required. On the southern site, however, outdoor living areas for the cottages are proposed, which would be subject to unacceptable noise levels .if not mitigated. The study further found that interior noise' levels will exceed acceptable City standards, for the cottages located on the southern site. Mitigation measures proposed below will reduce these impacts to within City standards. The proposed project will also generate noise during its construction. Although the potential impact is short term and temporary, it can be uncomfortable for adjacent residents. In the case of the proposed project, single family residential units are located immediately notch of the northern site. Mitigation measures are included below to reduce the potential impacts to these residents to less than significant levels. In order to mitigate noise levels on the project site to less than significant levels, the following mitigation measures shall be implemented. 1. A six foot wall oft a one foot berm shall be constructed on Washington Street, adjacent to the southern portion of the site. The wall shall be of solid construction, with no breaks or openings. 2. A six foot wall shall be constructed on Avenue 50, adjacent to the southern portion of the site. The wall shall be of solid construction, with no breaks or openings. 3. A windows closed condition shall be provided for all buildings on the southern site shown on Exhibit I -A of the noise impact analysis as requiring this condition. A mechanical, ventilation system shall be provided for all these units. 4. All construction equipment shall be properly maintained and muif]ered, and the engines shall be equipped with shrouds. 5. Stockpiling and staging areas, as well as servicing and fueling of equipment for the northern site shall be located adjacent to Avenue 50. 6. Construction activities shall be limited to those hours prescribed in the La Quinta Municipal Code. 7. A final noise analysis shall be completed when final lot layout and pad elevations have been completed to assure that the wall requirements are sufficient to meet the City's standards. The site is not located adjacent to an airport or air strip. "La Paloma Retirement Community Preliminary Noise Study," prepared by Urban Crossroads, July 2004. -23- r XII. POPULATION AND HOUSING — Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? (General Plan, p. 9 ff., application materials) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (General Plan, p. 9 ff., application materials) Potentially Leas Than Leas Than No Significant Significant w/ Significant Impact Impact Mitigation Impact !�l /.1 c) Displace substantial numbers of X people, necessitating the construction of replacement housing elsewhere? (General Plan, p. 9 ff., application materials) XII. a) -c) The development of the project site will not induce substantial growth, either with the construction of the proposed project, or under a multi -family development scenario. The sites are currently vacant, and development will displace no one. -24- XIII. a)Buildout of the site will have a less than significant impact on public services. The proposed project will be served by the County Sheriff and Fire Department, under City contract. Buildout of the proposed project will generate property tax which will offset the costs of added police and fire services, as well as the costs of general government. The project will have no impact on schools. The project will be required to pay the City's park fees for development of off site park facilities. -25- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XIII. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? (General Plan MEA, p. 57) X Police protection? (General Plan MEA, p. 57) X Schools? (General Plan MEA, p. 52 ff.) x Parks? (General Plan; Recreation and Parks X Master Plan) Other public facilities? (General Plan MEA, x p. 46 ff.) XIII. a)Buildout of the site will have a less than significant impact on public services. The proposed project will be served by the County Sheriff and Fire Department, under City contract. Buildout of the proposed project will generate property tax which will offset the costs of added police and fire services, as well as the costs of general government. The project will have no impact on schools. The project will be required to pay the City's park fees for development of off site park facilities. -25- XTV. RECREATION — a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? (Application