Loading...
SP 2008-085 Highway 111 & Dune Palms Rd - Coral Mountain Apartments (2010)CITY OF LA QUINTA – HIGHWAY 111 AND DUNE PALMS ROAD SPECIFIC PLAN TABLE OF CONTENTS    EXECUTIVE SUMMARY....................................................................................................................1  SECTION 1: INTRODUCTION ...........................................................................................................3  SECTION 2: SETTING .....................................................................................................................10  SECTION 3: LAND USE PLAN........................................................................................................12  SECTION 4: DEVELOPMENT PLAN...............................................................................................15  SECTION 5: SPECIFIC PLAN ADMINISTRATION .........................................................................26  SECTION 6: RELATIONSHIP TO LA QUINTA GENERAL PLAN POLICIES ................................27  APPENDIX A: PROPOSED DEVELOPMENT DESCRIPTION........................................................35  ATTACHMENTS...............................................................................................................................38  CITY OF LA QUINTA Page 1 of 38 EXECUTIVE SUMMARY This document, entitled Highway 111 and Dune Palms Road Specific Plan (“Plan”) has been written in compliance with the City of La Quinta (“City”) General Plan and Municipal Code (“LQMC”), and meets the guidelines provided by the State of California for specific plans. Development of Plan area is referred to herein as the “Project” and consequently, the Plan area is also referred to as the Project site. The Plan area is located directly south of Highway 111 just east of Dune Palms Road and is approximately 22 acres in size. The information within establishes the policy vision for the Plan area and provides for regulatory standards to ensure its implementation as the area develops. It is deliberately designed to permit a degree of flexibility and to allow for changes in local standards and the housing and commercial markets. Development of the Plan area is intended to be a collaborative effort between the La Quinta Redevelopment Agency (“Agency”), the La Quinta Housing Authority (“Authority”) and private developers (“Developers”). The northern portion of the Plan area is designated by the General Plan as Regional Commercial and zoned as Regional Commercial; the southern portion is designated as Commercial Park by the General Plan and zoned Commercial Park. It is bounded on the east by an existing commercial development (Komar/Costco Center) and on the west by a service station, an office complex and a mini-storage facility. The Desert Sands Unified School District (“DSUSD”) service and administrative facility, including the school bus lot, is located to the south. The Project as a whole is envisioned as a vibrant, dynamic development that serves both the housing needs of low income residents of La Quinta, as well as La Quinta shoppers and others in the area who desire a wider variety of commercial opportunities with goods and services that are not currently available in the immediate vicinity. The residential portion of the Project will add up to 200 new housing units in a series of buildings on the southern half of the property, and will use an architectural style compatible with other desert architecture as well as the environment itself. The residences will be developed as affordable apartment homes, with all units designated for occupants at affordability levels as yet to be determined, but including very low-, low-, and possibly moderate-income as defined by California Redevelopment Law. It will contain a mix of housing sizes to serve a variety of residents from singles to families. The new public roadway, “A” Street, will provide access to the neighborhood and a connection to both Dune Palms Road to the west and the adjacent Komar/Costco Center to the east. Pedestrian paths will traverse the residential community facilitating easy access to Dune Palms Road, Highway 111, and neighboring commercial developments. The commercial portion will provide up to 82,000 square feet of automobile sales and related uses and be constructed on the northern portion of the site, meeting design standards of the City as well as the corporate images of the future users. The development is envisioned to hold up to three automobile dealerships with associated service facilities. Vehicular access to the commercial portion will be provided at two entry points along Highway 111. The commercial development will also have access to “A” Street along its southern boundary. Both the commercial and residential components of the Project contribute towards satisfying the needs of La Quinta residents and are expected to be long-term assets to the community. CITY OF LA QUINTA Page 2 of 38 The Plan presents the vision of the Project and the associated guidelines necessary to see that vision through to implementation. Though a certain level of flexibility is provided, the standards established by the Plan will ensure that the Project meets or exceeds the expectations of the City and community at large. Development of the Project will be processed in accordance with the City’s development review and approval process as required by the LQMC. DOCUMENT ORGANIZATION The Plan has been organized into the following sections for clarity and easy reference as described below. 1. Introduction. Offers the project summary, scope, and objectives. 2. Setting. Description of existing conditions. 3. Land Use Plan. Identifies the land use regulations and development standards applicable to the Plan area. 4. Development Plan. Describes the general site plan, circulation, grading, utilities and phasing of the Project and establishes design guidelines for its architecture and landscaping. 5. Specific Plan Administration. Describes management of and changes to the Plan, as well as other administrative items. 6. Relationship to the La Quinta General Plan. Overview of how the Plan’s regulations, standards and guidelines support the General Plan’s goals, policies, and programs. CITY OF LA QUINTA Page 3 of 38 SECTION 1: INTRODUCTION 1.1 INTRODUCTION AND PURPOSE This document is the Highway 111 and Dune Palms Road Specific Plan, which has been created to facilitate the development of a project in accordance with the La Quinta General Plan. The Plan establishes the design and development guidelines for the Project, so that it will enhance the existing community and provide vibrant new retail and living environments in the City. The Plan was written to facilitate the development of a 22-acre area, with commercial uses in the northern half and residential uses in the southern half. This document has been written pursuant to LQMC Section 9.240.010 and in compliance with LQMC Section 9.70.030, which requires that a specific plan be approved for developments larger than ten acres within the Regional Commercial zone 1 . The vision presented within this document depicts the quality and design desired at the site, is in accordance with the City’s established Zoning Code and General Plan, and conforms to the City’s overall objective of preserving, maintaining, and enhancing the high quality of life La Quinta residents enjoy. Although the Plan addresses the composition and quality of the Project, it also provides policy and regulatory provisions to guarantee consistency with existing City policies and standards. In cases where the zoning and development regulation is non-specific within this document, the zoning and development regulations shall be guided by the LQMC, particularly Title 9 – Zoning, that is in effect at the time. A degree of flexibility is incorporated to allow future development to respond to the changes in society and the economic marketplace, but consistency with other City documents and policies shall remain. The La Quinta Redevelopment Agency prepared the Plan so that it might expediently facilitate the construction of the Project, creating employment and housing opportunities, and ensuring a high-quality development. The Plan will be used to guide any and all development at the Project site. All development plans, parcel or tract maps, or other entitlements shall be consistent with the regulations of the Plan as well as all other applicable municipal regulations. 1.1.1 Enabling Legislation The authority to prepare, adopt, and implement the Plan is granted to the City by the California Government Code (Title 7, Division 1, Chapter 3, Article 8, Sections 65450 through 65457). As with General Plans, the Planning Commission must hold a public hearing before it can recommend to the City Council the adoption of a specific plan or an amendment thereto. The City Council may, following a public hearing, adopt a specific plan and/or amendment to the Plan by either ordinance or resolution. The Plan is a regulatory document that, once adopted by the City Council, will serve as the Development Code for the Project. Upon completion of the specific plan adoption process, future development must be consistent with the Plan and amendments thereto. Topics and standards not addressed in the Plan shall be controlled by the General Plan and the LQMC. 1 The northern portion of the site is within a Regional Commercial zone. CITY OF LA QUINTA Page 4 of 38 1.2 HIGHWAY 111/DUNE PALMS PROPERTY AND LOCATION Approximately 22 acres in size, the Project site is located in the City of La Quinta on the south side of Highway 111, approximately 300 feet east of Dune Palms Road. It is generally rectangular in shape, measuring about 662 feet from east to west and 1,291 feet north to south. At the southern end, there is a slight “panhandle” that extends about 260 feet west to connect to Dune Palms Road. The site is bounded on the north by Highway 111 and on the south by the DSUSD administration and service facilities, which includes a school bus lot. Directly to the east is an existing commercial development (the Komar/Costco Center) and to the west lies Dune Palms Road, existing office development, an existing mini-storage facility, and a service station. On the opposite side of Dune Palms Road is another commercial development, anchored by Sam’s Club. An aerial photo of the subject property and its surroundings is provided in Figure 1 below. Figure 1: Project Aerial CITY OF LA QUINTA Page 5 of 38 1.3 OWNERSHIP The subject property consists primarily of parcel numbers 600-020-04, 600-020-05, and 600- 020-11 which are currently owned by the Agency, though they will be sold to private owners in the future. Figure 2 shows the parcel map for the Project site 2 . Figure 2: Specific Plan Area Parcel Map Project Site Source: Nolte Associates, Inc. 1.4 SITE HISTORY Up until the 1940’s, the site was undeveloped for urban uses, at which point the eastern half of the site was converted to agricultural uses with two accessory structures, likely water tanks 3 . The agricultural uses were terminated prior to 1974, at which point a trailer park, including a pool and two permanent structures, was operational in the northeastern section of the site. However, by 1980, residential occupancy at the trailer park had dwindled, with only a dozen or so trailers remaining. This minimal population remained until the early 2000’s, when the final trailers vacated the site and all remaining structures were removed. The Agency purchased the property in 2007 to facilitate the development of affordable housing and infill commercial development, both of which are identified as goals in the adopted Redevelopment Plan. 2 Lot Line Adjustment Number 09-501 was approved by the City Planning Department on October 6, 2009 and submitted to the County of Riverside for recording. 