Loading...
SP 04-073 Carmela (Pista De Dorado) (2004)Prepared By: The Keith Companies Palm Desert, CA 92260 Phone: 760.346.9844 Prepared For: Stonefield Development ��� APPROVED BY CIT COUNCIL ON ..��c�Lq.j-Z--..- RY�- DATE -- RES®# _.,.� I I q- CASE NO. -073 TIPS FOR STAGECOACH TRAVELERS lic best scat inside a stage is the one next to the driver. Even if you have a tendency to sea -sickness when riding backwards — you'll get over it and will get less jolts and jostling. Don't let "sly elph" trade you his mid -scat. In cold weather don't ride with tight -f itting boots, shoes, or gloves. When the driver ask you to get off and walk do so without grumbling, he won't request it unless absolutely necessary. If the team runs away — sit still and take your chances. If you jump, nine out of ten times you will get hurt. In very cold weather abstain entirely from liquor when on the road, because .you will freeze twice as quickly when under its influence. Don't growl at the food received at the station — stage companies generally provide the best they can get. Don't keep the stage waiting. Don't smoke a strong pipe inside the coach. Spit on the leeeward side. If you have anything to drink in a bottle pass it around. Procure you're stimulants before starting as "ranch" (stage depot) whiskey is not "nectar." Don't lean or lop over neighbors when sleeping. Take small change to pay expenses. Never shoot on the road as the noise might frighten the horses. Don't discuss politics or religion. Don't point out where murders have been committed, especially if there are women passengers. Don't lag at the wash basin. Don't grease your hair, because travel is dusty. Don't imagine for a moment that you arc going on a picnic. Expect annoyances, discomfort, and some hardships. — Omaha Herald 1877 Pista de Dorado Specific Plan PISTA DE DORADO SPECIFIC PLAN NOVEMBER 2, 2004 APPROVED BY CITY COUNCIL ON �o [- BY-'��:�DATE 1(6 RESO _ ��'� 114 CASE NO.. !ae s2q - Pista de Dorado Specific Plan TABLE OF CONTENTS SECTION 1.0 INTRODUCTION........................................................... •-------------- 4 1.1 Specific Plan Background........................................................................... 4 1.1.1 Purpose........................................................................................................4 1.1.2 Executive Summary.................................................................................... 5 1.1.3 The Process................................................................................................. 8 1.1.4 Relationship to Other Agencies.................................................................. 8 1.1.5 Regional Project Setting............................................................................ 9 1.1.6 Local Project Setting.................................................................................. 9 SECTION 2.0 SPECIFIC PLAN............................................................................. 14 2.1 Project Description ................. 2.2 Specific Thematic Plans............................................................................ 15 2.2.1 Conceptual Land Use Plan........................................................................ 15 2.2.2 Conceptual Circulation Plan...........................,......................................... 15 2.2.1 Conceptual Grading and Drainage Plan .................................................... 16 2.2.3.1 Improved and Natural Drainage Plan ....................................................... 16 2.2.3.2 Grading..................................................................................................... 16 2.2.3.3 Erosion Control......................................................................................... 21 2.2.4 Conceptual Water and Sewer.................................................................... 21 2.2.4.1 Water Plan ................................................................................................. 21 2.2.4.2 Sewer Plan................................................................................................ 22 2.2.5 Other Conceptual Dry Utility and Other Services .................................... 22 2.2.5.1 Electrical Plan........................................................................................... 22 2.3 Planning Standards and Design Guidelines .............................................. 23 2.3.1 Development Standards............................................................................ 23 2.3.2 Design Guidelines..................................................................................... 27 2.3.2.1 Residential Design Concept .............. 2.3.2.2 Landscape Design Concept....................................................................... 28 2.3.2.3.1 Public Facilities......................................................................................... 28 2.3.2.4 Private Facilities........................................................................................ 36 2.3.3 Alterations of the Specific Plan ................................................................ 40 SECTION 3.0 OPERATIONAL GUIDELINES..................................................... 40 3.1 Common Area Maintenance/Management............................................... 40 3.2 Equestrian Enhancement Area Maintenance/Management ...................... 40 3.3 Streets and Utilities................................................................................... 40 SECTION 4.0 IMPLEMENTATION PROGRAM ................................................. 42 4.1 Final Conditions of Approval/MMP......................................................... 42 A. Resolution No. 2004-120 (Tentative Tract 31874) B. Resolution No. 2004-119 (Specific Plan 2004-073) C. Resolution No. 2004-118 (Environmental Assessement 2004-511) Page 2 11/2/2004 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc L Pista de Dorado Specific Plan 5.1 APPENDIX ONE........................................................................... 120 5.2 APPENDIX TWO.......................................................................... 126 5.3 APPENDIX THREE..................................................................... 127 LIST OF EXHIBITS Exhibit 1 Aerial Plan View of Project Site .................................... 7 Exhibit 2 Site Photos............................................................... 8 Exhibit 3 Conceptual Land Use Plan.............................................10 Exhibit 4 City General Plan Land Use Map........ .............................11 Exhibit 5 City Zoning Map.........................................................12 Exhibit 6 Conceptual Circulation Plan ...........................................17 Exhibit 7 Street Cross Sections .................................................... 18 Exhibit 8 Perimeter Landscape Plan..............................................19 Exhibit 8a Plant Palette..............................................................20 Exhibit 9 Conceptual Drainage and Grading Plan ............................. 23 Exhibit 10 Conceptual Water Distribution & Sewer Plan ...................... 24 Exhibit 11 Conceptual Plan 1 Architectural Elevation and Floor Plan....... 28 Exhibit 12 Conceptual Plan 2 Architectural Elevation and Floor Plan....... 29 Exhibit 13 Conceptual Plan 3 Architectural Elevation and Floor Plan....... 30 Exhibit 14 Conceptual Plan 4 Architectural Elevation and Floor Plan....... 31 Exhibit 15 Conceptual Residential Streetscene................................. 32 Exhibit 16 Conceptual Gated Entry Concepts .................................. 33 Exhibit 17 Typical Front Yard Planting Plan A ................................ 35 Exhibit 18 Typical Front Yard Planting Plan B ................................ 36 Exhibit 19 Conceptual Park Landscape Plan ................................... 37 Exhibit 20 Conceptual Park Imagery ............................................. 39 Page 3 0:\40861\4086101\dccs\specific plan doc\SHonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan SECTION 1.0 INTRODUCTION 1.1 Specific Plan Background 1.1.1 Purpose The purpose of this Specific Plan is to set forth the detailed development principles, guidelines, and programs to facilitate the development of an approximately 40 -acre site located at the northwest corner of the intersection of Avenue 53 and Monroe Street. The proposed project is a single-family subdivision within a gated private community. This Specific Plan is intended to meet the requirements for a Specific Plan as set forth in State law. The State authorizes cities and counties to adopt Specific Plans as an appropriate tool in implementing their General Plans. Such a plan is to include the detailed regulations, conditions, programs, and any proposed legislation that is necessary for the systematic implementation of the General Plan. The Specific Plan provides the linkage between the General Plan, the general goals and policies of the City, and the detailed implementation of that plan with tools such as zoning ordinances, subdivision ordinances, and similar regulations. The Government Code (Section 65451) sets forth the minimum requirements of a Specific Plan and states: "A Specific Plan shall include a text and diagram or diagrams which specify all of the following in detail: 1) The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. 2) The proposed distribution, location and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities needed to support the land uses described by the plan. 3) Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where possible. 4) A program of implementation measures including regulations, programs, and public works projects necessary to carry out paragraphs (1), (2), and (3)." The Specific Plan shall include a statement of the relationship of the specific plan to the General Plan. The establishment of specific performance, design, and development standards is set forth to guide the development of the subject property in such a way as to implement the General Plan while maintaining some flexibility to respond to changing conditions which may be a factor in any long term development program. The document Page 4 0A4086l\4086l0l\docs\specific plan doc4Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan also acts to augment the City's Zoning Ordinance by providing particular design guidelines, a tailored list of allowable, conditionally allowable, and prohibited uses for the site, and unique development standards. 1.1.2 Executive Summary Pista de Dorado will be a 101 lot single-family subdivision located on approximately 40 acres at the northwest corner of Avenue 53 and Monroe Street (Exhibit 1), within Riverside County. An annexation request is in process to incorporate the site into the City of La Quinta. The site is currently located within the City's Sphere of Influence. An annexation application to LAFCO is has been filed for the project site. The land use designation on the City's General Plan and Zoning Map is LDR — Low Density Residential up to 4 dwelling units per acre (du/acre) with a Low Density Agricultural/Equestrian Overlay (LD/AER). (See Exhibits 4 and 5). This designation permits the development of single-family homes on large lots. The existing site is a rural agricultural estate developed with a single-family home, caretakers' residence, horse barn, RV barn, hay shelter, aviaries, animal corrals and pastures, and other accessory structures. There are grazing and exercise pastures, a fallow crop field, and a grape vineyard. There is minimal elevation change across the site, however, there is a man-made, landscaped dirt mound north of the structures and a small man-made pond east of the structures, along the tree -lined driveway. The site has approximately 1,320 feet of frontage on Avenue 53 and on Monroe Street. Avenue 53 is designated as a Collector with a 74 -foot right of way, and Monroe Avenue is designated as a Primary Arterial with a 110 -foot right of way, according to the City's General Plan. Monroe Street will have a 30 -foot wide landscape/multipurpose trail lot for the length of the project. There will be 10 -foot landscape setbacks along Avenue 53 for perimeter landscaping. The surrounding properties are historically agricultural lands, with scattered residential dwellings. The Rancho Santana Specific Plan was approved by the City of La Quinta in 2003 for the 80 -acre property to the north that will feature a single family residential community and on-site equestrian facilities and trails. Pista de Dorado Specific Plan area is shown on the Aerial Photograph on Exhibit 1. Site photos are found in Exhibit 2. Environmental Studies were performed on the site, including a biological assessment, cultural resources assessment, paleontological assessment, focused traffic study, noise analysis, soils and geotechnical analyses, preliminary hydrology and a Phase I Environmental Assessment. The project is a single-family subdivision with grading and infrastructure to be constructed in one phase. The builder may phase home construction in up to seven building phases. The homes will be one story structures. While no on-site horse -keeping will be provided within the subdivision, equestrian enhancements have been incorporated into the project for the public benefit consistent with equestrian/agricultural activities in the surrounding area, and Page 5 0:\40861\4086101\docs\specific plan doOStonefield 40 Specific Plan bb doc 11/2/2004 PLAN VIEW AERIAL OF PROJECT SITEPISTA DE DORADO SPECIFIC PLAN TMs Keith Companies .f CITY OF j NOT TO SCALE . QUINTA Exhibit 1 /N\ J Monroe Street At North East Corner of Property (Looking Southwest) Monroe Street at North East Corner of the Property (Looking West) SITE PHOTOS Near Avenue 53 and Monroe (Looking North) At Southwest Corner of the Property (Looking North) NOT TO SCALE TTa K ilz h lcO—Panlaa Exhibit 2 Pista de Dorado Specific Plan in compliance with the City of La Quinta General Plan policies for the project area. Within the subdivision will be a private community park for Pista de Dorado residents with an historic -western theme children's playground, benches and a shade structure, a half -court area for basketball, and other park amenities. Exhibit 3 depicts the site plan for the proposed development. Primary access to the site will be on Avenue 53, with a secondary access located on Monroe Street. The development will contain private streets and will be a gated community. 1.1.3 The Process Implementation of this Specific Plan is intended to carry out the goals and policies contained in the General Plan of the City of La Quinta in a planned and orderly fashion. The land use designation on the City's General Plan and Zoning Map is Low Density/Agriculture Equestrian Residential District allowing up to 4 dwelling units per acre. The proposed project density of 2.55 dwelling units per acre is below the maximum permitted by the La Quinta General Plan. The Land Use Map for the project site, contained in the 2002 La Quinta General Plan, is shown in Exhibit 4. A comparison of the development plan to the goals and policies of the adopted plan are contained in Appendix One. The property is already properly designated and zoned for the uses proposed. Zoning is Low Density/Agrarian Equestrian Residential (LD/AER) Overlay for the project site. Exhibit 5 depicts the zoning on the site and the surrounding parcels. The applicant has selected to prepare a Specific Plan for the Pista de Dorado development as modification to the adopted development standards for the project zoning are proposed, specific architectural and landscaping design standards are proposed, and specific amenities are proposed to satisfy the Equestrian Overlay development requirements contained in the General Plan. 1.1.4 Relationship to Other Agencies The site is currently located within unincorporated Riverside County and is part of an annexation request that has been initiated with the County Local Agency Formation Commission (LAFCO). The City can move forward with entitlement processing of the development plan, prior to approval of the proposed annexation by LAFCO. However, no construction -related permits can be issued until the annexation has been approved and recorded by LAFCO. In addition to City approvals, permits will be required by the Coachella Valley Water District (CVWD) for improvements to the water and sewer lines. Other improvements to infrastructure will be required by Imperial Irrigation District (electrical power), Verizon for telephone service, The Gas Company for natural gas service, and Time Warner for cable TV service. Each of these services will be coordinated by the developer prior to construction as required by the City of La Quinta. Page 8 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doe 11/2/2004 Pista de Dorado Specific Plan 1.1.5 Regional Project Setting The Pista de Dorado Specific Plan is located within the central portion of the Coachella Valley, a low desert environment surrounded by the San Jacinto, Santa Rosa, and Little San Bernardino mountain ranges. The project site is located on the desert floor, within a historically rural agricultural and equestrian land use area. The project location is within the Sphere of Influence of the City of La Quinta at the City's northeastern boundary. 1.1.6 Local Project Setting The project site is located southwest of the City of Indio, and north, south and east of the current boundaries of the City of La Quinta. Pista de Dorado is surrounded by agricultural properties, some of which have recently acquired development entitlements on them for single family land uses, such as the Rancho Santana Specific Plan that borders Pista de Dorado along the north. Regional Historical Background and Project Theme The Coachella Valley is a unique place with a history of serving as a regional transportation corridor between the Pacific Coast, Arizona and Mexico. The development of the Coachella Valley and its link to the outside world had very much to do with a mostly forgotten wagon trail, parts of which are still a dusty four-wheel-drive track that meanders across the desert to the Colorado River near Blythe, and a part of which has been covered over by Highway 111. For centuries an old Indian path called the Cocomaricopa Trail traveled through the valley to the Colorado River. The story of this wagon road really begins in about 1830 when mountain -man Pegleg Smith reported finding black gold nuggets a few miles west of La Paz (modern-day Ehrenberg, Arizona) in the McCoy Mountains. Thirty-two years later, in 1862, Paulino Weaver of the San Gorgonio Pass area was trapping beaver along the Arizona side of the Colorado River about 10 miles north of Blythe, and he spotted the glitter of gold in the bottom of a small gulch. Before long a new gold rush was heading to La Paz....and the miners were traveling through the Coachella Valley to the gold fields. William Bradshaw, a Los Angeles adventurer, quickly realized the need for a road to the gold fields at La Paz. A Cahuilla Indian is thought to have drawn Bradshaw a rough map indicating where watering holes and old campsites along the ancient Indian trail were located. The Bradshaw Trail, or "Via Oro," followed the general alignment of this old Indian trail. The inception of the stageline trail was intimately connected with hopeful miners who were Page 9 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 LEGEND (DSingle Family Residential Estates Q2 Park/Retention Basin ' Retention Basin 4, Equestrian Trail CONCEPTUAL LAND USE PLAN NOT TO SCALE Tha Kaith Companies Exhibit 3 VLDR VLOR :DR CITY GENERAL PLAN LAND USE MAP NOT TO SCALE Roads Township/Range Sections Railroads City Limits ------" Planning Area #1 " Planning Area #2 . ". "' .' City Sphere of Influence Residential Land Uses VLDR Very Low Density up to 2 du/ac LDR Low Density up to 4 du/ac .- MDR Medium Density up to 8 du/ac �`• MHDR Medium -High Density up to 12 du/ac HDR High Density up to 16 du/ac Hillside Overlay Agriculture/Equestrian Overlay Commercial Land Uses -_.._. M/RC Mixed/Regional Commercial CC Community Commercial NC Neighborhood Commercial CP Commercial Park O Office TC Tourist Commercial VC Village Commercial Other Land Uses I Industrial MC Major Community Facilities P Park Facilities OS Open Space G Golf Course Open Space W Watercourse/Flood Control Tt,a Kekh Exhibit 4 { 71 CITY ZONING MAP Zoning Designation Tourist Commercial — AL PROJECT rZ m fff maw am maw r� M HVL I i1. iL I Industrial LEGEND Office Commercial RESIDENTIAL Major Community Facilities Very Low Density Residential Low Density Residential F`'•1+ ^i',-'-;"• } ° J ' Cove Residential •rad Medium Density Residential Parks and Recreation Medium High Density Residential y •. - High Density Residential - �X Y'' VILLAGE COVE - - Open Space _ Village Commercial 1r ,. NONRESIDENTIAL DISTRICTS Floodplain - _ Regional Commercial .. Low Density AgneWhue"co„asr,a ca Neighborhood! Commercial Zoning Designation Tourist Commercial — AL PROJECT rZ m fff maw am maw r� M HVL I i1. iL I Industrial NOT TO SCALE The K h;h Exhibit 5 Office Commercial Major Community Facilities .. Commercial Park F`'•1+ ^i',-'-;"• } ° J ' SPECIAL PURPOSE DISTRICTS Parks and Recreation y •. Golf Course - - - -- - �X Y'' Open Space 1r ,. Floodplain - .. Low Density AgneWhue"co„asr,a Residential SPECIAL SYMBOLS ,- ___ i Equestrian Overlay _... N sift ° ■''+,K _____ City Limit�— ! ..