materials) b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Application materials) Potentially Less Than LAm Than No Significant Significant w/ I Significant Impact Impact Mitigation impact X KI XIV. a) & b) The proposed project will contribute park fees for off site park development. No impacts are expected. -26- Potentially LA= Than LA= Than No significant sipilktrut w! signilknnt Impart Impact Mitigation Impact XV. TRANSPORTATIONlfRAFFIC -- Would the project: a) Cause an increase in traffic which is X substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? ("Traffic Impact Analysis," Urban Crossroads, July 2004) b) Exceed, either individually or X cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? ("Traffic Impact Analysis," Urban Crossroads, July 2004) c) Result in a change in air traffic X patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (No air traffic involved in project) d) Substantially increase hazards due to a X design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? (site Plan) e) Result in inadequate emergency X access? (Site Plan) fl Result in inadequate parking capacity? X (Site Plan) g) Conflict with adopted policies, plans, X or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? (PMiect description) -27- XV. a) -g) A traffic Impact Analysis was prepared for the proposed project. The study analysed the impacts of a senior care facility as described above. The study did not analyse the potential impacts associated with development of up to 260 multi -family residential units. The traffic study found, as stated under the air quality section, that the proposed project will generate +617 average daily trips. The study further found that studied intersections will operate within City standards with and without the proposed project, and concluded that impacts of the proposed project on traffic levels would be less than significant. The study also analysed project design and turning movements into and out of the facility, and found that they could be hazardous, without mitigation. The study did not include analysis of the proposed project as a multifamily development, should the General Plan Amendment be approved and the proposed project not constructed. As described above, a multi -family project has the potential to generate 1,724 daily trips, or almost three times that estimated for the proposed project. Should the General Plan Amendment be approved, and the project not built as expected, the potential traffic impacts could be significant, without mitigation. The site is located within the service area of SunLine Transit, and can be served by it. Given the independent living portion of the project, residents are likely to utilize transit if available. In order to assure that project impacts are adequately mitigated, the study includes several mitigation measures, which are summarized below. 1. Driveways on Washington Street shall be restricted to right -in -right -out access only. 2. Driveways on Avenue 50 shall be restricted to right -in -right -out -left -in only. 3. A 100 foot long east -bound left turn rocket shall be constructed on Avenue 50 to allow safe access to the northerly site driveway. 4. A 100 foot long west -bound left turn pocket shall be constructed on Avenue 50 to allow safe access to the southerly site driveway. 5. Any Project proposed for the project site which is not a senior care project shall be required to prepare a traffic impact analysis which is project specific and reflective of the project proposed. With implementation of these mitigation measures, overall impacts to traffic are expected to be reduced to a less than significant level. "La Paloma Residential Development Traffic Impact Analysis," prepared by Urban Crossroads, July 2004) -28- Potentially significant Impact Less Than Significant w/ Mitigation Less Than Significant Impact No Impact XVI. UTILITIES AND SERVICE SYSTEMS. Would the project: a) Exceed wastewater treatment X requirements of the applicable Regional Water Quality Control Board? (General Plan MEA, p. 58 ff.) b) Require or result in the construction of X new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, p. 58 ff.) c) Require or result in the construction of X new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, p. 58 ff.) d) Have sufficient water supplies X available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? (General Plan MEA, p. 58 ff.) e) Result in a determination by the X wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project=s projected demand in addition to the provider --s existing commitments? (General Plan MEA, p. 58 ff.) f) Be served by a landfill with sufficient X permitted capacity to accommodate the project=s solid waste disposal needs? (Genera! PIa.