3 The history of the site was established through the review of aerial photographs, as a part of the environmental site assessment performed by Earth Systems Southwest. CITY OF LA QUINTA Page 6 of 38 1.5 OVERVIEW Development of the site will be comprised of two components, an auto sales oriented commercial retail development on the northern 10 acres, and an affordable housing development on the southern 10 acres with up to 200 units. The commercial portion is envisioned as the location for up to three branded 4 automobile dealerships, potentially with associated service centers. Automotive sales and service is a natural extension of other developments along Highway 111, the City’s primary commercial corridor. With automotive sales and service for luxury vehicles being limited in La Quinta and the eastern segment of the Coachella Valley in general, this location will allow automobile owners to receive service without having to commute to the western end of the Valley and beyond. Automotive sales and service is not the only commercial use permitted by the Plan, however, other commercial uses may require additional review under the California Environmental Quality Act (“CEQA”). In addition to the automobile/commercial component, the Plan further provides a unique opportunity to increase the supply of affordable housing in the city - most importantly meeting the needs of current and future residents, but also allowing La Quinta to continue to be a leader in affordable workforce housing. The location of the affordable housing development south of the commercial component provides insulation from Highway 111, while offering a wide range of services and job opportunities within a short walking distance. The new community will be available to very low- and low-income individuals and families, and may include some units affordable to moderate-income residents as well. The City and the Agency both support diversification of housing types, and continue to pursue their respective goals of fulfilling the City’s share of the Regional Housing Needs Allocation and meeting the requirements of California Community Redevelopment Law, while maintaining the high quality of life La Quinta residents enjoy. As a part of the Project, a new public roadway, “A” Street, will be constructed, which will intersect Dune Palms Road at the southern end of the site and traverse east/west between the commercial and residential portions, ending at the neighboring Komar/Costco site. The commercial portion of Project will be conveniently accessed directly from Highway 111 with secondary access from “A” Street, while access to the residential portion will be via “A” Street. The land use plan and “A” Street alignment are shown in the following Figure 3. 4 Term “branded” refers to a dealership being associated with a single vehicle manufacturer such as BMW or Honda, not independent retailers of a variety of cars. CITY OF LA QUINTA Page 7 of 38 Figure 3: Conceptual Project Land Use Plan The Project, and specifically the construction of “A” Street, will require the realignment and reconstruction of the access driveway to the DSUSD service facility, located directly south of the Project site. This driveway is the only entrance to the District’s bus yard, which is used by busses and staff vehicles, and not the general public. The existing driveway will be replaced by the signalized “A” Street intersection at Dune Palms Road. A variety of DSUSD activities will be served by this access point. The District’s maintenance function, to include a number of service vehicles, is located there. In addition, commissary or food service distribution functions are at CITY OF LA QUINTA Page 8 of 38 the location. Lastly, bus storage and maintenance takes place immediately south of the residential area. Part of the daily maintenance routine is a pre-travel safety check which includes testing lights and horns. Noise from the safety tests creates a significant design constraint for the nearby residential buildings; however, mitigation measures will be implemented to ensure interior noise levels comply with existing City standards. The conceptual realignment of the access driveway to accommodate both DSUSD vehicles as well as “A” Street traffic may require the acquisition of a small portion (approximately 7,000 square feet) of the adjacent mini-storage lot. This portion of the lot is currently used as a retention basin, which will be relocated south of the access driveway. 1.5.1 Associated Activities The Project will likely necessitate some modifications or improvements to property outside of the geographic boundary of the Project. One off-site impact of the Project is the possible extension of a storm water drainage improvement from the southeastern corner of the site to an outfall structure to be built in the La Quinta Evacuation Channel. The drainage pipeline would cut through a portion of the DSUSD site that is currently used as a retention basin. However, it is anticipated DSUSD could utilize an outfall for drainage also, potentially allowing redevelopment of areas currently dedicated to storm water retention. Drainage to the Evacuation Channel may be done via one or two pipelines, depending upon the best engineering and design options for the Project and the DSUSD property. Construction of this improvement could allow storm water from the Project site, and potentially the DSUSD property, to drain directly into the Evacuation Channel following onsite treatment of the “first flush” flow as required by the National Pollutant Discharge Elimination System (“NPDES”) Permit. Alternatively, storm water may be retained and treated onsite through a series of best management practices (“BMPs”) which may include:  Dry wells,  Detention/retention basins,  Catch/debris basins, and  Other BMPs as needed. It should be noted that onsite treatment of first flush flows will be required regardless of whether drainage directly to the Evacuation Channel is established. A preliminary Water Quality Management Plan has been prepared for this Project. Other off-site improvements include modifications to the DSUSD bus barn and storage yard and potential modifications to the Komar/Costco site parking lot to facilitate pedestrian traffic accessing the development via “A” Street. Proposed improvements to the DSUSD property include construction of a sound wall and improved circulation and ingress and egress. Proposed adjustments to the Komar/Costco parking lot include clear markings for delineation of traffic flow and pedestrian access to and from “A” Street. This may be done using additional landscaped curbs and a well marked walkway leading east from the point where “A” Street terminates at the Komar/Costco parking lot. CITY OF LA QUINTA Page 9 of 38 1.6 OBJECTIVES As the preparer of the Plan, the Agency has identified the following objectives, as well as those of the City. La Quinta Redevelopment Agency Objectives:  Ameliorate blighted conditions  Increase economic vitality  Promote job creation, private investment, and other positive economic indicators  Increase the supply of affordable housing within the Redevelopment Project Area  Develop a safe, vibrant housing community available to a range of singles and families at affordable rates City of La Quinta Objectives:  Ensure high-quality development that is consistent with the existing regional character and design standards  Ensure adequate infrastructure and public services  Enhance compatible uses along Highway 111, a major commercial corridor  Encourage infill development  Promote land uses featuring sustainable practices  Mitigate impacts to the highest degree feasible  Diversify the housing types available to residents  Meet Regional Housing Needs Assessment goals The Project facilitated by the Plan contributes to meeting each of these objectives by ensuring high quality standards are in place, while guiding the development types through the series of development standards found in this document, the General Plan, and the LQMC. Further discussion on development standards is provided in Section 3 of the Plan, and information on how the Plan will foster a project meeting the General Plan’s goals, policies, and programs is provided in Section 6. CITY OF LA QUINTA Page 10 of 38 SECTION 2: SETTING The following section provides an overview of the land uses in the surrounding area, as well as existing standards and provisions that apply to the property. In particular, this section describes how the Project site is defined by the existing regulations as set forth in the General Plan and LQMC. 2.1 SURROUNDING LAND USES AND ENVIRONMENT The Project site is situated along the south side of Highway 111, the City’s primary commercial corridor and a well traveled route, providing access to many Coachella Valley communities. Highway 111 features a wide range of commercial uses including offices, retail, services, and restaurants, and is a vital component of the City’s municipal revenues. The Komar/Costco site directly to the east of the Project site features retail, service, and restaurant uses, as does the Sam’s Club development on the western side of Dune Palms Road. Several automotive dealerships are also located along Highway 111, making the northern portion of the site an ideal spot to expand the types of automotive sales featured within La Quinta. The residential development on the southern portion of the site will be buffered from Highway 111 by the commercial component and from Dune Palms Road by the existing storage buildings. The DSUSD administrative facility directly to the south of the proposed apartments is an institutional use, which is active during the day, offering a quieter evening environment. This urban location provides residents with employment, retail, and restaurant opportunities within walking distance, and puts them within convenient proximity of a public transportation network provided by SunLine Transit. Nearby infrastructure is in place, including regional flood control facilities. The La Quinta Evacuation Channel is located southeast of the Project, running adjacent to the DSUSD site. Adjacent arterial roadways are largely developed, with full street improvements in place along both Highway 111 and Dune Palms Road. The new “A” Street will provide convenient access to the residential community from Dune Palms Road, and will also allow for vehicular and pedestrian access to the Komar/Costco site so that community residents may easily patronize the retail and restaurant establishments. In both the commercial and residential developments, design guidelines and the project approval process will ensure that the built environments created are not only compatible with surrounding land uses but also functional with attractive aesthetics. This will be particularly important for the residential component, which must rely on design and architecture to provide a sense of community within the urban atmosphere; but as discussed, the proximity of the development to convenient employment and retail opportunities will be a great asset to future residents. 