•City Sphare "'}(~rte ~ 1* Planning Area 1 Araa 2 `Planning N Y - 'Designations outside City limit U are Considered pre -zoning yF -- NOT TO SCALE The K h;h Exhibit 5 Pista de Dorado Specific Plan racing toward La Paz in a gold -fever frenzy. In its heyday, the Bradshaw Trail linked coastal southern California to Arizona and eastern states. Bradshaw's stage coaches brought people, the US mail, and supplies into and through the area. A series of stage stops were established in the Coachella Valley to service the teams and passengers, with one such stop said to have been located in La Quinta, near Point Happy. The stage road forks at Point Happy with one segment transitioning southeastward to Toro Village, and another segment continuing eastward through what is now the City of Indio. The reprint from the 1877 Omaha Herald lists tips for stage coach travelers, offering us a hint of what it must have been like back then. Bradshaw Trail referred to as the "Gold Road to La Paz," was soon eclipsed by construction of the Southern Pacific Railroad through the area in 1876, ending the dependency on the stage coach for regional travel. The reprint from the 1877 Omaha Herald, found on the inside cover, lists tips for stage coach travelers, offering us a hint what it must have been like back then. From the above historical setting, Pista de Dorado (Trail of Gold) takes its name and design character. The flavor of the old trails, stage coaches and stops, gold miners, horse-drawn wagons, and early settlers is celebrated by this project. The custom-designed play ground equipment, perimeter wall design, street sign and street light design, public art concepts, and other features all will reflect a taste of this rich local history. The classic architectural design of the homes will reflect this celebration of history and tradition. A sense of place and historical feel is offered to those who chose to live in Pista de Dorado. Page 13 0:\40861\4086101\docs specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan SECTION 2.0 SPECIFIC PLAN 2.1 Project Description The project site is approximately 40 acres in size and largely square in shape. The site is currently developed with a single-family home, a caretakers' house, horse barn, corrals, aviaries, and other accessory structures, fences, and gates. There is a landscaped earthen mound near the main house and a small lake. This specific plan will guide the development of a private residential community with upscale architecture and landscape designs in a western -equestrian design theme complementary to the surrounding properties and goals of the City of La Quinta General Plan. The project has been designed to enhance planned and existing public equestrian facilities and to offer residents a country villa atmosphere with a feel for by -gone days. Pista de Dorado will be a gated community consisting of 101 single family homes on lots ranging in size from 9,600 to 22,000 square feet, with semi -custom -look homes, on an average lot size of approximately 11,000 square feet, incorporating a centrally -located private family park for residents. The floor plans for the home sites will range in size from approximately 2,694 to 3,049 square feet of livable area. Each floor plan will have three front elevations offering a range of classic Italian Tuscany and Spanish/Mediterranean equestrian/country villa architectural themes in natural desert tone stucco colors with a variety of accent possibilities including, but not limited to, exterior shutters, recessed windows with lentils, and other classic design features. Front elevations and detailing/color schemes will be minimally repeated within the subdivision, thereby giving each dwelling an individual semi -custom look. Placement of homes on lots will incorporate variety and randomness to give a more custom feel to the project, and a sense of place. Most home sites will enjoy a view of the Santa Rosa Mountains. Varied setbacks will provide for an interesting and customized streetscape within the project. A decorative solid masonry block wall will surround the private community. Gated entries will be decorative and provide controlled access for residents. Options for a detached or attached casita will be offered for home sites that can accommodate them, and will be approved under a Master Minor Use Permit process. Restrictive covenants on the casitas are expected pursuant to City requirements. Within the project, a central focus of Pista De Dorado community life will be the private village park, a highly landscaped open space offering respite passive and active recreation facilities for the whole family, including a children's playground, half -court for basketball, shade structures, and a small landscape water feature. The park will be approximately 35,000 square feet in size and be visible shortly after one enters the project, creating an enhanced internal entry statement for the project. The private Pista de Dorado Park will serve as the village center and be an inviting place for birthday parties and neighborhood Page 14 0:\40861\4086101\docs\specific plan doc\Slonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan gatherings, as well as lying under a tree with a good book. The Homeowner's Association may choose to hold community meetings in the park. Pista de Dorado will be surrounded by a 6 -foot high block wall with vintage style detailing and decorative cap, reminiscent of a historic wall. Desert friendly landscaping along the perimeter, including the multi-purpose trail, will be provided as required by the City of La Quinta General Plan and the City's landscape guidelines. There will be two gated entries into the project; both gated entries will include decorative monument identification signs and extensive entry features and landscaping. A multi-purpose trail for pedestrians and horses, and on -street bicycle path will also be provided along Monroe Street. Along Monroe Street, the multi-purpose trail will be widened an additional ten feet to provide expanded equestrian facilities for a total of 30 feet width. Static obstacles, such as poles to weave through, a bridged dry wash crossing, and other suitable features for horse and rider are proposed within the enhanced area for equitation training and pleasure. The project will include privately maintained streets and open space with decorative low profile lighting to preserve the visibility of the naturally clear skies of the desert. 2.2 Specific Thematic Plans 2.2.1 Conceptual Land Use Plan The Tentative Tract Map 31874 will serve as the development plan for Pista de Dorado as depicted in Exhibit 3. The subdivision encompasses the entire 40 acres with single-family residential lots accessed from an internal private street system. Both street -side and driveway parking will be provided. 2.2.2 Conceptual Circulation Plan The Plan (Exhibit 6) will utilize the adjacent street system in a manner that is consistent with the City of La Quinta General Plan Circulation Plan. The property is located on the north side of Avenue 53 and the west side of Monroe Street. Monroe Street is a Primary Arterial and an Agrarian Image Corridor. Avenue 53 is a Collector street. Additional public street widening and improvements will be completed as part of this development. The main entrance is located on Avenue 53, with an entrance on Monroe Street providing a secondary access. Access cross sections are shown on Exhibit 7. The landscape design along the project frontage shall be complimentary to the landscaping in the area and the goals of the General Plan for image corridors. Exhibit 8 depicts the proposed landscape treatment along Monroe Street and Avenue 53. Page 15 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb.dcc 11/2/2004 Pista de Dorado Specific Plan Pista de Dorado will be a gated community with private streets. Parking will be allowed on both sides of interior streets. A multi -use trail will be developed along the east project boundary, adjacent to Monroe Street. See Exhibit 8. This trail system implements the La Quinta General Plan, along the eastern project boundary. The enhanced trail segment and Trail Stop will provide the first such amenities along the five mile length of Multi -Purpose trail along Monroe Street. The Monroe Street Multi -Purpose Trail segment begins at Avenue 52 and extends south to Avenue 62. As the project is located near the northern end of the trail, the Trail Stop provides a type of comfort station for those either ending or beginning their use of the trail. No restrooms are proposed for the Trail Stop at this time, however, they may be included as an additional public amenity as provided by the City. As development occurs along Monroe Street, it is anticipated that additional segments of the trail will be constructed in the future and that additional trail enhancements along the trail route will be provided by others. Pista de Dorado is taking the lead in designing the first trail enhancements for this segment of the trail system with a focus on the equestrian tradition of the project area. 2.2.1 Conceptual Grading and Drainage Plan 2.2.3.1 Improved and Natural Drainage Plan The site lies in flood Zone C according to Community Panel No. 060245-2300 B dated March 23, 1983. Zone C is an area of minimal flooding and no special protection or measures are required. Existing and improved drainage patterns are shown on Exhibit 9. 2.2.3.2 Grading The site will be graded in a single phase. It is anticipated that there will be a balance of material on the site. The preliminary grading concept for the property shows a retention basin at the southeast corner of the development for retention of storm flows and nuisance water. The private park will also serve as minor retention area. Existing structures will be demolished and removed. The artificial earthen mound that currently exists on the property will be leveled, and the pond will be filled in, so that the project site will be relatively flat, allowing for proper drainage conveyance. See Exhibit 9 for the conceptual drainage/grading plan. Page 16 OA40861\4086101\docAspeciFic plan doc\Slonefield 40 Specific Plan bb doc 11/2/2004 LEGEND j Main Entry -Gated (Full Movement) Secondary Entry -Gated (Right in- Right out) Equestrian Trail Major Circulation Pattern CONCEPTUAL CIRCULATION PLAN NOT TO SCALE -rho Kmtz h Companlaa Exhibit 6 SEE CROSS SECTION A -A - - ON EXHIBIT B FOR STREET DETAIL AN DEPTH LOOK AT THIS SEC71ON 42' _ STREET DETAIL 10' EX. 30' ROAD ESMT. ADDITIONAL 3U' EX. 30' ROAD ESMT PARKWAY EX. (PRIVATE) E/P +/-12' rt DDITIONAL EX. PARKWAY FjP +/-12' PROP. PROP EXI571NGASpHAL ISTINGASPHAL P/L � R/W PR P. I PROP 74' (ULTIMATE R/W) P t R/W 110 (ULTIMATE RMS PROP. 37' DEDICATION PROP. SS' DEDICATION - ARKWAY 72' 34' 9' PROP. (P BuC) PARKWAY BARRIER STD. CURB (PUBLIC) STD. CURB CURB - &GUTTER PROP. A.C. & GUTTER 2% FRC. }- .----^ 2% A.C. - JOIN EXISTING/PROPOSED GRADE EXISTING/PROPOSED JOIN , LAFIDSCAPEP PROP. BASE TING/PROPOSED MEDIAN COMPACTED SUBGRADE GRADE PROP. BASE 6' MEANDERING COMPACTED SUBGRADE SIDEWALK TYPICAL SECTION 10' WIDE MEANDERING TYPICAL SECTION AVENUE 53 MULTI-PURPOSE TRAIL MONROE STREET N.T.S N.T.S 10' P.U.E RfW STREET DETAIL 40' 18,0° 18.0' PROP. WEDGE PROP. CURB WEDGE JOIN _ 2 PROP. A.G. CURB 4G!1''ROPOSE _-- ---- GRADE PROP. COMPACTED SUBGRADE CIRCULATION CROSS SECTIONS TYPICAL SECTION PROPOSED INTERIOR STREET N.T.S NOT TO SCA0 R/W 10' P.U.E JOIN EXISTING7PRC GRADE TF�a KaitFt Companies Exhibit 7 MONROE AVENUE PERIMETER WALL 1 AVENUE 53 MONROE STREET CROSS SECTION A -A' PERIMETER LANDSCAPE PLAN *Plant Pallete depicted on following exhibit (8A) "'ISTA DE DORADO SPECIFIC PLAN NOT TO SCALE CITY OF LA QUINTA KEY MAP a I DD 1 Fyy pL � MONROE AVENUE P. KEY MAP NORTH The Keith Companies Exhibit 8 PLANT PALLETTE 1 -- -I-- NOT TO SCALE Exhibit 8A Pista de Dorado Specific Plan 2.2.3.3 Erosion Control The project will comply with the City's erosion control ordinance. The grading operations shall include adequate provisions for wind and water erosion control during, as well as after, grading operations have ceased. The details of erosion control shall be included in the project's Storm Water Pollution Prevention Plan (SWPPP) and PM 10 Plan. • Pre Grading — The portions of the site to be graded shall be pre -watered to a depth designated by the soils engineer prior to the onset of grading operations. • During Grading — Once grading has commenced, and until grading has been completed, watering of the site and/or other treatment(s) determined to be appropriate shall be ongoing. • Post grading — All disturbed areas shall be treated to prevent erosion for the term that the area will remain undeveloped. Wherever feasible, final landscape and irrigation shall be installed. SWPPP/NPDES/PM 10 Since the Coachella Valley experiences periods of moderate to heavy wind conditions, wind-blown dust and sand is a concern with mass grading operations. Because of health concerns, the Environmental Protection Agency has instituted a plan in the valley to curb excess PM 10 (small particle dust). The City also participated in the National Pollutant Discharge Elimination System program. The City of La Quinta requires SWPPP, NPDES, and PM 10 plans to control the wind and water born erosion associated with such grading operations. The project will comply with the City's requirements relative to these programs. 2.2.4 Conceptual Water and Sewer 2.2.4.1 Water Plan Coachella Valley Water District (CVWD) provides water service in the City. There is an existing 18" water line located in Avenue 54 and Monroe Street that terminates approximately 1/2 mile of the site. Per CVWD standards, dedication of a water well site will be required within the project area. The location of the well will be indicated on the tentative tract map for the project. Exhibit 10 shows the conceptual design for water service. A valley -wide overdraft condition exists for the local groundwater basin. In November 2000, the Coachella Valley Water Management Plan was prepared to provide water conservation goals toward reducing urban water demand by 10 percent. In compliance with Page 21 0:\40861\4086101\docs\specific plan doc\Stonerield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan this plan, Pista de Dorado will incorporate water conservation measures for landscape irrigation and domestic plumbing fixtures. Drought tolerant landscape plantings will be selected for their reduced water needs. 2.2.4.2 Sewer Plan Pista de Dorado homes will be served by sanitary sewer facilities. Sanitary sewer service for the project area is provided by Coachella Valley Water District (CVWD). Currently, there are no facilities in front of the project site. An 8 -inch gravity line is located at Avenue 52 and Monroe Street. Eight -inch gravity lines are proposed near Madison Street and Avenue 50, and Monroe Street and Avenue 55. This second line will connect to a lift station at Monroe Street and Avenue 57. Exhibit 10 shows the conceptual design for sewer service at Pista de Dorado. 2.2.5 Other Conceptual Dry Utility and Other Services 2.2.5.1 Electrical Plan The Imperial Irrigation District (IID) provides electric facilities in La Quinta. There are overhead services adjacent to the site. The City will require the installation of these services to be underground if the voltage is less than 34 KV. 2.2.5.2 Natural Gas The Gas Company provides natural gas services in the project area. There is service in Avenue 52 that will be utilized for the development. 2.2.5.3 Cable Television Time Warner Cable is the current purveyor of television cable service in the project area. There is service available from Monroe Street and Avenue 53 that will serve as a connection points for the Pista de Dorado project. 2.2.5.4 Telephone Verizon will provide telephone service in the Coachella Valley. There are service connection points in Monroe Street and Avenue 53. Page 22 0:\40861\4086101\docs\specific plan doc\Stonefteld 40 Specific Plan bb.doc 11/2/2004 Pista de Dorado Specific Plan 2.2.5.5 Solid Waste Waste Management of the Desert provides waste disposal service. It is anticipated that standard residential weekly street -side pick-up service will be implemented for Pista de Dorado residents. 2.3 Planning Standards and Design Guidelines 2.3.1 Development Standards The uses and development standards will be modified from those contained in the provisions of the La Quinta Zoning and General Plan regulations. Should conflict occur between the regulations and the Plan, the provisions of the Plan and supporting text shall prevail. The following proposed development standards are applicable to the Pista de Dorado Specific Plan and are meant to change and augment Sections 9.40 — 9.60 and 9.140 of the City's Municipal Code. Section 9.140 is included as Appendix Two. The balance of the City's Municipal Code applies to this project. Page 23 0:\40861\4086101\docs\specific plan do6Stonefield 40 Specific Plan bb doc 11/2/2004 J LEGEND Proposed 18" Water Line --------- Proposed 8" Water Line ------ - Proposed 8" Sewer Line CONCEPTUAL WATER DISTRIBUTION AND SEWER PLAN T TO SCALE I I -rha KHi h companies® I mllm*41= Exhibit 10 Pista de Dorado Specific Plan PERMITTED USES Single-family dwellings Attached or Detached Casitas_, subject to the Master Minor Use Permit requirements Garages and carports, sub ect to Section 9.06.060 of the La Quinta Municipal Code Patio covers, decks and gazebos, subject to Section 9.06.040 of the La Quinta Municipal Code Fences and walls, subject to Section 9.06.030 of the La Quinta Municipal Code Swimming pools, spas and cabanas, subject to Section 9.06.070 of the La Quinta Municipal Code Parks and Open Space Satellite dishes and antennas subject to Section 9.06.070 of the La Quinta Municipal Code LOW DENSITY/AGRICULTURAL-EQUESTRIAN RESIDENTIAL DISTRICT Proposed Existing Minimum lot size for single family dwellings (sq. ft. 9,600 10,000 Minimum lot frontage for single-family dwellings ft.) 80 100 Minimum lot frontage on cul-de-sacs and knuckles/irregular_ lots (ft.) 35/70 35 Maximum Lot coverage (% of net lot area) 50 40 Maximum structure height (ft.) 28 28 Maximum number of stories 1 2 Minimum front yard setback (ft.) 15 30 Minimum perimeter setback for landscape 1 10/20 20 Minimum side yard setback (ft.) 14 combined, no less than 5 on interior side 20 Minimum livable area excluding garage (sq ft.) 2,200 1,400 Minimum rear setback 15 30 Max No. of Horses for Private Use (per acre) 0 5 GENERAL NOTES 1. Perimeter landscape setbacks are adjacent to perimeter streets; fust number applies to Avenue 53 landscape setback; second number applies to Monroe Street landscape setback. Page 26 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan Casita development shall comply with Section 9.60. 100 of the City of La Quinta Zoning Code unless stated below: CASITA DEVELOPMENT STANDARDS Proposed Existing Height (maximum) 17 10 for up to 200 sq. ft. 17 for 201+ sq/.ft. Separation from Main Building 5 10 Front yard setback 15 20 Interior Side Yard Same as for main building Same as for main building Exterior Side Yard Same as for main building Same as for main building Rear Yard setback Same as for main building Same as for main building 2.3.2 Design Guidelines 2.3.2.1 Residential Design Concept This gated community will have a mixture of one-story, semi -custom -look homes incorporating a blend of classic country villa design flavors from Spain, Italy, and Early California, such as Tuscan, Spanish Revival/Mediterranean, Spanish Colonial, and Early California Mission and Rancho architectural styles. These architectural styles are frequently found in the La Quinta area and are well received in the project area. Architectural treatments will include, but are not limited to, multiple roof lines, beam lentils and decorative window shutters, decorative windows, arches, thick walls, rock accent fascia, stucco exteriors, decorative masonry treatments, low stuccoed garden and courtyard walls with decorative wrought -iron gates, French style doors, window hood moldings and canopies, wrought iron window grill -work, decorative roll -up garage doors with lites, side -loading garages, dual garages (one two -car and one one -car), tile roofs, decorative chimney treatments, and decorative exterior light fixtures and vent covers. Covered patios are included. Optional attached and detached casitas will be available. Exhibits 11, 12, 13 & 14 portray the range of conceptual architectural styles and floor plans anticipated for this project. Four floor plans will be offered, each with three front elevation alternatives. Conceptually, Plan 1 will feature 2,694 sq. ft. of livable area (2 or 3 bedrooms, 2 or 3 baths). Plan 2 will feature 2,773 sq. ft. of livable area (3 bedrooms, 3 baths). Plan 3 will feature 2,962 sq. ft. of livable area (3 or 4 bedrooms, 2 or 3 baths), and Plan 4 will feature 3,049 sq. ft. of livable area (4 bedrooms, 3 baths, 1 powder). All plans will be one- story units with three -car garages on the front elevations of each plan. Plans 2 and 4 will feature dual garage areas with two -car garage and single car garage configurations. Floor plans indicate a variety of interest by the undulating footprints for not only the front elevations, but the rear elevations as well. Plans will feature combinations of master suites Page 27 0:140861\4086101\docs\specific plan doc\StoneHeld 40 Specific Plan bb doe 11/2/2004 Pista de Dorado Specific Plan with master baths, great rooms, flex rooms, walk-in closets, breakfast nooks, laundry rooms, dining rooms, and galleries. Exhibit 15 illustrates an expected street scene with front yard interest and variability planned for the development. Final plan renderings may vary slightly in detail and floor plan designs, however, the four conceptual plans presented in this Specific Plan are typical of the semi -custom home product envisioned for Pista de Dorado. Final product designs will be subject to design review approval by the City of La Quinta. 