^. *,rE.", p. 5g t':.) g) Comply with federal, state, and local X statutes and regulations related to solid waste? (General Plan MEA, p. 58 ff.) -29- XVI. a) -g) Utilities are available at the project site. The service providers for water, sewer, electricity and other utilities I:ave facilities in the immediate vicinity of the site, and will collect connection and usaj;e fees to balance far the cost of providing services. The construction of the proposed project is expected to have less than significant impacts on utility providers. -30- Potentially Less Than ir.,eaa Thal No Signifieant Significant wl Significant Impact Impact Mitigation Impact XVII. MANDATORY FWDINGS OF SIGNIFICANCE -- F the project have the potential toX the quality of the environment,tially reduce: the habitat of a fishife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a Plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have the potential to achieve short-term, to the disadvantage X of long-term environmental goals? b) Does the project have impacts that are X individually iimited, but cumulatively considerable? ("Curnulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental x effects which will cause substantial adverse effects on human beings, either directly or indirectly? XVn• a) The site has the potential to impact cultural resources. The mitigation measures included in this Initial Study, however, will reduce these potential impacts to less than significant levels. XVII. b) The proposed project will provide a variety of housing types to future City residents, and is consistent with the General Plan's goals and policies. -31- XVII. c) Development of the proposed project is likely to have lower cumulative impacts than the current General Plan designations overall. The increase in residential density is off -set by the decrease in commercial office lands. XVII. d) The proposed project has the potential to adversely affect 'human beings, due to air quality, noise and traffic impacts. Mitigation measures provided in this report reduce these potential impacts to less than significant levels. XVIII- EARLIER ANALYSES. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case a discussion should identify the following on attached sheets: a) Earlier analyses used. Identify earlier analyses and state where they are available for review. Not applicable. b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. Not applicable. c) Mitigation measures. For effects that are "Less than Significant with Incorporated," describe the mitigation measureMitigation s which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. Not applicable. -32- CITY OF LA QUINTA MONITORING PROGRAM FOR CEQA COMPLIANCE DATE: October 312004 ASSESSORS 646-070-013, 770-040-012 PARCEL NO.: CASE NO.: General Plan Amendment 03-091, Zone PROJECT LOCATION: Northeast and southeast comers of Washington Change 03-112, Specific Plan 04-071, Street and Avenue 50. Conditional Use Permit 03-074, Site _ Development Permit 03-762, La Paloma EA/EIR NO: 2003-470 APPROVAL DATE: In Process APPLICANT: Westport La Quinta LP and Pacific Retirement Services THE FOLLOWING REPRESENTS THE CITY'S MITIGATION MONITORING PROGRAM IN CONNECTION WITH THE MITIGATED NEGATIVE DECLARATION FOR THE ABOVE CASE NUMBER SUMMARY MITIGATION MEASURES III. AIR UALTTY Maintain construction equipment. Utilize temporary power. Pre -water and stabilize soils. Inform personnel of ridesharing and alternative transportation. Stabilize undeveloped areas after 30 days. Enforce SCAQMI) Rule 403 RESPONSIBLE FOR MONITORING Contractor City Engineer Building Department Community Development Department Building Department Building Department Stop grading during winds of more I Building Department than 25 mph, 1 st and 2nd stage ozone episodes. Landscape Washington Street and Building Department Avenue 50 immediately after precise TIMING I CRITERIA Project Construction SCAQMD standards Prior to issuance of grading IID standards permits. Prior to issuance of building Site inspection I permits. Prior to the issuance of PMIO grading permits Management Plan During construction. I Site