2.2 GENERAL PLAN LAND USE AND ZONING ISSUES The Project site has General Plan land use designations of Regional Commercial (RC) in the northern portion and Commercial Park (CP) in the southern portion. Its zoning designations are Regional Commercial (CR) on the northern portion and Commercial Park (CP) in the southern portion, as shown in the following Figure 4. CITY OF LA QUINTA Page 11 of 38 Figure 4: Land Use and Zoning Designations Project General Plan Designations Project Zoning Designations The General Plan RC designation of the northern portion of the site permits a range of commercial uses, as does the underlying CR zoning. LQMC Section 9.70.030 specifically lists automobile oriented sales and service as a representative land use in the CR District, making this use particularly well suited to the site. The affordable housing land use proposed for the southern portion is a permitted use (LQMC Section 9.80.040) and subject to the City’s density bonuses for affordable housing provisions (LQMC Section 9.60.270) which includes provisions for relief from certain development standards including density limits. The density for the residential portion of the Project site is based upon the underlying High Density Residential (RH) zoning, which allows up to 16 units per acre, combined with the 35% density bonus provided for in LQMC Section 9.60.270, resulting in a maximum potential build-out of 216 units for the approximately 10 acres. The Plan, in consideration of the Project site’s physical characteristics reduces this number to a maximum of 200 dwelling units. CITY OF LA QUINTA Page 12 of 38 SECTION 3: LAND USE PLAN 3.1 LAND USE DESIGNATIONS Commercial Purpose: To serve unmet local consumer need and augment the community’s economy through encouraging the development and preservation of a high quality automobile sales and service related commercial area. Intent: To encourage a commercial automotive sales development in the northern portion of the Plan area that is compatible with the surrounding uses along Highway 111. To achieve this, development of the site is to be integrated into the existing commercial environment by utilizing high quality design features, architecture, and landscaping that meets or exceeds all applicable standards. To ensure compatibility between the commercial and residential portions of the Plan, as well as with the intensity of the surrounding properties, the total amount of allowable commercial building area is capped at a maximum of 82,000 square feet. This development envelope is smaller than the site’s potential footprint based on its current zoning. While there is a limit to the amount of floor area that can be built, in order to facilitate creativity and encourage design flexibility, there is no limit to the number or configuration of buildings that may be constructed, as long as all applicable regulations are adhered to. To present a cohesive and attractive development, all buildings, parking areas, and landscaping will be well integrated into the site and shall meet the City’s applicable Highway 111 Design Guidelines5 . Parking areas and buildings will have lighting features appropriate for the design of the development while providing for public safety. Fencing may be used to separate the commercial component from surrounding uses as needed. Landscaping will feature native plants, and provide a pleasing visual character on this well-traveled corridor. Residential Purpose: To enhance the variety and availability of affordable housing units within the City and thus assist the City and Agency in meeting the General Plan’s Housing Element Goals and the Agency’s Housing Implementation Plan requirements. Intent: To facilitate the development and preservation of a high density residential community, consisting of up to 200 multi-family dwelling units and associated open space, and recreational and community facilities. Towards this, the residential portion of the site is intended to be developed with affordable rental multi-family residences. Units may range from one to three bedrooms, and be up to three stories in design. Ultimately, the site plan may feature any number of residential buildings to best meet the needs of the community while making efficient use of the available land. The actual design of the project will be reviewed for compliance with the use and development standards of the Plan through the processing of a site development permit development. The characteristics of a residential development consistent with the Plan should include a pleasant residential environment that features a community clubhouse, swimming pool and connected open space with pedestrian walkways to encourage outdoor activities and safe pedestrian travel within the community. Additional recreational amenities may include tot lots, benches, and barbeques. The development should be predominately landscaped with regional 5 City of La Quinta, Highway 111 Design Theme, October 1997. CITY OF LA QUINTA Page 13 of 38 native plants, but may include limited designated turf areas for recreational use. Lighting features should be integrated into the entire site for safety and aesthetic purposes. 3.2 LAND USE REGULATIONS The following sections discuss the development parameters applicable within the Plan area. These standards ensure that the overall vision for the Plan is maintained irrespective of the individual developers and users of the site. Section 3.2.1 contains the allowed uses and permitting regulations for the two land use designations used in the Plan. These regulations establish the uses permitted within the commercial and the residential portions of the Plan. Section 3.2.2 contains the development standards for the two land use designations. These standards address the location and design of the buildings, landscape, and amenities within each land use designated area. Any land use regulations or development standards not specifically addressed in the Plan shall be governed by Title 9 of the LQMC. 3.2.1 Allowed Uses and Permitting Regulations Commercial Uses permitted in the area of the Plan designated Commercial are as listed under Regional Commercial (CR) in Table 9-5 of LQMC Section 9.80.040 subject to the following exceptions:  Sales and service of new motor vehicles at a branded dealership is a permitted use.  Sales and service of branded pre-owned motor vehicles associated with an on-site branded dealership is a permitted use (minor incidental sale of non-branded pre-owned vehicles of similar class is permitted).  Sales and service of pre-owned motor vehicles not associated with an on-site branded dealership is permitted subject to approval of a conditional use permit.  Static display of vehicles, associated with a permitted branded or non-branded dealership, at grade within a front landscape setback so long as no signage, banners, lights, balloons or other visible devices are used is permitted subject to approval of a minor use permit. Vehicle display areas shall not be allowed within the public right-of- way. Specific locations and conditions of use shall be addressed through the site development permit and minor use permit approval procedures. Note: Uses other than automobile sales may require additional environmental review per the California Environmental Quality Act. Residential Uses permitted in the area of the Plan designated Residential are as listed under High Density Residential (RH) District in Table 9-1 of LQMC Section 9.40.040. Note: Uses other than multi-family dwelling units may require additional environmental review per the California Environmental Quality Act. CITY OF LA QUINTA Page 14 of 38 3.2.2 DEVELOPMENT STANDARDS Commercial Development standards for the area of the Plan designated Commercial are those applicable to the Regional Commercial (CR) District contained in LQMC Chapter 9.90, parking regulations in Chapter 9.150 and all other supplemental non-residential development standards as set forth in the LQMC, subject to the following exception:  The total amount of commercial building square footage shall not exceed 82,000 square feet gross floor area.  Vehicle display areas located within a front landscape setback shall be located south of the public sidewalk and a minimum 5 foot landscape separation shall be maintained between the sidewalk and the vehicle display area. Residential Development standards for the area of the Plan designated Commercial are those applicable to the High Density Residential (RH) District contained in LQMC Chapter 9.50, the density bonuses for affordable housing provisions contained in LQMC Section 9.60.270 and all other applicable supplemental residential development standards as set forth in the LQMC, subject to the following exceptions:  Dwelling unit count shall not exceed 200.  Residential buildings shall not exceed a maximum total of 235,000 square feet, including community facilities consisting of a pool area and community center.  The minimum living area per residential unit shall be 700 square feet.  Minimum of 5 feet setback where residential is adjacent to non-residential and does not abut a roadway.  The maximum fence height may be allowed to exceed the standard as set forth in the LQMC where residential is adjacent to non-residential when recommended by a noise attenuation study and approved by the Planning Director.  The following minimum parking ratios, inclusive of handicapped and guest parking, shall apply unless alternative parking standards are approved in accordance with LQMC Chapter 9.150:  1.5 parking spaces/unit + .5 guest space/unit  1 space/employee for non-residential services and/or activities These standards may be adjusted by up to 10% through the Site Development Permit approval process.  If the total number of spaces required results in a fractional number, it shall be rounded up to the next whole number. CITY OF LA QUINTA Page 15 of 38 SECTION 4: DEVELOPMENT PLAN This section addresses the backbone elements of the project including circulation, site grading, drainage, and flood control. It also identifies the primary utility and service providers and lists guidelines for the architectural and landscaping design of the Project as well as sustainability and other environmentally related measures to be incorporated. To implement the Plan, certain discretionary permits (site development permits, conditional use permits, and/or minor use permits) will be required. These permits will translate the standards and guidelines of the Plan to the features that, once approved, will be constructed and ultimately implement the Plan. It is at this stage of the planning process that decision makers will be able to ensure that the residential and the auto/commercial components of the Project are compatible with each other as well as with the surrounding community. 