2.3.2.2 Landscape Design Concept The landscaping theme for Pista de Dorado consists of appropriate plantings for the desert area that have proven to be water efficient, and convey a classic desert feel. Entry areas are characterized by plantings of hybrid fan palms under planted with bougainvillea "la jolla", agave Americana and salvia greggii. Exhibit 16 depicts the decorative front gate entry design for Pista de Dorado. Parkways are informally planted with masses of sweet acacia, desert museum palo verde and Texas ebony. Underplanting of bougainvillea, deer grass and Texas Ranger are mixed with groundcovers of trailing acacia and lantana. The ranch fence is planted with bougainvillea and Lady Banks rose. Exhibit 17 & 18 illustrate the conceptual front yard landscape schemes for the project. The interior park has large open areas of lawn with seven varieties of trees for shade. An arbor/seating area will be planted with Lady Banks rose. Exhibit 19 illustrates the conceptual park landscaping plan. The play area is buffered from the adjacent homes with a planting of large shrubs which include cassia, red bird of paradise, Texas Ranger and yellow oleander. Additional color is provided throughout with penstemon and desert marigold. 2.3.2.3.1 Public Facilities a. Equestrian Trail Enhancements A ten (10) foot wide strip of land will be added to the existing 20 -foot public right of way area along Monroe Street for a total of 30 feet width to be reserved for the regional multi- use trail. Within this additional area will be interesting static equestrian obstacles for horse and riders to negotiate. Static obstacles such as a bridge crossing over a dry creek bed and poles to weave through will be placed in appropriate locations within this area. These obstacles are designed to be permanent, encountered at a walking pace, and will serve as training aids and "play" equipment for horse and rider. The equestrian portion of the multi use trail will meander in and out of this additional area providing an interesting horse backing riding and pedestrian experience. Page 28 O:\40861\408610]\dou\cpecificplan doc\Stonefield 40 Specific]?Imbbdoc 11/2/2004 Pista de Dorado Specific Plan At the northwest corner of Avenue 53 and Monroe Street will be the retention basin for the project, which will also feature an adjacent Trail Stop facility alongside the regional multi- use trail system. The Trail Stop will be a place for horse and rider as well as pedestrians to stop and rest. This will be the first such facility along the trail system and should set a new standard for future developments along the trail route. There will be a hitching area for riders to dismount and tie their horses, a watering trough for horses, a drinking fountain and benches for people. At the Trail Stop there could be a decorative, yet functional, monument -style map of the regional trail system, with locational information identified for users of the trail. There is also opportunity at the Trail Stop for a thematic public art piece. Exhibit 9 illustrates the enhanced trail concept for this project. Page 29 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 _"t Covered Patio Flex Space Bodmom 3/Bath 3 Library Gema Room Ottice Theatre 1.7 i. Master Suit Fireplace - Living h�edta LlnOn _ Entry I Linen Bedroom 2 = Courtyard Latin WW 10 _ t Master Bath l vmily Walk-in Close Ia 4 Walk-in [:lou" I Bath jI r Trash' [ +�; 3 Car�;aragc `�h. i 1 *!1 I41 Optional J Meter;j Attached Casitas Floor Plan Front Elevation CONCEPTUAL PLAN 1 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) _ NOT TO SCALE Plan 1 2,694 sq. ft. Scale: 1/4" = V- 0" Tha IGalth Campmnlaa j 7rtc= Exhibit 11 Breakfast Nook USO} I 11001 Equip. 00 .t a ); Hutch Niehe Dining ..��Ref sDiv Kitchen D,'0 NC ! li.l �laragc Flex Space Bodmom 3/Bath 3 Library Gema Room Ottice Theatre 1.7 i. Master Suit Fireplace - Living h�edta LlnOn _ Entry I Linen Bedroom 2 = Courtyard Latin WW 10 _ t Master Bath l vmily Walk-in Close Ia 4 Walk-in [:lou" I Bath jI r Trash' [ +�; 3 Car�;aragc `�h. i 1 *!1 I41 Optional J Meter;j Attached Casitas Floor Plan Front Elevation CONCEPTUAL PLAN 1 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) _ NOT TO SCALE Plan 1 2,694 sq. ft. Scale: 1/4" = V- 0" Tha IGalth Campmnlaa j 7rtc= Exhibit 11 J 1 I—I^�� Master Puoli9i*i-,t'�_1 Bath lI Master Suite I 6M4 kc Walk-in Clout A•C J r Bedroom 2 Floor Plan Covered Patio i I i Llnen I' J � r-�Ikw- /'Bath � _ Walk-in Laun ry _ Cloaet Great Room Breakfast rrxihO I ^ • - -2 Gauge - �lar — ' Floor Plan Covered Patio i I i Il} Bai}� Bedroom 3 11(c.r C gC J Optional Casitas Front Elevation CONCEPTUAL PLAN 2 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) NOT TO SCALE Plan 2 2,773 sq. ft. Scale: 1/4" = 1 0'• TFia FGafth Companla6 Exhibit 12 r-�Ikw- Great Room Breakfast s Nook 1.w WanHutchNiche ikfr LowWall Kitchen - Raf_ 110 Gallery f °cseal� • u -. �'.InidV Entry ; Opl, Door •, j for Dining ' k Flex Space COUrtvard • •� Formed Dining Gemc Ioom Then. Library Il} Bai}� Bedroom 3 11(c.r C gC J Optional Casitas Front Elevation CONCEPTUAL PLAN 2 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) NOT TO SCALE Plan 2 2,773 sq. ft. Scale: 1/4" = 1 0'• TFia FGafth Companla6 Exhibit 12 i l Covered Patio 1 X Master Suite `"`r'I"' � Breakfast p Paas rgniP. 00 �; Master i Nook Bath t Great Room I X I Media �I J111 X Vanity ; A•'C walk-in Corset 1¢'pwd - Kitchen Ref! r=(, C? r - iilaw IPXnch lichc Pantry Bedroom 2 c�„tt • i Flex Space Entry Library Dinin (_ -f 100 Came Room �' �f theatre Bath 2 Ltnen Bedroom 4/oath 3 Of ce Faaaw *1114 Bedroom 3 Laundry Courtyard • C;;. i:3 � I I it _ _ •I _, s Optional Detached �Et d Casitas Meter j Floor Plan :-t c � �a Front Elevation — M Rear Elevation CONCEPTUAL PLAN 3 (ARCHITECTURAL ELEVATION AND FLOOR PLAN). 7"ISTA DE DORADO SPECIFIC PLAN NOT TO SCALE CITY OF l Plan 3 2,947 sq. ft. Scale: 1/4" = V- 0" T'X K.1rh Companlaa Exhibit 13 I Trash � 1= Maar I Bcdroom 2 t Entry 8 po'wdcl' oM Door Flcx Room Libmry;Den Laundry Theatre .11 n .y llumc Dffiva .. L l Game Room F'olmal Dining I. Walk-in Ball[ 2 Closet i 1 I � y Courtyard l •4 Li - 1111 P - Floor Plan Bedroom 3 I Optional i Attached Casitas Front Elevation Front Elevation with Attached Casitas CONCEPTUAL PLAN 4 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) NOT TO SCALE Plan 4 3,049 sq. ft. Scale: IW = I'-0" Tha KBirh Companlaa Exhibit 14 K I r, Breakfast Covered Patio � Nook I >* Master Suite Pool Equip,- CD.9ti J" I f� r Walk-in FuOlfcf Closet Sink , Lc Kitchen D,O Ref Low Wall y, 711 Great Room Mnra Mastern{ r Bath -- mry, Bath 3 I Bedroom 4 I Trash � 1= Maar I Bcdroom 2 t Entry 8 po'wdcl' oM Door Flcx Room Libmry;Den Laundry Theatre .11 n .y llumc Dffiva .. L l Game Room F'olmal Dining I. Walk-in Ball[ 2 Closet i 1 I � y Courtyard l •4 Li - 1111 P - Floor Plan Bedroom 3 I Optional i Attached Casitas Front Elevation Front Elevation with Attached Casitas CONCEPTUAL PLAN 4 (ARCHITECTURAL ELEVATION AND FLOOR PLAN) NOT TO SCALE Plan 4 3,049 sq. ft. Scale: IW = I'-0" Tha KBirh Companlaa Exhibit 14 Planl Plan 2 Plan 3 Plan 4 with Attachcd Casitas CONCEPTUAL RESIDENTIAL STREETSCENE NOT' O SCALE Tha KaltFi CompanlaB Exhibit 15 PILASTER VINES ON CANOPYTREE ' - 6' HT WALL ni ENHANCED PAVING LU M) Z W _ _ Q W O af Z MONUMENT 0 r SIGN IF d, PEDESTRIAN - 4' WIDE GATE SIOEWALK ..'iJ. MAIN ENTRY ecur� ria` -0• KEY MAP STONE VENEER PILASTER --WI SAND MOLD BRICK CAP 53 AV�NUE I SECONDARY ENTRY scALc- r -to` -0• NOfRH ,-SMOOTH STUCCO WALL COPPER PANNEL -CARRUPE LIGHT --Wf EMBOSSED DETAIL MAIN ENTRY GATE CONCEPT SCALE- NM CONCEPTUAL GATED ENTRY CONCEPTS HOT TO 'SCALE I Tl,. HLail Fh Comp.,I.s Exhibit 16 PEDESTRIAN VEHICULAR GATE GATE 6HT WALL -IL -06 f cJ. r- VINES ON S. HT. WALL M1 �Y r /r. % ENHANCED PAVING -MON ^MENT y 53 AV�NUE I SECONDARY ENTRY scALc- r -to` -0• NOfRH ,-SMOOTH STUCCO WALL COPPER PANNEL -CARRUPE LIGHT --Wf EMBOSSED DETAIL MAIN ENTRY GATE CONCEPT SCALE- NM CONCEPTUAL GATED ENTRY CONCEPTS HOT TO 'SCALE I Tl,. HLail Fh Comp.,I.s Exhibit 16 Pista de Dorado Specific Plan b. Art in Public Places The requirement for Art in Public Places will be satisfied in accordance with Chapter 2.65 of the La Quinta Municipal Code. The historic flavor conveyed throughout this specific plan lends itself to conceptual public art opportunities that might include using the Bradshaw stage coach, mining, or one of the other related local historic themes. Within the Trail Stop, there is an opportunity for a public art piece portraying the historical theme of Pista de Dorado. c. Recreation Recreational requirements will be satisfied in accordance with Section 13.65 of the La Quinta Municipal Code. Residents of the project may utilize the adjacent regional multi -use trail system and Trail Stop along Monroe Street, by accessing Avenue 53 and Monroe Street via pedestrian gates at the formal entry locations, a pedestrian gate at the southeast corner of the project, as well as other public facilities in the area. 2.3.2.4 Private Facilities Community Park Centrally located within the gated development will be a 35,000 square foot private park with custom designed play equipment with a resilient safety ground surface, shade structure(s), gazebo, and a basketball half -court. Benches, shade structures, and attractive landscaping will also be provided that will include succulents, 24" and 36" box canopy trees, shrubs and groundcover, as well as decorative boulders, pebbles, decorative planter pots, a water feature, and decorative lighting. The play equipment will have a thick safety surface underneath to cushion potential falls by children using the equipment. The safety surface will feature an interesting historic themed design consistent with the theme of the project to compliment the play equipment. Play equipment may feature climbing, sliding, crawling, and riding experiences that may resemble stage coaches, stage stops, wagon wheels, horses, miners and mining equipment, local Native American villages, etc. The playground will have an interpretive aspect to it. Amenities for older youth and adults will consist of the basketball half -court, a shade structure with seating, and open areas. This design theme will fit into the design character of the project and the area. Exhibit 20 conceptually illustrates the design envisioned for the park. Play equipment will be made of durable materials suitable for the desert environment with safety and comfort, as well as creative play, in mind. Shade structures over portions of the play equipment and a shade feature with benches will be included, as well as a shallow water feature. Lighting in the park will consist of low-level walkway fixtures that are downcast and shielded. No lighting will be provided for the basketball half -court. A community swimming pool is not planned for the park, but private pools will be options for homebuyers. Construction of the park is planned for Phases 2 and 3 of home building phasing. Page 36 0:\40861\4086101\docs\specihc plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 TYPICAL FRONT YARD PLANTING PLAN (A) NOT TO SCALE PLANTLEa90 wnww.ar_x--. ro'P. w' !N4ySfM a rw W4L 1w•ui .N 1�� � w ' � 4.XlM,+W urf++St µ{�rti4111.I1,Y YiYe♦t -- //�re+l�a [Pl]la� fM! l-\71 � Zig.' �'nw i-ryei'"•--`�—� au r�ra.r.. w� Fi iu�rrRal.w.p ow.r.+rw.n�w.n..... r,....... w.�.+.-+.....,....r. �� M www+r'w.Mww+w N,.+r*W+a+yn�..i w.•..T�. Y#NrM1/f.wr�irrl4naNeFY W 1Yy Tha Kmit; h Companlaa Exhibit 17 TYPICAL FRONT YARD PLANTING PLAN (B) fu#r.wx. W��,..m..+..Y,,.. �.w HYw �wr wrr��.,r+�.•d.Y MYlw�f WMrr.#M /el+#wYY���FMw�nYwir.rrr#p.�y 3Mc�� W RaYYpkY��MO��tiCM�VYry. NOT TO SCALE T'h. Keith Campanian Exhibit 18 'ow STM+i+mus�� wer..ur •v rY�e� c` 1J1aY. Y1kO. ' /1 } wWr +r r..cw fd wY u yu�daa+y+.wn.v.mxw. m....--.. a 'r for #u - Y� •,Y M C�L 4YY#YkiNV+'r 14Nf - M#wYw BYIe/eYa`�iMw Ali -� 3 `y w.unu�#c. fu#r.wx. W��,..m..+..Y,,.. �.w HYw �wr wrr��.,r+�.•d.Y MYlw�f WMrr.#M /el+#wYY���FMw�nYwir.rrr#p.�y 3Mc�� W RaYYpkY��MO��tiCM�VYry. NOT TO SCALE T'h. Keith Campanian Exhibit 18 Pista de Dorado Specific Plan 2.3.3 Alterations of the Specific Plan The City's Director of Community Development shall have the authority to determine substantial conformance with the provisions of this Specific Plan when the changes are less than 11% of development standards. Minor design changes shall be reviewed and approved by the Planning Director. SECTION 3.0 OPERATIONAL GUIDELINES 3.1 Common Area Maintenance/Managefnent The common areas will be maintained by the Pista de Dorado Home Owner's Association. The Association will also maintain the landscaping along the trail expansion and in the Trail Stop. 3.2 Equestrian Enhancement Area Maintenance/Management The additional ten feet to be added to the regional multi -use trail shall be dedicated to the City of La Quinta for the public benefit, with the trail and non -landscape enhancements specifically maintained by the City. 3.3 Streets and Utilities Interior streets will be private, and will be maintained by the Pista de Dorado Home Owner's Association. a 11 0:\40861\4086l0Mdocs\specific plan doc\Stonefield 40 Specific Plan bb. doc J Page 40 11/2/2004 Pista de Dorado Specific Plan SECTION 4.0 IMPLEMENTATION PROGRAM 4.1 Final Conditions of Approval Page 42 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 A. Resolution No. 2004-120 (Tentative Tract 31874) RESOLUTION NO. 2004-120 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA ' QUINTA, CALIFORNIA, APPROVING THE SUBDIVISION OF ±40 ACRES INTO 101 RESIDENTIAL LOTS AND MISCELLANEOUS LOTS CASE NO.: TENTATIVE TRACT 31874 STONEFIELD DEVELOPMENT, INC WHEREAS, the City Council of the City of La Quinta, California, did on the 19' day of October, 2004, hold a duly noticed Public Hearing to consider the request of Stonefield Development, Inc., for the subdivision of ±40 acres into 101 single-family residential lots and other miscellaneous lots, located at the northwest corner of Monroe Street and Avenue 53, more particularly described as: APN 767-200-011 WHEREAS, the Planning Commission of the City of La Quinta, California did on the 28' day of September, 2004, hold a public hearing to consider this request, and adopted Resolution 2004-072, recommending approval of this request; and, WHEREAS, said Tentative Tract Map has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" as amended (Resolution 83-63) in that the La Quinta Community Development Department has prepared Environmental Assessment 2004-511 for this Tentative Tract Map in compliance with the requirements of the California Environmental Quality Act of 1970, as amended. The Planning Commission has determined that, as conditioned, the project will not have a significant adverse impact on the environment and therefore, .is recommending that a Mitigated Negative Declaration of environmental impact be certified. A Notice of Intent to Adopt a Mitigated Negative Declaration was posted with the Riverside County Recorder's office as required by Section 15072 of the California Environmental Quality Act (CEQA) statutes; and WHEREAS, the Community Development Department published the public hearing notice in the Desert Sun newspaper on .the 9' day of October, 2004, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and Resolution No. 2004-120 Tentative Tract Map 31874 Stonefield Development, Inc. Adopted: October 28, 2004 Page 2 WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons wanting to be heard, said City Council did make the following Mandatory Findings to justify approval of Tentative Tract Map 31874: 1. The Tentative Tract Map and its improvement and design, are consistent with the General Plan in that its street design and lots are in conformance with applicable goals, policies, and will provide adequate infrastructure and public utilities. 2. The design of the subdivision and its proposed improvements are not likely to create environmental damage or substantially and avoidably injure wildlife or their habitat because the site does not contain significant biological resources. 3. The design of the subdivision and subsequent improvements are not likely to cause serious public health problems because the construction of 101 residential units will not have considerable cumulative impacts. The project is consistent with the General Plan, and the potential impacts associated with General Plan buildout. 4. The design of the revised subdivision and the proposed types of improvements will not conflict with easements acquired by the public at large, for access through or use of the property within the subdivision in that none presently exist and access is provided within the project and to adjacent public streets. 5. That the Local Agency Formation Commission,has approved the annexation of the property into the City of La Quinta. This approval will become effective upon certification by LAFCO. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: 1. That the above recitations are true and constitute the findings of the City Council in this case; 2. That the City Council does hereby approve Tentative Tract Map 31874 for the reasons set forth in this Resolution, subject to the attached Conditions of Approval. Resolution No. 2004-120 Tentative Tract Map 31874 Stonof 1d Development, Inc. Adopted: October 28, 2004 Pape 3 3. That Specific Plan 2004-073 shall become effective upon annexation of the property into the City. PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council, held on this 19th day of October, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Sniff, Mayor Adolph NOES: None ABSENT: None ABSTAIN: None DON ADOLP 1q, May City of La Quinta, California ATTEST: ptil� -'Q� 4nel!�� — A) S. CREEK, CMC, I Clerk City of La Quinta, California (City Seal) APPROVED AS TO FORM: r' W. AT ERINE JE , City Attor ey City of La Quinta, California CITY COUNCIL RESOLUTION NO. 2004-120 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT 31874 STONEFIELD DEVELOPMENT, INC. ADOPTED: SEPTEMBER 28, 2004 GFNFRAI 1 . The applicant agrees to defend, indemnify and hold harmless the City of La Quinta ("City"), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Tentative Tract Map, or any Final Map recorded thereunder. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. This Tentative Tract Map, and any Final Map recorded thereunder, shall comply with the requirements and standards of Government Code § § 66410 through 66499.58 (the "Subdivision Map Act"), and Chapter 13 of the La Quinta Municipal Code ("LQMC"). The City of La Quinta's Municipal Code can be accessed on the City's Web Site at www.la-quinta.org. 3. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies: • Fire Marshal • Public Works Department (Grading Permit, Improvement Permit) • Community Development Department • Riverside Co. Environmental Health Department • Coachella Valley Unified School District • Coachella Valley Water District (CVWD) • Imperial Irrigation District (IID) • California Water Quality Control Board (CWQCB) • SunLine Transit Agency • SCAQMD Coachella Valley Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 2 The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When the requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvements plans for City approval. 4. The applicant shall comply with applicable provisions of the City's NPDES stormwater . discharge permit, Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water), LQMC; Riverside County Ordinance No. 457; and the State Water Resources Control Board's Order No. 99-08-DWQ . A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Permitee shall be required to submit a Storm Water Pollution Protection Plan ("SWPPP"). The applicant or his/her designer can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation. B. The applicant's SWPPP shall be approved by the City Engineer prior to any on or off-site grading being done in relation to this project. C. The applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City. D. The applicant's SWPPP shall include provisions for all of the following Best Management Practices ("BMPs") (8.70.020 (Definitions), LQMC): 1) Temporary Soil Stabilization (erosion control). 2) Temporary Sediment Control. 3) Wind Erosion Control. 4) Tracking Control. 5) Non -Storm Water Management. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 3 6) Waste Management and Materials Pollution Control. E. All erosion and sediment control BMPs proposed by the applicant shall be approved by the City Engineer prior to any onsite or offsite grading, pursuant to this project. F. The approved SWPPP and BMPs shall remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City. 5. Permits issued under this approval shall be subject to the provisions of the Infrastructure Fee Program and Development Impact Fee program in effect at the time of issuance of building permit(s). PROPERTY RIGHTS 6. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction and reconstruction of essential improvements. 7. The applicant shall offer for dedication on the Final Map all public street right- of-ways in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer. 8. The public street right-of-way offers for dedication required for this development include: A. PUBLIC STREETS 1) Monroe Street (Primary Arterial, Option A 110' ROW) — The standard 55 feet from the centerline of Monroe Street for a total 1 10 -foot ultimate developed right of way except for an additional variable right ,of way dedication at the proposed primary entry intersection measured a minimum 67 feet west of the centerline of Monroe Street and length to be determined by a traffic study prepared for the applicant by a licensed traffic engineer per Engineering Bulletin # 03-08. As a minimum, the required right of way shall be for a length of 100 feet plus a variable dedication of Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 4 an additional 50 feet to accommodate improvements conditioned under STREET AND TRAFFIC IMPROVEMENTS. 2) Avenue 53 (Collector, 74' ROW) - The standard 37 feet from the centerline of Avenue 37 for a total 74 -foot ultimate developed right of way except for an additional variable right of way dedication at the proposed secondary entry measured a minimum 47 feet north of the centerline of Avenue 53 and length to be determined by a traffic study prepared for the applicant by a licensed traffic engineer per Engineering Bulletin # 03-08. As a minimum, the required right of way shall be for a length of 100 feet plus a variable dedication of an additional 50 feet to accommodate improvements conditioned under STREET AND TRAFFIC IMPROVEMENTS.. 9. The applicant shall retain for private use on the Final Map all private street right-of-ways in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer. 10. The private street right-of-ways to be retained for private use required for this development include: A. PRIVATE STREETS Private Residential Streets measured shall have a 36 -foot travel width measured gutter or curb flow line to gutter or curb flow line. Curb design to be approved by the City Engineer. B. CUL DE SACS 1) The cul de sac shall conform to the shape shown on the tentative map with a 38 -foot curb radius at the bulb or larger as shown on the tentative map. Knuckle The knuckle shall conform to the shape shown on the tentative tract map except for minor revision as may be required by the City Engineer. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 5 Curve radii for curbs at all street intersections shall not be less than 25 feet or as approved by the Engineering Division on the street improvement plans. 1 1 . Dedications shall include additional widths as necessary for dedicated right and left turn lanes, bus turnouts, and other features contained in the approved construction plans. 12. Dedications shall include additional widths as necessary for dedicated right and left turn lanes, bus turnouts, and other features contained in the approved construction plans. Pursuant to this requirement, the Applicant shall include in the submittal packet containing the draft final map submitted for map checking, an offsite street geometric layout, drawn at 1 " equals 40 feet, detailing the following design aspects: median curb line, outside curb line, lane line alignment including lane widths, left turn lanes, deceleration lane(s) and bus stop turnout(s). The geometric layout shall be accompanied with sufficient professional engineering studies to confirm the appropriate length of all proposed turn pockets and auxiliary lanes that may impact the right of way dedication required of the project and the associated landscape setback requirement 13. When the City Engineer determines that access rights to the proposed street right-of-ways shown on the approved Tentative Tract Map are necessary prior to approval of the Final Map dedicating such right-of-ways, the applicant shall grant the necessary right-of-ways within 60 days of a written request by the City. 14. The applicant shall offer for dedication on the Final Map a ten -foot wide public utility easement contiguous with, and along both sides of all private streets. Such easement may be reduced to five feet in width with the express written approval of IID. 15. The applicant shall create perimeter landscaping setbacks along all public right- of-ways as follows: A. Monroe Street (Primary Arterial) — A minimum 20 -foot from the R/W-P/L. B. Avenue 53 (Collector) - 10 -foot from the R/W-P/L. The listed setback depth shall be the average depth where a meandering wall design is approved. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31 874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 6 The setback requirements shall apply to all frontages including, but not limited to, remainder parcels and sites dedicated for utility purposes. Where public facilities (e.g., sidewalks) are placed on privately owned setbacks, the applicant shall offer for dedication blanket easements for those purposes on the Final Map. 16. The applicant shall offer for dedication those easements necessary for the placement of, and access to, utility lines and structures, drainage basins, mailbox clusters, park lands, and common areas on the Final Map. 17. Direct vehicular access to Monroe Street and Avenue 53 from lots with frontage along Monroe Street and Avenue 53 is restricted, except for those access points identified on the tentative tract map, or as otherwise conditioned in these conditions of approval. The vehicular access restriction shall be shown on the recorded final tract map. 18. The applicant shall furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which grading, retaining wall construction, permanent slopes, or other encroachments will occur. 19. The applicant shall cause no easement to be granted, or recorded, over any portion of the subject property between the date of approval of the Tentative Tract Map and the date of recording of any Final Map, unless such easement is approved by the City Engineer. FINAL MAPS 20. Prior to the City's approval of a Final Map, the applicant shall furnish accurate AutoCAD files of the Final Map that was approved by the City's map checker on a storage media acceptable to the City Engineer. Such files shall be in a standard AutoCAD format so as to be fully retrievable into a basic AutoCAD program. Where a Final Map was not produced in an AutoCAD format, or produced in a file that can be converted to an AutoCAD format, the City Engineer will accept a raster -image file of such Final Map. The Final Map shall be of a 1 " = 40' scale. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 7 IMPROVEMENT PLANS As used throughout these Conditions of Approval, professional titles such as "engineer," "surveyor," and "architect," refer to persons currently certified or licensed to practice their respective professions in the State of California. 21. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of Section 13.24.040 (Improvement Plans), LQMC. 22_ The following improvement plans shall be prepared and submitted for review and approval by the Public Works Department. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. A. B. C. D. E. F. G On -Site Rough Grading Plan PM10 Plan SWPPP Storm Drain Plans Off -Site Street Plan 4' Vertical Off -Site Signing & Striping Plan 1 " = 40' Horizontal 1 " = 40' Horizontal 1 " = 40' Horizontal 1 " = 40' Horizontal 1 " = 40' Horizontal, 1 " _ 1 " = 40' Horizontal The Off -Site street improvement plans shall have separate plan sheet(s) (drawn at 20 scale) that show the meandering sidewalk, mounding, and berming design in the combined parkway and landscape setback area. On -Site Street Plan Vertical 1 " = 40' Horizontal, 1 " = 4' H. On -Site Signing & Striping Plan 1 " = 40' Horizontal Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 8 The following plans shall be submitted to the Building and Safety Department for review and approval. The plans shall utilize the minimum scale specified, unless otherwise authorized by the Building and Safety Director in writing. 'Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. On -Site Precise Grading Plan 1 " = 30' Horizontal Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formats approved by the City Engineer prior to commencing plan preparation. All Off -Site Plan & Profile Street Plans and Signing & Striping Plans shall show all existing improvements for a distance of at least 200 -feet beyond the project limits, or a distance sufficient to show any required design transitions. All On -Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans and/or as approved by the Engineering Department. "Rough Grading" plans shall normally include perimeter walls with Top Of Wall & Top Of Footing elevations shown. All footings shall have a minimum of 1 - foot of cover, or sufficient cover to clear any adjacent obstructions. "Precise Grading" plans shall normally include all on-site surface improvements including but not necessarily limited to finish grades for curbs & gutters, building floor elevations, parking lot improvements and ADA requirements. 23. The City maintains standard plans, detail sheets and/or construction notes for elements of construction on the Public Works Online Engineering Library at http://www.la-guinta.org/publicworks/tractl/z onlinelibrary/0 intropage.htm. 24. The applicant shall furnish a complete set of the AutoCAD files of all approved improvement plans on a storage media acceptable to the City Engineer. The files shall be saved in a standard AutoCAD format so they may be fully retrievable through a basic AutoCAD program. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 9 At the completion of construction, and prior to the final acceptance of the improvements by the City, the applicant shall update the AutoCAD files in order to reflect the as -built conditions. Where the improvement plans were not produced in a standard AutoCAD format, or a file format that can be converted to an AutoCAD format, the City Engineer will accept raster -image files of the plans. IMPROVEMENT SECURITY AGREEMENTS 25. Prior to approval of any Final Map, the applicant shall construct all on and off- site improvements and satisfy its obligations for same, or shall furnish a fully secured and executed Subdivision Improvement Agreement ("SIA") guaranteeing the construction of such improvements and the satisfaction of its obligations for same, or shall agree to any combination thereof, as may be required by the City. 26. Any Subdivision Improvement Agreement ("SIA") entered into by and between the applicant and the City of La Quinta, for the purpose of guaranteeing the completion of any improvements related to this Tentative Tract Map, shall comply with the provisions of Chapter 13.28 (Improvement Security), LQMC. 27. Improvements to be made, or agreed to be made, shall include the removal of any existing structures or other obstructions that are not a part of the proposed improvements; and shall provide for the setting of the final survey monumentation. When improvements are phased through a "Phasing Plan," or an administrative approval (e.g., Site Development Permits), all off-site improvements and common on-site improvements (e.g., backbone utilities, retention basins, perimeter walls, landscaping and gates) shall be constructed, or secured through a SIA, prior to the issuance of any permits in the first phase of the development, or as otherwise approved by the City Engineer. Improvements and obligations required of each subsequent phase shall either be completed, or secured through a SIA, prior to the completion of homes or the occupancy of permanent buildings within such latter phase, or as otherwise approved by the City Engineer. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 10 In the event the applicant fails to construct the improvements for the development, or fails to satisfy its obligations for the development in a timely manner, pursuant to the approved phasing plan, the City shall have the right to halt issuance of all permits, and/or final inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. 28. Depending on the timing of the development of this Tentative Tract Map, and the status of the off-site improvements at the time, the applicant may be required to: A. Construct certain off-site improvements. B. Construct additional off-site improvements, subject to the reimbursement of its costs by others. C. Reimburse others for those improvements previously constructed that are considered to be an obligation of this tentative tract map. D. Secure the costs for future improvements that are to be made by others. E. To agree to any combination of these means, as the City may require. Off -Site Improvements should be completed on a first priority basis. In the event that any of the improvements required for this development are constructed by the City, the applicant shall, prior to the approval of the Final Map, or the issuance of any permit related thereto, reimburse the City for the costs of such improvements. 29. If the applicant elects to utilize the secured agreement alternative, the applicant shall submit detailed construction cost estimates for all proposed on-site and off-site improvements, including an estimate for the final survey monumentation, for checking and approval by the City Engineer. Such estimates shall conform to the unit cost schedule adopted by City resolution, or ordinance. For items not listed in the City's unit cost schedule the proposed unit costs shall be approved by the City Engineer. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 11 At the time the applicant submits its detailed construction cost estimates for conditional approval of the Final Map by the City Council, the applicant shall also submit one copy each of an 8-1/2" x 11 " reduction of each page of the Final Map, along with a copy of an 8-1/2" x 11 " Vicinity Map. Estimates for improvements under the jurisdiction of other agencies shall be approved by those agencies and submitted to the City along with the applicant's detailed cost estimates. Security will not be required for telephone, natural gas, or Cable T.V. improvements. GRAniw-i 30. The applicant shall comply with the provisions of Section 13.24.050 (Grading Improvements), LQMC. 31. Prior to occupancy of the project site for any construction, or other purposes, the applicant shall obtain a grading permit approved by the City Engineer. 32. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following: A. A grading plan prepared by a qualified engineer, B. A preliminary geotechnical ("soils") report prepared by a qualified engineer, C. A Fugitive Dust Control Plan prepared in accordance with Chapter 6.16, (Fugitive Dust Control), LQMC, and D. A Best Management Practices report prepared in accordance with Sections 8.70.010 and 13.24.170 (NPDES stormwater discharge permit and Storm Management and Discharge Controls), LQMC. All grading shall conform to the recommendations contained in the Preliminary Soils Report, and shall be certified as being adequate by a soils engineer, or by an engineering geologist. A statement shall appear on the Final Map that a soils report has been prepared in accordance with the California Health & Safety Code § 17953. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31 874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 12 The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit. 33. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open graded, undeveloped land shall either be planted with interim landscaping, or stabilized with such other erosion control measures, as were approved in the Fugitive Dust Control Plan. 34. Gfading within the perimeter setback and parkway areas shall have undulating terrain and shall conform with the requirements of LQMC Section 9.60.240(F) except as otherwise modified by this condition requirement. The maximum slope shall not exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted with ground cover. The maximum slope in the first six (6) feet adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is within six (6) of the curb, otherwise the maximum slope within the right of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be depressed one and one-half inches (1.5") in the first eighteen inches (18") behind the curb. 35. Building pad elevations on the rough grading plan submitted for City Engineer's approval shall conform with pad elevations shown on the tentative map, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval. 36. Building pad elevations of perimeter lots shall not differ by more that one foot from the building pads in adjacent developments. 37. Prior to any site grading or regrading that will raise or lower any portion of the site by more than plus or minus three tenths of a foot from the elevations shown on the approved Tentative Tract Map, the applicant shall submit the proposed grading changes to the City Staff for a substantial conformance finding review. 38. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 13 Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation and the difference between the two, if any. Such pad certification shall also list the relative compaction of the pad soil. The data shall be organized by lot number, and listed cumulatively if submitted at different times. nRAINA[;F 39. The applicant shall revise proposed retention basins to comply with the provisions of Section 13.24.120 (Drainage), LQMC, Engineering Bulletin No. 97.03. More specifically, stormwater falling on site during the 100 year storm shall be retained within the development, unless otherwise approved by the City Engineer. Additionally, the 100 year stormwater shall be retained within the interior street right of way. The tributary drainage area shall extend to the centerline of adjacent public streets. The design storm shall be either the 3 hour, 6 hour or 24 hour event producing the greatest total run off. 40. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise. Nuisance water shall be retained on site. In residential developments, nuisance water shall be disposed of in a trickling sand filter and leach field or equivalent system approved by the City Engineer. The sand filter and leach field shall be designed to contain nuisance water surges totaling the following: 3.43 gph/2,000 sq. ft. of landscape area, 3.43 gph per residential unit, 416.7 gallons per hour per well site and off-site street nuisance water. The sand filter design shall be per La Quinta Standard 370 with the equivalent of 137.2 gph of water feed per sand filter to accept the above mentioned nuisance water requirements. Leach line requirements are 1.108 feet of leach line per gph of flow. 41. The project shall be designed to accommodate purging and blowoff water (through underground piping and/or retention facilities) from any on-site or adjacent well sites granted or dedicated to the local water utility authority as a requirement for development of this property: 42. No fence or wall shall be constructed around any retention basin unless approved by the Community Development Director and the City Engineer. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 14 43. For on-site common retention basins, retention depth shall be according to Engineering Bulletin 97.03, and side slopes shall not exceed 3:1 and shall be planted with maintenance free ground cover. For retention basins on individual lots, retention depth shall not exceed two feet. 44. Stormwater may not be retained in landscaped parkways or landscaped setback lots Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to Section 9.100.040(B)(7), LQMC. 45. The design of the development shall not cause any increase in flood boundaries, levels or frequencies in any area outside the development. 46. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route. 47. Storm drainage historically received from adjoining property shall be received and retained or passed through into the historic downstream drainage relief route. AMINUM41 48. The applicant shall comply with the provisions of Section 13.24.1 10 (Utilities), LQMC. 49. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above -ground utility structures including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 50. Existing overhead utility lines within, or adjacent to the proposed development, and all proposed utilities shall be installed underground. All existing utility lines attached to joint use 92 KV transmission power poles are exempt from the requirement to be placed underground. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 15 51. Underground utilities shall be installed prior to overlying hardscape. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained, or required by the City Engineer. The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. STREET AND TRAFFIC IMPROVEMENTS 52. The applicant shall comply with the provisions of Sections 13.24.060 (Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access For Individual Properties And Development), LQMC for public streets; and Section 13.24.080 (Street Design - Private Streets), where private streets are proposed. 