inspection During construction. I Site inspection. During grading I Site inspection. Immediately after preciseI Site inspection grading COMPLIANCE I DATE CHECKED BY SUMMARY MITIGATION MEASURES RESPONSIBLE FOR TIMING CRITERIA MONITORING 3V. BIOLOGICAL RESOURCES Coachella Valley Fringe -toed Lizard Habitat Conservation Plan's fee Community Development Department Prior to earth moving Fee payment mitigation shall be paid for south site SUMMARY MITIGATION MEASURES RESPONSIBLE FOR MONITORING TIMING CRITERIA V. CULTURAL RESOURCES Archaeological monitor to be on site during all earth moving. Building Department During grading g g g Inspection Phase II investigation for CA-RIV- 6074 Community Development Prior, to earth movin g Report submittal Department SUMMARY MITIGATION MEASURES RESPONSIBLE FOR MONITORING TIMING CRITERIA XI. NOISE Construct 6 foot wail on 1 foot berm on Washington for southern site. Building Department Prior to occupancy p y Inspection Construct 6 foot wall on Ave. 50 on southern site. Building Department Prior to occupancy l y Inspection Windows closed condition for buildings identified in Exhibit 1-A. Building Department Prior to occupancy Inspection Maintain construction equipment. Building Department During construction MMENENMEWMEE�__ Inspection COMPLIANCE DATE CHECKED BY f COMPLIANCE I DATE CHECKED BY COMPLIANCE DATE CHECKED BY Stockpiling on northern site to be Building Department During construction Inspection adjacent to Ave. 50. Construction only during prescribed Building Department During construction Inspection times. Final noise study, I Building Department I Prior to construction i Report submittal SUIVIIIURY NMGATION RESPONSIBLE FOR TIMING CRITERU MEASURES MONITORING XV. TRAFFIC & CIRCULATION Washington driveways to be right -in- Public Works Department Prior to occupancy Inspection right -out only. Ave. 50 driveways to be right -in- Public Works Department Prior to occupancy Inspection right -out -left -in only. 100 foot east bound left turn pocket to Public Works Department Prior to occupancy Inspection be constructed on Ave. 50. 100 foot west bound left tum pocket Public Works Department During construction Inspection to be constructed on Ave. 50. Any project not senior care to Community Development Prior to approval Report submittal. verform traffic analvsis_ r1pn2rtmonr n COMPL ANCE DATE CHECKED BY RESOLUTION NO. 2004-150 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA APPROVING A GENERAL PLAN AMENDMENT FROM LOW DENSITY RESIDENTIAL TO MEDIUM-HIGH DENSITY RESIDENTIAL AND OFFICE COMMERCIAL TO MEDIUM DENSITY RESIDENTIAL TO ALLOW THE CONSTRUCTION OF A SENION RETIREMENT COMMUNITY CASE NO.: GENERAL PLAN AMENDMENT 2003-091 PACIFIC RETIREMENT SERVICES AND WESTPORT LA QUINTA, L.P. WHEREAS, the City Council of the City of La Quinta, California, did on the 7"' day of December, 2004, hold a duly noticed Public Hearing to consider the request of Pacific Retirement Services and Westport La Quinta, L.P. for approval of a General Plan Land Use Amendment from Low Density Residential to Medium -High Residential at the northeast corner of Washington Street and Avenue 50 and Office Commercial to Medium Density Residential at the southeast corner of Washington Street and Avenue 50 to allow construction of a senior retirement community at the -- northeast and southeast corner of Washington Street and Avenue 50 on 21 total acres, more particularly described as: APN'S 646-070-013 and 770-040-012 WHEREAS, the Planning Commission of the City of La Quinta, California, did on the 9' day of November, 2004, hold a duly noticed Public Hearing to consider the request of Pacific Retirement Services and Westport La Quinta, L.P. for approval of a General Plan Land Use Amendment from Low Density Residential to Medium -High Residential at the northeast corner of Washington Street and Avenue 50 and Office Commercial to Medium Density Residential at the southeast corner of Washington Street and Avenue 50 to allow construction of a senior retirement community and recommended approval by adoption of Resolution 2004-085; and WHEREAS, said General Plan Amendment application has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" as amended (Resolution 83-68), in that the La Quinta Community Development Department has completed Environmental Assessment 2003-470. The Community Development Director has determined that the project with Mitigation Measures, will not have a sinnifiranT �.a..e...