4.1 DEVELOPMENT GUIDELINES The following subsections are meant to augment the overall vision of the Project to ensure the most cohesive and attractive possible developments. 4.1.1 Fencing and Walls Except as noted in Section 3.2.2 (Development Standards), all fencing and walls shall comply with existing LQMC standards. The appearance and/or style of the walls utilized within the Project should reflect the following qualities:  Interior walls separating patios will be stucco or masonry.  Walls separating recreational facilities from other segments of the development will consist of wrought iron fencing and/or masonry.  Perimeter fencing may be masonry, but may feature wrought iron with stucco pilasters.  If proposed, fencing for the automobile/commercial component should be designed to reflect the broader themes of that part of the development, and integrate with the surrounding environment. 4.1.2 Site Lighting All lighting shall comply with the existing LQMC standards. All lighting shall be designed and located so as to confine and direct light within the Project boundaries, which includes the landscape buffer areas located along the street frontages. Lighting for the project shall be consistent with lower lighting levels wherever practical. The Plan envisions lighting designs that incorporate features and fixtures such as the following, or alternatives that lead to equivalent lighting patterns: Buildings and Open Spaces:  All poles should be of a decorative or non-glossy finish, utilizing paint powder coating or an anodized surface.  Lighting fixtures should be designed to achieve ideal light distribution and minimize point source glare.  Commercial area lighting shall be designed to go to a security level lighting after business hours.  Fixtures should be mounted precisely to prevent glare from tilted fixtures. CITY OF LA QUINTA Page 16 of 38  All building-mounted lights shall be partially or fully shielded as applicable to Section 9.100.150 of the LQMC, including but not limited to patio, balcony, securing, and entry door lights.  All lights on the second and third floors should have extended drop shields so the light source cannot be seen from any public streets.  Pedestrian scale lighting shall be required along Highway 111 per the City’s approved Highway 111 Design Standards and should also be required on all pathways and in proximity to all community facilities. Parking Areas:  Lighting for parking lot areas should be LED or high pressure sodium fixtures mounted on steel poles, finished as stated above.  The maximum height for any light source shall be 22 feet above finished grade in the commercial component or 16 feet in the residential component.  All lenses should be of a flush design.  Parking area lighting shall also be shielded so as to minimize impacts to residential units. 4.1.3 Circulation The Project is easily accessed from two arterial thoroughfares - Dune Palms Road to the west, and Highway 111 to the north. Points of access for the commercial component should come directly from driveway entrances along Highway 111, with the primary entry generally centered on the northern property line. General Plan Exhibit 3.1 depicts the roadway build-out designations and typical cross sections for arterials. Highway 111 is identified as a Major Arterial, and has been improved to 6 lanes along the project frontage. Dune Palms Road is designated as a Primary Arterial and has been improved to 4 lanes along the project frontage. Secondary access points should be located near the northeastern corner of the site in the commercial portion along Highway 111, as well as at the midway point along the western Project border, connecting the Project to Dune Palms Road via the adjacent office development. The latter access point is anticipated to provide limited access for emergency and service vehicles, and will not be utilized by the general public. Primary access to the residential component should be via the new signalized intersection on Dune Palms Road and “A” Street that leads traffic through the Project site and ultimately connects to the Komar/Costco center to the east. The commercial component would also have access to “A” Street from its southern property line. Lastly, a connection to the DSUSD facility to the south provides access primarily for school busses, delivery vehicles, and employee vehicles from that facility to “A” Street and hence to the arterial system at the signalized intersection on Dune Palms Road. This connection replaces the current driveway used by DSUSD that accesses Dune Palms Road at a non- signalized intersection immediately south of the Project. The vehicular circulation is illustrated in Figure 5. CITY OF LA QUINTA Page 17 of 38 Figure 5: Conceptual Vehicular Circulation Source: Prest Vuksic Architects 4.1.3.1 Entries to the Project Site The residential community’s primary entrance is from Dune Palms Road via the proposed “A” Street, which will run along the western and northern sides of the Project. Adequate stacking space will be provided for entering and exiting traffic, coordinating well with the site’s internal circulation system. “A” Street will be a two-lane road with turning lanes angled to align with an entry point to a neighboring commercial center (Sam’s Club) on the western side of Dune Palms Road and will align with an existing driveway within the Costco/Komar commercial development to the east. A signalized intersection at Dune Palms Road will allow for left- and right-in, as well as left- and right-turns out. The main entry is further designed to accommodate the turning radii and maneuvering capabilities of the DSUSD busses and delivery trucks that will utilize the new signalized entryway. Upon entering the Project site, busses and other DSUSD staff traffic will proceed straight ahead while those wishing to travel along “A” Street or enter the residential development will turn left as shown in Figure 6. CITY OF LA QUINTA Page 18 of 38 Figure 6: Conceptual Entrance from Dune Palms Road "A " S t r e e t Mini Storage Facility Residential "A" Street Du n e P a l m s R o a d DSUSD The main entry for the commercial portion of the Plan is a right-in, right-out access via Highway 111. The secondary entry point is to be located further east on Highway 111 and will also be a right-in, right-out access. A third entry point is proposed off of “A” Street near the Costco/Komar development. Finally, a fourth entry point intended for emergency and service vehicles only is located north of the adjacent mini storage facility providing access between Dune Palms Road and the southwest corner of the auto/commercial component. Source: NGA Architecture 4.1.3.2 On-Site Circulation System The proposed “A” Street is the primary circulation connection within the Project, providing primary access to the residential component. The commercial component, DSUSD, and the neighboring commercial development can also be accessed via “A” Street. Both the commercial and residential developments will have internal accessways that circumnavigate the parcels, providing access to parking and links to “A” Street. The primary interior drives will be a minimum of 26 feet in width. A benefit of the site’s location is the close proximity to a number of shopping and employment opportunities and public transit. This factor reduces the need for residents to commute long distances for jobs, services, and shopping opportunities. Public transit is available nearby with existing stops located near the intersection of Highway 111 and Dune Palms Road. Pedestrian access routes will be located along the eastern property line of the auto/commercial component that will extend from Highway 111 south to “A” Street, and along “A” Street to provide access to the adjacent retail establishments and Highway 111, as shown in Figure 7. Within the Project, design concepts and delineated pathways should ensure a secure relationship between automobile traffic and pedestrians. Sidewalks and pedestrian paths will CITY OF LA QUINTA Page 19 of 38 allow for safe, easy pedestrian travel throughout the project, as well as provide convenient access to Dune Palms Road, the Costco/Komar Center and Highway 111. Figure 7 below depicts pedestrian access and circulation. Figure 7: Conceptual Pedestrian Circulation 4.1.3.3 Streetscape Treatment Source: Prest Vuksic Architects Streetscape treatments on Highway 111, Dune Palms Road and “A” Street will be designed to be both aesthetically pleasing and water efficient, with drought-tolerant planting types described further in Section 4.9 of this Plan. Streetscapes will consist of walkways consistent with the surrounding sidewalks, featuring drought tolerant planting beds to showcase water efficiency and quality landscape design along the arterials. Where applicable, such as on Highway 111, all other City landscaping standards shall apply. The internal streetscape along “A” Street will feature sidewalks and drought tolerant landscaping that integrates with the residential and commercial developments. As discussed in Section 3.2.1 of the Plan, additional streetscape features may be incorporated with the development of the auto dealerships along Highway 111; such as ground-level display pads shall be permitted in the Highway 111 landscape setback area on which for-sale vehicles, but no advertising devices, may be parked for greater visibility. Their specific locations shall be CITY OF LA QUINTA Page 20 of 38 established in the appropriate discretionary permit and will be carefully integrated with the walkway and adjacent landscaping materials. 4.2 PHASING It is expected that the project will be built in two phases. The multi-family residential component is expected to be constructed in the first phase, along with most, if not all, of the off-site improvements, including the storm water drainage system, which may include the outfall structure(s) into the La Quinta Evacuation Channel. Concurrent with the residential construction, it is anticipated that two limited automobile dealerships will be developed on the commercial portion of the site. During the first phase, the dealerships will provide service facilities and the sale of vehicles, possibly only certified pre-owned vehicles initially. A third dealership will likely be built in the second phase, and all three dealerships will be expanded to include the sales of both new and certified pre-owned vehicles. Construction of the first phase is expected to begin in 2010. No date has been established for the construction of the second phase, although it is estimated to begin approximately 5 years after the phase one dealerships have begun operating. Final Phasing Plans will be part of future Site Development Permits. “A” Street will be constructed to its ultimate configuration during Phase 1. 