53. The applicant shall construct the following street improvements to conform with the General Plan (street type noted in parentheses.) A. OFF-SITE STREETS 1) Monroe Street (Primary Arterial, Option A; 110' R/W): Widen the west side of the street along all frontage adjacent to the Tentative Map boundary to its ultimate width on the west side as specified in the General Plan and the requirements of these conditions. Rehabilitate and/or reconstruct existing roadway pavement as necessary to augment and convert it from a rural county -road design standard to La Quinta's urban arterial design standard. The west curb face shall be located forty-three feet (43') west of the centerline, except at locations where additional street width is needed to accommodate: a) Bus turnout (if required by Sunline Transit) b) A deceleration/right turn only lane at Primary Entry. The west curb face shall be located fifty five feet (55') west of the centerline and length to be determined by a traffic study prepared for the applicant by a licensed traffic engineer per Engineering Bulletin # 03-08. As a minimum, the required right of way shall be for a length of 100 feet plus a variable dedication of an additional 50 feet. , Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 16 Other required improvements in the Monroe Street right or way and/or adjacent landscape setback area include: a) All appurtenant components such as, but not limited to curb, gutter, traffic control striping, legends, and signs. b) A 10 -foot wide Multi -Purpose Trail. The applicant shall construct a multi -use trail per La Quinta Standard 260 and Specific Plan 04-073 along the Monroe Street frontage within the landscaped setback. The location and design of the trail shall be approved by the City. A split rail fence shall be constructed in accordance with Section 9.140.060 (Item E, 3a) of the Zoning Ordinance. Bonding for the fence to be installed shall be posted prior to final map approval. At grade intersection crossings shall be of a medium and design and location as approved by the Engineering Department on the street improvement plan submittal. C) Half width of an 18 - foot wide raised landscaped median along the entire boundary of the Tentative Tract Map. d) Establish a benchmark in the Monroe Street right of way and file a record of the benchmark with the County of Riverside. 2) Avenue 53 (Collector Street; 74' R/W): Widen the north side of the street along all frontage adjacent to the Tentative Map boundary to its ultimate width on the north side as specified in the General Plan and the requirements of these conditions. Rehabilitate and/or reconstruct existing roadway pavement as necessary to augment and convert it from a rural county -road design standard to La Quinta's urban arterial design standard. The north curb face shall be located twenty-five feet (25') north of the centerline. Other required improvements in the Avenue 53 right or way and/or adjacent landscape setback area include: a) All appurtenant components such as, but not limited to curb, gutter, traffic control striping, legends, and signs. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 17 b) 8 -foot wide meandering sidewalk. The meandering sidewalk shall have an arrhythmic horizontal layout that utilizes concave and convex curves with respect to the curb line that either touches the back of curb or approaches within five feet of the curb at intervals not to exceed 250 feet. The sidewalk curvature radii should vary between 50 and 300 feet, and at each point of reverse curvature, the radius should change to assist in creating the arrhythmic layout. The sidewalk shall meander into the landscape setback lot and approach within 5 feet of the perimeter wall at intervals not to exceed 250 feet. 3) Traffic Signal at Monroe Street and Avenue 53. The applicant shall be required to pay for 25% of the signalized intersection. Applicant is responsible for 25% of the cost to design and install the traffic signal. Applicant shall enter into a SIA to post security for 25% of the cost to design and install the traffic signal prior to issuance of an on-site grading permit; the security shall remain in full force and effect until the signal is actually installed. The applicant shall extend improvements beyond the subdivision boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks). B. PRIVATE STREETS 1) Construct 36 -foot wide travel width as shown on the tentative map measured from gutter flow line to gutter flow line where parking is allowed on both sides of the street. 2) The location of driveways of corner lots shall not be located within the curb return and away from the intersection when possible. C. PRIVATE CUL DE SACS 1) Shall be constructed according to the lay -out 'shown on the tentative map with 38 -foot curb radius or greater at the bulb similar to the layout shown on the rough grading plan. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31 874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 18 D. KNUCKLE 1) Construct the knuckle to conform to the lay -out shown in the tentative tract map, except for minor revisions as may be required by the City Engineer. 54. All gated entries shall provide for a three -car minimum stacking capacity for inbound traffic to be a minimum length of 62 feet from call box to the street; and shall provide for a full turn -around outlet for non -accepted vehicles. Where a gated entry is proposed, the applicant shall submit a detailed exhibit at a scale of 1 " = 10', demonstrating that those passenger vehicles that do not gain entry into the development can safely make a full turn -around (minimum radius to be 24 feet) out onto the main street from the gated entry. Two lanes of traffic shall be provided on the entry side of each gated entry, one lane shall be dedicated for residents, and one lane for visitors. The two travel lanes shall be a minimum width of 20 feet of total paved roadway surface or as approved by the Fire Department. Entry drives, main interior circulation routes, standard knuckles, corner cutbacks, bus turnouts, dedicated turn lanes and other features shown on the approved construction plans, may require additional street widths as may be determined by the City Engineer. 55. The applicant shall' design street pavement sections using CalTrans' design procedure for 20 -year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows: Residential 3.0" a.c./4.5" c.a.b. Collector 4.0" a.c /5.0" c.a.b. Primary Arterial 4.5" a.c./6.0" c.a.b. or the approved equivalents of alternate materials. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 19 56. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 57. General access points and turning movements of traffic are limited to the following: A. Primary Entry (Monroe Street): Right turn movements in and out are permitted; Left turn movement out are restricted. Left turn movements in are restricted until the east side of Monroe Street is improved to it's ultimate General Plan right of way width and full width street improvements installed. B. Secondary Entry (Avenue 53): Full turn movements are permitted. 58. Improvements shall include appurtenances such as traffic control signs, markings and other devices, raised medians if required, street name signs and sidewalks. Mid -block street lighting is not required. 59. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the City Engineer. Improvement plans for streets, access gates and parking areas shall be stamped and signed by qualified engineers. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 20 CONSTRUCTION 60. The City will conduct final inspections of habitable buildings only when the buildings have improved street and (if required) sidewalk access to publicly maintained streets. The improvements shall include required traffic control devices, pavement markings and street name signs. If on-site streets in residential developments are initially constructed with partial pavement thickness, the applicant shall complete the pavement prior to final inspections of the last ten percent of homes within the development or when directed by the City, whichever comes first. LANDSCAPING 61. The applicant shall comply with Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans), LQMC. 62. The applicant shall provide landscaping in the required setbacks, retention basins, common lots and park areas. 63. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and parks shall be signed and stamped by a licensed landscape architect and reviewed by the Architecture and Landscaping Review Committee. 64. The applicant shall submit the final landscape plans for approval by the Community Development Department (CDD), prior to plan checking by the Public Works Department. When plan checking has been completed by CDD, the applicant shall obtain the signatures of CVWD and the Riverside County Agricultural Commissioner, prior to submittal for signature by the City Engineer. NOTE: Plans are not approved for construction until signed by the City Engineer. 65. Landscape areas shall have permanent irrigation improvements meeting the requirements of the City Engineer. Use of lawn areas shall be minimized with no lawn, or spray irrigation, being placed within 18 inches of curbs along public streets. PUBLIC SERVICES Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 21 66. The applicant shall provide public transit improvements as required by SunLine Transit Agency and approved by the City Engineer. QUALITY ASSURANCE 67. The applicant shall employ construction quality -assurance measures that meet with the approval of the City Engineer. 68. The applicant shall employ, or retain, qualified engineers, surveyors, and such other appropriate professionals as are required to provide the expertise with which to prepare and sign accurate record drawings, and to provide adequate construction supervision. 69. The applicant shall arrange for, and bear the cost of, all measurements, sampling and testing procedures not included in the City's inspection program, but which may be required by the City, as evidence that the construction materials and methods employed comply with the plans, specifications and other applicable regulations. Upon completion of construction, the applicant shall furnish the City with reproducible record drawings of all improvement plans that were approved by the City. Each sheet shall be clearly marked "Record Drawing," "As -Built" or "As -Constructed" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all AutoCAD or raster -image files previously submitted to the City, revised to reflect the as -built conditions. MAINTENANCE 70. The applicant shall comply with the provisions of Section 13.24.160 (Maintenance), LQMC. 71. The applicant shall make provisions for the continuous and perpetual maintenance of all private on-site improvements, perimeter landscaping, access drives, and sidewalks. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 22 FEES AND DEPOSITS 72. The applicant shall comply with the provisions of Section 13.24.180 (Fees and Deposits), LQMC. These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 73. Permits issued under this approval shall be subject to the provisions of the Infrastructure Fee Program and Development Impact Fee program in effect at the time of issuance of building permit(s). 74. Within 24 hours of approval of the tentative tract map by the City Council, the developer shall submit to the Community Development Department, a check made out to the County of Riverside for $1,314 to allow filing of a Notice of Determination for Environmental Assessment 2003-492 as required by State law. 75. Prior to final map approval by the City Council, the developer shall meet the Parkland Dedication requirements by payment of in -lieu fees as set forth in Section 13.48 of the La Quinta Municipal Code. FIRE MARSHAL 76. For single family residential areas, approved standard fire hydrants, located at each intersection and spaced 330 feet apart with no portion of any lot frontage more than 165 feet from a hydrant. Minimum fire flow shall be 1000 GPM for a 2 -hour duration at 20 PSI. 78. Blue dot retro -reflectors shall be placed in the street 8 inches from centerline to the side that the fire hydrant is on, to identify fire hydrant locations. 79. Any turn or turn -around requires a minimum 38 -foot turning radius. 80. All structures shall be accessible from an approved roadway to within 150 feet of all portions of the exterior of the first floor. 81. The minimum dimension for access roads and gates is 20 feet clear and unobstructed width and a minimum vertical clearance of 13 feet 6 inches in height. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 23 82. Any gate providing access from a public roadway to a private entry roadway shall be located at least 35 feet setback from the roadway and shall open to allow a vehicle to stop without obstructing traffic on the road. Where a one- way road with a single traffic lane provides access to a gate entrance, a 38 - foot turning radius shall be used. 83. Gates shall be automatic, minimum 20 feet in width and shall be equipped with a rapid entry system (KNOX). Plans shall be submitted to the Fire Department for approval prior to installation. Automatic gate pins shall be rated with a shear pin force, not to exceed 30 pounds. Gates activated by the rapid entry system shall remain open until closed by the rapid entry system. , 84. The required water system, including fire hydrants, shall be installed and accepted by the appropriate water agency prior to any combustible building material being placed on an individual lot. Two sets of water plans are to be submitted to the Fire Department for approval. 85. The applicant or developer shall prepare and submit to. the Fire Department for approval, a site plan designating required fire lanes with appropriate lane painting and/or signs. 86. Building plan check is to run concurrent with the City plan check. Submittals are the responsibility of the owner. MISCELLANEOUS 87. Perimeter wall designs including height, color, material, design shall approved by the Architecture and Landscaping Review Committee and Planning Commission prior to issuance of building permit for the wall. 88. Proposed street names with a minimum of two alternative names per street shall be submitted to the Community Development Department for approval. Names to be approved prior to recordation of final map. 89. All mitigation measures contained in Environmental Assessment 2004-511 shall be met. 90. Prior to final map approval, the developer shall submit to the Community Development Department for review, a copy of the proposed Covenants, Conditions, and Restrictions (CC and R's) for the project. Resolution No. 2004-120 Conditions of Approval — Final Tentative Tract 31874 Stonefield Development, Inc. Adopted: October 19, 2002 Page 24 91. This tentative tract map shall expire two years after City Council approval, unless recorded or granted a time extension pursuant to the requirements of Division 13 of the La Quinta Municipal Code. 92. Production homes require approval of a Site Development permit application by the Planning Commission. 93. Recreational amenities shall be provided within the project on the "park" site as conceptually shown in Specific plan 2004-073. 94. Multi -use trail improvements as shown in Specific Plan 2004-073 shall be provided as approved by the City. Maintenance of the trail improvements shall be by the developer and/or Homeowners Association. 95. Police Department comments on file in the Community Development Department shall be considered and implemented where feasible. 96. The two cul-de-sacs closest to the west property line shall be redesigned to move them away from the west property line to the satisfaction of the Community Development Department. RESOLUTION NO. 2004-119 A RESOLUTION OF THE OF THE CITY COUNCIL OF LA QUINTA, CALIFORNIA, ESTABLISHING DEVELOPMENT STANDARDS, PRINCIPLES, GUIDELINES AND PROGRAMS FOR 101 RESIDENTIAL LOTS CASE: SPECIFIC PLAN 2004-073 APPLICANT: STONEFIELD DEVELOPMENT, INC. WHEREAS, the City Council of the City of La Quinta, California did, on the 19T" day of October, 2004 hold a duly noticed Public Hearing to consider a request by Stonefield Development, for approval of a Specific Plan to establish development standards, principles, guidelines and programs to allow the subdivision of ±40 acres into 101 residential lots for property to be annexed into the City of La Quinta, located at the northwest corner of Monroe Street and Avenue 53, more particularly described as: APN 767-200-011 WHEREAS, the Planning Commission of the City of La Quinta, California did on the 281'' day of September, 2004, hold a public hearing to consider this request, and adopted Resolution 2004-071, recommending approval of this request; and, WHEREAS, the Community Development Department published a public hearing notice in the Desert Sun newspaper on the 9"' day of October, 2004, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and WHEREAS, said Specific Plan has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" as amended (Resolution 83-63) in that the La Quinta Community Development Department has prepared Environmental Assessment 2004-511 for this Specific Plan in compliance with the requirements of the California Environmental Quality Act of 1970, as amended. The Planning Commission has determined that the project, as conditioned, will not have a significant adverse impact on the environment and therefore, is recommending that a Mitigated Negative Declaration of environmental impact be certified. A Notice of Intent to Adopt a Mitigated Negative Declaration was posted with the Riverside County Recorder's office as required by Section 15072 of the California Environmental Quality Act (CEQA) statutes; and Resolution No. 2004-119 Specific Plan 2004-073 Stonefield Development, Inc. Adopted: October 19, 2004 Page 2 WHEREAS, at the Public Hearing upon hearing and considering all testimony and arguments of all interested persons desiring to be heard, said City Council did make the following Mandatory Findings to justify approval of said Specific Plan: Finding A - Consistency with General Plan The property is designated Low Density Agriculture/Equestrian Residential. The proposed project will be developed with residential uses and density, which are allowed under the General Plan. Finding B - Public Welfare Enhancement The project will not be detrimental to the public health, safety and welfare in that the project is designed in compliance with the City's General Plan and design the Specific Plan, as well as other County and State standards, such as CEQA. Findings C and D - Land Use Compatibility and Property Suitability The residential project is within a residentially designated and zoned area. The project provides adequate buffering through landscaping and walls to ensure compatibility with surrounding land uses. Additionally, the project will provide adequate perimeter landscaping and acceptable architectural design guidelines. . NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California as follows: 1. That the above recitations are true and correct and constitute the findings of said City Council in this case; and 2. That it does hereby acknowledge that Environmental Assessment 2004-511 has determined that no significant effects on the environment have been identified and mitigation measures are being imposed if needed; and 3. That it does hereby approve Specific Plan 2004-073, for the reasons set forth in this Resolution and subject to the attached Conditions of Approval. 4. That Specific Plan 2004-073 shall become effective upon annexation of the property into the City. Resolution No. 2004-119 r^ Specific Plan 2004-073 Stonsfleld Development. Inc. Adopted: October 19. 2004 Page 3 PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council, held on this 19" day of October, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Sniff, Mayor Adolph NOES: None ABSENT: None ABSTAIN: None DON ADOL -, M or City of La Quinta, California ATTEST: J GREEK, CMC, City - A City of La Quinta, California (City Seal) APPROVED AS TO FORM: AM. mHERINE SON, City Attorney . City of La Quinta, California CITY COUNCIL RESOLUTION NO. 2004-119 CONDITIONS OF APPROVAL — FINAL SPECIFIC PLAN 2004-073 STONEFIELD DEVELOPMENT, INC. ADOPTED: OCTOBER 19, 2004 GENERAL 1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta ("City"), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Specific Plan, or any Final Map recorded thereunder. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. This Specific Plan, and any Final Map recorded thereunder, shall comply with the requirements and standards of Government Code § § 66410 through 66499.58 (the "Subdivision Map Act"), and Chapter 13 of the La Quinta Municipal Code ("LQMC"). The City of La Quinta's Municipal Code can be accessed on the City's Web Site at www.la-quinta.org. 3. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain the necessary clearances and/or permits from the following agencies: • Fire Marshal • Public Works Department (Grading Permit, Improvement Permit) • Community Development Department • Riverside Co. Environmental Health Department • Desert Sands Unified School District • Coachella Valley Water District (CVWD) • Imperial Irrigation District (IID) • California Water Quality Control Board (CWQCB) • SunLine Transit Agency • CalTrans Resolution No. 2004-119 Conditions of Approval — FINAL Specific Plan 2004-073 Stonefield Development, Inc. Adopted: October 19, 2004 Page 2 The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When the requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvements plans for City approval. 4. The use of the subject property for residential uses shall be in conformance with the approved exhibits and conditions of approval contained in Tentative Tract Map 31874, Specific Plan 2004-073 and Environmental Assessment 2004-511, unless otherwise amended by the Conditions of Approval. 5. The Specific Plan text Exhibit 9 (Conceptual Drainage and Grading) shall be revised after City Council approval to include the subsurface drainage facilities. 6. Within 30 days after City Council approval of this Specific Plan, the applicant shall submit five copies of a final text document to the Community Development Department, incorporating all corrections and revisions, conditions of approval and mitigation measures required for this project. C. Resolution No. 2004-118 (Environmental Assessement 2004-511) RESOLUTION NO. 2004-118 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA CERTIFYING A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT PREPARED FOR TENTATIVE TRACT MAP 31874 AND SPECIFIC PLAN 2004-073 ENVIRONMENTAL ASSESSMENT 2004-511 STONEFIELD DEVELOPMENT, INC. WHEREAS, the City Council of the City of La Quinta, California, did, on the 19"' day of October, 2004 hold a duly noticed Public Hearing to consider the request of Stonefield Development, Inc. for Environmental Assessment 2004-511 prepared for Tentative Tract 31874 and Specific Plan 2004-073, located at the northwest corner of Monroe Street and Avenue 53, more particularly described as: APN 767-200-011 WHEREAS, the Planning Commission of the City of La Quinta, California did on the 28th day of September, 2004, hold a public hearing to consider this request, and adopted Resolution 2004-070, recommending certification of this Environmental Assessment; and, WHEREAS, the Community Development Department published a public hearing notice in the Desert Sun newspaper on October 9, 2004, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and WHEREAS, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did find the following facts, findings, and reasons to certification of said Environmental Assessment: 1. The proposed applications will not be detrimental to the health, safety, or general welfare of the community, either indirectly, or directly, in that no significant unmitigated impacts were identified by Environmental Assessment 2004-511. Resolution No. 2004-118 Environmental Assessment 2004-511 Stonefield Development, Inc. Adopted: October 19, 2004 Paye 2 2. The proposed project will not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife population to drop below self sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of rare or -endangered plants or animals or eliminate important examples of the major periods of California history or prehistory. Potential impacts associated with cultural and paleontologic resources can be mitigated to a less than significant level. The site does not contain significant biological resources. 3. There is no evidence before the City that the proposed project will have the potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends. The site does not contain significant biological resources. 4. The proposed project does not have the potential to achieve short-term environmental goals, to the disadvantage of long-term environmental goals, as the proposed project supports the long term goals of the General Plan by providing a variety of housing opportunities for City residents. No significant effects on environmental factors have been identified by the Environmental Assessment. 5. The proposed project will not result in impacts which are individually limited or cumulatively considerable when considering planned or proposed development in the immediate vicinity, as development patterns in the area will not be significantly affected by the proposed project. The construction of 101 residential units will not have considerable cumulative impacts. The project is consistent with the General Plan, and the potential impacts associated with General Plan buildout. 6. The proposed project will not have environmental effects that will adversely affect the human population, either directly or indirectly. The proposed project has the potential to adversely affect human beings, due to air quality and noise impacts. The Coachella Valley is in a non -attainment area for PM 10, and the site will generate PM 10; however, there are a number of mitigation measures to reduce the potential impacts on air quality. Noise impacts have been addressed through a series of mitigation measures, which will lower the potential for significant impacts to less than significant levels. Resolution No. 2004-118 Environmental Assessment 2004511 Stonefbeld Development, Inc. Adopted: October 19, 2004 Pape 3 7. There is no substantial evidence in light of the entire record that the project may have a significant effect on the environment. 8. The City Council has considered Environmental Assessment 2004-511 and said reflects the independent judgment of the City. 9. The City has on the basis of substantial evidence, rebutted the presumption of adverse effect set forth in 14 CAL Code Regulations 753.5(d). 10. The location and custodian of the City's records relating to this project is the Community Development Department located at 78-495 Calle Tampico, La Quinta, California. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: 1. That the above recitations are true and correct and constitute the findings of the City Council for this Environmental Assessment. 2. That it does hereby certify Environmental Assessment 2004-511 for the reasons set forth in this Resolution and as stated in the Environmental Assessment Checklist and Mitigation Monitoring Program, attached and on file in the Community Development Department. 3. That Environmental Assessment 2004-511 reflects the independent judgment of the City. PASSED, APPROVED and ADOPTED at a regular meeting of the La Quinta City Council held on this 191'' day of October, 2004, by the following vote, to wit: AYES: Council Members Henderson, Osborne, Perkins, Sniff, Mayor Adolph NOES: None ABSENT: None ABSTAIN: None Resolution No. 2004-118 Environmental Assessment 2004-511 Stonefield Development, Inc. Adopted: October 19, 2004 Pape 4 virw A -*..— DON ADO PH,ayor City of La Quinta, California ATTEST: J . GREEK, CIVIC, Clerk City of La Quinta, California (City Seal) APPROVED AS TO FORM: AT ERINE JE N, City Attorney City of La Quinta, California 1 2 3 0 Environmental Checklist Form (EA 2004-511) Project title: Tentative Tract Map 31874, Specific Plan 2004-073 Lead agency name and address: Contact person and phone number: City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 Stan Sawa 760-777-7125 Project location: Northwest corner of Avenue 53 and Monroe Street. APN: 767-200-001 5. Project sponsor's name and address: Stonefield Development 23333 Avenida de Caza Coto de Caza, CA 92679 6. General plan designation: Low Density 7. Zoning: Low Residential, with Agri culture/Equestrian Density/Agricultural/Equestrian* Overlay* 8. Description of project: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off-site features necessary for its implementation. Attach additional sheets if necessary.) A proposal to subdivide 38.64 acres into 101 single family residential lots, as well as lots for streets, retention basins, a well site and landscaped parkway. The site is proposed to have access from both Monroe Street and Avenue 53. The minimum lot size is proposed to be 9,600 square feet. Lot size ranges from 9,600 to 21,608, with most lots in the range of approximately 10,000 square feet. The project site is currently in the City's sphere of influenced, and undergoing annexation. 9. Surrounding land uses and setting: Briefly describe the project's surroundings: North: Vacant (Low Density Residential under construction) South: Vacant (Low Density Residential, Golf Course Open Space) West: Vacant (Low Density Residential, Golf Course Open Space) East: Vacant (Agriculture County) 10. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement.) Coachella Valley Water District *The property is currently in unincorporated Riverside County. Pre -annexation General Plan and Zoning designations were assigned to the property during the General Plan Update process, and have been assumed here. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Biological Resources Hazards & Hazardous Materials Mineral Resources Public Services Utilities / Service Systems Agriculture Resources Cultural Resources Hydrology / Water Quality Noise Recreation Air Quality Geology /Soils Land Use / Planning Population / Housing Transportation/Traffic Mandatory Findings of Significance DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature -2- Date EVALUATION OF ENVIRONMENTAL IMPACTS: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. 'Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more 'Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from 'Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures; and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 9911 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance I. a) -d) Neither Avenue 53 nor Monroe Street are designated Image Corridors in the General Plan. The proposed subdivision will result in the construction of 101 single family residences on lots of approximately 10,000 square feet. There are no significant aesthetic landmarks in the area. The site is surrounded by properties designated for golf course and residential land uses at similar grades to the proposed project. The City regulates building height for single family homes to one or two stories, which will limit the potential mass associated with the site. The impacts associated with aesthetics are expected to be insignificant. The ultimate construction of single family homes on the site will result in a slight increase in light generation, primarily from car headlights and landscape lighting. The City regulates lighting levels and does not allow lighting to spill over onto adjacent property. Impacts will not be significant. -4- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact I. AESTHETICS -- Would the project: ` a) Have a substantial adverse effect on a X scenic vista? (General Plan Exhibit 3.6) b) Substantially damage scenic resources, X including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? (Aerial photograph) c) Substantially degrade the existing X visual character or quality of the site and its surroundings? (Application materials) d) Create a new source of substantial X light or glare which would adversely affect day or nighttime views in the area? (Application materials) I. a) -d) Neither Avenue 53 nor Monroe Street are designated Image Corridors in the General Plan. The proposed subdivision will result in the construction of 101 single family residences on lots of approximately 10,000 square feet. There are no significant aesthetic landmarks in the area. The site is surrounded by properties designated for golf course and residential land uses at similar grades to the proposed project. The City regulates building height for single family homes to one or two stories, which will limit the potential mass associated with the site. The impacts associated with aesthetics are expected to be insignificant. The ultimate construction of single family homes on the site will result in a slight increase in light generation, primarily from car headlights and landscape lighting. The City regulates lighting levels and does not allow lighting to spill over onto adjacent property. Impacts will not be significant. -4- II. a) -c) The proposed project site has been in agriculture, and is currently partially farmed. The property is not under Williamson Act contract. The property is isolated from other farmlands, and is in an area of the City which is rapidly developing. The loss of 40 acres of partially utilized, isolated farmland is not expected to be significant. -5- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact II. AGRICULTURE RESOURCES: Would theproject: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide X Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? (General Plan EIR p. III -21 ff.) b) Conflict with existing zoning for X agricultural use, or a Williamson Act contract? (Zoning Map) c) Involve other changes in the existing X environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? (General Plan Land Use Map) II. a) -c) The proposed project site has been in agriculture, and is currently partially farmed. The property is not under Williamson Act contract. The property is isolated from other farmlands, and is in an area of the City which is rapidly developing. The loss of 40 acres of partially utilized, isolated farmland is not expected to be significant. -5- III. a), b) & c) The proposed project would result in 101 single family residential units on the site. These units are likely to generate approximately 1,055 vehicle trips per day'. Since automobile emissions are the largest contributor to air quality issues in the region, these vehicle trips will be the most significant generators of air pollutants as a result of the project. Based on this traffic generation, and an average trip length of 10 miles, the following emissions can be expected to be generated from the project site. "Trip Generation, 6`h Edition," Institute of Transportation Engineers, category 210, Single Family Residential, detached. W Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact III. AIR QUALITY: Would the project: a) Conflict with or obstruct X implementation of the applicable air quality plan? (SCAQMD CEQA Handbook) b) Violate any air quality standard or X contribute substantially to an existing or projected air quality violation? (SCAQMD CEQA Handbook) X c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (SCAQMD CEQA Handbook, 2002 PMI 0 Plan for the Coachella Valley) d) Expose sensitive receptors to X substantial pollutant concentrations? (Project Description, Aerial Photo, site inspection) e) Create objectionable odors affecting a X substantial number of people? (Project Description, Aerial Photo, site inspection) III. a), b) & c) The proposed project would result in 101 single family residential units on the site. These units are likely to generate approximately 1,055 vehicle trips per day'. Since automobile emissions are the largest contributor to air quality issues in the region, these vehicle trips will be the most significant generators of air pollutants as a result of the project. Based on this traffic generation, and an average trip length of 10 miles, the following emissions can be expected to be generated from the project site. "Trip Generation, 6`h Edition," Institute of Transportation Engineers, category 210, Single Family Residential, detached. W Moving Exhaust Emission Projections at Project Buildout (pounds per day) Ave. Trip Total Total No. Vehicle Trips/Day Length (miles) miles/day 1,055 x 10 — 10,550 PMio PM10 PM10 Pollutant ROC CO NOX Exhaust Tire Wear Brake Wear Grams at 50 mph 949.50 24,687.00 5,064.00 - 105.50 105.50 Pounds at 50 0.23 0.23 SCAQMD Threshold lbs./da 75 550 100 150 Assumes 1,055 ADT. Based on California Air Resources Board's EMFAC7G Emissions Model. Assumes Year 2005 summertime running conditions at 75T, light duty autos, catalytic. As demonstrated above, the proposed project will not exceed any of SCAQMD's recommended daily thresholds. The project's potential impacts to air quality resulting from vehicular emissions are therefore expected to be less than significant. The City and Coachella Valley are a severe non -attainment area for PM10 (Particulates of 10 microns or less). The Valley's 2002 PM10 Plan adopted much stricter measures for the control of dust both during the construction process and during project operations. These include the following, to be included in conditions of approval for the proposed project: CONTROL MEASURE TITLE & CONTROL METHOD BCM -1 Further Control of Emissions from Construction Activities: Watering, chemical stabilization, wind fencing, revegetation, track -out control BCM -2 Disturbed Vacant Lands: Chemical stabilization, wind fencing, access restriction, revegetation BCM -3 Unpaved Roads and Unpaved Parking Lots: Paving, chemical stabilization, access restriction, revegetation BCM -4 Paved Road Dust: Minimal track -out, stabilization of unpaved road shoulders, clean streets maintenance The proposed project will generate dust during construction. Under mass grading conditions, this could result in the generation of 972.6 pounds per day, for a limited period while grading operations are active, assuming that the site will be mass graded. If the site is graded in sections, impacts are expected to be lower. The contractor will be required to submit a PM10 Management Plan prior to initiation of any earth moving activity. In addition, the potential impacts associated with PM10 can be mitigated by the measures below. 1. Construction equipment shall be properly maintained and serviced to minimize exhaust emissions. -7- 2. Existing power sources should be utilized where feasible via temporary power poles to avoid on-site power generation. Construction personnel shall be informed of ride sharing and transit opportunities. 4. Imported fill shall be adequately watered prior to transport, covered during transport, and watered prior to unloading on the project site. Any portion of the site to be graded shall be pre -watered to a depth of three feet prior to the onset of grading activities. 6. Watering of the site or other soil stabilization method shall be employed on an on- going basis after the initiation of any grading activity on the site. Portions of the site that are actively being graded shall be watered regularly to ensure that a crust is formed on the ground surface, and shall be watered at the end of each work day. 7. Any area which remains undeveloped for a period of more than 30 days shall be stabilized using either chemical stabilizers or a desert wildflower mix hydroseed on the affected portion of the site. Landscaped areas shall be installed as soon as possible to reduce the potential for wind erosion. Landscape parkways on Monroe Street and Avenue 53 shall be installed with the first phase of development on the site, as shall the project's perimeter wall. 9. SCAQMD Rule 403 shall be adhered to, insuring the clean-up of construction - related dirt on approach routes to the site. 10. All grading activities shall be suspended during first and second stage ozone episodes or when winds exceed 25 miles per hour Implementation of these mitigation measures will ensure that impacts associated with PM10 are mitigated to a less than significant level. III. d) & e) The project will consist of residential units and will not result in objectionable odors, nor will it expose residents to concentrations of pollutants. In Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact IV. BIOLOGICAL RESOURCES -- Would theproject: a) Have a substantial adverse effect, either X directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? ("General Biological Resources Assessment..." Natural Resources Assessment, Inc. May 2004) b) Have a substantial adverse effect on any X riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? ("General Biological Resources Assessment..." Natural Resources Assessment, Inc. May 2004) c) Have a substantial adverse effect on X federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? ("General Biological Resources Assessment..." Natural Resources Assessment, Inc. May 2004) d) Interfere substantially with the X movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? ("General Biological Resources Assessment..." Natural Resources Assessment, Inc. May 2004) e) Conflict with any local policies or X ordinances protecting biological resources, such as a tree preservation policy or ordinance? ("General Biological Resources Assessment..." Natural Resources Assessment, Inc. May 2004) f) Conflict with the provisions of an adopted Habitat Conservation Plan, . X Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? (General Plan Exhibit 6.3) IV. a) -f) A biological resource study was prepared for the proposed project site 2. The study included a records search as well as on-site investigation. The on site investigation included particular focus on identifying burrowing owl on the site, as well as sensitive plants. A protocol survey for burrowing owl was not completed. The study concluded that the site's long term use as farm land, and its isolated nature in regards to natural habitat make it of poor value for native species habitat. The study did not identify burrowing owl on the property, and identified only common species throughout. Because of the site's use as farm land, impacts to biological resources are expected to be negligible. 