� :...__-. -- �� •• • _.. W I Ipact on the environment and therefore, recommends a Mitigated Negative Declaration of environmental impact be certified; and Resolution No. 2004160 General Plan Amendment 2003-091 Poclfle Retirement services end Westport La Quints, L.P. Adopted: November 7. 2004 Pogo 2 WHEREAS, the Community Development Department published the public hearing notice in the Desert Sun newspaper on November 27, 2004, for the City Council meeting as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons wanting to be heard, said City Council did make the following mandatory findings of approval to justify approval of said General Plan Amendment: 1 . The proposed General Plan Amendment is internally consistent with the goals, objectives, and policies of the General Plan in that the General Plan Amendment results in promoting housing for the senior population in a controlled and supervised environment. 2. Approval of the General Plan Amendment will not create conditions materially detrimental to the public health, safety, and general welfare in that the resulting project will provide adequate setbacks, be well designed and landscaped, and will comply with all applicable City, County, State and Federal requirements. 3. The General Plan Amendment is compatible with adjacent properties -in that the resulting senior housing project is compatible with and will minimize the impacts to the surrounding single family residences. 4. The General Plan Amendment is suitable and appropriate for the property in that it will allow development of a complex for senior citizens with access from adjacent arterial streets and will be in close proximity to nearby medical and commercial and recreational facilities. 5. Approval of the General Plan Amendment is warranted because the property is in a location that will generate less tenant traffic due to residents' age and will in turn create a safer situation for traffic passing the site. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: That the above recitations are true and constitute the findings of the City Council in this case; Resokalon Ne. 2004150 '--� Generel Men Anandmeet 2003-081 P*Wfk ReWement Swwkee end We VOK Le Gulnte, L.P. Adopted: November 7, 2004 Pepe 3 2. That it does approve General Plan Amendment 2003-091 for the reasons set forth in this Resolution and as shown on the attached exhibit: PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 7' day of December, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Mayor Adolph NOES: Council Member Sniff ABSENT: None ABSTAIN: None ATTEST: GREEK, CMC, i y Clerk City of La Quinta, California (CITY SEAL) APPROVED AS TO FORM: City of La ON ADOL H, M or City of La Quinta, California 014 LDR TO.FAHDIII Mir Pff A 7.1 low* roc ORDINANCE NO. 411 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, AMENDING THE OFFICIAL ZONING MAP OF THE CITY, BY REZONING CERTAIN PROPERTY FROM LOW DENSITY RESIDENTIAL 17/1 TO MEDIUM-HIGH RESIDENTIAL AND OFFICE COMMERCIAL TO MEDIUM DENSITY RESIDENTIAL TO ALLOW CONSTRUCTION OF A SENIOR RETIREMENT COMMUNITY CASE NO. ZONE CHANGE 2003-112 PACIFIC RETIREMENT SERVICES AND WESTPORT LA QUINTA, L.P. The City Council of the City of La Quinta does ordain as follows: SECTION 1. The La Quinta Official Zoning Map is hereby amended by rezoning 14t acres located at the northeast corner of Washington Street and Avenue 50 from Low Density Residential 17/1 to Medium -High Residential and 7t acres located at the southeast corner of Washington Street and Avenue 50 from Office Commercial to Medium Density Residential: The property shown and depicted for such rezoning on the map is attached to, and made a part of this Ordinance. SECTION 2. ENVIRONMENTAL. The Zone Change has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" (as amended and adopted in City Council Resolution 83-68), in that the Community Development Department conducted an Initial Study (EA 2003-470) and has determined that the proposed Zone Change will not have a significant adverse impact on the environment and therefore, the City Council has certified a Mitigated Negative Declaration of environmental impact. SECTION 3. EFFECTIVE DATE. This Ordinance shall be in full force and effect thirty (30) days after its adoption. SECTION 4. POSTING. The City Clerk shall, within 15 days after passage of this Ordinance, cause it to be posted in at least three public places designated by Resolution of the City Council; shall