4.3 SITE GRADING The existing terrain at the Project site is relatively flat with a small mound approximately 20 feet above the surrounding terrain in the northeast quadrant of the property. The elevation difference from the high point (+/- 76 feet) to the low point (+/- 52 feet) is approximately 25 feet. It is anticipated that the entire site will be rough-graded at the onset of construction. The overall height of the site will be very slightly raised in order to minimize the impacts of the Project on neighboring uses. As a result, approximately 1,200 cubic yards of soil will be imported. The Project area will be graded so that the general hydrological flow is to the southeast. As discussed, the City is anticipating an off-site improvement which would involve an underground conveyance system to bring storm water runoff from the Project site to the La Quinta Evacuation Channel. It is anticipated that Project drainage can be discharged directly into the nearby evacuation channel via this underground conveyance system. One or more dry wells and/or small retention basins shall be included in the site design to prevent nuisance water from entering the Evacuation Channel. Other on-site facilities will ensure that appropriate water quality standards are met. Should the connection to the Evacuation Channel not be constructed, on-site retention of storm flows shall be utilized. A grading plan will be performed for the Project that identifies proposed land uses within the site boundary, preliminary pad locations and elevations, contours, and retention/detention basin locations as needed. 4.4 FUGITIVE DUST CONTROL / PM10 The Coachella Valley experiences periods of moderate to high wind conditions. Therefore, wind blown dust and sand are a concern during local grading operations. The South Coast Air Quality Management District and the Environmental Protection Agency have instituted a plan in the Coachella Valley to reduce excess PM 10 (small particle dust). These provisions must be adhered to during grading operations. All standard City of La Quinta mitigation measures and conditions of approval will be utilized to ensure that there is adequate PM 10 control in place. CITY OF LA QUINTA Page 21 of 38 4.5 STORMWATER In general, methods for filtration and removal of sediments, waste, oils and grease will be consistent with all local, State and federal requirements. Given the nature of the use, project design features for the auto dealer uses will be an important part of discretionary permits. The provisions of the NPDES General Permit for Stormwater Discharges Associated with Construction and Land apply to construction projects over 1 acre in size. Since the development site is over 20 acres, a Notice of Intent (“N.O.I.”) and NPDES permit containing a Best Management Practices Plan must be prepared and filed. A Stormwater Pollution Prevention Plan (“SWPPP”) must also be prepared for the development and submitted to the City of La Quinta. Erosion control will be addressed in the SWPPP. The NPDES Permit for Municipal Separate Storm Sewer System for the White Water River Region contains requirements for residential and commercial developments that may discharge or affect storm water runoff in the White Water River Basin. Among other things, these requirements oblige developers of new projects or redevelopment of “priority projects” to prepare a Water Quality Management Plan (“WQMP”). This Project meets the requirements established; therefore a WQMP will be prepared. 4.6 DRAINAGE AND FLOOD CONTROL The following guidelines shall be used to implement a drainage and flood control plan. 4.6.1 Hydrology The Plan area is covered by Flood Insurance Rate Map 06065C2234G revised August 28, 2008, which shows that the Project area is designated as Zone X, shaded and unshaded. Zone X unshaded indicates that it lies outside the 500-year flood plain. Zone X shaded indicates areas of 500-year flood. Off-site flows tributary to the site area have been intercepted and retained by adjacent development and are considered negligible. 4.6.2 Regional Flood Control The storm water drainage system in the City of La Quinta is administered by the Coachella Valley Water District (“CVWD”). Generally speaking, the regional storm water drainage system consists of improvements to the major natural drainage channels that run through the City. The Project will include facilities to convey runoff from the 100-year storm event to the La Quinta Evacuation Channel via underground pipes, or the Project will retain runoff in facilities located on the site. 4.6.3 Temporary Measures The drainage plan proposes to temporarily direct surface runoff via graded swales to two or more retention basins during the development of the site and between construction phases for the automotive/commercial part of the Project. 4.6.4 Permanent Measures Drainage facilities will be provided within the private streets on the property, and/or through naturalized drainage courses, leading to either a major storm drain connecting to the La Quinta Evacuation Channel or to on-site retention facilities. Facilities will be sized to accommodate 100-year storm flows, consistent with City standards. CITY OF LA QUINTA Page 22 of 38 4.6.5 Nuisance Water A minimal amount of nuisance water is expected due to the use of drought-tolerant landscaping where practical, and technologically advanced efficient irrigation systems. The overall drainage plan will collect and convey all nuisance water into one or more dry well collection points or small retention basins. These facilities will allow the nuisance water to be treated as necessary and to percolate or evaporate, avoiding discharge to the Evacuation Channel. 4.7 UTILITIES The utilities infrastructure that will serve the development is described below and is designed to provide a coordinated system of infrastructure and public services to adequately serve the project at full build out. This section identifies standards relative to land use for the site and establishes the infrastructure and public service policies. 4.7.1 Sewer Plan The Project is located within the jurisdiction of CVWD for sewer service. An existing 10-inch sewer main is located within the Dune Palms Road right-of-way, and an 18-inch main is located within the southern portion of the Highway 111 right-of-way. Service connection is proposed at the northeast corner of the Project, connecting to the 18-inch main in Highway 111. Sewage lines will be provided throughout the site as needed for adequate capacity. 4.7.2 Potable Water Plan The development is located within the jurisdiction of the CVWD for water service. Existing 18- inch water mains are located within both Dune Palms Road and Highway 111 rights-of-way. A main line will be installed on site, with service connection provided at the northeast corner of the Project, in Highway 111. 4.7.3 Electrical Plan Electric service is provided to the site by the Imperial Irrigation District (IID). All electrical facilities will be underground. Distribution lines are located along the east and west property lines. The available connections distribute 12,500 volts. Connections are expected to be from existing service points. Service to the development is expected to be routine. 4.7.4 Natural Gas Natural gas service is provided to the site by The Gas Company. A 4-inch main is located within the north side of the Highway 111 right-of-way, and a second 4-inch main is located within the west side of Dune Palms Road right-of-way. The point of connection is available anywhere along the Project’s frontage. Service to the development is assumed to be routine. 4.7.5 Telephone Telephone service will be provided to the development by Verizon. The point of connection is located within the Highway 111 right-of-way, where an existing underground line is located on the north side. Service to the development is assumed to be routine. 4.7.6 Cable Television Cable television service will be provided to the site by Time Warner. Underground lines exist along both Highway 111 and Dune Palms Road. Service to the development is assumed to be routine. CITY OF LA QUINTA Page 23 of 38 4.8 GENERAL ARCHITECTURAL THEME The design and architectural themes for the Project components have yet to be determined, though they should generally follow the guidelines described below. The interpretation, flexibility, including potential alternative design concepts, and incorporation of these guidelines into the building design process shall be through the City’s Site and Architectural Design Review procedures. 4.8.1 Auto/Commercial As described, permitted uses in the commercial part of the Project emphasize automotive sales and service, specifically branded vehicle dealerships. The general architectural theme of these facilities should reflect a sophisticated, technical atmosphere. Specifically, the design of automobile sales and service facilities may be based upon corporate motifs employed by the brands represented, although all design work should be of high quality that blends well visually with surrounding uses on Highway 111. Characteristics may include:  Clean, bright colors, particularly whites and silvers, and use of glass  Use of geometric lines and angles in facades  “Engineered” look to complement vehicles Figure 8 provides a sampling of branded dealership design that may be similar to the Project. Figure 8: Sample Designs of Branded Auto Dealerships Materials and colors used should integrate with the overall appearance of Highway 111, while allowing the user to incorporate necessary brand recognition strategies. 4.8.2 Residential The buildings constructed on the site should generally have a Desert Modern/Contemporary character, and maintain a consistent theme carried out by quality materials and imaginative design that will complement the existing character of La Quinta. A simple yet strong architectural vocabulary that will rely on strategically placed key details and the careful selection of landscape materials should define the aesthetics of the development. Architectural details may include balconies, recessed openings, low walls, courtyards, and awnings. Other salient characteristics of the architectural character may include features such as: Architectural design that is unique in character, but consistent with surrounding area;  The use of articulated facades with balconies and patio areas; CITY OF LA QUINTA Page 24 of 38  Shaded walkways and sunscreen eyebrows;  Building integration with drought tolerant landscaping, such that the architecture appears as an extension and outgrowth of the landscape;  Site planning and building designs that should be sensitive to views, privacy, adjacent developments, and a coherent, multi-modal circulation network; and  Mechanical elements of the buildings will be screened from view by walls, fences or landscaping. Selected materials and color palettes should complement the overall design of the community and integrate with the neighboring developments to the highest degree feasible. 4.9 LANDSCAPING The landscape concept follows functionality, emphasizing water efficient materials coupled with technologically advanced methods for ensuring the most efficient application of irrigation. Some interior spaces, primarily open space portions of the residential community, will include some turf landscaping for recreational purposes. Interior streetscapes may also incorporate a street tree program to provide shade for pedestrians and contribute to the overall feel of the community. Other portions of the site will incorporate drought-tolerant plant types consistent with Coachella Valley Water District guidelines. Irrigation of all landscaping shall be carefully monitored to ensure water use efficiency. 