2 "General Biological Resources Assessment Stonefield 40 Acres," prepared by Natural Resources Assessment, Inc., May 2004. I Us V. a) -b) & d) A cultural resource survey and associated report were prepared for the project site'. The survey found one isolate on the property, as well as one circa 1925 shotshell. These finds are considered indicative of the potential for sub -surface artifacts. Therefore, the report recommends the imposition of the following mitigation measure: A qualified archaeological monitor shall be present during all earth moving and grading activities. The monitor shall be empowered to stop or redirect activities on the site should a resource be identified. A final report shall be filed with the Community Development Department prior to issuance of a certificate of occupancy for the first house on the project site. Monitors shall include a Native American monitor. Proof of retention of monitors shall be given to the Community Development and Public Works Departments prior to issuance of first earth -moving or clearing permit. 2. The final report on the monitoring shall be submitted to the Community Development Department prior to the issuance of the first Certificate of Occupancy for the project. 3. Collected archaeological resources shall be properly packaged for long term curation, in polyethylene self -seal bags, vials, or film cans as appropriate, all within acid -free, 3 "Phase I Cultural Resources Investigation of 40 Acres......," prepared by the Keith Companies, June 2004. Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact V. CULTURAL RESOURCES -- Would theproject: a) Cause a substantial adverse change in X the significance of a historical resource as defined in '15064.5? ("Phase I Cultural Resources Investigation...," Keith Companies, June 2004) b) Cause a substantial adverse change in X the significance of an archaeological resource pursuant to '15 064.5? ("Phase I Cultural Resources Investigation...," Keith Companies, June 2004) c) Directly or indirectly destroy a unique X paleontological resource or site or unique geologic feature? ("Paleontologic Assessment..." San Bernardino County Museum, February 2004) d) Disturb any human remains, including X those interred outside of formal cemeteries? "Phase I Cultural Resources Investigation...," Keith Companies, June 2004) V. a) -b) & d) A cultural resource survey and associated report were prepared for the project site'. The survey found one isolate on the property, as well as one circa 1925 shotshell. These finds are considered indicative of the potential for sub -surface artifacts. Therefore, the report recommends the imposition of the following mitigation measure: A qualified archaeological monitor shall be present during all earth moving and grading activities. The monitor shall be empowered to stop or redirect activities on the site should a resource be identified. A final report shall be filed with the Community Development Department prior to issuance of a certificate of occupancy for the first house on the project site. Monitors shall include a Native American monitor. Proof of retention of monitors shall be given to the Community Development and Public Works Departments prior to issuance of first earth -moving or clearing permit. 2. The final report on the monitoring shall be submitted to the Community Development Department prior to the issuance of the first Certificate of Occupancy for the project. 3. Collected archaeological resources shall be properly packaged for long term curation, in polyethylene self -seal bags, vials, or film cans as appropriate, all within acid -free, 3 "Phase I Cultural Resources Investigation of 40 Acres......," prepared by the Keith Companies, June 2004. standard size, comprehensively labeled archive boxes and delivered to the City prior to issuance of first Certificate of Occupancy for the property. Materials shall be accompanied by descriptive catalogue, field notes and records, primary research data, and the original graphics. The project contractor is required by state law to report a finding of human remains, should such a find be made during project grading. Law enforcement officials are responsible for the proper investigation and disposal of remains. V. c) A paleontologic survey was prepared for the proposed project site4. The study found that the project site is within the historic lake bed of ancient Lake Cahuilla. The study further found both mollusk shells and undated bone fragments which may or may not be fossils.. Development of the site could result in significant impacts to paleontologic resources without mitigation. In order to assure that these potential impacts are mitigated to a less than significant level, the following mitigation measure shall be implemented. 1. A paleontologist shall be present on site during all earth moving and trenching activities in areas of undisturbed lakebed soils. The paleontologist shall be empowered to stop or redirect earth moving activities to adequately investigate potential resources. The paleontologist shall be required to submit to the Community Development Department, for review and approval, a written report on all activities on the site prior to occupancy of the first building on the site. 2. Proof of retention of monitors shall be given to City prior to issuance of first earth- moving or clearing permit. 3. The final report on the monitoring shall be submitted to the Community Development Department prior to the issuance of the first production home building permit for the project. 4. Collected paleontological resources shall be properly packaged for long term curation, in polyethylene self -seal bags, vials, or film cans as appropriate, all within acid -free, standard size, comprehensively labeled archive boxes and delivered to the City prior to issuance of first building permit for the property. Materials will be accompanied by descriptive catalogue, field notes and records, primary research data, and the original graphics. 4 "Paleontological Assessment Stonefield Development," prepared by the San Bernardino Museum, February 2004- -12- in conjunction with the submittal of grading plans. This requirement will ensure that impacts from ground shaking are reduced to a less than significant level. The site is located in an area having a potential for liquefaction hazards. In order to assure that liquefaction issues are mitigated to a less than significant level, the following mitigation measure shall be implemented: Prior to the issuance of grading permits, the applicant shall submit, for review and approval by the City Engineer, a liquefaction study which determines the depth to groundwater at the project site, and recommends any special construction techniques to assure that structures on the site will be protected in a seismic event. Portions of the project site are located in an area of very severe blow sand potential. The mitigation measures included above under air quality are designed to mitigate the potential impacts associated with blow sand at the project site to a less than significant level. The site is not subject to landslides, nor does it have expansive soils. The proposed project will be required to connect to the CVWD sanitary sewer system, and septic tanks will not be installed. With implementation of the above mitigation measure, impacts associated with soils and geology are expected to be less than significant. SEE -15- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact VII. HAZARDS AND HAZARDOUS MATERIALS --Would theproject: a) Create a significant hazard to the X public or the environment through the routine transport, use, or disposal of hazardous materials? (Application materials) b) Create a significant hazard to the X public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? ('Report of Phase I Environmental Site Assessment..." Earth Systems Southwest, Jan. 2004) c) Emit hazardous emissions or handle X hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? ('Report of Phase I Environmental Site Assessment..." Earth Systems Southwest, Jan. 2004) d) Be located on a site which is included X on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? ('Report of Phase I Environmental Site Assessment..." Earth Systems Southwest, Jan. 2004) e) For a project located within an airport X land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) f) For a project within the vicinity of a X private airstrip, would the project result in a safety hazard for people residing or working in the prqject area? (General Plan -15- land use map) g) Impair implementation of or physically X interfere with an adopted emergency response plan or emergency evacuation plan? (General Plan MEA p. 95 ff) h) Expose people or structures to a X significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (General Plan land use map) VII. a) -h) The construction of 101 residential units on the proposed project site will not result in significant impacts associated with hazardous materials. The City implements the standards of Household Hazardous Waste programs through its waste provider. These regulations and standards ensure that impacts to surrounding areas, or within the project itself, are less than significant. The site is not in an area subject to wildland fires. The site's use as farm land has been analysed in a Phase I Environmental Assessments. Recommendations have been made in that study regarding a storage area which may require further study. Since the potential impacts associated with this storage area are not known, the following mitigation measure shall be implemented to reduce the potential impacts to a less than significant level. Prior to issuance of grading permits, a Phase II investigation of the storage areas for prior pesticide use and potential spillage shall be completed, and any clean up required, if necessary, shall be completed. 5 "Report of Phase I Environmental Site Assessment..." prepared by Earth Systems Southwest, January, 2004. -16- -17- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact VIII. HYDROLOGY AND WATER UALITY -- Would theproject: fi a) Violate any water quality standards or X waste discharge requirements? (General Plan EIR p. III -187 ff.) b) Substantially deplete groundwater X supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? (General Plan EIR p. III -187 ff.) c) Substantially alter the existing drainage X pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? ('Preliminary Hydrology..." TKC, June 2004) d) Substantially alter the existing drainage X pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? ('Preliminary Hydrology..." TKC, June 2004) e) Create or contribute runoff water X which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? ('Preliminary Hydrology..." TKC, June 2004) f) Place housing within a 100 -year flood X -17- hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? (General Plan EIR p. III -87 ff. ) g) Place within a 100 -year flood hazard X area structures which would impede or redirect flood flows? (Master Environmental Assessment Exhibit 6.6) VIII. a) & b) Domestic water is supplied to the project site by the Coachella Valley Water District (CVWD). The development of the site will result in the need for domestic water service for 'residential units, both for domestic water and landscaping irrigation. The CVWD has prepared a Water Management Plan which indicates that it has sufficient water sources to accommodate growth in its service area. The CVWD has implemented or is implementing water conservation, purchase and replenishment measures which will result in a surplus of water in the long term. The project proponent will be required to implement the City's water efficient landscaping and construction provisions, including requirements for water efficient fixtures and appliances, which will ensure that the least amount of water is utilized within the homes. The applicant will _also be required to comply with the City's NPDES standards, requiring that potential pollutants not be allowed to enter surface waters. These City standards will assure that impacts to water quality and quantity will be less than significant. VIII. c) & d) The City requires that all projects retain the 100 year storm on site. In order to achieve this requirement, a preliminary hydrology study was completed 6. The study analyzed the potential storm flows resulting from a 100 year storm, and the required capacity of the retention basin to accommodate those volumes. The study found that a retention basin capable of containing 3.16 acre feet was required. The retention basins within the project (shown as lots R & Q on the map) has been sized to accommodate this volume, with Lot Q as the primary area, and Lot R acting as additional capacity. The City Engineer will review the final hydrology study for the proposed project, and approve its findings prior to recordation of the map. Impacts associated with storm water drainage are therefore not expected to be significant. VIII. e) -g) The site is not located in a flood zone as designated by FEMA. 6 'Preliminary Hydrology & Hydraulics Report," prepared by the Keith Companies, June 2004. so Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact i IX. LAND USE AND PLANNING - Would the project: a) Physically divide an established X community? (Aerial photo) b) Conflict with any applicable land use X plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (General Plan Land Use Element) c) Conflict with any applicable habitat X conservation plan or natural community conservation plan? (Master Environmental Assessment p. 74 ff.) IX. a) -c) The project site is currently in agriculture, and will not impact any existing community. The proposed project is consistent with the General Plan designation for the property, and will result in a total of 101 single family homes. This type of development is consistent with surrounding existing and approved development. No impacts are expected as a result of project implementation. The project site is outside the boundary of the mitigation fee for the Coachella Valley Fringe -toed Lizard Habitat Conservation Plan. X. a) & b) The proposed project site is within the MRZ-1 Zone, and is therefore not considered to have potential for mineral resources. -20- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact X. MINERAL RESOURCES -- Would the project: i a) Result in the loss of availability of a X known mineral resource that would be of value to the region and the residents of the state? (Master Environmental Assessment p. 71 ff.) b) Result in the loss of availability of a X locally -important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? (Master Environmental Assessment p. 71 ff.) X. a) & b) The proposed project site is within the MRZ-1 Zone, and is therefore not considered to have potential for mineral resources. -20- XI. a) -f) A noise study was prepared for the proposed project'. The study found that noise levels for lots on Avenue 53 are expected to remain below the City's standard of 65 dBA CNEL. However, noise levels for lots on Monroe Street, without mitigation, will reach 69.7 dBA 7 "40 Acre Residential Development Preliminary Noise Study," prepared by Urban Crossroads, April, 2004. -21- Potentially Less Than Less Than No Significant Significant w/ Significant bnpact Impact Mitigation Impact XI. NOISE Would the project result in: a) Exposure of persons to or generation X of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? ("Preliminary Noise Study," Urban Crossroads, April 2004) b) Exposure of persons to or generation X of excessive groundborne vibration or groundborne noise levels? ("Preliminary Noise Study," Urban Crossroads, April 2004) c) A substantial permanent increase in X ambient noise levels in the project vicinity above levels existing without the project? ("Preliminary Noise Study," Urban Crossroads, April 2004) d) A substantial temporary or periodic X increase in ambient noise levels in the project vicinity above levels existing without the project? ("Preliminary Noise Study," Urban Crossroads, April 2004) e) For a project located within an airport X land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? (General Plan land use map) 0 For a project within the vicinity of a X private airstrip, would the project expose people residing or working in the project area to excessive noise levels? (General Plan land use map) XI. a) -f) A noise study was prepared for the proposed project'. The study found that noise levels for lots on Avenue 53 are expected to remain below the City's standard of 65 dBA CNEL. However, noise levels for lots on Monroe Street, without mitigation, will reach 69.7 dBA 7 "40 Acre Residential Development Preliminary Noise Study," prepared by Urban Crossroads, April, 2004. -21- CNEL, which exceeds the City's standards. The study also analyzed the potential well site (shown as Lot P on the Tract Map), and the noise generation potential from equipment on that site. The study found that with mitigation, potential impacts associated with noise from the well site could be mitigated to less than significant levels. The study also considered the potential impacts to second story construction from roadway noise on Monroe and Avenue 53. Noise levels are expected to reach between 62.6 and 69.2 dBA CNEL without mitigation. Although the building construction itself can provide from 12 to 20 dBA CNEL noise attenuation, the potential second stories of homes on Monroe and Avenue 53 could still exceed the City's 45 dBA CNEL interior noise standard without the provision of a mechanical ventilation system, to allow a "windows closed" condition. In order to assure that the potential impacts associated with noise at the project site are reduced to a less than significant level, the study recommends the implementation of the following mitigation measures: 1. A 6 foot high wall shall be constructed, at a minimum, along the northern property line of lot 13, the eastern property lines of lots 4 through 12, the southern property line of lot 8, the northern property line of lot 7, the southern property line of lot 4, and the eastern property line of lot 3. The wall shall be of solid construction, in block or similar material, with no breaks or openings. 2. All second story units located along Avenue 53 and Monroe shall be provided with a mechanical ventilation system (air conditioning). 