certify to the adoption and posting of this Ordinance; and shall cause this Ordinance and its certification, together wvith proof of posting, to be entered into the Book of Ordinances of this City. PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 21 ST -day of December, 2004, by the following vote: Ordnance No. 411 Zone Change 2003-112 Pacific retirement Services and Westport La Quinta L.P. Adopted: December 21, 2004 Page 2 AYES: Council Members Henderson, Osborne, Perkins, Mayor Adolph NOES: Council Member Sniff ABSENT: None ABSTAIN: None DON ADO H, NUyvorr City of La Quinta, California ATTEST: J . GREEK, NC, Clerk City of La Quinta, California (CITY SEAL) APPROVED AS TO FORM: M. KAT ER I NNE JE -NS ,City Attorney City of La Quinta, California Ordinance No. 411 Zone Change 2003-112 Pacific retirement Services end Westport La Quinta L.P. Adopted: December 21, 2004 Page 3 STATE OF CALIFORNIA) COUNTY OF RIVERSIDE) ss. CITY OF LA QUINTA ) I, JUNE S. GREEK, City Clerk of the City of La Quinta, California, do hereby certify the foregoing to be a full, true, and correct copy of Ordinance No. 411 which was introduced at a regular meeting on the 7' day of December, 2004, and was adopted at a regular meeting held on the 21" day of December, 2004, not being less than 5 days after the date of introduction thereof. I further certify that the foregoing Ordinance was posted in three places within the City of La Quinta as specified in a Resolution of the City Council. 1 J E S. GREEK, CMC, City Clerk City of La Quinta, California DECLARATION OF POSTING I, JUNE S. GREEK, City Clerk of the City of La Quintg, California, do hereby certify that the foregoing ordinance was posted on 4$11-0/.- 4 , pursuant to Council Resolution. JUNE S. GREEK, CMC, City Clerk City of La Quinta, California 0:;F! V W.M'o 7.MK a 2math; ri pp U14 X5 4A walk V W.M'o 7.MK a F RESOLUTION NO. 2004-152 A RESOLUTION OF THE OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING DESIGN CRITERIA AND DEVELOPMENT STANDARDS FOR A SENIOR RETIREMENT COMMUNITY ON 21* ACRES LOCATED ON THE NORTHEAST AND SOUTHEAST CORNERS OF WASHINGTON STREET AND AVENUE 50 CASE NO.: SPECIFIC PLAN 2004-071 PACIFIC RETIREMENT SERVICES AND WESTPORT LA QUINTA, L.P. WHEREAS, the City Council of the City of La Quinta, California did, on the 7' day of December, 2004, hold a duly noticed Public Hearing to consider a request by Pacific Retirement Services and Westport La Quinta, L.P. for approval of a Specific Plan for design criteria and development standards for the development of a senior retirement community on 21 t acres on the northeast and southeast corners of Washington Street and Avenue 50, more particularly described as: APN'S 646-070-013 and 770-040-012 WHEREAS, the Planning Commission of the City of La Quinta, California did, on the 9' day of November, 2004, hold a duly noticed Public Hearing to consider a request by Pacific Retirement Services and Westport La Quinta, L.P. for approval of a Specific Plan for design criteria and development standards for the development of a senior retirement community on 21 t acres on the northeast and southeast corners of Washington Street and Avenue 50, and adopted Resolution 2004-089, recommending approval of this request; and WHEREAS, the Community Development Department mailed case file materials to all affected agencies for their review and comment on the proposed project. All written comments are on file in the Community Development Department; and WHEREAS, the Community Development Department published the public hearing notice in the Desert Sun newspaper on November 27, 2004, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and Resolution No. 2004-152 SpecMc Plan 2004-071 PacMo Retirement Services and Westport Le Q tints, L.P. Adopted: November 7, 2004 Pape 2 WHEREAS, the La Quinta Community Development Department has completed Environmental Assessment 2003-470 and based upon this Assessment, with Mitigation Measures, the project will not have a significant adverse effect on the environment; therefore, a Mitigated Negative Declaration of environmental impact is recommended; and WHEREAS, at the Public Hearing upon hearing and considering all testimony and arguments of all interested persons desiring to be heard, said City Council did make the following Mandatory Findings to justify approval of said Specific Plan: Finding A - Consistency with General Plan As proposed the project will have a Medium -High