4.9.1 Landscaping Guidelines Landscape plans shall be approved through the City’s site development permit process. Landscaping features may include:  Native/drought tolerant plants and trees  Turf in limited areas  Trellising of climbing flora Accessories to landscaping and open space design may include:  Benches  Shade structures  Barbeques  Screening walls  Meandering walkways/paths  Tot lots/play equipment In addition to the plant palette and other allowable landscaping fixtures, the Project shall be designed to be consistent with the City’s Water Efficiency Ordinance (LQMC 8.13) and incorporate the following features.  Ground cover should be used to protect soil from erosion, including gravels, rocks, or plant materials.  Plant materials should be located and designed to avoid interfering with motorist sightlines.  A variety of plant and groundcover colors, heights, and textures should be used to provide visual stimulation.  Landscaping along Highway 111 should integrate with adjacent frontages and conform to specific City guidelines (Highway 111 Design Guidelines) to provide continuity. CITY OF LA QUINTA Page 25 of 38  Utility equipment and trash containers should be screened from view. 4.10 EFFICIENCY MEASURES Internal as well as exterior building designs and construction practices shall be guided by the desire for long term energy efficiency to the highest degree feasible. Efficiency measures associated with site design or building fixtures should enhance the appearance of the community and integrate with the architecture. The Project shall utilize design, construction, and operational measures to achieve the intent of the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) standards or comparable industry standards for new construction. Such measures should include:  Exceeding the California Code of Regulations Title 24 requirements at the time of building permit issuance by 20%  Energy efficient appliances and energy saving light bulbs  Water efficient appliances and other water conservation techniques  Drought tolerant landscaping as discussed above, along with efficient irrigation methods  Efforts to reduce greenhouse gas emissions  Features to encourage alternative forms of transportation such as:  Easy and safe pedestrian access to neighboring developments and public transportation  Bicycle racks CITY OF LA QUINTA Page 26 of 38 SECTION 5: SPECIFIC PLAN ADMINISTRATION The Plan is intended to be predominantly a policy document, though it does serve certain regulatory functions with respect to permitted uses and development standards. As such, administration of the Plan shall be guided by the following information. 5.1 ADMINISTRATION The City shall administer the provisions of the Plan in accordance with the Government Code, the Subdivision Map Act, the City General Plan and the LQMC. The City Planning Department shall oversee and enforce the site development standards and design guidelines set forth by this document. Any administrative interpretation of the Plan may be appealed to the Planning Commission. Any decisions of the Planning Commission may be appealed to the City Council. Development procedures, regulations, standards and specifications contained in the Plan shall supersede the relevant provisions of the LQMC, as they currently exist or may be amended in the future. Any development regulation or building requirement not addressed in the Plan shall be subject to all relevant City ordinances, codes and regulations. 5.2 DEVIATIONS/AMENDMENTS Any changes to this document, or to projects considered for entitlement pursuant to this document, shall be reviewed to see if they require an amendment to the Plan. If the Planning Director determines that the deviation (a) is minor, (b) will not result in a significant change to the projects as originally envisioned, and (c) is in compliance with the spirit and intent of the Plan, the Director may approve the deviation, based on findings to that effect that shall be documented in the project file. Any amendment to the Plan shall be processed in accordance with Government Code Section 65453 and LQMC Section 9.240.010. 5.3 SEVERABILITY All regulations, conditions, and programs contained herein shall be deemed separate, distinct, and independent provisions of the Plan. In the event that any such provision is held invalid or unconstitutional, the validity of all the remaining provisions of the Plan shall not be affected. CITY OF LA QUINTA Page 27 of 38 SECTION 6: RELATIONSHIP TO LA QUINTA GENERAL PLAN POLICIES The following section identifies goals, policies, and programs in the La Quinta General Plan that are applicable to the Highway 111/Dune Palms Multi-use Project, followed by a response indicating compatibility and/or consistency. 6.1 LAND USE GOALS, POLICIES AND PROGRAMS Policy 5: “All land use development proposals shall be consistent with all applicable land use policies and standards contained in the General Plan.” The Plan is consistent with the General Plan. 6.2 RESIDENTIAL GOALS, POLICIES AND PROGRAMS Goal 1: “The maintenance and protection of residential neighborhoods to assure that future housing needs are met.” The Plan proposes up to 200 units of housing to meet the City’s needs in accordance with the City’s 2009 Housing Element Update. Goal 2: “A broad range of housing types and choices for all residents of the City.” The Plan proposes low-, very-low, and potentially moderate-income housing units. There are a limited number of high density multi-family housing units in La Quinta. The proposed development will provide additional units of this type and it is intended that these units will qualify toward the City’s 2008-2014 Regional Housing Allocation Number as recognized in the City’s 2009 Housing Element Update. Policy 2: “Encourage compatible development adjacent to existing neighborhoods and infrastructure.” Although the site is not immediately adjacent to residential neighborhoods, the Plan proposes building heights and site design to complement and be compatible with the surrounding areas. Infrastructure facilities are readily available to serve the site. Policy 5: “The City shall maintain residential development standards including setbacks, height, pad elevations and other design and performance standards which assure a high quality of development.” The proposed housing will meet all development standards as set forth by the City and identified in the Plan. 6.3 ADEQUATE HOUSING RESOURCE GOALS, POLICIES AND PROGRAMS Goal 1: “Provision of a diversity of housing opportunities that satisfy the physical, social, and economic needs of existing and future residents of La Quinta”. The proposed Project will create new housing opportunities for existing and future residents of La Quinta. In accordance with the City’s 2009 Housing Element Update, the units will qualify toward the City’s 2008-2014 Regional Housing Allocation. Program 1.4: “Direct new housing development to viable areas where essential public facilities can be provided and employment opportunities, educational facilities, and commercial support are available.” CITY OF LA QUINTA Page 28 of 38 The proposed Project is located within close proximity of employment opportunities, educational facilities and commercial support. Program 1.6: “Develop Medium, Medium High and High Density residential uses in the appropriate designations as well as in locations within the Mixed/Regional Commercial and Village Commercial designations that enhance creative site planning, promote the mixed-use concept where applicable, provide opportunities for affordable and/or employee housing, facilitate the efficient use of public facilities, and support alternative transit modes.” The proposed Project is High Density affordable housing and includes a community center with multiple uses. It is within walking distance of shopping, employment and transit service. Program 3.2: “Encourage a mixture of diverse housing types and densities in new developments guided by Specific Plans, around the Village and within the Mixed/Regional Commercial area to enhance their people orientation and diversity through provision of incentives use of density transfer and density bonus provisions.” The Plan prepared for the Project is within a Regional Commercial area and provides high-density residential housing types. Program 3.6: “Apply shared parking provisions in mixed-use areas as a part of the Village Commercial and Mixed/Regional Commercial designation, and reduced parking requirements for assisted housing devoted to Low and Very Low income households, and/or seniors, as well as second units for seniors and the disabled where applicable.” The Plan allows for reduced parking requirements for low- and very low- income households. 6.4 AFFORDABLE HOUSING OPPORTUNITIES GOALS, POLICIES AND PROGRAMS Goal 2: “A variety of housing opportunities that accommodate the needs of all income levels of the population.” The proposed Project accommodates very low-, low-, and potentially moderate-income levels. The units will qualify toward the City’s 2008-2014 Regional Housing Allocation Number as recognized in the City’s 2009 Housing Element Update. Program 1.3: “Continue to stimulate private developer and non-profit entity efforts in the development and financing of Low and Moderate income housing, utilizing the Redevelopment Set Aside Housing Fund or other resources available such as HOME funds, CHFA Single Family and Multi-Family programs; HUD Section 208/811 loans and HOPE II and III Homeownership programs to partially support the project. The City shall hold workshops and pre-development meetings with the prospective proponents of affordable housing to advertise the potential types of financial incentives available and the types of project characteristics considered for assistance, in addition to expanding their website to include a summary of available assistance programs and requirements”. The project developer is an experienced developer of affordable housing and is familiar with available financial resources. The City has assisted the Project with the use of Redevelopment Housing Fund revenue. CITY OF LA QUINTA Page 29 of 38 6.5 HOUSING ELEMENT GOALS, POLICIES, AND PROGRAMS 6 Goal 1.1: “Provide housing opportunities that meet the diverse needs of the City’s existing and projected population.” The expansion of affordable housing will provide greater housing opportunities and options for residents consistent with the City’s 2009 Housing Element Update. Policy 1.2: “Focus housing growth within existing City boundaries until it is necessary to pursue annexation or development in planning areas for affordable housing.” The proposed residential development is within the existing boundaries. Policy 1.3: “Direct new housing development to viable areas where essential public facilities can be provided and employment opportunities, educational facilities, and commercial support are available.” The Project location is near a major commercial corridor (Highway 111), and there are many employment opportunities and commercial support facilities. Goal 2.1: “Assist in the creation and provision of resources to support housing opportunities for lower and moderate income households.” The Agency’s and City’s assistance will result in a residential component that will be entirely affordable to very low-, low-, and potentially moderate-income households. Policy 2.2: “Support public, private, and nonprofit efforts in the development of affordable housing.” The Agency and City have partnered with a private developer for the creation of the affordable residential community. Policy 6.1: “Promote higher density and compact developments that increase energy efficiency and reduce land consumption.” The Plan facilitates up to 20 dwelling units per acre, minimizing certain impacts and land consumption. 