3. A final noise study shall be submitted with building permits for the proposed project. Noise will also be generated from the project site during construction. Lands surrounding the property, however, are currently vacant, and planned for a golf course community. Should this community be built before the proposed project, it will include the construction of a wall, which should provide sufficient attenuation of the temporary noise impacts associated with construction of the proposed project. With implementation of the mitigation measures above, impacts associated with noise shall be reduced to less than significant levels. The proposed project site is not located within the vicinity of an air strip or airport. -22- XII. a) -c) The construction of 101 residential units will not generate growth in the City, but will rather accommodate growth pressures caused by commercial and other types of projects in the area. -23- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XII. POPULATION AND HOUSING — Would the project: a) Induce substantial population growth X in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? (General Plan, p. 9 ff., application materials) b) Displace substantial numbers of X existing housing, necessitating the construction of replacement housing elsewhere? (General Plan, p. 9 ff., application materials) c) Displace substantial numbers of X people, necessitating the construction of replacement housing elsewhere? (General Plan, p. 9 ff., application materials) y XII. a) -c) The construction of 101 residential units will not generate growth in the City, but will rather accommodate growth pressures caused by commercial and other types of projects in the area. -23- found that both Monroe and Avenue 53 would operate at acceptable levels at General Plan buildout. The proposed project, therefore, will have less than significant impacts on traffic and circulation in the area. The project does not include inadequate parking or unsafe designs. The site is located within the service area of SunLine Transit, and can be served by it. Overall impacts to traffic are expected to be less than significant. -27- -28- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XVI. UTILITIES AND SERVICE SYSTEMS. Would the project: a) Exceed wastewater treatment X requirements of the applicable Regional Water Quality Control Board? (General Plan MEA, p. 58 ff.) b) Require or result in the construction of X new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, p. 58 ff.) X c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, p. 58 ff.) d) Have sufficient water supplies X available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? (General Plan MEA, p. 58 ff.) e) Result in a determination by the X wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project=s projected demand in addition to the provider=s existing commitments? (General Plan MEA, p. 58 ff.) 0 Be served by a landfill with sufficient X permitted capacity to accommodate the project=s solid waste disposal needs? (General Plan MEA, p. 58 ff.) g) Comply with federal, state, and local X statutes and regulations related to solid waste? (General Plan MEA, p. 58 ff.) -28- XIII. a) Buildout of the site will have a less than significant impact on public services. The proposed project will be served by the County Sheriff and Fire Department, under City contract. Buildout of the proposed project will generate sales and property tax which will offset the costs of added police and fire services, as well as the costs of general government. The project will be required to pay the mandated school fees and park in lieu fees in place at the time of issuance of building permits to reduce the impacts to those services. -24- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XIII. PUBLIC SERVICES 1 a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? (General Plan MEA, p. 57) X Police protection? (General Plan MEA, p. 57) X Schools? (General Plan MEA, p. 52 ff.) X Parks? (General Plan; Recreation and Parks X Master Plan) Other public facilities? (General Plan MEA, p. X 46 ff.) XIII. a) Buildout of the site will have a less than significant impact on public services. The proposed project will be served by the County Sheriff and Fire Department, under City contract. Buildout of the proposed project will generate sales and property tax which will offset the costs of added police and fire services, as well as the costs of general government. The project will be required to pay the mandated school fees and park in lieu fees in place at the time of issuance of building permits to reduce the impacts to those services. -24- XIV. a) & b) The proposed project includes interior open space areas which will be available to residents for recreational purposes (lots R and Q, proposed for retention basins). In addition, park in lieu fees will be collected to address the project's impacts on the City's recreational facilities. -25- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XIV. RECREATION -- a) Would the project increase the use of X existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? (Application materials) b) Does the project include recreational X facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Application materials) XIV. a) & b) The proposed project includes interior open space areas which will be available to residents for recreational purposes (lots R and Q, proposed for retention basins). In addition, park in lieu fees will be collected to address the project's impacts on the City's recreational facilities. -25- XV. a) -g) The project site has the potential to generate 1,055 average daily trips. The proposed project is consistent with the General Plan and Zoning designations placed on the property by the City. The General Plan EIR included lands in the City's sphere in its analysis, and -26- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XV. TRANSPORTATION/TRAFFIC -- Would the project: a) Cause an increase in traffic which is X substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or,.congestion at intersections)? (General Plan EIR, p. III -29 ff.) b) Exceed, either individually or X cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? (General Plan EIR, p. III -29 ff.) c) Result in a change in air traffic X patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (No air traffic involved in project) d) Substantially increase hazards due to a X design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? (Tentative Tract Map 3 l 874) e) Result in inadequate emergency X access? (Tentative Tract Map 31874) f) Result in inadequate parking capacity? X (Tentative Tract Map 31874) g) Conflict with adopted policies, plans, X or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? (Project description) XV. a) -g) The project site has the potential to generate 1,055 average daily trips. The proposed project is consistent with the General Plan and Zoning designations placed on the property by the City. The General Plan EIR included lands in the City's sphere in its analysis, and -26- XVI. a) -g) Utilities are available at the project site. The service providers for water, sewer, electricity and other utilities have facilities in the immediate vicinity of the site, and will collect connection and usage fees to balance for the cost of providing services. The construction of the proposed project is expected to have less than significant impacts on utility providers. -29- XVII. a) Potential impacts associated with cultural and paleontologic resources can be mitigated to a less than significant level. The site does not contain significant biological resources. XVII. b) The proposed project supports the long term goals of the General Plan by providing a variety of housing opportunities for City residents. 1 XVII. c) The construction of 101 residential units will not have considerable cumulative impacts. The project is consistent with the General Plan, and the potential impacts associated with General Plan buildout. J -30- Potentially Less Than Less Than No Significant Significant w/ Significant Impact Impact Mitigation Impact XVII. MANDATORY FINDINGS OF SIGNIFICANCE -- a) Does the project have the potential to X degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate. important examples of the major periods of California history or prehistory? j b) Does the project have the potential to X achieve short-term, to the disadvantage of long-term environmental goals? b) Does the project have impacts that are X individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental X effects which will cause substantial adverse effects on human beings, either directly or indirectly? XVII. a) Potential impacts associated with cultural and paleontologic resources can be mitigated to a less than significant level. The site does not contain significant biological resources. XVII. b) The proposed project supports the long term goals of the General Plan by providing a variety of housing opportunities for City residents. 1 XVII. c) The construction of 101 residential units will not have considerable cumulative impacts. The project is consistent with the General Plan, and the potential impacts associated with General Plan buildout. J -30- XVII. d) The proposed project has the potential to adversely affect human beings, due to air quality and noise impacts. Since the Coachella Valley is in a non -attainment area for PM10, and the site will generate PM10, Section III), above, includes a number of mitigation measures to reduce the potential impacts on air quality. Noise impacts have been addressed through a series of mitigation measures, which will lower the potential for significant impacts to less than significant levels. XVIII. EARLIER ANALYSES. Earlier analyses may be used where, pursuant to the tiering, program EK or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case a discussion should identify the following on attached sheets: a) Earlier analyses used. Identify earlier analyses and state where they are available for review. Not applicable. b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. Not applicable. c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. Not applicable. J -31- 0 0 0 0 N w A w a a U Cfj H C8 a� H ai C? Fi I:t Q O N j Cd A 00O p a' o 0 M N U/ zs w F d A U �q zA a� U w OV a o vi A a c Ell CA a o o o 0 U ci L" CIJ U U bA U U U bo V - 0 0 o o �. a oo A A A A a w� i o QF) F ,� A Cd Cd AO cli CL4 Q Cd oo U V 0 U Cl z Om � cd O N O + cd 250 cl P, m ►Fi �O �O Cd cM En a? NC o o Cd Ts �¢' 3 a -�~ m o U o v o to o a a. w -n 43 E F ' d A U pq A . U W u Ho U U �. C7 H � A W � o oz o�41 w U A -C o a� + 41 a� an on +� �+- ou TZ +� ami o ani ca } o + ° in (L) �o cd v n w cd o 04 .—, a 'a� i, H a ~ai o R. � °? o > 0 rAv d cd 0 O 21 N cd , , o � o on 4a i , Cd o I. Cd M d � � u ��cd � ¢, .oma U) Na >' V3 ; � ° to +1 �, o'� °N ° a, O o an C N ° b •C �-, cd a� M ° cd 1) +� ° Cd - o a. ° Cd (5 lm. " �At.. Q) �d o4-4 No� td O oo N +h ++ .o a U U ss�, nj M O U a) bD 'C Cd w+ bq bU A , 4 � o AQ o U Cd aUA o (D cd a) a) to N U w z °o a, o "" o o o En o h ¢ .O a) o cn C13 a� 0 o -d ou U ,� +, U w O b �, O ''. H .. o a� In N � a� ++ a) a)cli U +�+ Fr aJ bD 0 4 +� bU VI Cd .b i-+ U E.U. U �" „•_, U N 6" s� Q p �E O Ocd 11 .0 ' U � w N p�++ cd ) .OO zN O �' ' riFr � Cd a) c6,'C4:4 0 6,_� Q Cd M O "" "" r. a) U O W b a) to cd 0 o o U a .� .° a +' ap a� o° 4 is 'Q. ' Q '� A v �° i. '� U A o U a� o o id o +� w p U .n U P, W H d A U pa A axe o�U OV Cd 4-4 0 W � �H U Q)60 o °:°,n U M. cd Q. O W H d A U pa A axe o�U OV 4-4 0 W � �H U � � d C7 z � H Cd bo 0 0 a a o� o w�.a O � z� oz ao CZ b � w O U H�I O rA � a O aW LCII � � d x � �-i � U U F d A W y� U Fq �A a� V W OV W 0 � y �H d z � H 0 0 a a o� W � o a � o � UA O H�I �4 rA aW a En � � d x � �-i � U J F d A W ,7, U pq ax �U W OV U U � bA F U U O O � O O O O w a a a a� 0 z u A a b b d UA o 0-4 Cd �o H a o o oe ,t Cd O v V] O a W O N N 40, U O W M ao mi V] zvii y O O 0 Pista de Dorado Specific Plan 5.1 APPENDIX ONE: General Plan Policies General Plan Policies 5.1 APPLICABLE GENERAL PLAN POLICIES The General Plan of the City of La Quinta includes Goals, Policies and Programs that were identified and adopted by the City to properly implement the plan. An evaluation of the key policies and programs (in Italics) that affect the development of, and compliance by, Pista de Dorado are discussed below. LAND USE ELEMENT Land Use Goals, Policies and Programs Policy 4: "Specific Plans shall be required under the following • For all projects 10 acres or more in the Commercial Park, Industrial/Light Manufacturing, Tourist Commercial, Resort Mixed Use and Regional Commercial designations, prior to any land use divisions or subdivisions. • For all projects proposing the integration of golf courses, tourist commercial and residential uses. • For all projects proposing flexible development standards differing from the City's Development Code. The Pista de Dorado Specific Plan proposes to modify the existing development standards so that the property can be utilized fully without compromise to the surrounding land uses. Program 4.2 "For approved Specific Plans, the Director of Community Development shall have the authority to determine substantial conformance in a Specific Plan, and waive the need for a Specific Plan amendment under the following circumstances: When changes in the land use allocation within the Specific Plan are less than 5%, When no new land use is proposed, When off-site circulation pattern and turning movements will not be altered by the proposed change." The Pista de Dorado Specific Plan provides methods for alterations to the Plan that will allow for conformance to the guidelines of the General Plan. Policy 8: The City shall carefully consider sphere of influence and subsequent annexations to accommodate growth. 120 0:\40861\4086101\docs specific plan doc\Stonefield 40 Specific Plan b1a doc 11/2/2004 Pista de Dorado Specific Plan The Pista de Dorado site is located within the City's Sphere of Influence; annexation into the City is a logical extension of the boundaries. Program 8.1 All annexation applications by landowners shall be accompanied by required environmental and fiscal impact analysis to ensure orderly development of the City. The annexation request submittal by a representative of Stonefield Development contains the previously certified environmental analysis, prepared for Annexation No. 15, to support the annexation. Policy 9: Agricultural and equestrian uses are encouraged. The Pista de Dorado plan includes an enhancement to the existing regional multi -use trail along Monroe Street that will provide for an equestrian exercise and training area with static obstacles for the equestrian -public to utilize. In addition, there will be an equestrian oriented trail stop facility developed at the southeast corner for the project site that will provide for the public horse and rider amenities as part of the regional multi -use trail system along Monroe Street. Residential Goals, Policies and Programs Goal 2 A broad range of housing types and choices for all residents of the City. The Pista de Dorado plan provides conventional single-family homes in an upscale private community in a family setting. Program 1.2 Apply the City's discretionary powers and site development review process consistently to assure that subdivision and development plans are compatible with existing residential areas. Policy S the City shall maintain residential development standards including setbacks, height, pad elevations and other design and performance standards that assure a high quality of development. Program S.1 The Development Code shall include development standards and design guidelines for each residential zoning designation. The Pista de Dorado Plan provides development standards consistent with standards contained within the Development Code for lands designated Residential Low with Agriculture Equestrian Overlay. The homes will be subject to the City's Site Development process. TRAFFIC AND CIRCULATION ELEMENT Page 121 0A40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb.doc 11/2/2004 Pista de Dorado Specific Plan Traffic and Circulation Goals, Policies and Programs Program 2.4 On Primary Arterials, the minimum intersection spacing shall be 1.060 feet. The design speed shall be 50 mph. Left turn median cuts may be authorized if turn pocket does not interfere with other existing or planned left turn pockets. Right in/out access driveways shall exceed the following minimum separation distances: • More than 250 feet on the approach leg to a full turn intersection; • More than 150 feet on the exit leg from a full turn intersection; • More than 250 feet between driveways Policy 6 Develop and encourage the use of continuous and convenient bicycle routes and multi -use trails and development to places of employment, recreation, shopping, schools, and other high activity areas with potential for increased bicycle, equestrian, golf cart and other non -vehicular use. Policy 14 In order to preserve the aesthetic values on the City's streets, minimum landscape setbacks shall be as follows: Highway 111— 50 feet Other Major & Primary Arterials — 20 feet Secondary Arterials & Collector Streets —10 feet The Pista de Dorado Plan provides for controlled access to the perimeter streets. The access points are in compliance with the policies on intersection spacing. The Plan also provides for the construction of sidewalks & multi -use trails along Monroe Street and Avenue 53. OPEN SPACE ELEMENT Open Space Element Goals, Policies and Programs Policy 7: The City shall encourage the preservation of open space in privately owned development projects. The Pista de Dorado Plan provides open space with a private recreational amenity within the project, and public recreational opportunities along the perimeter adjacent to Monroe Street. Policy 4: The City shall develop and implement plans for linkages between open spaces areas, parks, recreational facilities and cultural resources. The Pista de Dorado Plan will provide private recreational opportunities as well as public recreational opportunities, in addition to payment of required park fees not met by the value Page 122 0:\40861\4086101\do&specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan of the provided amenities. In addition, the Plan will provide linkages to the City's trails and bikeways. PARKS AND RECREATION ELEMENT Parks and Recreation Element Goals, Polices and Programs Policy 4 The City shall develop and implement plans for linkages between open space areas, parks, recreational facilities and cultural resources. The Pista de Dorado Plan will provide private recreational opportunities in addition to public opportunities. In addition the Plan will provide linkages to the City's trails and bikeways via Monroe Street and Avenue 53. NATURAL RESOURCES ELEMENT Air Quality Goals, Policies and Programs Program 5.1: The City shall support the development of golf -cart and pedestrian oriented retail centers, community -wide trails and dedicated bike lanes. The Pista de Dorado Plan is providing links to bicycle paths and community trails along Monroe Street and Avenue 53. Energy and Mineral Resources Goals, Policies and Programs Program 3.2: The City shall support the development of local and regional bikeways to provide residents and visitors with non -vehicular travel alternatives. The Pista de Dorado Plan is providing links to bicycle paths and community trails whereby reducing reliance upon energy and mineral consumption. Biological Goals, Policies and Programs Program 2.4: A qualified biologist shall perform all biological studies. The City shall prepare and adopt standards for the performance of biological resource analyses and provide these to all applications. Standards shall include personnel qualifications, field monitoring, recordation, documentation and sampling requirements. A biological resource assessment was performed by Natural Resources Assessment, Inc., the results of which were negative for an endangered, threatened or rare species. Paleontological Goals, Policies and Programs Page 123 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb.doc 11/2/2004 Pista de Dorado Specific Plan Policy 1: The City shall require the preparation of paleontological resource analysis by a qualified paleontologist for all development proposals, which occur in area of High Sensitivity. A paleontological assessment was performed by the Division of Geological Services of the San Bernardino County Museum. The results of the assessment were negative. However, mitigation measures are suggested in the event resources are encountered during grading operations. Water Resources Goals, Policies and Programs Program 2.2: The City shall continue to implement, its on-site retention requirements for new development proposals where possible as a potential way of recharging groundwater. The Pista de Dorado Plan proposes to retain on-site 100% containment of 100 -year storm flows and nuisance flows. INFRASTRUCTURE AND PUBLIC SERVICES ELEMENT Infrastructure and Public Services Goals, Policies and Programs Education Facilities Goal Policy 3: The City shall support the process of securing school impact mitigation fees from developers in accordance with State law. The Pista de Dorado development will participate in the payment of mitigation fees in accordance with State law. Surface Water & Storm Drainage Goal Policy 3: All new development shall include on-site retention/detention basins and other necessary storm water management facilities to accommodate run-off from the 100 year storm. The Pista de Dorado Plan proposes to retain on-site containment of the 100 -year storm run- off. Domestic Water Goal Policy 3: New development projects shall be required to use native drought tolerant landscaping materials to promote and enhance water conservation efforts. The Pista de Dorado Plan proposes to use native and drought tolerant plant materials combined with efficient irrigation methods to promote water conservation. Page 124 OA40861\4096101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan Public Utilities Goal Policy3: All utility and electric wires up to 34.5 kilovolts serving new development shall be installed under ground. Pista de Dorado Plan proposes to underground utility services that are less than 34.5 kilovolts. ENVIRONMENTAL HAZARDS ELEMENT Geologic and Seismic Hazards, Goals, Policies and Programs Policy 3: Development in area subject to collapsible or expansive soils shall be required to conduct soil sampling and laboratory testing and to implement mitigation measures, which minimize such hazards. A soils and geotechnical investigation was performed by Earth Systems Southwest for the Pista de Dorado project site. Construction shall conform to the recommended measures and standard construction practices. CULTURAL RESOURCES ELEMENT Program 3.2.1 Require all proposed project sites to be surveyed by a qualified archaeologist, historian, and/or architectural historian, as appropriate, to identify any potential cultural resources that may be affected, unless the preponderance of the evidence demonstrates that such survey is unnecessary. A Phase I Cultural Resources Investigation was conducted by TKC for the Pista de Dorado Plan site. While no significance resources were recorded, it was recommended that monitoring of earth -moving activities be conducted given the nature of surrounding cultural resources and the location of two isolates on the project site. Page 125 0:\40861\4086101 \docs specific plan doc\Stone6eld 40 Specific Plan bb doe 11/2/2004 Pista de Dorado Specific Plan 5.2 APPENDIX TWO: Section 9.140.070 La Quinta Municipal Code Page 126 0:\40861\4086101\docs\specific plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004 Pista de Dorado Specific Plan 5.3 APPENDIX THREE: Specific Plan Design Team Specific Plan Design Team TKC Doug Franklin, P.E., Conceptual Engineering Michael A. Peroni, General Planning Oversight Leslie J. Mouriquand, M.A., Planning Coordinator, Text Preparation & Project Archaeologist Erik Lainas — Graphics, Planning John D. Goodman II, M.S., Historical Research & Project Archaeologist Chuck Glass —Conceptual Design Emil_Benes Associates, Inc. Emil Benes— Supervising Project Architect Pekarek-Crandall, Inc. Architects RGA, Inc. Rob Parker —Project Landscape Architect Stonefield Development, Inc. Arthur McCaul — Vice President of Land Acquisition and Forward Planning Page 127 0:\40861\4086101\docs\specif1c plan doc\Stonefield 40 Specific Plan bb doc 11/2/2004