and Medium Density Residential designation which conditionally permits the senior retirement community. Additionally, the project provides adequate perimeter landscaping and acceptable architectural General Plan and Toning requirements. Finding B — Public Welfare Enhancement The project will not be detrimental to the public health, safety and welfare in that the project is designed in compliance with the City standards and County and State standards, such as CEQA. Additionally, the facility helps provide housing variety for City residents. Findings C and D — Land Use Compatibility and Property Suitability The project is in an area designated and zoned for the use which is proposed and therefore, suitable for senior retirement development. The project provides adequate buffering through landscaping, large setbacks and perimeter walls to ensure compatibility with surrounding land uses. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California as follows: i . That the above recitations are true and correct and constitute the findings of said City Council in this case; and Resokn on No. 2004-152 r specMe Plan 2004-071 Padit Retirement services and Westport Ls QuMta, L.P. Adopted: November 7, 2004 Page 3 2. That it does hereby acknowledge that Environmental Assessment 2003- 470 has determined that no significant unmitigated effects on the environment have been identified; and 3. That it does hereby approve Specific Plan 2003-071, for the reasons set forth in this Resolution and subject to the attached Conditions of Approval. PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quints City Council, held on this 7t' day of December, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Mayor Adolph NOES: Council Member Sniff i ABSENT: None ABSTAIN: None ON ADOLPH, yor City of La Quints, California ATTEST: JU . GREEK, CMC, erk City of La Quints, California (CITY SEAL) Resokrtion No. 2004-152 Specific Plan 2004071 Paclfk Retirement Services and Westport La Quints, L.P. Adopted: November 7, 2004 Pape 4 APPROVED AS TO FORM: g0,(HERINE M. KA JENS ,City Attorney City of La Quinta, California CITY COUNCIL RESOLUTION 2004-152 CONDITIONS OF APPROVAL - FINAL SPECIFIC PLAN 2004-071 PACIFIC RETIREMENT SERVICES AND WESTPORT LA QUINTA LP ADOPTED: DECEMBER 7, 2004 GENERAL 1. The use of the subject property for a congregate care facility shall be in conformance with the approved exhibits and conditions of approval contained in Conditional Use Permit 2003-074, Site Development Permit 2003-762 and Environmental Assessment 2003-470, unless otherwise amended by the following conditions. 2. The approved shall be used within two years of the effective date of approval, otherwise, it shall become null and void and of no effect whatsoever. "Used" means the issuance of a building permit for the project. A time extension for this Specific Plan may be requested as permitted in Municipal Code Section 9.200.080 D. 3. Developer agrees to indemnify, defend, and hold harmless the City of La Quinta in the event of any legal claim or litigation arising out of the City's approval of this project. The City of La Quinta shall have the right to select its defense counsel in its sole discretion. The City shall promptly notify the developer of any claim, action or proceeding and shall cooperate fully in the defense. 4. All conditions of approval from all applications for this project shall either be included in the Specific Plan text or attached, as appropriate. Five copies of the final approved Specific Plan shall be submitted to the Community Development Department within 30 days of final approval by the City Council. 5. The perimeter wall along the north property line of the north site may be a maximum eight feet high as measured from the north side. The design of this wall, including the north -facing finish, demolition, and prevention of dead space between new and existing walls shall be to the satisfaction of the Building Official and City Engineer. Resokrtlon No. 2004152 Conditions of Approval - FINAL Specific Plan 2004071 Pacific Retirement Services and Westport La Qulnta, LP Adopted: December 7, 2004 Page 2 6. The northern -most carports located of the north site shall be enclosed on the north elevation with architecturally compatible materials and shall have a sloped or mansard concrete tile roof to the satisfaction of the Community Development Director. 