6.6 COMMERCIAL GOALS, POLICIES AND PROGRAMS Program 1.2: “The City will encourage an integration of a wide range of support services at employment centers, including child care, occupational health, fitness facilities and convenience retail shops.” The Plan allows for recreational facilities, and is located adjacent to a retail center offering employment opportunities. 6.7 OTHER LAND USE GOALS, POLICIES AND PROGRAMS Goal 2: “The preservation of open space and recreational resources as a means of preserving and enhancing the quality of life and economic base of the City.” Open space will be a focal point of the residential development and include a variety of recreational opportunities. 6 City of La Quinta, General Plan Housing Element, State of California Department of Housing and Community Development Review Draft, August 12, 2009. CITY OF LA QUINTA Page 30 of 38 Program 3.3: “The City shall encourage the use of native landscaping and “links” golf courses which preserve natural open space areas.” The Plan includes a landscape palette that emphasizes native and other water efficient planting types. Policy 4: “The City shall continue to include park facilities planning in neighborhood planning efforts.” The Plan proposes facilities within the open space which may include a tot lot and pool to satisfy some of the recreation needs of the residents of the site. 6.8 TRAFFIC AND CIRCULATION GOALS, POLICIES AND PROGRAMS Program 2.3: “On Major Arterials, the minimum intersection spacing shall be 2,600 feet in residential areas, and may be 1,060 feet for commercial frontage. Intersection spacing may be reduced to 500 feet at the Whitewater Channel and La Quinta Evacuation Channel. The design speed shall be 60 miles per hour. Left turn median cuts may be authorized if turn pocket does not interfere with other existing or planned left turn pockets. Right in/right out access driveways shall exceed the following minimum separation distances (in all cases, distances shall be measured between the curb returns):  more than 250 feet on the approach leg to a full turn intersection;  more than 150 feet on the exit leg from a full turn intersection;  more than 250 feet between driveways All access configurations shall require City Engineer review and approval.” The Plan recognizes Highway 111 to be a Major Arterial and Dune Palms Road to be a Primary Arterial. The Traffic Study identifies intersection design and spacing. Program 2.4: “On Primary Arterials, the minimum intersection spacing shall be 1,060 feet. The design speed shall be 50 mph. Left turn median cuts may be authorized if turn pocket does not interfere with other existing or planned left turn pockets. Right in/right out access driveways shall exceed the following minimum separation distances (in all cases, distances shall be measured between the curb returns):  more than 250 feet on the approach leg to a full turn intersection;  more than 150 feet on the exit leg from a full turn intersection;  more than 250 feet between driveways All access configurations shall require City Engineer review and approval.” The Plan recognizes Highway 111 to be a Major Arterial and Dune Palms Road to be a Primary Arterial. The Traffic Study identifies intersection design and spacing. Policy 4: “Encourage expansion of ridership and the service area of the public transit systems operated by the Sunline Transit Authority within the City.” The Plan proposes residential development and employment opportunities within walking distance of Sunline Transit routes and stops. Program 5.1: “In order to locate jobs and housing near each other to reduce shorter work commutes, make a concerted effort to increase City-based employment; encourage mixed-use development with a residential component contiguous with or near to employment centers; CITY OF LA QUINTA Page 31 of 38 facilitate use of the City’s home occupation ordinance; and encourage major employers to evaluate telecommuting opportunities, either home-based or at local centers, as well as part- time options for employees.” The Plan proposes a residential development near employment centers along the Highway 111 corridor. Policy 13: “Continue to implement the Image Corridors in the City, and identify new image corridors for streets brought into the City through annexation.” The Plan recognizes that both Dune Palms Road and Highway 111 are Image Corridors, and includes revised Image Corridor setbacks and height standards. Policy 15: “The City shall maintain building height limits along Primary, Secondary and Agrarian Image Corridors in its Development Code.” The buildings will be limited in height according to current standards. 6.9 OPEN SPACE ELEMENT GOALS, POLICIES AND PROGRAMS Policy 7: “The City shall encourage the preservation of open space in privately owned development projects.” The open space in the residential segment proposed in the Plan accounts for more than 30% of the total area. 6.10 PARKS AND RECREATION ELEMENT GOALS, POLICIES AND PROGRAMS Goal 2: “Sufficient parkland and recreational facilities to meet the active and passive recreational needs of all residents and visitors.” The Plan proposes open space and several recreational facilities throughout the development to serve Project residents. 6.11 ENERGY AND MINERAL RESOURCES GOALS, POLICIES AND PROGRAMS Policy 1: “The City shall encourage the incorporation of energy conservation features in the design of all new construction and the installation of energy-saving devices in existing development.” The Plan identifies energy conservation opportunities. Program 1.2: “Passive design concepts which increase energy efficiency, such as the use of landscaping materials and site orientation to provide shade and windbreaks, shall be encouraged.” The Plan identifies design standards that incorporate active and passive features to increase energy efficiency. 6.13 BIOLOGICAL RESOURCES GOALS, POLICIES AND PROGRAMS Policy 2: “Staff shall review all development applications for vacant land for their potential impacts to existing wildlife and habitat. Agricultural lands shall be exempt from this requirement, except as described.” A biological survey has been completed for the Project site. CITY OF LA QUINTA Page 32 of 38 Policy 3: “Native, drought-tolerant desert plant materials shall be incorporated into new development to the greatest extent practical. Invasive, non-native species shall be discouraged.” The Plan provides for the use of native, drought-tolerant plants as noted in Section 4.9 of this Plan. 6.14 PALEONTOLOGIC RESOURCES GOALS, POLICIES AND PROGRAMS Goal 1: “The identification and preservation of significant paleontologic resources which occur in the City.” A paleontologic study has been performed for the site. 6.15 WATER RESOURCES GOALS, POLICIES AND PROGRAMS Policy 1: “The City shall support the Coachella Valley Water District in its efforts to supply adequate domestic water to residents and businesses.” The Project area will be adequately served by the Coachella Valley Water District. 6.16 SURFACE WATER & STORM DRAINAGE GOALS, POLICIES AND PROGRAMS Policy 2: “All drainage facilities identified in the Comprehensive Drainage Master Plan 7 shall be constructed to conform to the requirements and standards of the city and CVWD.” Drainage facilities will be in conformance with all applicable city and agency standards. Policy 3: “All new development shall include on-site retention/detention basins and other necessary storm water management facilities to accommodate runoff from the 100-year storm.” The Plan addresses storm water management facilities within the Project area. Policy 4: “The City shall assure that roadway storm water facilities are designed, constructed and maintained in a manner which eliminates standing water and flooding.” All roadway storm water facilities will conform to City standards. 6.17 DOMESTIC WATER GOALS, POLICIES AND PROGRAMS Policy 1: “The City shall assure that adequate, high-quality potable water supplies and facilities are provided to all development in the community.” The Coachella Valley Water District will serve the Project area with potable water. 6.18 SANITARY SEWER GOALS, POLICIES AND PROGRAMS Policy 1: “The City shall assure the provision of adequate sanitary sewer collection and treatment services and facilities to all development in the community.” The Coachella Valley Water District will provide adequate sanitary sewer services to the Project area. 7 City of La Quinta, Master Drainage Plan, March 2009. CITY OF LA QUINTA Page 33 of 38 6.19 PUBLIC UTILITIES GOALS, POLICIES AND PROGRAMS Policy 3: “All utility and electric wires up to 34.5 kilovolts serving new development shall be installed underground.” All utility and electric wires will be installed underground. Program 4.1 “To the greatest extent practical, all new utility equipment boxes, including but not limited to traffic signal equipment, and electrical and telephone equipment, shall be located either underground, or away from street corners and effectively shielded from public view. Undergrounding of these facilities is preferred.” All utility equipment boxes will be underground to the greatest extent practical. Program 1.2: “The Building Department shall ensure that all plumbing fixtures in new development and remodeling projects conform to applicable California statutes and codes especially dealing with water saving fixtures. The residential development will implement water saving features, including appliances, as applicable. Policy 6: “All development plans shall be reviewed for their potential to create surface and ground water contamination hazards from point and non-point sources. The contamination hazards were evaluated in the EIR. 6.20 HAZARDOUS MATERIALS GOALS, POLICIES AND PROGRAMS Policy 4: “To reduce the potential impacts of subsurface sewage disposal systems on human health and the environment, the City shall encourage, to the greatest extent practical, the connection of new development to the Coachella Valley Water District’s sewage collection system.” The development will be connected to the Coachella Valley Water District’s sewage system. 