7. Roof tiles shall be concrete "S" tile. 8. On the south site, vehicular access to Washington Street shall be right out only, if deemed appropriate by the City Engineer. ,37.82 50.711 11 II i x ,38.56 5 LEGEND - 679.3 - EXISTING SPOT ELEVATIONS - EXISTING CONTOURS Q- EXISTING EASEMENT DELTA —C - - EXISTING ELECTRIC _G —- EXISTING GAS ----IRR - - EXISTING IRRIGATION _T ---- - EXISTING PHONE ...S - EXISTING SEWER B�JSN ,38.88 w - - EXISTING WATER ----Q - EXISTING CABLE R/W - EXISTING RIGHT OF WAY - EXISTING LOT LINE - EXISTING BOUNDARY — — — — — — — — — — — — — - EXISTING EASEMENT - PROPOSED CURB — — - PROPOSED AND EXISTING CENTER LINE - PROPOSED RIGHT OF WAY i ABBREVIATIONS- A.C. = ASPHALT N = NORTH C/L = CENTERLINE PROP. = PROPOSED E = EAST P.U.E. = PUBLIC UTILITY EASEMENT E/P = EDGE OF PAVEMENT R = RADIUS EX. = EXISTING R/W = RIGHT OF WAY L = LENGTH S = SOUTH MAX. = MAXIMUM S.F. = SQUARE FOOTAGE MIN. = MINIMUM W = WEST NORTH SITE 6' MEANDE- COMPACTED SUBGRADE 6' MEANDE-i RING SIDEWALK STD. CURB CURB & GUTTER EX. �% A.C. lwff FW BASE COURSE-' 6' MEANDE-1COMPACTED SUBGRADE 6' MEANDE- RING SIDEWALK SITE AREA 596,530 SF TOTAL BUILDING AREA 171,195 SF INDEPENDENT LIVING FACILITY AREA 135,086 SF ASSISTES LIVING / ALZHEIMER'S AREA 18,581 SF SKILLED NURSING FACILITY AREA 17.528 SF LANDSCAPE AREA 173,520 SF HARDSCAPE AREA 251,815 SF REQUIRED PARKING 224 SPACES TOTAL PARKING SPACES PROVIDED 249 SPACES ON -STREET PARKINIC SPACES 84 SPACES CARPORT PARKING SPACES 165 SPACES ACCESSIBLE PARKING SPACES REC)UIRED 6 SPACES ACCESSIBLE PARKING SPACES PROVIDED 10 SPACES SECTION A -A WASHINGTON STREET N.T.S. 50' 32' BARRIER CURB LANDSCAPED -J MEDIAN SECTION B -B AVENUE 50 N.T.S. NO. REVISIONS APPROVED 7DAT 1, REVISED BASE PLAN & GENERAL NOTES 04 MAY 04, 2004 IN THE CITY OF LA OUINTA COUNTY OF RIVERSIDE, STATE OF CALIFORNIA SITE PLAN LEGAL DESCRIPTION A PORTION OF THE SOUTH 1/2 OF THE SOUTHWEST QUARTED OF THE SOUTHEAST QUARTER OF SECTION 31, TOWNSHIP 5 SOUTH, RANGE 7 EAST, SAN BERNARDINO MERIDIAN. ASSESSORS PARCEL NUMBERS - 646 -070-013 / 770-040-012 DEVE!�,.OPER WESTPOR'd HOLDINGS LA QUINTA, LLC. 3801 PGA BOULEVARD, SUITE 805 PALM SEMI M GARDENS, FLORIDA 33410 TELEPHONE (561)624-1225 FAX - PACIFIC AXEPACIFIC RE"E IREMENT SERVICES, INC 1200 MIRA MAR MEDI"OPD, 0REGON 97504 TELEPHONE` (541)857-6514 FAX- (541)857-6514 ENGINEER M, SA CXjNGULTING, INC 34200 8013 11015E DRIVE RANCHO ARAGE, CALIFa:' 1.42A i;227U TELEPHONE, (760)320-9bil FAX, (780)=$-7893 R00ERT S. SMITH, RCE 26401 ARCHITECT ANKROM MOISAN ASSC = IA "Eu_ 6720 =SOUTHWEST MA(: ►DAM K° c_'>UE, SU -"TL'. PORTLAND, OREGON 91 �fn TELEPHONE ° (503)245- FAX- CuJ`s')245-7710 GENERAL NOTES EXISTING CITY ZONING- NORTH SITE / RL (RESIDENTIAL LOW) SOUTH SITE / CO (OFFICE COMMERCIAL) PROPOSED CITY ZONING- NORTH SITE / RH (HIGH DENSITY RESIDENTIAL) SOUTH SITE / MHDR (MEDIU-HIGH DENSITY RESIDENTIAL) EXISTING LAND USE, VACANT PROPOSED LAND USE- NORTH SITE / CONTINUING CARE RETIREMENT COMMUNITY SOUTH SITE / CONTINUING CARE RETIREMENT COMMUNITY EXISTING CITY GENERAL PLAN- NORTH SITE / LDR (LOW DENSITY RESIDENTIAL) SOUTH SITE / CO (OFFICE COMMERCIAL) PROPOSED CITY GENERAL PLAN, NORTH SITE / MHDR (MEDIUM-HIGH DENSITY RESIDENTIAL) SOUTH SITE / MHDR (MEDIUM-HIGH DENSITY RESIDENTIAL) GROSS ACREAGE- NORTH SITE (14.01 ACRES) / SOUTH SITE (7.67 ACRES) NET ACREAGE NORTH SITE (13.69 ACRES) / SOUTH SITE (7.04 ACRES) UTILITIES- ELECTRIC- IMPERIAL IRRIGATION DISTRICT (760)398-5854 GAS- THE GAS COMPANY (760)335-7762 TELEPHONE- VERIZON COMPANY (760)864-1715 WATER- COACHELLA VALLEY WATER DISTRICT (760)398-2651 CABLE- TIME WARNER (760)325-1508 SEWER- COACHELLA VALLEY WATER DISTRICT (760)398-2651 USA- UNDERGROUND SERVICE ALERT (800)227-2600 NOTE SEE ARCHITECT'S PLANS FOR BUILDING FUNCTION DETAILS o: 0 12' w 0 z STD. CURB _ ai & GUTTER\ w SOUTH SITE SITE AREA TOTAL BUILDING AREA GARDEN APARTMENTS COTTAGES LANDSCAPE AREA HARDSCAPE AREA TOTAL PARKING SPACES PROVIDED ON -STREET PARKING SPACES CARPORT PARKING, SPACES GARAGE PARKING SPACES IN COTTAGES ACCESSIBLE PARKING SPACES REOUIRED ACCESSIBLE PARKING SPACES PROVIDED 306,369 SF 81,920 SF 11,540 SF 70,380 SF 142,401 SF 82,013 SF 64 SPACES 10 SPACES 20 SPACES 34 SPACES 2 SPACES 2 SPACES ti0 ROP AVENUE AVENUE 50 AVENUE 52 w z 0 Ln Ql VICINITY MAP 2 N.T.S. w 0 o: z 0 2 Mo., pr*4�* R 0' 60' 120' 180' 24( SCALE 1 "=60' MSA CONSULTING, INC. MAWMR0, SMITH & ASSOCIATES, INC. Pt•A 4Nwo ■ Crm Emnamm ■ LAND SURvEywo 34200 BoB HoPa DRm ■ RANcHo MmAGB ■ CA 92270 IDTa>La HONE (760) 320-9811 ■ FAx (760) 323-7893