6.21 GEOLOGIC AND SEISMIC HAZARDS GOALS, POLICIES AND PROGRAMS Policy 5: “To minimize the hazards associated with groundshaking and other seismic events, all new structures shall be built in accordance with the latest version of the Uniform Building Code (UBC) and/or International Building Code.” All buildings shall comply with the Uniform Building Code as adopted by the City of La Quinta. Policy 9: “All new development shall be required to minimize, to the greatest extent practical, blows and other wind erosion hazards affecting properties downwind.” The Plan addresses wind and erosion control on the site and will minimize effects to the greatest extent practical. 6.22 FLOODING AND HYDROLOGY GOALS, POLICIES AND PROGRAMS Policy 5: “Drainage policies and development standards shall provide for a reduction in runoff from developed lands and shall be consistent with local and regional storm water management plans.” The City and CVWD are working together to implement runoff reduction. CITY OF LA QUINTA Page 34 of 38 Program 5.1: “At the discretion of CVWD, new development shall continue to be required to construct on-site retention/detention basins and other necessary storm water management facilities that are capable of managing 100-year storm water flows. New development immediately adjacent to the Coachella Valley Storm Water Channel shall continue to have the option of discharging 100-year storm water flows directly into the storm water channel.” The City and CVWD have agreed to adequate management of site drainage. 6.23 NOISE GOALS, POLICIES AND PROGRAMS Policy 1: “The City shall maintain noise standards in conformance with the Table 8.1, Community Noise and Land use Compatibility.” The proposed Project will conform to all City noise standards. 6.24 HISTORIC PRESERVATION GOALS, POLICIES AND PROGRAMS Program 3.2.1: “Require all proposed project sites to be surveyed by a qualified archaeologist, historian, and/or architectural historian, as appropriate, to identify any potential cultural resources that may be affected, unless the preponderance of the evidence demonstrates that such survey is unnecessary”. An archaeological study was performed for the site. CITY OF LA QUINTA Page 35 of 38 APPENDIX A: PROPOSED DEVELOPMENT DESCRIPTION The Plan has been written to provide guidelines for the development of an approximately 10 acre commercial site and a 10 acre residential site with a new public roadway. At the time the Plan was written, the Agency was the property owner and development plans for the Project were not yet fully determined. The information contained in this Appendix provides a brief overview of the development likely to be implemented, based upon current Agency agreements and discussions. A.1 PROPOSED PROJECT DESCRIPTION The proposed development described in this section meets the objectives and intent of the Plan, envisioning an automobile sales and service development on the northern portion of the site and an affordable rental housing community to the south as described below. As described in the Plan, the proposed Project will require the construction of new public roadway, “A” Street, extending east-west through the site, to be classified as a Local Roadway, requiring approximately 2.14 acres of the Project’s total 22 acres. “A” Street will intersect with Dune Palms Road at a new signalized intersection at the southwestern corner of the Project site, then traverse the western and northern borders of the residential component, terminating to the east into the neighboring Komar/Costco commercial development. “A” Street serves as a boundary, separating the two land use components of the project. A.1.1 Auto Commercial Concept The proposed commercial component fronts on Highway 111, and is located directly north of the residential uses, which will be buffered by “A” Street, as well as appropriate setbacks and landscaping. The commercial component itself would serve to buffer the apartment homes in the south from the traffic and noise of Highway 111. The primary use permitted in the Plan is the sale and service of automobiles, thus two to three dealerships are proposed, utilizing a shared entry from Highway 111. It is proposed that the dealerships will be new to the east Coachella Valley, and the location will provide convenient sales and service for residents of La Quinta and the greater area. The main entrance to the commercial component is envisioned from Highway 111 and would culminate in a roundabout feature directly south of the driveway entrance, in front of the dealerships. This entry will generally be reserved for customers, although it also allows access to a perimeter aisle which circumnavigates the parcel and provides limited access to “A” Street. Delivery and service trucks will enter from a secondary entrance east of the main drive on Highway 111. This second entry will provide more direct access to the southern end of the parcel where parts and automobiles will be delivered. The commercial site is anticipated to be developed in two phases. The first phase will be the construction of two buildings - one on the east and one of the west side of the roundabout - each of which will house dealership showrooms and offices, service bays, parts storage, and small boutiques for branded accessories and merchandise. During the first phase, the dealerships will likely focus on brand certified, pre-owned vehicle sales and vehicle service. The parking and delivery areas, as well as all lot grading, will be completed during phase one. The second phase of construction, expected to take place approximately five years after the first phase, will add a third building at the southern point of the roundabout to accommodate a third dealership. The existing dealerships would at that time be modified to include new vehicles sales as well as the certified pre-owned vehicles. Any necessary re-alignment of CITY OF LA QUINTA Page 36 of 38 parking and/or delivery areas on the southern end of the parcel will be completed during the second phase of construction. The architectural designs and stylistic tones of the dealerships will be visually appealing and compatible with other Highway 111 uses, while conveying the images of the respective corporate affiliations. Appropriate signage and brand images will be incorporated into the final design of the commercial development such that the needs of the automobile franchises are met, while the high aesthetic standards of La Quinta are adhered to. A.1.2 Residential Concept The proposed residential component will provide highly desirable affordable housing for singles, couples and families with children, with a variety of unit sizes to accommodate the needs of future residents. Up to 200 apartment homes will be designed to reflect a Desert Modern architectural style, which features clean lines and colors to complement the desert’s beauty, as well as energy and water-saving features to enhance sustainability and lower service costs to residents. Many of the buildings contain a mix of unit sizes and heights, not to exceed two stories. Units would range from one to three bedrooms with a minimum size of 700 square feet and an estimated average size of 900 square feet. Buildings are proposed to be primarily arranged in groupings to create a series of open spaces buffered from parking areas, which will improve the safety of children at play and reinforce the pedestrian character of the development. The overall site plan would maintain stylistic elements visually similar to those in other areas of La Quinta, including meandering paths, drought resistant landscaping, and compatible building design and detailing. Because of the noise environment along the south edge of the residential development stemming from the DSUSD bus yard, the proposed footprints of the buildings have been designed so that they form a barrier or sound attenuation feature along the southern boundary. The buildings immediately adjacent to the DSUSD property will be designed and built with extra insulation/sound absorbing features along the southernmost walls to ensure that interior noise levels meet City standards, notwithstanding the daily safety checks of the bus horns. The Desert Modern architectural style of the residential development may be characterized by elements such as:  Articulated facades  Primarily horizontal emphasis  Balconies and patio areas  Sunscreen eyebrows  Flat roofs  Shaded walkways The Desert Modern style compliments surrounding uses, while incorporating a contemporary lifestyle image that will harmonize with the surrounding commercial uses. A.1.2.1 Open Space and Recreation The residential component is designed to maximize open space and areas for landscaping in order to create a livable, enjoyable environment. To balance between function and aesthetic features, buildings will be largely oriented towards open spaces and an activity area that is both safe for children and visually appealing. The key central open space will extend through the center of the residential site, from near the southwestern entrance near Dune Palms Road toward the northeastern corner of the Project before A Street meets the Komar/Costo site. This is the primary recreational area within the development and will be the only area where turf landscaping in play areas will be implemented. The site design provides for ample drought- CITY OF LA QUINTA Page 37 of 38 tolerant landscaping throughout the development. It is anticipated that roughly four acres of the residential site will have landscaping of some kind. To minimize water usage but still offer ample play areas for children, turf is expected to be used only in strategic play areas and kept to a minimum to reduce water demand of the site. In total, under one acre of turf is anticipated. The remaining open space, as well as the pan handle, will be landscaped with native and drought tolerant plantings. Trees may also be strategically located within the residential component. The centralized open space core is proposed to be anchored by a pool and community center in the southwestern area. Other features may include pedestrian walkways leading through the central landscaping and turf areas, passive recreation areas, a tot lot, BBQ’s, shade structures, places to sit, or a community garden. This environment will encourage residents to enjoy outdoor activities and allow space for adults to supervise children at play. Additionally, if needed, the area provides the necessary emergency access for public safety vehicles. A.1.2.2 Community Center A community center for the development is proposed on site for the benefit of the residents. The community center would likely be located near the main entrance to the residential community to allow current and potential residents easy access to the leasing office. In addition to management offices, the center may include meeting rooms, a computer room, game room and a checkstand or similar facility for pool and recreational equipment. The meeting rooms may be reserved by residents and used for a variety of needs such as club meetings or tutoring sessions. Restrooms will also be available for residents enjoying the adjacent pool area. CITY OF LA QUINTA Page 38 of 38 ATTACHMENTS Attachment A: Resolutions and Conditions of Approval